Loading...
HomeMy WebLinkAbout21-3021Address: 39018 5-rh Ave ZEPHYRHILLS, FL 33542 City of Zephyrhills 5335 Eighth Street Zephyrhills, FL 33542 Phone: (813) 780-0020 Fax: (813) 780-0021 Building Valuation: $5,768.10 Electrical Valuation: $13,458.90 Mechanical Valuation: Plumbing Valuation: Total Valuation: $19,227.00 Total Fees: $176.13 Amount Paid: $176.13 Date Paid: 10/12/2021 1:05:31 PM f- I ELCMISC-003021-2021 Issue Date: 10/12/2021 REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. W 1:11011111! 11 lll:iiii i I i ��� iii 1 111111,111 11111 mm�� accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. TRACTOR SIGNATURE PE IT OFFICEP I L/ PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER t, 813-780-0020 City of Zephyrhil,,s Permit Application Fax-813-780-0021 BuildrtDepFrtment Date Received Phone Contact for Permitting 813 648 N__ 0086 ffiffff fffff Owner's Name Haley Carpenter Owner Phone Number (727)741-0146 Owner's Address 1 39018 5th Ave, Zephyrhills Owner Phone Number��� Fee Simple Titleholder Name Owner Phone Number �A Fee Simple Titleholder Address JOB ADDRESS 39018 5th Ave, Zephyrhills, FL 33542 LOT# SUBDIVISION Zephyr Heights I PARCELID# 12-26-21-0030-00300-0010 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT SIGN 0 DEMOLISH 11 INSTALL 8 REPAIR PROPOSED USE SFR COMM OTHER TYPE OF CONSTRUCTION BLOCK Q FRAME STEEL DESCRIPTION OF WORK Installation of a roof -mounted photovoltaic solar panel system. BUILDING SIZE SQ FOOTAGE HEIGHT ®BUILDING $, ,, s VALUATION OF TOTAL CONSTRUCTION ELECTRICAL $_ � AMP SERVICE PROGRESS ENERGY W.R.E.C. =PLUMBING $ MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS 0 ROOFING SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS I FLOOD ZONE AREA =YES NO BUILDER MPANY I Sunrun Installation Services, Inc. SIGNATURE REGISTERED Y / N FEE CURREN Address 5280 Tampa W. Blvd, Tampa FL 33634 License# I EC13007964 ELECTRICIAN SIGNATURE Sunrun Installation Services, Inc. REGISTERED I YIN I FEE CURREN Address 5280 Tampa W. Blvd, Tampa FL 33634 License# I EC13007964 PLUMBER COMPANY SIGNATURE REGISTEREDL_IZFEE CURREN Y I N Address License # MECHANICAL COMPANY SIGNATURE REGISTERED YIN FEE CURREN Address License# OTHER COMPANY SIGNATURE REGISTERED L11FEE CURREN Address License# fffffftrift#ffffffffffftffffffff�#fftfffffffsffffffffffffffffft€fft RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms, R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page, (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All Commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (PloUSurvey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive than County regulations, The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009, Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law —Homeowners Protection Guide" prepared by the Flonda Department of Agriculture and Consumer Affairs, If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the "owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers -Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks, US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways, understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone W" unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a ,.compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall, - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction, I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the pen -nit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned, FLORIDA JURAT (F OWNER OR AGENT Who is/are personalty known to me or(JqaiAave produced Notary Public Commission No. 14 1" kv J05'A-rC 60A C Name of Notary typed, printA or stamped ..RY ........... . J05HUA LONG My COMMIMONHH1 31615 EXPIRES! MAY 20,2025 !,NI,11.1�` Bonded through 1st State Insurance ��01111 Subs ib e�J) re %thi ��d,Wor (oAffil WhowQJ2 me or [Tas/have produced as identificatyon. Notary Public Coemission No. S6bva Name of Notary typed, printed or st mped A$" LOW tw, 10knore 'M Mil ' Astra v. 1. 55 October 5, 2021 E nrun WS CAT 2 Subject : Structural Certification for Proposed Residential Solar Installation. � No 849 isms Matthew Walsh, State of Florida. Job Number: 802R-01 8CARP; Rev A 'ro'e:sM ion , Engineer. License No. 84923 Client: Maley Carpenter L�—z This item has been digitally signed and sealed by James Matthew Walsh, PE on 1015/2021 Address: 39018 5Th Ave, Zephyrhills, FL, 33542 p using a Digital Signature. Printed copies of this document are not considered signed and ------ sealed and the SHA authentication code must /////'ONAL� be verified on electronic copies. I I it I i, � \\ Attn: To Whom It May Concern Digitally Signed: 10/07/21 Afield observation of the existing structure at the address indicated above was performed by a site survey team from Sunrun. Structural evaluation of the loading was based on the site observations and the design criteria listed below. Design Criteria: • 2020 FBC (7th Ed.) Amendments to 2018 IRC/IBC/IEBC, 7-16 ASCE & 2018 INDS • Basic Wind Speed V = 138 mph, Exposure B • Ground Snow Load = 0 psf Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable existing building code provisions adopted/referenced above. Additionally, the PV module assembly and hardware supporting it have been designed according to manufacturer's specifications per the loading criteria referenced above. Installer shall inspect the existing roof framing to verify it is in suitable condition and does not exhibit any signs of damage which may diminish the capacity of its members or connections prior to commencement of PV installation. 225 Bush St. Suite 1400 San Francisco, CA 94104 Elm t, ANtt P10 TECHNO'Co' fi HOP SP(FT PRO - (M4Pj CEME0UAUTY (TEE q-) ?' 'A' I V10 TECHN0600Y (ALT) Q,ANTUM TECHNOLOGY: LOW LEA:ELISED COST OF ELECTRICITY Higher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 19.5%, INNOVATIVE ALL-WEATHER TECHNOLOGY " Optimal yields, whatever the weather with excellent low -light and temperature behaviour. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID Technology, Anti PID i Technology', Hot -Spot Protect and Traceable Quality Tra.QTM EXTREME WEATHER RATING High-tech aluminium alloy frame, certified for 1 high snow (5400 Pa) and wind loads (4000 Pa). A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance warranty2. STATE OF THE ART MODULE TECHNOLOGY Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. r APT test conditions according to IL_cfTS 62804-1:2015, method B (-1500 V, 168h) See data sheet on rear for further information THE IDEAL SOLUTION FOR: 69 Rooftop entarrays on residential bu(Idinas Engineeredin Germany OCELLS I A'' MECHAWC.Al SPECIFICATION 0 1740mm x 1030mm x 32mim (including frame) t kg 199 a.- t . . . . . . . t Fo'­"" 3.2 noun thermally pre stressed glass with anti reflection technology Composite film F Black anodised aluminium I 6 x 20 monocrystalline QLANTUM solar half cells C3 53-101 Drum x 32-60 Tim x 15-18 man "Protection l"class ,l,P67,- with -bypass Idiodes 4 Tama Solar cable; (+)1150mm, (-)>1150nnnt St�ubli MC4, Hanwha Q CELLS HQC4; IP68 # 4 le -en (DETAIL A) . . . .. .......... ...... ...... ..... . ..... ELECTRICAL CHARACTERISTICS ... ......... . ....... ....... POWER CLASS ............... . . ...... . ....... 330 335 340 ..... . ...... .... 345 M N'M 1, RAI 1P - �R E0,111,0 AdR, A 3'r Ai-,"O 4 1-� I 's T L) 110 rv, S, S t,` i PCrA',,R ),O,_�: IF' ATI alit... Nti 01 f,"I"? i .. ........ .. .. ... . . ............ ... ........... . ... . .... . ...... Erin, IWj .. . ............ 330 335 340 345 - - --------- ----- Co [A] 10.41 10.47 10.52 10.58 V.. [V] 4015 40.41 40,66 - ------------ 40.92 1­1 [A] ....... . ..... .. ....... _'­'_'­'_­­­_­ ... . 9,91 9,97 10.02 ........... . ... ...... . . ...... 10,07 V,11 IV] 33.29 3362 33.94 34.25 ---- --- - ------ . ............. .... .......... ... . . ............. . .. ........ ... . ... ... ....... [%] . .. ...... . . 2: 18.4 s: 18.7 2:19,0 .. ... .... ..... ... . . .......... .... . ........... ... ..... . ... ...... i'111111M�"' INC, No'�N'14' _P�k Pr" Fur, . .......... .... - ................. 247.0 260�7 254.5 2582 . .... Z ri Z lso [A] - ----- --- . . .... .... . ... 8.39 8.43 8.48 ...... 8.52 Voc, [V] 3Z86 38.10 38.34 . ..... ..... .... .. .... ... ..... 3&59 I D" [A] 7.80 784 Z89 7.93 ', o'Ir VMn, [V] 31.66 31.97 32,27 ... . .... .. 32.57 I'll M eas urement tolerances P., t 3 %; lso; Vuc 5 % at STC: 1000 W/mF, 25 2 AM 1,5 according to I EC 60 9 0 4-3, 2800 W/M 2, N M OT, spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE - ------- - ----- . . . .. . ............. - ----- .. . ..... ..... ........ 5 At least 98% of nominal power our- - 31, - - - - ---- - - - - - -- ­T- - -F -- T ing first year. Thereafter max, 0,54% -------------- degradation per year. At least 93.1% of nominal power up to 10 years, At --------------least 85 % of nominal power tip to 'R c 25 years. - - ---------r­----- 11 ----- 11 All date within measurement toler- ances. Full warranties in accordance with the warranty terms of the 2" 400 Boa, Boo Eow Q CELLS sales organisation of your A respective country Typical module performance under low irradiance conditions in comparison to STC conditions (25'C, 1000W/m2). ......... . ..... .. .... TEMPERATURE COEFFICIENTS . ........ . .... ...... . ..... . ........... ... . .. ... ..... ........... . o,"' ff i i.o' a [%/KI +0,04 ..... ......... P [%/Kj -0 27 .. . . ....... . .................... ..... .. ....... y [%/K] 0.36 NMOT [1C] 43±3 PROPERTIES FOR SYSTEM DESIGN [VI 1000 P, 'i t" c' a c I as_'� I i i"'c m Class 11 rv"a'.ir'nufn R iz"s"', ',w' [A] 20 --- -------_ ............ C/TYPE2 .... ..... ..... . ... . ..... Niiax' _'t�ol°ig" [Pa] 3600/2667 40°C - +85°C ;Fla„ i01111 LIN_ P�':i [Pa] 5400/4000 ... . .. ....... .. QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMNTION VDEQLxlftyTDEt of Do IEC 61215 2016; .................. .. . .. . ... .... �241 �' to 0 A '_O UEC 61730,2016 This data she.! o .mplas I C E . ... ....... 1780mm 1080mrn 1208mrn 673,8kg 28 pallets --- - - ------ 26 pallets 32 modules AithDINEN50380. jjt zic� 1815mm 1150mm 1220mm 683kg 28 pallets 24 pallets 32 modules Noto: Installation Instructions must be followed. Seethe installation and operating manual rccontact our technical service department for further information) on approved installation and use of this product Q CELLS supplies solar modules in two different stacking methods, depending on the location of manufacture (modules are packed horizontally or vertically). You can find more detailed information in the document 'Packaging and Transport turf.-tch", .,.liable from Q CELLS Hanwha Q CELLS GmbH Sonmenallee 17-21,06766 Bitterfeld-Wonen, Germany I TEL +49 (0)3494 66 99-23444 1 FAX +49 (0)3494 66 99-23000 1 EMAIL sales@q-cells.com I WED www,q-cells,com Engineered in Germany OCELLS Enphase IQ 7 and IQ 7+ Microinverters CERTIFIED L -!y To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 MicroTM and Enphase IQ'7+ Micro ' dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ EnVoyTM , Enphase IQ BatteryTM , and the Enphase Enlighten' monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations an undergo over a million hours of power -on testin enabling Enphase to provide an industry-leadin warranty of up to 25 years. I Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable Optimized for high powered 60-celf/120 half -cell and 72- ce11/144 half -cell* modules More than a million hours of testing Class 11 double- insulated enclosure Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) *The IQ 7f Micro is required to support 72-cell/144 half -cell modules, f=k ENPHASE, Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2- U IQ7PLUS-72-2-US Cornrt only used module pairings' 235 W - 350 W + 2 5 - 440 + Module compatibility tall -cell/ 120 half -cell PV modules 60-cell/120 half -cell and 72 arty ce;l/144 Bali -cell PV modules Maximum input DC voltage; 48V 60 V Peak power tracking voltage 27 V- 37 7 2 V 45V Operating range 16 V - 45 V 16 V - 60 V Min/Max start voltage 22 V r 48 4r 22 V / 60 V Max CC short circuit current (module isc) 15 A 15 A Overvolta e class DC hart II ,€ DC port backfeed current B A 0-A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required, AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Mi roinverter 250 VA, 295 VA Maximurn continuous output power 240 VA 290 VA Nominal ( L) voltage/range2 240 V" / 201 V / 240 V / "; 208 V / 211-264 V 183.229 V 211-264 V 183-229 V Maxii-num continuous output current 1.0 A (240 V) 115 A (208 V) 1,21 A (240 V) 1.39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 try AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-t) branch circuity 16 (240 VAC) 13 (208 VAC) 13 (240 VAC.) 11 (208 VAC) Overvoltage claw AC port %ll Ili AC port backfeC d current 1€1 me, 18 rnA Rower factor setting 1.0 1;0 Power factor (ad;ustable) 0.85 leading_ 0,85 lagging 0.85 leading ... 0,85lagging EFFICIENCY e@240 A @208V @240 V @2 8 A Peak efficiency 97. % 97.6 % 97.5 % 97.3 % CtEC weighted efficiency `TO a, 97.0 } 97.0 % 97.C1 °a MECHANICAL ICAL DATA .. .. ..,,.,,.. A biertt tempr?rature range . . . . 400C to +6 0C Relative hurrtidity range 4%to 100% (condensing) Connector type RAC (or Arnph nol H4 UTX with additional Q vDCC-5 adapte() Dimensions (NxWxD) 212 m m x 175 rmrm x 30.2 mrn (without bracket) Weight 1,08 kg C2.3ltas) Cooling Natural convection -too fans Approved, for wet locations Yes Pollution degree PCi3 Enclosure Class 11 double -insulated, corrosion resistant polymeric: enclosure Environmental category l' UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLq) Monitoring Enlighten Manager and MyEniighten monitoring options. Both options require installation of an Enishase IQ Envoy. Disconnecting aeons The AC and DC connectors have been evaluated and approved by Cll- foe use as the load -break disconnect required by NEC: 690, Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UD174111EEE1547, FCC. Part 15 Class B. ICES-0003 Class B, CANA'SA-C22,2 NO, 107.I-01 This product is UL Listed as PV Rapid Shut Crown Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C'2 2,1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC c=onduciors, when installed according manufacturer's instructions, I_ No enforced CAC ratio. Seethe compatibility calculator at t �LL�3�Fhase,eotztf��slsu�nc rtfmodul� cgLLt�a4ibility. 2. Nominal voltana range can be extended beyond nominal if required by the wility. 3. Limits may vary: Refer to local requirements to define the number of mlcroinverters per branch in your area. To learn more about Enphase offerings, visit enphase.com <t 2023 Enpi ase Energy. All rights reserved Enphase, the Enphase logo, Enphase !Q 7, En.pha e IQ 71, Enpl sc ; Botteiy, Enphase Enlighten, Erphasc ,Q =Envoy, and other trademarks or service names are the trademarks of _rphase `-nergy_ Inc. Data subject to change, 2090 08 1 `2