Loading...
HomeMy WebLinkAbout21-3368City of Zephyrhills 5335 Eighth Street Zephyrhills, FL 33542 BGR-003368-2021 Phone: (813) 780-0020 Fax: (813) 780-0021 Issue Date: 12/15/2022 Permit Type: Building General (Residential) 14 26 21 0010 03600 0100 38235 C Avenue Name: BRIAN ENRIGHT Permit Type: Building General (Residential) Contractor: BRIAN ENRIGHT Class of Work: Garages Address: Po Box 1569 Building Valuation: $16,000.00 ZEPHYRHILLS, FL 33542 Electrical Valuation: $800.00 Phone: (813) 469-6755 Mechanical Valuation: Plumbing Valuation: $1,500.00 Total Valuation: $18,300.00 Total Fees: $363.75 Amount Paid: $363.75 L/ Date Paid: 2/1/2023 1:33:54PM a 10414ROM *Man V A q entities such as water management, st e agencies or federal agencies. 111 11311111rlrlll� Complete Plans, Specifications add fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PEV OFFICEU A 0 ft a Ilk 14 26 21 0010 03600 0100 ages $16,000.00 : $800,00 Phone: (813) 469-6755 Mechanical Valuation: Plumbing Valuation: Total Valuation: $16,800,00 Total Fees: $292.50 Amount Paid: $292.50 Date Paid: 12/15/2022 3:00:19PM BGR-003368-2021 Issue Date: 12/15/2022 Contractor: BRIAN ENRIGHT t3 - REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. MMEM��� accordance with City Codes and Ordinances., NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. 4 PE I CO A / OR SIGNATURE PE IT OFFICE 1- PERMItIEXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department • Owner's Address I _3 b, !X) 3 6 0, 'ri V c-_, Fee Simple Titleholder Name ?I "D ) L. (c Fee Simple Titleholder Address 7— _;,Z) Z5 LOT # JOB ADDRESS C, I -N c_ LILL— SUBDIVISION E==== PARCELID#= (OBTAINED FRD PR4RERTY TAX NOTICE) WORK PROPOSED NEW CONITR ADDIALT 11 INSTALL REPAIR PROPOSED USE SFR Comm TYPE OF CONSTRUCTION BLOCK FRAME BUILDING SIZE SO FOOTAGE SIGN DEMOLISH OTHER STEEL HEIGHT BUILDING ­ 1 " V VALUATION OF TOTAL CONSTRUCTION I 2", Z Lf-71 Lki-L)o �_00 t ti 1 �FEE BUILDER -_COMPANY SIGNATURE REGISTERED CURREN Address License# ELECTRICIAN COMPANY SIGNATURE' REGISTEREDFEE CURREN Address License # PLUMBER COMPANY SIGNATURE REGISTERED FEE CURREN / =N- Address License # MECHANICAL COMPANY F_ SIGNATURE REGISTERED --t—Y T—N J_ —FEE—C—URREN Y/N Address License # OTHER COMPANY SIGNATURE REGISTERED _L_ Y/ _N J C RREN Address License # RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & I dumpster; Site Work Permit for subdivisionsilarge projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans wl Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction, Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) — Agent (for the contractor) or Powerf Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (Plot/Survey/Footage) Driveways -Not over Counter if on public roadways.,needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law, if the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): if valuation of work is$2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner" prior to commencement, CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. - if the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. - If fill material is to be used in any area, i certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application, A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension, if work ceases for ninety(90)consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT AY RESULT IN YOUR PAYING ICE FOR IMPROVEMENTS TO YOUR P . IF YOU INTEND TO T I FINANCING, CONSULT iT YOUR OURLENDERORANATTORNEYBFOREREcORDINGYOURNOTICEOFCOMMENcEMENT. FLORIDA JURAT(F.S. 117.03) NER OR AGENT ONTRACTOR L> bscribed and sworn to{or affirmed)befor e this ubscr' ed and savor o(or affirmed)befe me thin W o Isar rson nown to me or has/have produc Who is are personaii known to me or haslhave produoed _ _ as identification, as identification. _ { f Notary Public Notary Public e,4e m;ebg Commis&dh Nom, , Commissi t o. �Ea9t a, "�« Q�. ;. wwY, •.^ JACQUELINE 8OOE3 Name of Nota en t 0627657 Name of Notary typed prid ed-or stamped 'e Ii, ry typ ' any nR �; EXpires D r t2,2022 6 Tray Fain insumn M9 INSTR#2022086114OR BK10594 PG1 440 page 1 of 1 04/18/2022 1012 AM RcpL 2443897 Rec: 10.00 DS: 0.00 IT: 0.00 Nikki Alvarez-Sowles, Esq., Pasco County Clerk & Comptroller '77 . . 7 7 7 7 7 7 . . . . . . ki b. wvA: 0) Nam Md 04mbr, b) TdOOKM W. $Jn addkim I* Wm=K bWy fU 713.13(t M �' R (L ("9 0- a! &Mco-& )eputy Clerk BOUNDARY SURVEY Client: TENBFM & ASSOCIATES Work order number: 13770—ZH Date of Survey: 3/26/03 A VENUE "B " CAM Jao' ILGAL --Q�IP�T Lots 10 and 11, 81o6k 36, MOORE'S FIRST ADDITION, as recorded in Plot Book 1, Page 57, Public Records of Pasco Cow7ty, Florida, MASVIW?Y 04LL 1.0' 132. 00'(R) I J2. 11 '(Ad) SECTION 14, TOWNSHIP 26 S., RANGE 21 E. PASCO COUNTr, FLORIDA cN" C. Fred Deuel and Associates, Inc. 5151 Gall Blvd. ZephythMs. Florida 33541 Phone: (813) 762—a77 Fax: (613) 782-54215 W�4kE — — — — — — — — - - 18.00. LOT -6 LOT 11 03 SE CCRNER MOCK JO 1J2.00'(R&M) i I I M P.= P*A d coww"wd TAR Top of am* P. Fwnmwd Cal" PON TAM Tag d SWP I PJUL PNMNN* R"W= V=ffw9 0MC Cwxr* PAL pdt of as Ow*q PAL L, Fakd = w wa UMM Fit Fvmd hm ftd F& FmM NA F*rA ko = SP sawad Fach F CJL FwA Vwmrmd Cp- = F. ftwW Md & Mw CJJ I WA 5A 11r bm w pi Iq W. Th RM SYAM Sd Nd %W VOW F4m FM at of� V" Lkw I U� Uwq P* kM VwwaW F Ep PWWMA ftpw*nw soein" &w"C" SM =d RIaly al. MMM M- Qd am zq#Vw8 CGINT pt-St pow = Sdw cam pwt am* CwAffft -4-- 19