HomeMy WebLinkAbout21-2561City of Zephyrhilis
11
5335 Eighth Street
Zephyrhills, FL 33542
ELCMISC-002661-2021
Phone: (813) 780-0020
Fax: (813) 780-0021
Issue Date: 07/27/2021
REINSPECTION FEES: I With respect to Reinspection fees will comply with Florida Statute 553.801 the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection, whichever is greater, for each subsequent reinspection.
Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permit required from other governmental
entities such as water management, state agencies or federal agencies. I
Mn= I I I I I I I Ill I I I! I I III I I I I I I I Ti I I I I I I Ill I I I I I Ill! I I M��
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
VO OCCUPANCY BEFORE C.O.
COT
CTOR SIGNATURE
*4 1 Ill to] ki Ill I M
1@410en. 0
PE 11 IT 01'I
ITHOUT APPROVED INSPECTION
813-780-0020 City of Zephyrhills Permit Application Fax-813-180-0021
Liuilding Department
Date Received
Phone Contact for Permitting 1(
Owner's Name JOSE RAMIREZ Owner Phone Number (813)351-9885
r
Owner's Addre s 1 4826 TIMBER WAY ZEPHYRHILLS, FL 33542 Owner Phone Number
Fee Simple Titleholder Name Owner Phone Number
Fee Simple Titleholder Address ____] LOT #
JOB ADDRESS 14826 TIMBER WAY ZEPHYRHILLS, FL 33542 —
;ZUBDIVISION I -COURT SQUARE I PARCEL to# )0-00000-0130
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED
NEW CONSTR [_71
ADD/ALT
SIGN DEMOLISH
e
INSTALL [�:J
REPAIR
PROPOSED USE
SFR
COMM
OTHER
TYPE OF CONSTRUCTION
BLOCK
FRAME
STEEL
DESCRIPTION OF WORK
[ROOF MOUNTED SOLAR PV SYSTEM INSTALLATION - 10.44 KW
BUILDING SIZE SO FOOTAGE HEIGHT
=BUILDING VALUATION OF TOTAL CONSTRUCTION
=ELECTRICAL n== AMP SERVICE 0 PROGRESS ENERGY W.R.E.C.
=PLUMBING $
=MECHANICAL VALUATION OF MECHANICAL INSTALLATION
=GAS ROOFING SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO
BUILDER COMPANY
SIGNATURE AJ--- 6- REGISTERED Y/N --FEE CURREN
Address License # r 0
ELECTRICIAN COMPANY
SIGNATURE REGISTERED N FEE CURREN Y/N
Address License#
PLUMBER COMPANY
SIGNATURE I REGISTERED L_YLN_j FEE CURREN L_y LN_J
Address License #
MECHANICAL COMPANY
SIGNATURE REGISTERED Y/N FEE CURREN
Address License #
OTHER COMPANY
SIGNATURE REGISTERED L_y LN _J FEE CURREN Y I N
Address License #
RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction,
Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed,
Sanitary Facilities & 1 dumpster- Site Work Permit for subdivisions/large projects
COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction.
Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed,
Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance
SIGN PERMIT Attach (2) sets of Engineered Plans.
-PROPERTY SURVEY required for all NEW construction.
Directions.
Fill out application completely.
Owner & Contractor sign back of application, notarized
If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500)
— Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences (Plot/Survey/Footage)
Driveways -Not over Counter if on public roadways..needs ROW
813-780-0020 City of Zephyrhills Permit Application Fax-813-M-0021
Building Department
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive
than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they
may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and
contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements
may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009.
Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this
application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is
not entitled to permitting privileges in Pasco County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or
expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that
such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery
Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final
power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior
to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant,
have been provided with a copy of the "Florida Construction Lien Law —Homeowners Protection Guide' prepared by the Florida Department of
Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a ropy of the above described
document and promise in good faith to deliver it to the "owner" poor to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with
all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as
indicated. I certify that no work or installation has commenced prior to issuance of a pennit and that all work will be performed to meet standards of all
laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I
understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I
must take to be in compliance. Such agencies include but are not limited to:
Department of Environmental Protection -Cypress Bayheads, Weiland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
Southwest Florida Water Management District -Wells, Cypress Bayheads, Weiland Areas, Altering
Watercourses.
Army Corps of Engineers -Seawalls, Docks, Navigable Waterways.
Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment,
Septic Tanks.
US Environmental Protection Agency -Asbestos abatement.
Federal Aviation Authority -Runways.
I understand that the following restrictions apply to the use of fill
- Use of fill is not allowed in Flood Zone "V' unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required,
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to
commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or
other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as
authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from
thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work
authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a
period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to
exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered
abandoned.
10110141
9111
OWNER OR AGENT
Subscribed and sworn to (or affirmed) before me this
by
Who is/are personally known to me or has/have produced
as identification.
Public
Commission
CONTRACTOR
Subscribed and swom to (or affirmed) before me this
by —_
Who is/are personally known to me or has/have produced
as identification.
Commission
Name of Notary typed, printed or stamped Name of Notary typed, printed or stamped
Public
NoUry Public 7— 777 77'—,
1-"ate Of Florida
S
,K:* COMM# HHO6M,7
110reS12/712024,
r
A £53 PYHS<.Sw 3 LCN 4C4<fnt ^a Pal LEEb'i £�S
SOLAR BEAR LLC
4091 AMTC CENTER DR LARG07 FL 33764
Your Solar Solutions Provider
(727) 471-7442
V6 w. UR L4R EAR.0 M
EC13006630
SOLAR HOME IMPROVEMENT AGREEMENT
DATE:
CUSTOMER NAME (hereinafter, the "Customer")
3u1y 7 2021
3ose Sanchez Ramirez
ADDRESS: 4826 Timber way
CITY, STATE, ZIP:
Zephyrhills FL 33542
HOME PHONE NUMBER:
WORK PHONE NUMBER:
MOBILE PHONE NUMBER:
813-351-9885
813-351-9885
EMAIL: carmenramirez755@gmail.com
This Solar Home Improvement Agreement (this "Agreement") is between Solar Bear LLC ("Solar Bear", "We" or "Contractor") and
you ("Customer") for the sale and installation of the solar system described below (the "Project" or the "System") at your home
(the "Property" or your "Home"). The Parties agree as follows:
1. Was a full years usage of the customers electric bills provided? YES I x
2. If no, does the customer understand we cannot guarantee 95% 0 105%offset YES ED
3. Does the customer understand the ITC 26% TAX CREDIT is based on their taxable income? YES ED
IF YOU DO NOT PAY TAXES YOU DO NOT GET A TAX CREDIT
PROPOSED SYSTEM SIZE (100% OFFSET) PURCHASED SYSTEM SIZE
(Based on 12 months previous usage)
14.04 KW 17,623 KWH ANNUALLY 10.44 KW 14,034 KWH ANNUALLY
Total System Cost: 47,969
x Check Here If Any Portion of the project
Total System Cost is Financed.
If checked, the Customer will receive a separate
agreement from the Finance Provider outlying
their terms and conditions.
r >t
I%
I understand, that if I cancel, I will be held financially
responsible for the cost of the permit and any work that
may have tak n pJAq,Q, aY:
Sign
7/7j2021
Date
NOTICE OF RIGHT TO CANCEL. THIS IS A LEGAL BINDING AGREE M ENT AND YOU MAY ONLY CANCEL THIS AGREEMENT PRIOR TOM I DINIGHTOF THE THIRD BUSINESS DAY AFTER THE DATE YOU SIGN THIS
AGREEMENT. TO CANCEL THIS AGREEMENT, PLEASE SEETHE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT, THANK YOU FOR YOUR ALLOWING US TO SERVE YOU?
71712021
Customer Signature:' Date:
Customer Signature: Date:
7/7/2021
Representative: a P Date:
8378 Foxtail Loop, Pensacola, FL 32526 1 (850)712-4210 1 chad�@odwineno.com
july 21, 2021
To: Z,ephyrhills Building Department
5335 80, St.
Zephyrhills, FL 33542
Re: Ramirez — Residential PV Roof Mount Installation
4826 'Timber Way
Zephyrhdls, FL 33542
Plan Reviewer,
This letter is regarding the installation of a new roof mounted Solar PV System on the existing
residential structure at the address above. I have reviewed the attachment plan and have
determined that the roof mounted PV system is in compliance with the applicable sections of the
following Codes as amended and adopted by the jurisdiction:
2020 Florida Building Code 7th Edition, FBC
ASCE 7 Min. Design Loads for Buildings & Other Structures
Per 2020 FBC, the Roof Mounted PV system will be subject to the following design criteria:
Design Wind Speed(V,at)-140mph 3sec gust, Exposure Category — B
The PV System consist of the modules, railing, and connection hardware, The system will add a
dead load of approximately 3 psf to the roof.
The existing roof covering is Asphalt Shingle with min. 1/2" plywood decking and 2" x 4" roof trusses
24" O.C. The roofing, decking, and roof trusses are in good condition. The existing structure will be
adequate for supporting the additional PV dead load and wind loads.
The securement method of the PV system is to be flush mounted to the asphalt shingle roof with the
Ironridge railing and the Sum-nodo Nano Mounts. The attachments can be attached up to 72" apart
in roof zones 1, 2e, 48" apart in roof zones 2r, and 3. The mounts should be staggered, where
possible, to allow distribution of the design loads evenly to the structure. The mounts shall be
installed with a main. 5/16" lag screw with mininraum 2-5/16" thread length.
Please see attached documents and contact me should you have any questions.
Sincerely,
D. Chad Godwin, PE 81360
Exp. 02/28/'2023
ASCE 7-16 CHAPTER 29 WIND LOADS - Rooftop Solar Pan
Risk Category
Basic Wind Speed (Ult),
Wind Speed(asd)
Roof Angle
Effective Wind Area
Wind Load Parameters
Wind Directionality Kd
Exposure Cat. B,C, or D
Topographic factor K,,
Ground Elevation Factor K,
Velocity Exposure Coefficient K
Array Edge Factor /e
Solar Panel Equalization Factor a
Velocity Pressure qp
Mean Roof Height h
0.4h
least horizontal dim
10% of least horizontal dim
Roof Zone Set Back a
h/B
II
ftz
psf
ft
ft
in
ft
ft
108
=
19.50
0.85
B
1.00
1.00
} y
1.50
0.68
17.91
6.00
°`
3.00
3.00
0.50
- Part 1:
Table 1.5-1
Figure 26.5-18
FRC R301.2.1.3
26.20
Load Types Load, PSf
Dead Load, D
3
Weight of Ice, D;
0
Earthquake,E
0
Fluid, F
n/a
Flood Load, Fa
n/a
Table 26.6-1
Lateral Earth psi, H
n/a
Section 26.7
Live Load, L
n/a
26.8 or 26.8.2
Roof Live, L,
n/a
Table 26.9-1
Rain, R
n/a
Table 30.3-1
Snow, S
29.4.4 *Modules
are considered
Exposed
Self-Straining,T
n/a
Fig. 29.4-8
Wind, W
see talc
qh=0.00256 K,K,,KdK,V'
Wind -on -Ice, Wi
n/a
h2
5
in
Not> 10in(height above roof)
2h2
10
in
min distance array shall be from the .of edge, Gable Ridge, or hip ridge
0.25
In
min gap between all papers but not> 6.7ft
d1
1.00
ft
Horizontal distance orthogonal to panel edge
d2
0.25
ft
Horizontal distance from edge of one panel to
the nearest edge in the next row
0.5h
7.50
ft
1.51-p
F
9.00
ft
Figure 30.3-2G(Hip roof, h<60ft, 21°<0<27°)
J
Zone
1
2r
2e
3
GC
-1.30
-1.80
-1,80
-1.80
uplift
GC,
0.70
0.70 1
0.70
1 0.70
downward
p = gh(GCp)( c)( ta)
-23.89
-33.08
-33.08
-33.08
psf uplift 29.4-7
p = %JGQ(-'/ i(yai
12.86
12.86
12.86
12.86
psf downward 29.4-7
Module Length
Module Width
Module Area
Total Design Load (Uplift)
Total Design Load (Downforce)
Design Load per Module
Design Load per Module
Distributed Load (Uplift)
Distributed Load (Down)
Railspan Between Anchor Points
Point Load per Mount (Uplift)
Point Load per Mount (Down)
uesign Calcu
C(Lp)
A
Pdo,gn
Pd'sign
T p
Tdown
Pdist up
PdistDown
R
R
latlons Tor the use oT Attacntnent to KOOT
i ru$s,LKaTter
ft
ft2
psf
psf
Ibs Top =
Ibs To, =
plf Top / E
Of To, / E
ft
Ibs
Ibs
1 1 ZE \��
��til� �� l,t ti,��
20
-23,89
-33.08
-33,08
-33.08
12.86
12.86
12.86
12.86
-465.89
-645.07
-645.07
-645.07
250.86
250.86
250.86
250.86
-71.67
-99.24
-99.24
-99.24
38.59
38.59
38.59
38.59
-430.05ry595.45
1 -396.97
-396.97
115.78
115.78
1 77.19
77.19
Specific Gravity G
Diameter of Lag Screw D
Pullout Value of W
# of Lag screws
Thread Length Td
Design Pullout Value per Mount W,
SAFTEY FACTOR SF
Max Cantilever M
709.63631 709.63631 709,63631 709.6363
1 2r
*P
design
* Pdesrgn
*2
°2
Table 11.2A, NDS 2005, page 68 (SYP)
In
Ibs/in W=1800 G'" D"'
Maximum Cantilever from Last attachment
24 1 24 16 16 in
Table L2, NDS 2005
W, = W * # of Lags *Td
Calculation: SF=W,/R (Uplift)
Max rail span * 33%
Inverter Type:
Enphase IQ7PLUS-72-2-US
PV Panel:
(29) Silfab-SIL 360 NX
Racking:
Iron Ridge
Total Wattage:
10,440W
Roof Type:
Composition Shingle
Wind Load:
27 to 45 Deg
Fastener Type:
Use Sunmodo NanoMounts
Sheet Index
S-1 Cover Sheet / Site Plan
S-2 Detail
E-I One - Line
S-IA Mounting Plan
General Notes:
-Enphase IQ7PLUS-72-2-US Micro Inverters
are located on roof behind each module.
-First responder access maintained and
from adjacent roof.
-Wire run from array to connection is 40 feet.
4 na
rSOLAR BEAR
6 101 Johns Rd, Ste I
Tampa, FL 336341
727-471-7442 1
Legend Y
i Chimney
/ 7=] First responder access
Satellite
Utility Meter C Vent Pipe
PV Disconnect
GI-OUnd Access Point
X
N
Ground Access Point
H
0
U3' Access Pathway
S
E
GrOUnd Access Point
System meets the tequirements of'NFPA 70th Edition, Chapter 1 1. 1-2
-COGF-N Disconnect
LOCated adjacent, to
Utility 11"eter
Utility Meter
Meets All Editions of Florida Fire Prevention Code 2017 7th Edition
Represents all Fire Clearance 1st Responder Access
including Alternative methods minimum of 36" unobstructed as per
Section R324 of the 2018 IRC
Meets the requirements of the following- (2020 FL Residential Code & FBC, 7th Edition (2018
International Residential Code) - 2nd Printing modified by the FL Building Standards , 2018
International Energy Conservation Code, City of Zephyrhills Code, 2017 National Electric Code.)
0 0
X
R-I
# Modules (14)
Pitch.- 27'
Azimuth: 147'
R-3
# Modules (1)
Pitch: 27'
Azimuth: 147'
R-2
# Modules (14)
Pitch: 27'
Azimuth: 57'
Install ,Hi be done to ManUCLICtUl-el- SPCC
JOSE RAMIREZ
4826 TIMBER WAY
ZEPHYRHILLS, FL
33542
Layout Subject to Change Bq�Aqpjj
= I 0M•
Design, LLC
2,378 Foxtail Loop
Pensacola, FL 32526
D. Chad Godwin, PE
Chad(�(godwineng.cotrt
Date: 7/19/2021
Revised by:
�
Rev #- 00
v �a Ieev te:
Page:
61 of I
N
Comimss for Aerial
Ironridge XR- 100
General Notes:
- Sunmodo Nano Mount are secured to rafters
72" O.C. in Zone 1, g 72" O.0 in Zone 2e,
48" O.C. in Zone 2r & g 48" O.C. in Zone 3
310-16 X 3/4
HEX HE40 SOLT
FLANGE NU T
General Notes: (Optional)
- Sunmodo Nano Mount are secured to plywood decking
48" O.C. in Zone 1, g 24" O.0 in Zone
24" O.C. in Zone 2r & g 24" O.C. in Zone 3
using 5/16" x 4.75" stainless steel Lag bolts. using (4) #6.3mm x 76.2mm stainless steel Lag bolts.
- Subject roof has One layer. - Subject roof has One layer.
- All penetrations are sealed. - All penetrations are sealed.
- -- - - ---- ---- - ---------
Roof Section it Roof Rafter and Spacing Overhan Notes-
91
RI-R3 6/rrx4" @ 24 O.C.
Exposure Category - B
-Designed as per ASCE7-16
12 Truss
Inverter Type: Enphase IQ7PLUS-72-2-US
PV Panel:
(29) Silfab-SIL 360 NX
Racking:
Iron Ridge
Total Wattage:
10,440W
Roof Type:
Composition Shingle
Wind Load:
27 to 45 Deg
Fastener Type:
Use Sunmodo NanoMounts
us=
Install be done to Ma11L1111CtL11_,'N_ SPCC
Godwin Engineering and
C -
0,,'i�xc 81
Design, LLC
8378 Foxtail Loop
1360
Pensacola, FL 32526
z:
D. Chad Godwin, PE
E C
;<0 OF Z�
Rio "I-
1- R10,- A
Chad(�-.�godwinengxom
11, _® X ,
\4"o ":�'
//j) ONALe
dn_k'
SOLAR BEAR
6 101 Johns Rd, Ste V
Tampa, FL 33634
727-471-7442
Date: 7/19/2021
Drawn by: TMC
Revised b
Rev Date:
3/8 IN MIN, TEXT
TURN RAPID
SHUTDOWN SWITCH TO
3/16 IN MIN, TEXTI, THE "OFF" POSITION T 'als
SHUT DOWN PV 7—
SYSTEM AND REDUCE
SHOCK HAZARD IN THE
ARRAY.
#12 OF Cable for Home runs under 100'
410 OF Cable for Home runs over 100'
(1) Line I
(1) Line 2
Per Circuit
(1) EGC
DUAL POWER SUPPLY
SOURCES UTILITY GRID AND
PV SOLAR ELECTRIC SYSTEM
POWER SOURCEOUTPUT CONNECTION:
DO NOT RELOCATE THIS bvERcuRREN_T
DEVICE
SV'SIC111 1110CtS 111C (1F0LII1dh11_1 requlreme;lts of'NFIC 690,43
IIICILidilll�l the label belo,,4
In Case of Emergency Call
Solar Bear
at 727-471-7442
EC #- EC13006630
NEMA3R
Junction Box
Black- L I
Red - L2
Green - Ground
Enphase Combiner Box
1) - 20A Breaker
Per Circuit
3 Circuits
240V
10// 1 5A Breaker for Envoy
Disconnect
Solar Combiner Box
HX-IQ-AM 1-240
MMMMMINVERTER OUTPUT CONNECTION:
DO NOT RELOCATE THIS
Enphase IQ Trunk Cable
Q- 12-240
#12AWG THHN-THWN-2
UL 9703
,Grounding Conductor
to be bare 48 Avg
111
RATED AC OUTPUT CURRENT: 35 OoA
NOMINAL OPERATING VOLTAGE 240VAC
#6 AWG 'I"[ PNN
(1) Line I
(1) Line 2
(I ) Neutral
,v8 (1) EGC
in ra) least 3/4" Conduit Typically
Note:
-All wiring to meet the 2017 NEC and
Florida electric codes.
60A Disconnect
-Type of conduit to be determined
on site by contractor.
Install will be dom-, to MaI1LIl'aCtU1-C1- S
Photovoltaics:
(29) Silfab-SIL 360 NX
Inverters:
(29) Enphase IQ7PLUS-72-2-US Micro Inverters
Circuits:
(2) circuits of (10) Modules
(1) circuit of (9) Modules
Maximum Inverters Per 20A Circuit (13)
"I'llitIA Lockable- D,,c
60A Service Rated
Fused Disconnect
Neutral to Ground Bond
AC Disconnect
50A Fuse
I ocnl end Adjac,fil to t 11l't, Afetar
46 AWG THWN
(1) Line I
( 1) Line 2
(1) Neutral
in (ii) least 3/4" Conduit Typically
(it"CNO"[ S'
t ngpomid,:d stem per 690.41 k k)(1)
(;I:,(, Inust be ln,stallcd per 250,641
61L(' mitt bc conuruo)u)I ft[,,c,rStbr SrjiCC(j ft,111
Imelter In e"IsOna, scr" fcc,_Ilound ,:,Stcm or colilbltlotls Flom the
alra% S to the Csktlmservice gkound s):stem
(it-,C mu,;t be min h8 X' k G and iitsialed In condu;i
f I' (iL(' is not in Conduit, it muse be no min
Disconnects will be Visible, lockable, adjacent to
and within 10' of utility meter
All Labels & Markings For photovoltaic system %,611 be
reflective and meet all requirervients for NITA 11. 12
Meter
Line Side Tap
Refer to NEC 312 8 for
Conditions on taps in s,
and over
'c""'cra devices
Er,clos"Ics 1, 1tire conditions are not
met a tap box will
need to be installed
2
Enphase Output Ckt Per String
To Overcurrent Protection Device
T
AC Max Output Current
.. . . . ........
12.1
AC Max Output Current * 1.25%
15.1
OverCUrrent Protection (A)
20
No. of Current Carrying Cond
<4
Conductor Gauge (AWG)
10
Enphase Total Output Ckt
AC Max Output Current
35.09
AC Max Output Current 1 25%
43.9
Overcurrent Protection (A)
50
- -- ---- - ---------- - - -- ------ No. of Current Carrying Cond
<4
Conductor Gauge (AWG)
6
NEC LABEL NOTES
1. THE WARNING SIGN(S) OR LABEL(S) SHALL COMPLY
WITH NEC 110.21 (B)
2. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT
WHERE THEY ARE INSTALLED,
3. LABELS TO BE A MIN LETTER HEIGHT OF 3/8" AND
PERMANENTLY AFFIXED.
4. LABELS SHALL ALSO COMPLY WITH THE SPECIFIC
REQUIREMENTS OF THE AUTHORITY HAVING
JURISDICTION.
Main Distribution Panel
200A Main
Godwin Engineering and
Design, LLC
8378 Foxtail Loop
Pensacola, FL 32526
D. Chad Godwin, PE
Chad(cr godwineng.com
SOLAF�NM
C. 0/
/
""\' '0 E
Cl 1360
A
OF
�4
z
01V tv
AL'E,
6 101 Johns Rd, Ste 8
Tampa, FL 33634
727-471-7442
Date: 7/19/2021
Drawn by: T
Rev Date:
Page: E-1
Inverter Type:
Enphase IQ7PL[JS-72-2-US
PV Panel:
(29)
Sitfab-SIL 360 NX
Total Wattage:
I 0,44101W
0
XR-100 IT Iron Ridge Rail
AFAM
® Splice Bar
2
Sunmodo Nano Mounts
;A
Iron Ridge UFO's
74
Iron Ridge Sleeves/End Caps
32
Combiner
3
Iron Ridge Ground Lugs
8
Silfab-SIL 360 NX
29
Enphase IQ7PLUS-72-2-US
29
60A Fused Disconnect
I
50A Fuses
2
20A Breakers
3
Enphase Combiner Box
I
I
R-1
# Modules (14)
Pitch: 27'
Azimuth: 147'
Inverter Type:
PV Panel:
Racking:
i77*-&d+'ff7ft—agC:
Roof Type:
Wind Load:
W93�
to]
A V -1
# Modules (1)
Pitch: 27'
Azimuth: 147'
OL --� Proposed Mounting locations
M
251-1011 -- -- ------- ----- - --Iot-71
R-2
# Modules (14)
Pitch: 27'
Azimuth: 57'
K
Zone I & 2e: Max cantilever is 24" as per manufacturer spec.
I
Max Cantilever = Max Span * (3)=72"*(j)=24"1
Zone 2r & 3: Max cantilever is 16" as per manufacturer spec.
I
Max Cantilever = Max Span * (3)=4 8 I 16
Customer Info:
Enphase IQ7PLUS-72-2-US
(29) Sitfab-SIL 360 NX
Iron Ridge
10,440W
Composition Shingle
27 to 45 Deg
Use Sunmodo NanoMounts
Ih �
Y-3
6-01
'70
Plans satisk zones
1 13( -1-5 MT 1
Install kvill be done tO
Mail LT fliCt ffl-el- SI)eC
Godwin Engineering and
A C.
\,\
Design, LLC
N
8378 Foxtail Loop
360
ff
Pensacola, FL 32526
C.) -rE oF
D. Chad Godwin, PE
Chad(&
0 R 10
_/godwineng.com
gi� X
X// C;,
IVA L stv
4, 21-ilk
Sit')LAR BEAR
09 X 0 WIT rm LOT,
Tampa, FL 33634
727-471-7442
Date: 7/19/2021
FVrawn by: TMC
Rev Date:
age: S-IA
G
INDUSTRY LEADING WARRANTY
All our products include an industry
leading 25-year product workmanship
and 30-year performance warranty.
35+ YEARS OF SOLAR INNOVATION
Leveraging over 35+ years of worldwide
experience in the solar industry, Silfab
is dedicated to superior manufacturing
processes and innovations such as
Bifacial and Back Contact technologies,
to ensure our partners have the latest in
solar innovation.
NORTH AMERICAN QUALITY
Silfab is the leading automated solar
module manufacturer in North America.
Utilizing premium quality materials and
strict quality control management to deliver
the highest efficiency, premium quality
PV modules.
ONV-GL
PERFORMER
MER
Test Conditions
STC
NOCT
Module Power (Pmax)
.. ....
w
360
------
258
s.....
Maximum power voltage (Vpmax)
v
366
33.1
M1ax1imu_m'p9wer current (Ipmax)
A,
Open circuit voltage (Voc)
v
44.5
40.4
Short circuit current (ISE)
A
10.5
8.2
Module efficiency
%
Maximum system voltage (VDC)
v
1000
Series fuse rating
A
20
Power Tolerance
Wp
0 to +10
Measurement conditions: STC 1000 W/M2 - AM 1.5 - Temperature
25 'C - NOCT 800 W/rnl - AM 1.5 - Measurement uncertainty
5 3%
- Sun simulator calibration reference modules from Fraunhofer Institute. Electrical characteristics
may vary by ±5% and
power by 0 to +1 Ow.
Temperature Coefficient Isc
+0.0654 %/'C
Temperature Coefficient Voc
-028 %/'C
Temperature Coefficient Pmax
-036 O/o/'C
NOCT 2°C)
46 'C
Orieratine temperature
-401+85 'C
Module weight
Dimensions (H x L x D)
I I -- -------- —1--"--"-, 1 --
Maximum surface load
Hail impact resistance
Cells
Glass
Cables and connectors (refer to installation manual)
1832 mm x 1000 mrn x 38 mm
Im
o 25 mm at 83 km/h
72.13 in x 39.4 in x 1,5 in
o 1 in at 51.6
ce,
Backsheet High durability, superior hydrolysis and UV resistance, multi -layer dielectric film,
fluorine -free PV backsheet
Frame Anodized Aluminum (Black)
Bypass diodes 3 diodes -_30SQ10415T1(45V max DC blocking voltage, 30A max forward rectified current)
junction Box UL 3730 Certified, IEC 62790 Certified. IP67 rated
Module product workmanship warranty 251
30
Linear power performance guarantee
97.1 %end 1 year 91.6% end 1211 yea
>_ 85.1 % end 2511 vear >_ 82.6% end 3011
ULC ORD C1 703, UL1 703, CEC listed***, UL 61215-1/-1-1/-2, UL 61730-1/-2,
Product IEC 61215-1/-1-1/-2***. IEC 61730-1/-2***, CSA C22.2#61730-1/-2, IEC 62716
Ammonia Corrosion; IEC61701:201,1 Salt Mist Corrosion Ce rtifed UL Fire Rati 2
Factory IS09001:2015
All states except California California
... Modules Per Pallet: 26 Modules Per Pallet: 26
Pallets Per Truck: 34 Pallets Per Truck: 32
Modules Per Truck: 884 e, Modules Per Truck: 832
*A Warning. Read the Safety and Installation Manual
for mounting specifications and before handling,
installing and operating modules.
**12 year extendable to 25 years subject to regis-
tration and conditions outlined under "Warranty"at
www.silfabsolar.com.
***Certification and CEC listing in progress.
PAN files generated from 3rd party performance
data are available for download at:
www.silfabsolar.com/downfoads.
Silfab Solar Inc.
240 Courtneypark Drive East
Mississauga ON L5T2Y3 Canada
S11fab
Tel +1 905-255-2501 1 Fax +1 905-696-0267
SOLAR
info@silfabsolar.com I www.silfabsolar.com
E 0 Im
Silfab Solar Inc.
800 Cornwall Ave
Bellingham WA 98225 USA
Tel +1 360-569-4733
Is" (38o'.)
E
E
R01
5"
E E j
E
E
E
C
C
1,02" [26mml
39.37"[1000.m]
----------- I
- ------------
i
all Sheet
Enphas Nor invert rs
phase
IQ 7 and IQ +
Microinverters
MR
To barn more about Enphase offerings, visit enphase.com
The high-powered smart grid -ready
Enphase IQ 7 Micro" and Enph sM 7+ Io1k°ro"
dramatically simplify the installation process while
achieving the highest system efficiency.
Part of the Enphase IQ System, the IQ 7 and
IQ 7+ M[croinverters integrate with the Enphase
IQ Envoy", Enphase IQ Battery7A and the Enphase
Enlighten'" monitoring and analysis software,
IQSeries Microinverters extend the reliability
standards set forth by previous generations and
undergo over a million hours of power -on testing,
enabling Enphase to provide an industry -leading
warranty of up to 25 years.
Easy to Install
Lightweight and simple
Faster installation with improved, lighter two -wire cabling
Built-in rapid shutdown compliant (NEC 2014 & 2017)
Productive and Reliable
Optimized for high powered 60-cell and 72-cell* modules
More than a million hours of testing
Class 11 double -insulated enclosure
UL listed
Smart Grid Ready
Complies with advanced grid support, voltage and
frequency ride -through requirements
Remotely updates to respond to changing
grid requirements
Configurable for varying grid profiles
Meets CA Rule 21 (UL ; 741_SA)
*The 10 7+ Micro is required to _-uppin 72-cell modules.
Enphase IQ 7 and IQ 7 irrr
Module compatRidity 60-Ce l PV modules only Etg-cell and 72-cell PV modules
Maxim urn input Dc Vortage 48V 60 v
Peak roster tracking vo tage 27 V 37 V 27 V - 46 ty
Operating range 16 A 3 k7 16 V - 60 E
" in/Max start 'vo tag 22 =1 j 48 ,t' 22 V 1 fact `J
Overvcltageclass DC port
Deg portbackfeed current
V arrtay conf ou ation
OUTPUT DATA
Peak output power .
Maximum csonticluous output power
'; 11im=rla(�:-€ } 7o€tagrttr�arlra^e
Maximurri :.coon€sr us, output ut current
Nc rY,'inal ffecl 4e';
Extended frequency range
C short`circtit fault current over 3 cycles
Muaximurn units per 20 A (t-L) branch c,scu
Overvoltage class AC port
AG port backfeeci current
Po ter fay tot etfing
Power factor (adjustable)
EFFICIENCY
ri ,i
0 A 0A
t x 1 ungrounded array; No additiopai DC monde prote taora required
, -
AC stole prntection requires max 20A per' ` oar ch cfrr slit
10 7la irroinveartet 107+Mic:roinverter
24VA
290VA
240 V r`
208 V l
240 v I
C V 7
21 -264 V
1 3 22g E
11-2 4 V
193-229V
1.0 A (240 V')
1.1 A (208 V)
€,21 A (240 )
1,39 A i208 V
ptt2
60 Hz
47 - 63 Hz
47 68 riz
E ArrAs
5,8 Arms
16 (240 ` AQz
13 (208 VAC)
13 (24 "VAC)
11 (203 Ail
CEC weig Med efficiency 97,G i 0%
MECHANICAL DATA
Relative humidity range 4'? to
Connector type ((Ctr 60- -€US & Iri7PL -72-13 US) Friends PV2 €IVI nterma€eablei.
Adaptors far modules with yIC 4 or U rX r„opn ectOFS
PV2 to MCy. edcr ECA SZO-S22
PV2 to Ulrk order ECA-S20-s23
Dimensions (wxHx) 212 rt m x 11755 rnm x 20.2 tsr ithout rtariret)
Vir,eight 1,08 kg (2,38lbs)
Approved for wet liacatirins Yes
s5ollotowl degree, P
E^#c€cwure Class 4 doub€r ar.suiritedz corrosion resistant polymeric +
ErWirrrnroe_- tal categtory f UV exposure rabag ; NEMIA type 61 outdd r
FEATURES
... ,-.
g,,+ar€tmunic €on orser€ ne sniimu 2affont (PLC)
Monitoring Enlighten Manager and MyE=1[itghterl Monitoring € ptscsri-s
Both options require installation of an Enphase !Q Envoy
Compliance CA Pule 21(UL 17,41- A)
UL 62109-1, UL1 41i€EEEt647, FCC tart tEClasx 8[CEC GO03 Class et,
CAt /NSA-Ci22.2 NO, 1371-0T
This Product is UL misted as PV Rapid Shut Down Equipment arid confcsr€t?a VAth NEC 201 m and
NEC-2017 section 69E.12 and C22.1 2 0 , 5 Rule 64-213 Rapid Shutdown of PV Systems, for AC;
and DC conductors, when Instaited according ma rufactu tits instrruc3ions,
1. No enforced DCJAG ratios. See the compatibility calculator at hjt_ptcYenl;rhaaemot1psta�sl�ta�rYtpaiit l 1 y.
2. Nominal voltage range can be extended beyond norninal if required scythe utility.
3_ Urrs¢ts may vary. Refer to Focal requirements to define the number of rnicroinverters per branch in your area.
To learn more about Enphase offerings, visit enphase.com
O 2018 Enphase Energy. All right, reserved_ All trardernarks or brands used are the property nP EnWh ise Energy, Inc.
20' 8-0ut-24
L)ata Sheet
Enphase Networking
n p h a Zs ate,
IQ Combiner 3.
(X-1Q-AM1-240-3)
LISTED
To learn more about En hale offerings, visit enphase.com
The Enphase IQ CIombiner with Eriphase
I
IQ Envoy- consolidates interconnection
equipment into a single enclosure and
streamlines PV and storage installations by
providing a consistent, pre -wired solution for
residential applications. It offers up to four
2-pole input circuits and Eaton BR series
bulbar assembly.
Smart
includes IQ Envoy for communication
and control
Flexible networking supports Wi-Fl,
Ethernet, or cellular
Optional As receptacle available for PLC
bridge
Provides production metering and optional
consumption monitoring
IM
Reduced size from previous combiner
Centered mounting brackets support single
stud mounting
Supports back and side conduit entry
Up to four 2-pole branch circuits for 240 VAC
plug-in breakers (not included)
80 A total PV or storage branch circuits
BE=
Durable NRTL. certified NEMA type
3R enclosure
Five-year warranty
UL listed
n% EN PHASE.
Enphase IQ Combiner 3
MODEL NUMBER
ACCESSORIES and REPLACEMENT PARTS (no" in6uded, order separately)
Enphase Mobile Connect"
CELLMODEWI-03 (4G / 12-year data plan) Plug and play industrial grade ceflulaf anode m, with data taar, for systems up to 60
CELLMODEM-01 (3ra, / 5-year data plant microinverter. - (Available ih the US, Canada, Mexico, Puerto tco, and the US Virgin ft
CELLMODEM-W (4G based LTEM,,,,,` 5--year cars piano where there is adequate cellular servirce m the instailation area j
Consurription olorutmn.g* C Tf
C-1-200-SPLIT Split core current transformers enable whole home consumption metpnng (4 ;- 2,5,,,).
EPI-C-01 Power iine carrier (communication bridge pair), quantity 2
XA-ENV-PCBA- 3 Replacen-*nt 10 Envoy pdrited cticuft board (PCB) for Combiner 3
ELECTRICAL SPECIFICATIONS
System vartage 1203/240 VAC, 60 Hz
Max, continuous current rating (output to grid) 65A
Max, fuse/circ-Oft rating'(0utpup 90A
Branch circuits (Solar and"ar storage) Yip to four 2-pole Eaton BR series Distributed Generatron (DG) breakers onty (not included)
Mae, continuous current Fatfrig, (input from Pv) 64A
Max. total branch circria breaker rating (input) BOA of distributed generation i90A with, Q Envoy breaker included
MECHANICAL DATA
Weight T5 kg (1&5 lbs)
Coofmg Nlatural convection, plus heat, sNeW
Enclosure enyifonrnaroa! rating, Outdoor, NRTL-cerfiffed, NEMA type 3R, polycatbonate consttuc
Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AING copper conductors
60 A breaker branch inpuu 4 to I fo AWG copper coaductors
Main itig combined ouitput 10 to 210 AWG copper conduclors
Neutral and groun,& 14 fo 1/0 copper conductors
A[ways follow iocal code requirements for conductor sizing,
Ethernet Optional, 302-3, CatSE (or Cat 6) UTP Ethemet cable (not included)
Cotripliance, IQ Envoy UL 60601 -I/CANCSA 22-2 No, 610 10 1
ConsLimr%on f ,nonitoring is requVed for iEnioriase S*orage sysfems
To learn more about Enphase offerings, visit enpha-secom
0 20 18 Enphasee Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner.
1 13 w-10 2018 09 n' ENPHASE.
Z ail Family XR Rail Family
IRONRIDGE XR R
Sola Is Not Always,-, Skinny
but the worst storms in 40 years. High winds capable of
ripping panels from a roof, and snowfalls weighing
enough to buckle a panel frame.
HiloLOISIMMINUMM11111
Sloped roofs generate both vertical and lateral
forces on mounting rails which can cause them
to bend and twist. The curved shape of XR Rails
is specially designed to increase strength in both
directions while resisting the twisting. This unique
feature ensures greater security during extreme
weather and a longer system lifetime.
Compatible with Flat & Pitched Roofs
SM
gg� XR Rails are
i NO -ppe-a-s—,
INS
compatible with a
l 0
MW
]2�7 IronRidge offers
IN a range of tilt leg 5
—001
to
FlashFoot and
A options for flat
01 a a
A
other Pitched roof
attachments-
roof mounting
VOIN.,ram applications.
All XR Rails are made of 6000-series
aluminum alloy, then protected with an anodized finish. Anodizing prevents surface
and structural corrosion, while also providing
a more attractive appearance.
mr-giglIELOrgoismway 211r.A1211211HI 0 .9 - OM tj M I M 12 MQ AVA�A I a
XRIO
XR 10 is a sleek, low -profile mounting
rail, designed for regions with light or
no snow. It achieves spans up to 6 feet,
while remaining light and economical.
6'spanning capability
Moderate load capability
Clear & black anodized finish
Internal splices available
�_M
XR100 is the ultimate residential
mounting rail. It supports a range of
wind and snow conditions, while also
maximizing spans up to 10 feet.
10' spanning capability
Heavy load capability
Clear & black anodized finish
Internal splices available
M1111#1
XR1 000 is a heavyweight among
solar mounting rails. It's built to handle
extreme climates and spans up to 12
feet for commercial applications.
12'spanning capability
Extreme load capability
Clear anodized finish
Internal splices available
'T design Table Is meant to be span chart for conveying generat rail capabilities. Use approved ceadfication letters, far actual d sig guidance. dance.