HomeMy WebLinkAbout21-3048I
City of Zephyrhill'T,
5335 Eighth Street
Zephyrhills, FIL 33542
Phone: (813) 780-0020
Fax: (813) 780-0021 1
---------------- -------- -----
BGC-003048-2021
Issue Date: 10/25/2021
Complete Plans, Specifications add fee Must Accompany Application. All work shall be performed ir
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
X"--
CONTRACTOR SIGNATURE
PEfIT OFFICE0
I IWO
X . 0
1111I•", 1,111-11:2 0 111 ���
CITY OF ZEPHYRHILLS — BUILDING DEPARTMENT
RIGHT-OF-WAY I PqP PERMIT
DATE. PERMIT #:
No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building
Department. Any application for approval of construction operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete
scope of the proposed work In triplicate to the office of the Building Official for approval prior to the commencement of any work, A copy of this permit is to be
kept readily available at the site of the work at all times.
PARCELID#: 11-26-21-0010-16900-0080 CITY ROAD Alley way
LOCATION (Legal Description):
38544 5th Avenue, See attached Legal Descri
Permission is hereby granted to Spectrum Sunshine State LLC of 30432 SR-54 We�sle Chapel, FL. 33543
For the construction and maintenance of:
Installation 101' new catv cable and 2" hdr)
.f! inner -duct by_opentrench/directional bore method
within ails v way.
Subject to the following conditions:
1. The construction and maintenance of such utility shall not interfere with the property and rights of a prior occupant,
2. All work shall be done in keeping with the standards of the City Streets Department and under the supervision of the City Building Official, who
will be notified at least one day prior to commencement of construction.
1 All materials and equipment shall be subject to inspection by the City Building Official.
4. During construction all safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all responsibility
from damage of any nature arising from this permit. Subject to the same terms and conditions, the permit holder may take such safety measures,
including placing and display of caution signs, as it may deem necessary in conduct of construction and maintenance work hereunder. It is the
responsibility of the permiftee to ????
5, All private and all City property shall be restored to its original condition as far as practical in the opinion of the City Building OfficmL
6. All underground crossing installations shall be laid at such depth as may be specified by the City Building Official.
7, The sketch covering the details of this installation shall be made a part of this permit, This pennit is granted with the understanding that the
applicant has notified all other utility users in the area covered by the permit and takes full responsibility for any damage incurred by prior
Installations as a result of his operations in order that they may safe guard their interests,
& It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this
permit shall not operate to create or to vest any property right in said holder.
9. Whenever the City decides to further exploit the City Rights of Way, any or all said poles, wires, pipes, cables, or other facilities and
appurtenances authorized hereunder, shall be immediately removed from said Rights of Way, or reset or relocated thereon as required by the
City Building Official at the expense of the holder of this permit.
10, The holder shall save and keep the City harmless from any and all damages, claims, or injuries that may occur by reason of the construction,
maintenance, and operation of said facility,
11, The holder shall complete the requested work within _ days or this permit shall become null and void. In the event the work requested is
not completed upon the expiration date of this permit, the City shall have the right to complete such work and to charge the holder of the permit
for all costs incurred in completed said work.
12, The holder shall post a cash or surety bond with the City Manager in the sum of $ dollars to guarantee performance of the
obligations herein, and to guarantee maintenance of the right-of-way described herein for a period of one (1) year following completion of the
requested installation, In the event a surety bond is posted, the surety bond shall be made payable to the City and shall obligate the surety to
hold the City harmless In the event the holder of this permit should fail to meet any of its obligations hereunder. The bond shall also Indemnify
the City for all court costs and reasonable attorneys fees in the event legal action Is required to collect on said bond.
SUBMITTED BY:
MMEEMIM
1 A r �A et kell
Signature & Title 1'i)&Ay_)
Address 30432 SR-54 Wesley ppel Fl. 33543
Phone# j?J 3 6_5 Email r 'd
7 r
APPROVED BY:
CITY OF ZEPHYRHILLS
Utilities Supervisor
PuNic Works,Date
Building Dept Date
City Date
JOB LOCATION MAP
UTILITY LEGEND
X
PWR WOOD POLE
PWR CONCRETE POLE
PWR STEEL POLE
�E
ST LITE
JOINT USE TRANS
®
JOINT USE
e
FIRE HYDRANT
CULVERT
0
STORM DRAIN
99. N
W+r
s
APPLICATION CITY OF ZEPHYRHILLS PERMIT
TO PLACE NEW CONDUIT & CABLE WITHIN COUNTY RIGHT OF WAY
JOB DESCRIPTION
CATV UNDERGROUND CONSTRUCTION
General Notes
1 All CatV Construction within tie kubilc fights of WaII shall be in conformina
with thPLo(al ,Jundhctlon's "Minimum Standards"
2 f rt 6 Comrac' .11 r,& i 1 Cal'. 5m mire ari, odic r i L hticr prior to
comtnencernc'rit of col" W)ctlon
3, IJse the '' Virectional fore Method"' for all driveway crossngs,
A: All open asphalt cuts shall he restored as per crhikit I' of the
FV 0.f tiblibl accommodation cpaide:
5: Al side walk removal and replacement shall ke restored to
e uo i furis ',cti n' a,.d C V Of 5 ?r,)L d 5 ecific iori f 'a522
6. rlI aerial con verb, -hail mairrfam amnimurn of` I ff' clearance parallel 1f
and crossiml all '',J:Of, ifighth of Way.
7: Al aerial coristxuctron shall maintain a minimum of Id' clearance parallel to
and 18' crossinq al! County and Munlclpalltles r qht of Way.
M: MJ,t maintain minimum 2ft sc.peratlon between ^x 4ir, utilities
rveat"'wr cpirvi aver or under or parAlclirr.
9 ha'in r . aeq PZ c u- a' 4 li t.1 iri con fiic?, zon
to minimized rages
10: underground utilities have been plaited from availblc records and
field obervabai--), but are not necessarily exact. Therefore unlitu locations
estll he ✓crrimd CiOf: ind'9ncE of t enchin�, plowing and boring.
`o ld,n .h.airvc- can rc made :n evert; c` cor`,iict.
I, i'e ',n;ration sFr rc--girl within tkiree i's) wccks ;after tilde ire,tallatiori
of cahle/ candult, Full grass ki seed and mulch or-oddlna, as approved:
12. No open trenches to be Icf{; open overrirgl Needs to be backfilled
or covered ( Fublic 5afeta -lazzardJ
3: P o nx aratao, T: ne pear ted witi,n 10' of prote<.ted txees
20 or Grans .Js:. /til ubljW ,1,Aa a -Midi be prred by drectiois hrac°
befit mq out,ide of protecieo radius.
14, These drawing- are for permit mcl purposes orlu:
l5- A' Conrauctioli Methods vd M,keriais within l Kr/ W shal comply with the
C ditjar. ofd,c N J ,n Stand &r thm S and rd Seen°i�.x ons for goad & Bridge
Consfruc ,on -rid de ,,!ltba A�(.anmod ha Manual C JAM)
16: hli FPO- f:/ ✓ di_turoea N nls N(Ti, 4all be resiared to v- original cooplon
or better ar>d ut -rcordance w applicable'190 speuficatlons. A11 a dlst)rbed
by con5lrurtni shall be re-orsded and sodded, matching rm4ivig grass type.
17, hiu dnrrage rausea ru the contractor shall be repaired by the contractor/
sUFcor✓`.r;adar <t hr, sole cyrflsc.
0, I,%r not place ouvioacr par',, on sidewAk..
PROJECTNAME: 38>445THAVE COUNTY PASCO
DACE 10-19-21 SECTION _ 1I TOWNSHIP 26 F
ENGINEER _ NATHAN ELDRIDGE DRAWN BY _ C.B_M
PRISMNUMBER 319975% WORKORDFR4 1405301 SCALE NONE
TYPE OF PERMIT CITY TRACKING 4. N/A DRAWING SHEET I OF 3
PROFILE VIEW OF CATV UNDERGROUND CONSTRUCTION
PROFILE A
TYPICAL CATV TRENCH PARALLEL TO ROAD ROW
5TH AVE LOOKING WEST
CAL
grade grade
I
24°' ----=----------- ------------------- -�------------ ------------------=----- 24"
8° 10'
isting Ped
22'
I
48"----r--- -- ------ -----------1-------- ------ ------ 48"
60- ------------- -------- -
---------------------60°.
72 --------------------------------------------------=----- 72,.
i
84----------------- ----------------- —— —— ------- --------------------84"
1
TYPICAL UNDERGROUND CATV DRIVEWAY CROSSING
<oo<./aspnoe
36' Imi, 5' 1 36' Imi, 1 5' 36' Imin.
C-inq .4. vanes
Proposed Caty
HOPE 1—,da<t
01ft Catv Cable & (1) 2" HDPE Innerduct
Open Trench Minimum
36" Depth
STANDMI) TRENa
DETAIL
Onveway Bores Minimum
36" Depth
'.. NOTE: ALL EXISTING UTILITY DEPTHS & LOCATIONS BASED ON A
3a ^Mµ
N. t2.
se'Nw
=>
STANDARD, AVAILABLE RECORDS AND FIELD OBSERVATIONS.
WILL REQUIRE UNDERGROUND LOCATES PRIOR TO CONSTRUCTION.
'
A MINIMUM OF 24" VERTICAL AND 24" HORIZONTAL SEPARATION
FROM EXISTING UTILITIES MUST BE OBSERVED.
A MINIMUM OF 18" VERTICAL AND 36" HORIZONTAL SEPARATION
FROM EXISTING GAS MAINS MUST BE OBSERVED.
APPLICATION CITY OF ZHPHYRHILLS PERMIT
PROJECT NAME: 38544 5TH AVE
COUNTY PASCO
qr /�/�y,�� g,
TO PLACE NEW CONDUIT & CABLE WITHIN COUNTY RIGHT OF WAY
DATE I0-18-21
SBC£tON 1 I TOWNSHIP _ 2( RANGE _ 21
BNGINEBR NATHAN ELDRIDGE
DRAWN BY C.B.M
�Y/
JOB DESCRIPTION
PRISMNUMBER 319059
WORKORUERN. 1405101
SCALE NONE
S
CATV UNDERGROUND CONSTRUCTION
TYPE OF PERMIT CITY
TRACKING #. N/A
DRAWING SHEET 3 OF 3
MOT-13-06
(See Note
6) W20-IF
G20-2 SPEEDING PINE6
(See Note 6)
ROAD WORK
NOTES: X
2, This Index applies to Two -Lane, Two-way 6" White (See Note 7) __14
and Million,, Roadways, including Media,, to fl
Of divided roadways, with work on the
shoulder. 10' Min,
2. L - Taper Length
X - Work Zone Sign Spacing
B - Buffer Length
See Index 102-600 for 1", "W', "B", and X X X
,h snhelizi,g device spacing values, �L B
3. For incidental work (e.g. mowing or fitter
removal), Only the Read Work Ahead !go ROAD RiEs RIGHT
DOLGED 8 BID
WORK HOUMER is req,hrod. _<�> \_�"
CLOSED
�R W WES CLOSED
4. When four or more work vehicles enter the AH PRESEST UL—w2j,
I, (See
(SCG20 2
through traffic lanes in a one hour period W20- I F See Note 6) W21-5. D Note 6)
(excluding establishing and terminating the
work area) , use a flogger or lane closure
to accommodate work vehicle ingress and TWO-LANE ROADWAY
--
egress. SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY
WITH WORK ZONE SPEED OF 45 MPH OR LESS
5. For work less than two feet from the
traveled way and work zone speed is
greater than 45 MPH, use a lane closure,
6, The "Speeding Fine, Doubled When Work...
Pro,ont"sign, (MOT-13-05) and "End Read W20-IF
Work" Signs 020-2) along with the G20-2
associated work zone sign spacing (See NCtC 6) ROAD
distances may be omitted when the . .....
WORK -
temporary condition is in place for 24 END AHEAD
hour, or less- ROAD WOftK
7. Temporary pavement markings may be omitted when the work zone is in place
for 3 days or less.
8. If the work encroaches an a marked bicycle lane or ridable shoulder, close the lane or
shoulder in accordance with the Plans,
9. Omit 'Shoulder Closed" signs (W21-5a) along -X X
-- ---------- -
with associated work zone sign spacing
distances for work on the median 3L
RIGHT ROAD \4 END
ROAD WORK
Work Area AHEAD CLOSED
SYMBOLS: WORK OU.E
4 G20-2
W20-IF W21-5a (See Note 6)
a Charnelizing Device (See Index 702-600)
D Work Zone Sign
TWO-LANE ROADWAY
Lane Identification and Direction of Traffic SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY
LAST ZI DESCRIPTION: -22 INDEX REVISION 12 FY 2021 SHEET
FDOT I TWO-LANE AND MULTILANE, WORK ON SHOULDER
11101120 1 -low— STANDARD PLANS I � 10'2'-602 � 1 of 2
SYMBOLS:
MWork Are.
a Ch-roli,ing Device (See Ind- 102-600)
D Work Zero Sign
Lane Identification and Direction of Traffic
LA5T JZ� DESCRIPTION:
REVISION
11101120
6" White (See Note 7)
Median
x x
x
DAD
WORK SRouioER
END
AHEAD
G20-2
W20-IF (See Net, 6) W21-5.
(See Note 6)
(See Note 9)
MULTILANE ROADWAY
SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY
WITH WORK ZONE SPEED OF 45 MPH OR LESS
Median
x x x
YQ
WORK snouLOER END
AHEAD c�osea ROAD WORK
G20-2
W20-IF W21-5, (See Note 6)
(See Note
9)
MULTILANE ROADWAY
SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY
FY 2021-22 1 INDEX
SHEET
FDOT, TWO-LANE AND MULTIK LANE, WORRY ON SHOULDER
._.v_ STANDARD PLANS 10 1 2-602 � 2 of 2