Loading...
HomeMy WebLinkAbout22-3720City of Zophyrhills Phone:5335 Eighth Street 8 / 1 780-0021 Issue Date: 03/08/2022 �i • � s . e e s • »e• .r •a ,eMid.e. accordanceComplete Plans, Specifications add fee Must Accompany Application. All work shall be performed ir sd and Ordinances..i OCCUPANCY ` ir" OCCUPANCYNO BEFORE . CON RACTOR SIGNATURE PE IT OFFICE PERMITI IN 6 MONTHS WITHOUTINSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED 813-780-0020 City of Zephyrhills Permit Application Building Department ,2_ Fax-813-780-0021 ► 813 0086 seaax.aanaeir xesn� r JOB ADDRESS g LOT# SUBDIVISION I R3 �F t PARCEL (OBTAINED. FROM PROPERTY TAX NOTICE) WORK PROPOSED � NEW CONSTR ADDlALT SIGN DEMOLISH INSTALL REPAIR PROPOSED USE SFR COMM t OTHER TYPE OF CONSTRUCTION BLOCK E:J FRAME STEEL DESCRIPTION OF WORK Installation of agoof-mounted photovaltaiC solar psnel system. BUILDING SIZE = SQ FOCITAGE= HEIGHT BUILDING $ gy VALUATION OF TOTAL CONSTRUCTION ELECTRICAL $ AMP SERVICE PROGRESS ENERGY WR.E.C. PLUMBING $ MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION GAS ROOFING Q SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA YES NO BUILDER COMPANY � s SIGNATURE � REGISTERED `dun Y nNinstalia �(On SeCVIC@, Inc. Y 1 N m� .. Address 5260 Tampa W. Blvd, Tampa FL 33634_ License#C930ti7964��-� ELECTRICIAN COMPANY Sunrun Inst�FEE Services, Inc. SIGNATURE REGISTERED Y / N REN Y / N Address 6280 Tampa W. Blvd, Pampa FL 33634 License# C13t t)i964 PLUMBERE::���� COMPANY SIGNATURE REGISTERED Y 1 N FEE CURREN Y i N Address License # MECHANICALE:=:= COMPANY SIGNATURE REGISTERED Y 1 N F�IU.EN Y! N Address License # OTHER COMPANY SIGNATURE REGISTERED Y I N,� �FIERR�N Y I N Address License # RESIDENTIAL Attach (2) Plot Plans, (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (10) working days after submittaldate. Required onsite; Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster, Site Work Permit for subdivisions/large projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page, (1) set of Energy Forms, R-O-W Permit for new construction_ Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans wl Silt Fence installed, Sanitary Facilities & 1 dumpster, Site Work Permit for all new projects. All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. —PROPERTY SURVEY required for all NEW construction_ Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (Plot/Survey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-780-0020 City of ,Zephyrhills Permit Application Fax-813-780-0021 Building Department NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which maybe more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES_ If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for amisdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division -licensing Section at 727-847.8009, Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will by responsible If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County_ TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90.07; as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of pennitting. If is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances_ CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that I, the applicant have been provided with a copy of the 'Florida Construction Lien Law --Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the owner' prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable Taws regulatingconstruction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes; zoning regulations, and land development regulations in the jurisdiction. l also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance Such agencies include but are not limitedto, Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, WaterANastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses, ` Army Corps of Engineers -Seawalls, Cocks, Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways. I understand that the following restrictions apply to the use of fill Use of fill is not allowed in Flood Zone W" unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plain addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wail construction, i certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties, If use of fill is found to adversely; affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If 1 am the AGENT FOR THE OWNER, i promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work; plumbing, signs, wells, pools, air conditioning', gas, or other installations not specifically included in the' application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes_ Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing. from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension If work ceases for ninety (90) consecutive days the job is considered abandoned WARNING TO OWNER: YOUR FAILURE. TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING. CONSULT h LURIDA JUKAT (F.S 17 3) (j�� Who ib/are personally known to ire or has/have produced as identification. Notary Public Aeary !ptrinteptaQd—' ` minisslon# HN 102796 �a picas May it 202 awdW Thm Troy Fayt MUMA06 00 7 1 as ear war*�; a rJ ate ra�Wlon# H' 27 �. ;{ 96 96 pires May 11, 20 Fain I M y $00n37099 Subject : Structural Certification for Proposed Residential Solar Installation. Job Number! 802R-599VEGA; Rev A Client: Nelson R Vega Address: 35599 Stella Vast Dr, Zephymills, FL, 33541 Attn: To Whom It May Concern sunrun Antra v. 1,64 WS ijl�ll CAT 1 E W pk �CEN'sl C- No 849�3 STO"s ,p ORIO Signed on: 2,11712022 Afield observation of the existing structure at the address indicated above was performed by a site survey team from Sunrun. Structural evaluation of the loading was based on the site observations and the design criteria listed below. Design Criteria: 2020 FBC (7th Ed.) AMENDMENTS TO 2018 IRC/IBC/IEBC, 7-16 ASCE & 2018 NDS Basic Wind Speed V = 138 mph, Exposure B Ground Snow Load = 0 psf Based on this evaluation, I certify that the alteration to the existing structure by the installation of the PV system meets the requirements of the applicable existing and/or new building code provisions referenced above. Additionally, I certify that the PV module assembly including all attachments supporting it have been reviewed to be in accordance with the manufacturer's specifications. 225 Bush St. Suite 1400 San Francisco, CA 94104 1 3 afi< arunsity'Tested „ Yw ID, 40682587 CELLS OERNIANYI$ MOST T !.8A Nth PV j YIELD SECURITY POPULAR PROVIDER ist Fl BSnlz technab�9Y tunope }1 IN tX .ANTUNI TECHNOLOGY: Y: LOW L VELIS D COST OF ELECTRICITY Nigher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 19.5 %. 'o'.. II~ NtOt1ATWE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low -light and temperature behaviour. }w ENDURING HIGH PERFORMANCE ( ) F Long-term yield security with Anti LID Technology, Anti PID Technology', Hot -Spot Protect and Traceable Quality Tra.QTd. EXTREME WE TH P RATING High-tech aluminium ally frame, certified for 1,� high snow (5400 Pa) and wind loads (4000 Pa). A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performance warranty2. STATE JP THE APT MODULE TECHNOLOGY Q,ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology, A APT test conditions according to l ECTTS 62804-1:2015, method 6 (-1500 V,168 h) 2 See data sheet on rear for further information. THE IDEAL SOLUTION FOR: 69 Rooftop arrays on residential buildings Engineered in Germany OCELLS MECHANICAL SPECIFICATION FoiA at 1740 mm x 1030 mm x 32mm (Including frame) ........ :. �_ .......,...�..._. _ ..._........ .......... .,.__ vac rum urc vhh 799kg eao� sacrum r- r _,_. 0cl,>. 3 2mn thermally pie stressed glass with "rrsom anti refleotlontechnology _.._......., .. _....._. __-.,..e. .»._.,,:...... ....................... ._.......�, e.,......._._. 9pai,tsm46mm ...m^I ,atokCovO r Composite film naMe -._,. ._---.-�.>.». .__.:......_._,.-. ._._..,»...,.-m;. ....._ ........:.._... _.._...._....-.-.-...:_._._.... »...�.�.. 901 rum a nne Black anodised aluminium Ceti 6 x 20 monocrys allure Q ANTUM solar half cells ao rum Jun,,�,e,,Lax 53-101mind x32-60men x15-18none Protedtidn class IF'67 with bypass diodes a io 4mn 2Solarcable; (+)>1150mm (} c 1150mon $x pm rage hates connector Staubli MC4, Hanwha Q CELLS HQC4, IP68 Mevn ny:iewtoEman) a -� 31 rum nFTAii. A.-16�m'i`n� 26.SmmT `(E TB Bmm ELECTRICAL CHARACTERISTICS P'6WW6LASS 334m„ 336 µ340 346 N en" is v . ,.RFOI Ni, , f a,9,. a,2> ES,1 a DID t (POWER t.., s. lzaW l 5', r --OW) por... at(tit, �, _ _ .-. poll, _r Wj 330 335 � 340 345 � _Fl ..�, Short„Circuit Current! I:,a [At 10,41 10.47 1052 1058 Open Circuit i at s , Vo , [U'] 40.15 40.41 40,66 40,92 Current AAPP iMm [A] 991 997 1002 100T 5 V Vh<„1 a. V� 33.29 33 62 33 94 3/2. 2 , 3 f.oc.."eyn [%] >18R o187 "x19C 193 AT NORMAL C-.NtT, ON1,S,aa„M ?' Jh...i V.ircu t Citrreof l,u [A] 8.39 8 43 8 A8 8.52 m . .n_ Open t r,. u Vcc IV] 3786 38.10 3834 38,59 A urientol,MPr .. _ -. nF m. 780 784 789 Z93 , ..,.. .. vor, "ur` MP"", Vnr [V] 31,66 31,97 32.27 3257 Maur ement tolerances ft ,,,r 3 / I,o; Vac t5 %at STC:1000 Wlm 2,.25±2°C AM 1.5 according to IEC 60904-3 -'800 WJm2, NMOT, spectrum AM 1 5 � 0 CELLS PERFORMANCE WARRANTY Mm PERFORMANCE AT LOW IRRADIANCEµN� w Atleast 98%ofnominal power our- ua - -----r- — -- �--- +ti _ 7ng first year. Thereafter max_ 0.54 ,x,..,�. , as --- ----- ----- i j degradation per year. Ateast931% of nominal power up to 10 years. At ""n - �. least 85% of nominal power up to r L __ uc 26 years. r, sa ''----_.''-----r------r----_-' a �r �- All data within measurementtoler- sp ancea.Fullwarrantiesinaccordance Be ' with the warranty terms of the zaa aria sac eaa mac o s Q CELLS sales organisation of your nr, NA"", oi, ilWto 1, 0 to respective country. Typical module performance under Tow fradiance conditions In comparison to STC conditions (25'C,1000VAnia}. TEh(PERATUREGOEFFIG ENiS un - o Teami,,klaaaaazuroarEa,ea�tot,, �.�_„� .. n TlrK) �0,04� rtr�, �,r.,t,ast.,,_clr,ti-�1=„ .w re.� �jlKj 0-27� -- .i a,NVIOT t a 1 43±3 „ PROPERTIES FOR SYSTEM DESIGN F,SavirL t t Tt _. r to a.t IV] 1000 V i' ri .,7 .Iaor as ll o .rvtx urn CNN se'Cu„ont € [A] 20 „ e 'ah g ba-,e. ,f on 1, t..,,a; U L 61730 G7TYPE 2 � frIa:h D , a', Lrr rd, rnhl [Pal3600/267ermiuc 40°C`+85"C se o y ,t :a a, Fa. 11 [Pa] 540014000 on Driit a u d _ t.r. w QUALIFICATIONS AND CERTIFICATES PACKAGING, INFORMATION 0 IDE Qoality Tasted ...,v...,a ...,..�,.m.�.., ....,.,m»,.. ...,gym ,.�.._,,,..,..m...� ..P.,.,.��. ,.. _..,.m-,-_�.. ......_..,..... ..,n.....�...._ .2at.x._ ...qm».-......F..,., � SO 61215:2018; 0 CY_O Lta�HC� O IEC 61730 2016. m '.guar"i1bnd' " g 28 pallets 26 pallets 32 modules. Thisdate shsetcampliss Fro altat 1780m rt �080tYtm 1208mm 673.8k with DIN EN 50350. t i x 1:r s is ;,;,ziAz Cot f ca„. � 1815mm 1150mm 1220mm 683kg 28 pallets 24 pallets 32 modules' pz,c, Lug!, np N.inu Installation instructions must be followed: See the installation and operating manual or contact our technical service department for further information on approved installation and rise of this product, Q CELLS supplies solar modules in two different stacking methods, depending on the location of manufacture (modules are packed horizontally or vertically). You can find more detailed information !nine document"Pachoging and Transport Information". available from Q CELLS- 0 Hanwha Q CELLS Gmbh Sonnenailee 17-21, 06766 Bitterfeld-Wolfen, Germany I T L -+49 f0)3494 66 99-23444 I FAX r49 (0)3494 66 99-23000 1 ">»MML sales@q-cells.com I WEB www,q-cells.com Engineered in Germany OCELLS