HomeMy WebLinkAbout22-4420City of Zephyrhilis 7L,77,117"'7
5335 Eighth Street
Zephyrhills, FL 33542 ELCMISC-004420-2022
Phone: (813) 780-0020 Issue Date: 07/14/2022
Fax: (813) 780-0021
REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the
local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or
first reinspection, whichever is greater, for each subsequent reinspection.
Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permit required from other governmental
entities such as water management, state agencies or federal agencies,
�Mw"'Imrri IT17371' = 4XI., =W9, K%yI .
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
........... .. . .... . . . . . .
RACTOR SIGNATURE PE IT OFFICE
PER IT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
'1! 1w
813-780-0020
City of Zephyrhills Permit Application
Building Department
Fax-813-780-0021 r,
Date Received
Phone Contact for Permitting -
Owner's Name Barbara Malaba Owner Phone Number (401) 440-6211
11
Owner's Address k7856 Prairie Rose Lp ZephyrhiIts, FL 33542 Owner Phone Number
Fee Simple Titleholder Name Owner Phone Number
Fee Simple Titleholder Address
JOB ADDRESS 37656 Prair e Rase Lp Zephy hills, FL 33542 LOT #
SUBDIVISION WALNUT GROVE TOWNHOUSES PARCEL to# 15-26-21-0210-00000-0070
(OBTAINED FROM PROPERTY TAX NOTICE)
WORK PROPOSED NEW CONSTR BX ADD/ALT SIGN DEMOLISH
El INSTALL REPAIR
PROPOSED USE SFR COMM OTHER
TYPE OF CONSTRUCTION BLOCK 0 FRAME STEEL
DESCRIPTION OF WORK Installation of roof mounted photavol4aic solar system.
BUILDING SIZE SO FOOTAGE HEIGHT
€�Iiik-W t - C"IL x � L 'A�Ex "III tit k" ,k tlux V 't' �Ex x i.'W kX'% V-,�L"k�L't kx A W'E Ex
BUILDING $ VALUATION OF TOTAL CONSTRUCTION $29,850
X ELECTRICAL $ 29,850 AMP SERVICE PROGRESS ENERGY = W.R.E C.
PLUMBING $
=MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
GAS ROOFING = SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS �� FLOOD ZONE AREA =YES NO
BUILDER COMPANY
SIGNATURE REGISTERED Y / N FEE CURREN
Address � License # �nT
._ _.
ELECTRICIAN COMPANY Ensolar USA LLC
SIGNATURE REGISTERED YIN FEE CURREN Y ( N
Address License #
PLUMBER COMPANY SIGNATURE REGISTERED �FE.RREN Y ( N
Address License #
MECHANICAL _ COMPANY
SIGNATURE REGISTERED Y / N FEE CURREN Y / N_j
Address License #
OTHER COMPANY
SIGNATURE _ _ REGISTERED Y / N FEE CURREN Y I N
Address License #
RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms, R-O-W Permit for new construction,
Minimum ten (10) working days after submittal date. Required onsite, Construction Plans: Stormwater Plans wl Silt Fence installed,
Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisionstlarge projects
COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page, (1) set of Energy Forms, R-O-W Permit for new construction.
Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stornwater Plans wt Silt Fence installed,
Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance
SIGN PERMIT Attach (2) sets of Engineered Plans.
****PROPERTY SURVEY required for all NEW construction.
Directions:
Fill out application completely.
Owner & Contractor sign back of application, notarized
If over $2500, a Notice of Commencement is required, (A/C upgrades over $7500)
'* Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Reroofs if shingles Sewers Service Upgrades A/C Fences (PloUSurveytFootage)
Driveways -Not over Counter if on public roadways.. needs ROW
813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021
Building Department
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive
than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they
may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and
contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements
may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009.
Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this
application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is
not entitled to permitting privileges in Pasco County,
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or
expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that
such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery
Fees must be paid prior to receiving a 'certificate of occupancy' or final power release. If the project does not involve a certificate of occupancy or final
power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior
to permit issuance in accordance with applicable Pasco County ordinances_
CONSTRUCTION MIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that I, the applicant,
have been provided with a copy of the "Florida Construction lien Law —Homeowner's Protection Guide' prepared by the Florida Department of
Agriculture and Consumer Affairs. If the applicant is someone other than the "owner', I certify that I have obtained a copy of the above described
document and promise in good faith to deliver it to the "owner prior to commencement.
CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with
all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as
indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all
laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I
understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I
must take to be in compliance. Such agencies include but are not limited to:
Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater Treatment.
Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
Army Corps of Engineers -Seawalls, Docks, Navigable Waterways.
Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment,
Septic Tanks.
US Environmental Protection Agency -Asbestos abatement.
Federal Aviation Authority- Runways_
I understand that the following restrictions apply to the use of fill:
Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to
commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or
other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as
authority to violate, cancel: alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from
thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work
authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a
period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to
exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered
abandoned.
OWNER OR AGENT
Subscribed and sworn to (or affirmed) before me this
by
Who is/are personally known to me or has/have produced
as identification.
otary Public
Commission
Name of Notary typed, printed or stamped
me
identification.
a^ Notary Public
Commission No.w
1
Name o Nota typed, printed or stamped
DIRECTOR'S OF PAGES
PV-1 PROJECT SUMMARY
PV-2 SITE PLAN
PV-3 SINGLE -LINE DIAGRAM
PV-4 SAFETY LABELS
PV-5.1 ATTACHMENT PLAN 1
PV-5.2 ATTACHMENT PLAN 2
PV-6 ATTACHMENT DETAILS
PV-7 FIRE SAFETY PLAN
MODULE DATASHEET
INVERTER DATASHEET
ARRAY WIRING BOX DATASHEET
X DISCONNECT DATASHEET
w
MOUNTING SYSTEM DATASHEET
QMOUNTING SYSTEM ENGINEERING LETTER
UL 2703 CLASS A FIRE CERTIFICATION
UL 2703 GROUNDING AND BONDING CERTIFICATION
ANCHOR DATASHEET
PROJECT DETAILS
PROPERTY OWNER BARBARA MALABA
PROPERTY ADDRESS 37856 PRAIRIE ROSE LP,
ZEPHYRHILLS, FL 33542
APN NIA
ZONING RESIDENTIAL
USE AND OCCUPANCY ONE- OR TWO-FAMILY DWELLING
CLASSIFICATION GROUP (GROUP R3)
AHJ CITY OF ZEPHYRHILLS
UTILITY COMPANY DUKE ENERGY FLORIDA
ELECTRICAL CODE 2017 NEC (NFPA 70)
FIRE CODE 2020 FFPC
OTHER BUILDING 2020 FL BUILDING CODE
CODES
I"
I
32d
I REYES M RL71Z DONATE PE# 88991 AN ENGINEER LICENSED PURSUANT TO CHAPMR 4M,
CERTIFY THAT THE PV ELECTRICAL SYSTEM AND ELECTRICAL O DESIGNED
APPROVEDAND USING THESNIA T' MOST RECENT VERSION O
THE FLORIDA BUILDING CODE,'
r Palmetto Palm
1 PARCEL
PV-1 SCALE, NTS
LOCALE
P!{_' SCALE: ITS
Prairie R
fVap date @=
SCOPE OF WORK
THIS PROJECT INVOLVES THE INSTALLATION OF A GRID -
INTERACTIVE PV SYSTEM, PV MODULES WILL BE MOUNTED
USING A PREENGINEERED MOUNTING SYSTEM. THE MODULES
WILL BE ELECTRICALLY CONNECTED WITH DC TO AC POWER
INVERTERS AND INTERCONNECTED TO THE LOCAL UTILITY
USING MEANS AND METHODS CONSISTENT WITH THE RULES
ENFORCED BY THE LOCAL UTILITY AND PERMITTING
JURISDICTION.
THIS DOCUMENT HAS BEEN PREPARED TO DESCRIBE THE
DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGH DETAIL TO
DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND
REGULATIONS. THE DOCUMENT SHALL NOT BE RELIED UPON
AS A SUBSTITUTE FOR FOLLOWING MANUFACTURER
INSTALLATION INSTRUCTIONS. THE SYSTEM SHALL COMPLY
WITH ALL MANUFACTURERS INSTALLATION INSTRUCTIONS, AS
WELL AS ALL APPLICABLE CODES. NOTHING IN THIS DOCUMENT
SHALL BE INTERPRETED IN A WAY THAT OVERRIDES THEM.
CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL
DETAILS IN THIS DOCUMENT.
SYSTEM DETAILS
NEW GRID -INTERACTIVE
DESCRIPTION
PHOTOVOLTAIC SYSTEM WITH NO
ENERGY STORAGE
DC RATING OF SYSTEM
7.04KW
AC OUTPUT RATINGS
4.64KW,19AA
INVERTER(S)
16 X ENPHASE IQ8PLUS-72-2-US
MODULE
APTOS SOLAR DNA-144-MF26-44OW
ARRAY WIRING
(2) BRANCH OF 8 IQBPLUS-72-2-US
MICROINVERTERS
INTERCONNECTION DETAILS
POINT OF
NEW SUPPLY SIDE AC CONNECTION
INTERCONNECTION
PER NEC 705.12(A)
UTILITY SERVICE
120/240V 1tp
SITE DESIGN PARAMETERS
ASHRAE EXTREME LOW
-5°C (23°F)
ASHRAE 2% HIGH
35°C (95°F)
CLIMATE DATA SOURCE
VANDENBERG AIRPORT
WIND {ASCE 7 16j
137 MPH, EXPOSURE CATEGORY B,
RISK CATEGORY 11
)
N. 88991 m
STATE OF
Digitally signed by Reyes Manuel Ruiz
Donate
Reason: Printed copies of this
document are not considered signed
and sealed and the signature must be
verified on any electronic copies.
Bate: 2022.07.11 17:22:13-04'00'
0
ra
THIS ROOF CAN STAND THE LOAD OF THE WIND AND THE DEAD LOAD.
1 SITE PLAN f}
PV-2 SCALE. V =10'
GENERAL NOTES
EQUIPMENT LIKELY TO BE WORKED UPON WHILE
ENERGIZED SHALL BE INSTALLED IN LOCATIONS THAT
SATISFY MINIMUM WORKING CLEARANCES PER NEC
110.26.
2417 UNESCORTED KEYLESS ACCESS SHALL BE
PROVIDED TO ALL DUKE ENERGY FLORIDA EQUIPMENT.
CONTRACTOR SHALL USE ONLY COMPONENTS LISTED
BY A NATIONALLY RECOGNIZED TESTING LABORATORY
FOR THE INTENDED USE.
CONTRACTOR IS RESPONSIBLE FOR FURNISHING ALL
EQUIPMENT, CABLES, ADDITIONAL CONDUITS,
RACEWAYS, AND OTHER ACCESSORIES NECESSARY
FOR A COMPLETE AND OPERATIONAL PV SYSTEM.
(E) MAIN SERVICE PANEL (MSP), OUTDOOR
(E) UTILITY METER, OUTDOOR
(N) AC COMBINER (Cl), OUTDOOR, OUTPUT CIRCUIT
/ CONDUCTORS SHALL BE RUN IN LFNC CONDUIT OVER
ROOF NO CLOSER THAN 7/8" ABOVE ROOF SURFACE
(N) VISIBLE -OPEN TYPE, LOCKABLE, READILY
ACCESSIBLE, LABELED PV SYSTEM AC DISCONNECT
LOCATED WITHIN 10 FT OF UTILITY METER (SW1),
OUTDOOR
(N) TRANSITION BOX (JB1), OUTDOOR, OUTPUT CIRCUIT
CONDUCTORS SHALL BE RUN IN LFMC CONDUIT
THROUGH THE INTERIOR OF THE BUILDING
(N) PROPOSED ROOF -MOUNTED PHOTOVOLTAIC
ARRAY. 4/12 (20.0-) SLOPED ROOF, 8 PV MODULES
(BLACK FRAME, BLACK BACKSHEET), 270° AZIMUTH
(N) TRANSITION BOX (JB2), OUTDOOR, OUTPUT CIRCUIT
CONDUCTORS SHALL BE RUN IN LFMC CONDUIT
THROUGH THE INTERIOR OF THE BUILDING
(N) PROPOSED ROOF -MOUNTED PHOTOVOLTAIC
ARRAY. 4/12 (20.0°) SLOPED ROOF, 8 PV MODULES
(BLACK FRAME, BLACK BACKSHEET), 180° AZIMUTH
ROADWAY
ALL ARRAY CIRCUITS SHALL BE ROUTED THROUGH
THE INTERIOR OF THE BUILDING, AND WHERE
fl POSSIBLE, ALONG THE BOTTOM OF LOAD BEARING
MEMBERS. NO CONDUIT SHALL BE INSTALLED ABOVE
THE ROOF.
�UEL�R(;tl�;
No 88991
'7� a °m STATE OF ;per
CREATOR: R.R. I
r .�
f
PV MODULE
440W MICROINVERTER
as
3 �l4
I
qiq 81N 18IN a
8, CH dCN
iiiI + i + y7
I I
i
i
- JUNCTION BOX
J81-2
l
{
1 2
I
1
/ AC COMBINER
--
2 C1
r---~
I
l
. /�
/�
U=�:�
i
1
I
3
--- F1-2 PVACDISCONNECT
L _ i
30A I EATON DG222NRB
F I
SW
4
SP W/150AMCB)LOADS
T,'�16�01/L214TD
11 jj 1AILITY
hI�ETER/240V
1�, 3W
1 PM1-16 1 16 1 APTOS SOLAR DNA-144-MF26-440W I 440VV 1 41OW 1 11.33A I 10T4A I 49.9V I 41.OV I-0.1452W-C (429%I°C) 1 20A I
INVERTERS
REF. QTY.
MAKE AND MODEJ I AC VOLTAGE GROUND
RATED POWER @qAX vUTPUi CURRENT MAX INPUT CURRENT
I MAX INPUT VOLTAGE
CEC WEIGHTED EFFICIENCY
11-16 1 16
21 NOT SOLIDLYGROUNDED
290VV t2A 15.0A
60V
97.0%
DISCONNECTS OCPDS
REF. QTY. MAKE AND MODEL RATED CURRENT MAK RATED VOLTAGE REF. QTY, RATED CURRENT MAX VOLTAGE
SW1 1 EATON DG222NRB OR EQUIV. 60A VAC CB1-2 2 20A 240VAC
F1-2 2 39A 240VAC
RAPID SHUTDOWN DEVICES COPAPLIANT WITH REQUIREMENTS AS PER NEC 690.12(B)(2). PV CIRCUIT CONDUCTORS LOCATED OUTSIDE THE ARRAY BOUNDARY 4DEFINED AS 3 FEET FROM THE POiN7" OF
' '3 PENETRATION INTO A BUILDING OR MORE THAN 3 FEET FROM AN ARRAY) SHALL BE LltATEO TO NOT MORE THAN 30V W3THIN 30 SECONDS OF RAPID SHUTDOWN INITIATION. CONDUCTORS LOCATED
INSIDE OF THE ARRAY BOUNDARY SHALL BE LIMITED TO NOT MORE THAN 80 VOLTS VVITHIN 30 SECONDS OF SHUTDOWN.
ZL ENPHASE SYSTEM MEETS REQUIREMENT S FOR PHOTOVOLTAIC RAPID SHUTDOWN SYSTEM (PVRSS), AS PER NEC 690,12(B)(2).
HE DC AND AC CONNECTORS OF THE ENPHASE 107PLUS-72-2-US AND ARE LISTED TO MEET REQUIREMENTS AS A DISCONNECT MEANS AS ALLOWED BY NEC 690.15(D). MATING CONNECTORS SHALL
COMPLY WITH NEC 690.33.
THE ENPHASE 107PLUS-72-2-US HAS A CLASS 11 DOUBLE -INSULATED RATING AND DOES NOT REQUIRE GROUNDING ELECTRODE CONDUCTORS (GEC) OR EQUIPMENT GROUNDING CONDUCTORS (EGO).
THE RATING INCLUDES GROUND FAULT PROTECTION (GFP). TO SUPPORT GFP, USE ONLY PV MODULES EQUIPPED WITH DC CABLES LABELED PV INIRE OR PV CABLE.
A
MICRO€NVERTER BRANCH CIRCUIT CONDUCTORS ARE MANUFACTURED ENPHASE Q CABLES LISTED FOR USE IN 20A, OR LESS CIRCUITS OF ENPHASE IQ MICROINVERTERS. THEY ARE ROHS. OIL
RESISTANT, AND UV RESISTANT, THEY CONTAIN T'V70 12 AVVG CONDUCTORS OF TYPE THHNriH%P!N-2 DRYNVET AND CERTIFIED TO UL3003 AND UL 9703.
l "\
DC PV CONDUCTORS ARE NOT SOLIDLY -GROUNDED, NO DC PV CONDUCTOR SHALL BE WHITE- OR GRAY -COLORED
ALL METAL ENCLOSURES, RACEWAYS, CABLES AND EXPOSED NONCURRENT -CARRYING METAL PARTS OF EQUIPMENT SHALL BE GROUNDED TO EARTH AS REQUIRED BY NEC 250.4(B) AND PART III OF
ARTICLE 250 AND DC EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45. THE GROUNDING ELECTRODE SYSTEM SHALL ADHERE TO NEC 690.47(A) AND NEC 250.169 AND
INSTALLED 1N COMPLIANCE WITH NEC 250.64.
{�
ti
MAX DC VOLTAGE OF PV MODULE IS EXPECTED TO BE 54.2V AT -5°C (-4.9-C - 25°C) X -0.145V/C+49.9V = 54.2V}.
®,
AC AGGREGATION PANEL BUSBAR AND THE OVERCURRENT PROTECTION PROTECTING THE BUSBA? SHALL BE SIZED IN ACCORDANCE WITH NEC 705.12(B)(2){3)(C).
"1
THE ENPHASE IQ COMBINER 3 CONTAINS A FACTORY -INSTALLED COMMUNICATIONS GATEWAY WITH AN OCPD RATED NO MORE THAN 15A.
POINT -OF -CONNECTION IS ON THE SUPPLY SIDE OF SERVICE DISCONNECT, AT A LOCALLY -APPROVED CONNECTION POINT, USING LOCALLY -APPROVED METHODS AND HARDWARE, IN COMPLIANCE WITH
NEC 705.12(A).
APV
SYSTEM AC DISCONNECT SHALL BE A VISIBLE KNIFE -BLADE TYPE DISCONNECT THAT IS ACCESSIBLE AND LOCKABLE BY THE UTILITY. THE DISCONNECT SHALL BE LOCATED WITHIN 10 FT OF UTILITY
METER. DISCONNECT SHALL BE GROUPED IN ACCORDANCE VVITH NEC 230.72. GROUNDED CONDUCTOR SHALL BONDED INSIDE DISCONNECT PER NEC 250.24(B) AND NEC 250.24(C).
PV SYSTEM AC DISCONNECT MEETS NEC 690.12(C) REQUIREMENT FOR A RAPID SHUTDOWN iNITiAT]ON DEVICE
CONDUCTOR AND CONDUIT SCHEDULE W/ELECTRICAL CALCULATIONS
CURRENT -CARRYING MAX.
TEMP.CORR. CONT. TERM. AMP.@ TERM.
CONDUCTOR
Dii
CONDUIT /CABLE
CONDUCTORS OCPD EGC FACTOR FILL FACTOR CURRENT CURRENT BASE AMP. DEBATED AMP. TEMP. RATING TEMP. RATING
CONDUIT/CABLE. (125°fo)
E.
1 10 AWG TH'VVN-2, COPPER
IS' DIA. LFMu
2 20A 10 ANdG THAN-2, COPPER 0,76 (55-C) 1.0 9,6$A 12.1A 4flA 30.4A 90°C 40A
2 10 AWG THR(N-2, COPPER
1.0" DIA LFMC
2 20A 10 AWG THWN-2, COPPER 0T8 (55°C) 3.0 9.68A 12.1A 4CA 30.4A 90°C 40A
3 6AWGTHWN-2,COPPER
1.0"DIA. LFNC
3 30A 6AVVGTHWN-2,COPPER 0.96{35°C) 1.0 19.36A 24.2A 75A 72A 75°C 65A
4 6 A'WG Ti NN-2, COPPER
I.0' DIA. LFNC
I34A NtA 0.86 (35°C} 0 9.36A 24.2A 75A 72A 5°C 65A
GENERAL ELECTRICAL
NOTE
UTILITY HAS 24-HR UNRESTRICTED
ACCESS TO ALL PHOTOVOLTAIC
1 SYSTEM COMPONENTS LOCATED AT
THE SERVICE ENTRANCE,
CONDUCTORS EXPOSED TO
SUNLIGHT SHALL BE LISTED AS
2 SUNLIGHT RESISTANT PER NEC
ARTICLE 300.6 (C) (1) AND ARTICLE
310.10 (D),
CONDUCTORS EXPOSED TO WET
Uj
LOCATIONS SHALL BE SUITABLE FOR
3 USE IN WET LOCATIONS PER NEC
ARTICLE 310.10 (C).
Of U n ej
GROUNDING NOTES
cy-a
—�
3m
ALL EQUIPMENT SHALL BE
1 PROPERLY GROUNDED PER THE
REQUIREMENTS OF NEC ARTICLES
250 & 690
PV MODULES SHALL BE GROUNDED
TO MOUNTING RAILS USING MODULE
�
LUGS OR RACKING INTEGRATED
CO <c >_
GROUNDING CLAMPS AS ALLOWED
2
tt�
BY LOCAL JURISDICTION, ALL OTHER
EXPOSED METAL PARTS SHALL BE
GROUNDED USING UL-LISTED LAY -IN
LUGS.
INSTALLER SHALL CONFIRM THAT
CD
MOUNTING SYSTEM HAS BEEN
EVALUATED FOR COMPLIANCE WITH
3 UL 2703 "GROUNDING AND BONDING„
WHEN USED WITH PROPOSED PV
"
MODULE.
`>� cEr
IF THE EXISTING MAIN SERVICE
N.88991
PANEL DOES NOT HAVE A
=
VERIFIABLE GROUNDING
STATE OF xz
4 ELECTRODE, IT IS THE
CONTRACTOR'S RESPONSIBILITY TO
Digitally signed by Reyes Manuel Ruiz
INSTALL A SUPPLEMENTAL
Donate
GROUNDING ELECTRODE,
Reason: Printed copses of this
AC SYSTEM GROUNDING
document are not considered signed
ELECTRODE CONDUCTOR (GEC)
and sealed and the signature must be
5 SHALL BE A MINIMUM SIZE #BAWD
verified on any electronic copies.
Date: 2022.07.11 17:22:30-04'00'
WHEN INSULATED, #6AWG IF BARE
WIRE,
EQUIPMENT GROUNDING
SINGLE -LINE DIAGRAM
CONDUCTORS SHALL BE SIZED
ACCORDING TO NEC ARTICLE 690.45,
6 AND BE A MINIMUM OF #10AWG
PROJECT ID: 2D81C0-1
WHEN NOT EXPOSED TO DAMAGE,
DATE: 07/11/22
AND #6AWG SHALL BE USED WHEN
CREATED BY: R.R.
EXPOSED TO DAMAGE
GROUNDING AND BONDING
CHECKED BY:
CONDUCTORS, IF INSULATED, SHALL
REVISIONS
7 BE COLOR CODED GREEN, OR
MARKED GREEN IF #4AWG OR
LARGER
SINGLE -LINE DIAGRAM
F�V-3 SCALE: NTS
PV-3
(D AC COMBINER PANEL (Cl)
NEC705.12(B)(2)(3)(C)
(D AC SOLAR DISCONNECT (SW1 IN NULL)
EACH DISCONNECTING MEANS FOR
PHOTOVOLTAIC EQUIPMENT (SW1)
NEC690,13(B)
(D AC DISCONNECT (SW1 IN NULL)
LABELING NOTES - - ------- - P-D906FE
ALL AND SIGNAGE PLAQUES AND SIGNAGE REQUIRED BY 2017 NEC
PC WILL
FTJAND 2020 FFPC WILL BE INSTALLED AS REQUIRED,
LABELS, WARNING(S) AND MARKING SHALL COMPLY
WITH ANSI Z535.4, WHICH REQUIRES THAT DANGER,
WARNING, AND CAUTION SIGNS USED THE STANDARD
HEADER COLORS, HEADER TEXT, AND SAFETY ALERT
SYMBOL ON EACH LABEL. THE ANSI STANDARD
REQUIRES A HEADING THAT IS AT LEAST 50% TALLER
THAN THE BODY TEXT, IN ACCORDANCE WITH NEC
110.21(B).
A PERMANENT PLAQUE OR DIRECTORY SHALL BE
INSTALLED PROVIDING THE LOCATION OF THE SERVICE
DISCONNECTING MEANS AND THE PHOTOVOLTAIC
SYSTEM DISCONNECTING MEANS IF NOT IN THE SAME LLJ
c/)
LOCATION IN ACCORDANCE WITH NEC 690,56(8), C) Lli
-------- cr- z: co
LABEL(S) WITH MARKING, "TURN RAPID SHUTDOWN
SWITCH TO THE'OFF' POSITION TO SHUT DOWN THE uj 0
ENTIRE PV SYSTEM,` SHALL BE LOCATED WITHIN 3 FT OFu-
SERVICE DISCONNECTING MEANS THE TITLE SHALL
UTILIZE CAPITALIZED LETTERS WITH A MINIMUM HEIGHT UJI
OF 318" IN BLACK ON A YELLOW BACKGROUND, AND
REMAINING TEXT SHALL BE CAPITALIZED WITH A Of lif
MINIMUM HEIGHT OF 3/16" IN BLACK ON WHITE < <
BACKGROUND fir,
r1w Of
LABEL(S) WITH MARKING, 'RAPID SHUTDOWN SWITCH 0 < — >-
FOR SOLAR PV SYSTEM," SHALL BE LOCATED WITHIN 3
FT OF RAPID SHUTDOWN SWITCH THE LABEL SHALL 0 L0 a-
HAVEHAVE 3/8" TALL LETTERS AND BE REFLECTIVE WITH Lli t,
WHITE TEXT ON A RED BACKGROUND
�kkjEL Rij
>
-'\CENS ffi0
No 88991
STATE OF
0
"',SIONAL
C
STRUCTURAL DESIGN PARAMETERS
SEISMIC
0.061 SDS
WIND (ASCE 7-16)
137 MPH, EXPOSURE CATEGORY B,
RISK CATEGORY 11
GROUND SNOW LOAD
0 PSF
ROOF PROPERTIES
ROOF MATERIAL
COMPOSITION SHINGLE (1 LAYER)
SLOPE
4/12 (20.0°)
MEAN ROOF HEIGHT
15.6FT
ROOF DECKING
15/32" OSB
CONSTRUCTION
TRUSSES (2X4 TOP -CHORD), 241N OC
MODULE MECHANICAL PROPERTIES
MODEL
APTOS SOLAR DNA-144-MF26-44OW
DIMENSIONS (AREA)
82.51N X40.91N X 1AIN (23A SO FT)
WEIGHT
55.3LB
MOUNTING SYSTEM PROPERTIES
RAIL MODEL
IRONRIDGE XR100
ANCHOR MODEL
ROOF TECH RT2-04-SD5-60, 2.881N
AIR GAP
2,0 INCH EMBEDMENT INTO TRUSSES
FASTENING METHOD
OR DECKING WITH (2) 3/16IN DIA.
FASTENERS
GROUNDING AND
INTEGRAL GROUNDING CERTIFIED
BONDING
TO UL 2703 REQUIREMENTS
NOTES
TRUSS LOCATIONS ARE APPROXIMATE, ANCHORS MAY
BE FASTENED TO DECKING WHERE NEEDED, IN NO
CASE SHALL THE ANCHOR SPACING EXCEED 'MAX.
ANCHOR SPACING"
ANCHOR PLACEMENT PARAMETERS (ASCE 7-16)
}WIND PRESSURE ' MODULE WIND MAX, ALLOWABLE MAX. ANCHOR MAX. ALLOWABLE
ZONE EXPOSURE RAIL SPAN SPACING CANTILEVER
ZONES 1, 2E, 2R, NORMAL 72.01N 72.01N 28.81N
3
DISTANCE a IS EQUAL TO 10% OF THE BUILDING'S LEAST HORIZONTAL DIMENSION ("LHD") OR
40% OF THE MEAN ROOF HEIGHT, WHICHEVER IS SMALLER, BUT NOT LESS THAN 4% OF THE LHD
OR 3 FT. THESE SETBACKS ARE APPLIED TO THE BUILDING FOOTPRINT AND PROJECTED TO THE
ROOF PLANES IN ACCORDANCE WITH GUIDANCE PROVIDED BY ASCE 7-16 FIGURES 30.3-2B-1.
a = MAX(MIN(0.4 * MEAN ROOF HEIGHT, 0.1 ` LHD), 0.04 * LHD, 3 FT)
3.2 ft = max(min(0.4 * 15.6 ft, 0.1 * 31.7 ft), 0.04 * 31.7 ft, 3 ft)
♦4�4;1458B99gps
No 88991
> °° STATE OF "�tt
o' ,; f
> i
®®p.,rS/O A �
ATTACHMENT
AN
DATE: 7/11 /22 1
STRUCTURAL DESIGN PARAMETERS
SEISMIC
0.061 SDS
WIND (ASCE 7-16)
137 MPH, EXPOSURE CATEGORY B,
RISK CATEGORY 11
GROUND SNOW LOAD
0 PSF
ROOF PROPERTIES
ROOF MATERIAL
COMPOSITION SHINGLE (1 LAYER)
SLOPE
4/12 (20.0°)
MEAN ROOF HEIGHT
15.6FT
ROOF DECKING
15/32" OSB
CONSTRUCTION
TRUSSES (2X4 TOP -CHORD), 241N OC
MODULE MECHANICAL PROPERTIES
MODEL
APTOS SOLAR DNA-144-MF26-44OW
DIMENSIONS (AREA)
82.51N X 40.91N X 1.41N (23.4 SO FT)
WEIGHT
55.3LB
MOUNTING SYSTEM PROPERTIES
RAIL MODEL
IRONRIDGE XR100
ANCHOR MODEL
ROOF TECH RT2-04-SD5-60, 2.881N
AIR GAP
2.0 INCH EMBEDMENT INTO TRUSSES
FASTENING METHOD
OR DECKING WITH (2) 3/161N DIA.
FASTENERS
GROUNDING AND
INTEGRAL GROUNDING CERTIFIED
BONDING
TO UL 2703 REQUIREMENTS
NOTES
TRUSS LOCATIONS ARE APPROXIMATE. ANCHORS MAY
BE FASTENED TO DECKING WHERE NEEDED, IN NO
CASE SHALL THE ANCHOR SPACING EXCEED "MAX.
ANCHOR SPACING"
gm
ANCHOR PLACEMENT PARAMETERS (ASCE 7-16) DISTANCE a IS EQUAL TO 10% OF THE BUILDING'S LEAST HORIZONTAL DIMENSION ("LHD") OR
WIND PRESSURE MODULE WIND MAX. ALLOWABLE MAX. ANCHOR MAX. ALLOWABLE 40% OF THE MEAN ROOF HEIGHT, WHICHEVER IS SMALLER, BUT NOT LESS THAN 4% OF THE LHD
ZONE EXPOSURE RAIL SPAN SPACING CANTILEVER OR 3 FT. THESE SETBACKS ARE APPLIED TO THE BUILDING FOOTPRINT AND PROJECTED TO THE
ZONES 1, 2E, 2R, NORMAL 72.01N 72,01N 28.81N ROOF PLANES IN ACCORDANCE WITH GUIDANCE PROVIDED BY ASCE 7-16 FIGURES 30.3-2B-1.
3
a = MAX(MIN(0.4 * MEAN ROOF HEIGHT, 0.1 * LHD), 0.04 * LHD, 3 FT)
3.2 ft = max(min(0.4 * 15.6 ft, 0.1 * 31.7 ft), 0.04 * 31.7 It, 3 ft)
LIM
� Xa 140EL Rt/J`3 es°®
tics �e®--�C. E ft s--*,,0�
No 88991 `.�
�m s�
s STATE OF ®mom
®p$57 -
11,1111110
ATTACHMENT
PLAN
DOC ID: 2D81C0-1
DATE: 7/11122
CREATOR: R.R.
REVIEWER:
REVISIC}NS
RACKING ELEVATION JRANSVERS CIEW
\)�'V SCALE: NTS
4 IRONRIDGE UNIVERSAL—, /4IRONRIDGE UNVERSAL PV MODULE
FASTENING OBJECT W1 FASTENING OBJECT
STOPPER SLEEVE
COMP. SHINGLE
ROOFING
IRONRIDGE I
XRl GO RAIL Ll Lil ROOF DECKING
ROOF FRAMING SPACING ATTACHMENT SPAN ROOF FRAMING
RACKING ELEVATION (LONGITUDINAL EJEW
SCALE: NTS
MOUNTING SYSTEM NOTES
ELA3HlNj2 SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURERS'INSTRUCTIONS.
IF THERE IS ANY CONFLICT BETWEEN WHAT IS DEPICTED HERE AND INSTRUCTIONS
2 PROVIDED BY A MANUFACTURER, THE MANUFACTURER'S INSTRUCTIONS SHALL
SUPERCEDE.
IRONRIDGE UNIVERSAL
FASTENING OBJECT
ROOF TECH RT-MINI
(INSTALL AS PER
MANUFACTURER'S
INSTALLATION MANUAL)
COMP. SHINGLE
ROOFING
STAINLESS WOOD SCREWS
EMBEDDED INTO ROOF FRAMING
IRONRIDGE XR1 00 RAIL
IRONRIDGE L-FOOT
APPLY ROOF
SEALANT TO THE
TOP & EACH SIDE
OF THE BRACKET
JROOF DECKING
\1
/` onnr
UNDERLAYMENT
ROOF FRAMING
ATTACHMENT DETAILLTMNSVERSE VIEW)
1\p_v-) SCALE: NTS
ROOF TECH RT-MINI - --!
(INSTALL AS PER
MANUFACTURERS
INSTALLATION MANUAL)
COMP. SHINGLE
ROOFING
ROOF UNDERLAYMENT
ROOF DECKING
ROOF FRAMING,
---IRONRIDGE
XR100 RAIL
7" MAX. TO
TOP OF RAIL
L--i-
APPLY ROOF SEALANT
TO THE TOP & SIDES
OF THE BRACKET
STAINLESS WOOD SCREWS
EMBEDDED INTO ROOF FRAMING
K'D-'\, ATTACHMENT DETAIL (LONGITUDINAL VIEW)
SCALE: NTS
�AUEL RU
No 88991
STATE OF
0
..........
'IS10NAL %NN
"111111110k
ATTACHMENT
DETAILS
=1
ACCESS AND SPACING REQUIREMENTS SHALL BE
REQUIRED TO PROVIDE EMERGENCY ACCESS TO THE
ROOF, PROVIDE PATHWAYS TO SPECIFIC AREAS OF THE
ROOF, PROVIDE FOR SMOKE VENTILATION
OPPORTUNITY AREAS, AND TO PROVIDE EMERGENCY
EGRESSION FROM THE ROOF. THE AHJ SHALL BE
PERMITTED TO MODIFY ROOF ACCESS BASED UPON
FIRE DEPARTMENT VENTILATION PROCEDURES OR
ALTERNATIVE METHODS THAT ENSURE ADEQUATE
ACCESS, PATHWAYS, AND SMOKE VENTILATION. (FFPG
11.122.21)
NOT LESS THAN TWO T WIDE PATHWAYS ON SEPARATE
ROOF PLANES, FROM GUTTER TO RIDGE, SHALL BE
PROVIDED ON ALL BUILDINGS. ONE PATHWAY SHALL BE
PROVIDED ON THE STREET OR DRIVEWAY SIDE OF THE
ROOF. FOR EACH ROOF PLAN WITH A PV ARRAY, A 3'
WIDE PATHWAY FROM GUTTER TO RIDGE SHALL BE
PROVIDED ON THE SAME ROOF PLANE AS THE PV
ARRAY, ON AN ADJACENT ROOF PLANE, OR
STRADDLING THE SAME AND ADJACENT ROOF PLANES.
PATHWAYS SHALL BE LOCATED IN AREAS WITH MINIMAL
OBSTRUCTIONS SUCH AS VENT PIPES, CONDUIT, OR
MECHANICAL EQUIPMENT. (FFPC 11A2.2.2.2.1)
FOR PV ARRAYS OCCUPYING UP TO 33% OF THE PLAN
VIEW ROOF AREA, A MIN, 18" PATHWAY SHALL BE
PROVIDED ON EITHER SIDE OF A HORIZONTAL RIDGE.
(FFPC 11.12222.2)
PV MODULES INSTALLED ON ROOF WITH IRONRIDGE
ROOF MOUNTING SYSTEM. THE MOUNTING SYSTEM IS
UL 2703 CLASS A FIRE RATED ON THIS STEEP -SLOPED
ROOF WHEN INSTALLED WITH TYPE 1 OR 2 MODULES.
THE APTOS SOLAR DNA-144-MF26-440W IS UL 61730-1
CERTIFIED TYPE 1.
(; 1.5 WIDE FIRE ACCESS PATHWAY, PER FFPC
11.122.2,2.1
1.5' WIDE FIRE ACCESS PATHWAY
4 ROOF ACCESS POINT
ROADWAY
TOTAL PLAN VIEW ARRAY AREA IS 352.3 SQ.FT, WHICH
REPRESENTS 16.6% OF TOTAL PLAN VIEW ROOF AREA
(2123.7 SQ.FT)
THIS SYSTEM UTILIZES MICROINVERTERS, THERE ARE
NO DC CIRCUITS OUTSIDE OF THE ARRAY PERIMETER
OR INSIDE THE BUILDING,
ALL ARRAY CIRCUITS SHALL BE ROUTED THROUGH
THE INTERIOR OF THE BUILDING, AND WHERE
POSSIBLE, ALONG THE BOTTOM OF LOAD BEARING
MEMBERS. NO CONDUIT SHALL BE INSTALLED ABOVE
THE ROOF.
FIRE SAFETY PLACE
PlA-7 SOLE.: V =10'
•,c
at��a \CEtVgdmC� q No 88991
�g o�
STATEOF
0se ��t?Rgt�9a
FIRE
SAFETY
Residential I Commercial
30 Year 1
5 3X IEC RETC Top
Warranty St !lords Performer
3140 De to Cruz Blvd., Ste
200 Santa Clara, CA 95054
tOS"
Irv---aptossolar,com
S_, r technology
info@aptossolar,com
Designed & Engineered in Silicon Valley
440W I 445W 1450W
Our DNA" Split Cell Series impressively combines
advanced solar technologies to maximize performance.
Our patented Dual Nano Absorber (DNAT`1) Technology
allows the panel to operate at high -efficencies in
extreme temperatures. Contact our sales team today to
learn more about our line of high-efficienty solar panels.
Patented DNATm technology boosts power
performance Sc module efficiency
Advanced split cell technology with 9 ultra -thin
busbars allows for less resistance and more photon
LL--J capture
(�) Ideal solution for applications affected by shading
All -black design for pristine aesthetics
No excessive silver bussing or ribbons
Robust product design is reslient
in extreme weather. Up to 5400 Pa snow load
and 6200 Pa wind load
O(T� as c E
UM Intertek
C CH us
*,aR 6W xWj u� UL61730-1,
UL61730-2
Linear Performance Warranty
9851.
97%
9(r7%
83,7%
8o2%
76,7%
0 Aptos Warranty * Industry Standard
35m,
STCrated Output P_ (W)
440W
445W
450W
Module Efficiency
20.2191
20,43%
20.66Y.
Open Circuit Voltage V_ (V)
49,9
50A
50.3
Short Circlut Current Isc (A)
11.33
11,40
11A7
Rated Voltage V_ (V)
41-0
412
41A
Rated Current l _ (A)
10.74
10,81
10,88
Temperature Coefficients Pn_ -0-38%
Temperature Coefficierits 1. +005%/Ic
Temperature Coefficients V, -0.29%/C
Normal Operating Cell Temperature (NOCT) 441C
Maximum Series Fuse 20A
Maxinturn System Voltage 1,000 VDC (UL&JEC)
Maximum Load Capacity (Tested to UL 1703) 5400 Pa Snow Load/ 6200 Fla Wind Load
Fire Performance Class Class C/Type I
Number of Modules per Pallet
31
Number of Pallets per 40ft Container
22
Pallet Dimensions
2110 X 1120 X 2365
Pallet Weight (kg)
810A
Container Weight (kg)
17823
Antos Solar Technology reserves the right to make specification changes without notice
12
a
I
R,
>4 00 rn::
=> do
to ::r- 0
Z-
cal
A -A,
72-7
B.3
Cell Type
Monocrystalline
Class
3,2mm, and -reflection coating, high
tra-nclsSion, low 1ron, tempered glass
Frame
Anodized Aluminum Alloy
Junction Box
IP68
Dimensions
2095 X 1039 X 35mm,
output Cable
4mm2 (EU)12AWG
Weight
53.131bs.(25Akg)
Cable Length
(47.24)1200mm
Encapsulant
POE
(S) us
Oa-usC
E
Intertek
U161730-1,
cw
UL61730-2
Is
,
n. ENPHASE.
Our newest 108 Microinverters are the industry's first microgrid-forming, software -
defined microinverters with split -phase power conversion capability to convert DC
power to AC power efficiently. The brain of the semiconductor -based microinverter
is our proprietary application -specific integrated circuit (ASIC) which enables the
microinverter to operate in grid -tied or off -grid modes. This chip is built in advanced
55nm technology with high speed digital logic and has super -fast response times
to changing loads and grid events, alleviating constraints on battery sizing for home
energy systems.
Part of the Enphase Energy Systern, fQ8 sense
Microinverters integrate With the Enphase 10
Battery,:Enphase 10 Gateway, and the Enphase
App monitoring and analysis software.
111,; ,9R ; *-,A -
117
Connect PV modules quickly and sasjjjjiy to
108 Was Mlorpinvarters using the included
4-DCC-2 adapter cable with plug-n-play MC4
connectors,
with various regulations, when 1 ailed
according to manufacturees instn ndlons;
0 2022 Enphase Energy. Ali rights reserved. Emma", the Enphase logo, 108 necroinvernue,
and other names are trademarks of Enphase Energy, I= Data subject to charge,
IOBSE-DS-0001-01-EN-US-2022-03-01
Lightweight and compact with
plug-n-play connectors
Power Line Communication
(PLC) between components
Faster installation With simple
two -wire cabling
High productiVity and reliability
Produce power even when the
grid is down
More than one million cumulative
hours of testing
Class It double -insulated
enclosure
Optimized for the latest high-
powered PV modules
Microgirld-forming
- Comolles With the latest
k7=0i
range of lgrW proo*
- Maki CA Rule 21 (UL 1741-
r me
. 0—
-0 >
0
__4
::10 rn
0-
00 M:rn
on
00
10
sCe
IN
Commonly used module paldngs2
IN
235-350
235-440
260-460 295-500
320-540-
295-500-
Module compatibility
60-celf/120 half-pell
60-celf/120 half -cell, 66-ceIV132 half
-cell and 72-celf/144
half -cell
MPPT voltage range
V
27-37
29-45
33-45 36-45
38-45
38-45
operating range
v
25-48
25-58
min/max start voltage
V
30/48
30/58
Max input DC voltage
V
50
60
Max Do current' [module Ise]
A
15
Overvoltage, class DO port
If
DC port backfeed current
mA
0
PV array configuration
1xI Ungrounded array, No additional DCside protection required; AC side protection requires max 20A per branch circuit
Peak output power.
VA
246
300
330 366
384
366
Max continuous output power
VA
240
290
325 349
380
360
Nominal (L-L) voltage/ran
240/211-264
208/1183-250
Max continuous output current
A
lo
t21
t35 1.45
1-58
V3
Nominal frequency.
Hz
60
Extended frequency —go
in,
50-68
Max units per 20 A ((-L) branch circuit/
16
13
11 11
10
9
Total harmonic distortion
.5%
Overvoluige class AC port
lit
AC port backfeed current
rk
30
Power factor setting
1.0
Grid -tied power factor (Adjustable)
0-85 leading - 0.85 tagging
Pearkefficiency
915
97.6
97.6 976
97.6
97A
CEC weighted efficiency
%
97
97
97 97:5
97
97
Night-time power consumption
MW
60
Ambient cenpicature range
-40°C to +60*C (-40*F to -14OPF)
MEN=
Relative humidity range
4% to 100% (condensing)
DC Connector type
MC4
Dimensions (HxWxD)
212 mm (8,Y) x US mm (6.9") x 30.2 mm (1,21
weight
1.08 kg (2Z8 lbs)
Cooling
Natural comection - no fare
Approved for wet locations
Yea
Acoustic noise at I m
<60 dBA
Pofftrtlon degree
PD3
Enclosure
Clear 11
double -insulated, corrosion resistant polymeric enclosure
Erf4rom category / UV exposure rating
NEMA Type 6 / out
CA Rule 21 (UL 1741-W, UL 62109-1, U6.1741/ISEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-=2 Na IG7.1-01
Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section
69012 and C22A-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and Do conductors, when installed according to
manufacturer's instructions.
(1) The IOSH-208 variant will be operating in grid -tied mode only at 208V AC. (2) No efforced DC/AC ratio. See
the compatibility calculator at httpw//Iinkenphase=m/module-compafffbirity (75) Maximum continuous input
Do current is 10,6A (4) Nominal voltage range can be extended beyond nominal If required by the utility. (5)
Units may vary. Refer to focal requirements to define the number of mcroinverters per branch in your area I48SE-DS-0001-01-EN-US-2022-03--01
Eriphase Networking
r-11
Enphase
IQ Combiner 3
(X-M-AM1-240-3)
LISTED
To learn more about Enphase offerings, visit enphasexom
The Erlphase IQ Combiner 3_' mth Enphase
1Q EnvoY"' consolidates interconnection
equipment into a single enclosure and
streamlines PV and storage installations by
providing a consistent, pre -wired Solution for
residential applications. It offers up to four
2-pole input circuits and Eaton BR series
busbar assembly.
Smart
Includes IQ Envoy for comrnunication
and control
Flexible networking supports Wi-Fi,
Ethernet, or cellular
Optional AC receptacle available for PLC
bridge
Provides production metering and optional
consumption monitoring
Reduced size from previous combiner
Centered mounting brackets support single
stud mounting
Supports back and side conduit entry
Up to four 2-pole branch circuits for 240 VAC
plug-in breakers (not included)
80 A total PV or storage branch circuits
umm
- Durable NRTL-certifiedNEMA type
3R enclosure
Five-year,warranty
UL listed
o"
ENPHASE,
',tilt I Ill,,"
0
ZZ:0
w>® Mdo
0000
1-0
0 Q0
Irv, s,
%
Enphase IQ Combiner 3
MODEL NUMBER
ACCESSORIES and REPLACEMENT PARTS (not included, order separately)
Consumption Monitoring* CT
CT-200-SPLIT Split core current transformers enable whole home consumption metering (+/- 2-51/.).
EPLC-01 Power line carrier (communication bridge pair), quantity 2
XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3 (required for EPLC-01)
XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board (PCB) for Combiner 3
ELECTRICAL SPECIFICATIONS
System Voltage 120/240 VAC, 60 Hz
Eaton BP, series busbar rating 125 A
Max, continuous current rating (output to grid) 65A
Branch circuits (solar and/or storage) Up to 'our 2-pole Eaton Be series Distributed Generation (DG) breakers onp, (Plot included)
max. continuous current rating (input from Pal) 64A
Max. total branch circuit breaker rating (input) 80A of distributed generation / 90A with IQ Envoy breaker included
ME1113212MEEM
Weight T 5 kg (16,5 ibs)
Ambient temperature range -401 C to +461 C (401 to 1151 F)
Cooling Natural convection, plus heal, shield
Enclosure environmental rating Outdoor, NIRTL-certified, NEMA type 3R, polycarborrate construction
Wire sizes 20 Ato 50 A breaker inputs: 14 to 4 Woo copper conductors
60 A breaker branch input: 4 to 1/0 ApIG copper conductors
Main lug combined output: 10 to 210AVIG copper conductors
Neutral and ground: 14 to 1/0 copper conductors
Always follow level code requirements for conductor sizing.
Attitude To 2000 meters (6,56,3 rest)
INTERNET CONNECTION OPTIONS
Ethernet Optional, 802.3, Cat5E (or Cat 6) UTP Ethernet cable (not included)
Compliance, IQ Envoy UL 60601-1,/CANCSA 22.2 No. 61010-1
* Consumption monitoring is required for Eriphase Storage Systems.
To learn more about Enphase offerings, visit enphase.com
'9, 20 1 v Ennhas,_ Ene,jy Al ngh!.�, use AH I radefnatks ),I bl-81nds n ,is doc.ument are �y lhv,ii :,,',-;rv,,,e 0'eIrw-r nENPHASE
3
aIRON RIDGE
Muilt for solar's toughest roofs.
Flush Mount System
1ronRidge builds the strongest mounting system for pitched roofs in solar. Every component has been tested to
the limit and proven in extreme environments.
Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings, and
is also why our products are fully certified, code compliant and backed by a 25-year warranty.
Strength Tested
All components evaluated for superior
structural performance.
Class A Fire Rating
Certified to maintain the fire resistance
rating of the existing roof.
UL, 2703 Listed System
Entire system and components meet
newest effective UL 2703 standard.
Pre -stamped engineering letters
available in most states.
25-Year Warranty
Products guaranteed to be free
of impairing defects.
XR Rails
MW
A low -profile mounting rail
for regions with light snow.
6' spanning capability
Moderate load capability
Clear and black finish
Clamps & Grounding
✓ i ter,
The ultimate residential
solar mounting rail.
8' spanning capability
Heavy load capability
Clear and black finish
A heavyweight mounting
rail for commercial projects.
12' spanning capability
Extreme load capability
Clear anodized finish
a�k$�t4aa�aet�rr
mZ
•g�,
aC
C40
A ® m
� m; r
Oko
b
_ �Fplf
&I46ii141
All rails use internal splices
for seamless connections.
Self -drilling screws
Varying versions for rails
Forms secure bonding
jpa
OF
,. ,,
Universal Fastening Objects
bond modules to rails.
Fully assembled & lubed
Single, universal size
Clear and black finish
Flash and mount XR Rails
with superior waterproofing.
Twist -on Cap eases install
Wind -driven rain tested
Mill and black finish
R sourc;es
Snap onto the UFO to turn
into a bonded end clamp.
Bonds modules to rails
Sized to match modules
Clear and black finish
��r✓ �� �i/�i lr f✓
��r✓�%�fX�,;,r �i � fi
y��//rr ✓ f✓rFr
� � ,r ✓ r f✓/r✓r rr,.
Flash and mount conduit,
strut, or junction boxes.
Twist -on Cap eases install
Wind -driven rain tested
Secures 3/4' or 1 ' conduit
Bond modules to rails while
staying completely hidden.
Universal end -cam clamp
Tool -less installation
Fully assembled
Drop -in design for rapid rail
attachment.
Secure rail connections
Slot for vertical adjusting
Clear and black finish
Connect arrays to
equipment ground.
Low profile
Single tool installation
Mounts in any direction
Bonding Hardware
Bond and attach XR Rails
to roof attachments.
T & Square Bolt options
Nut uses 7/16" socket
Assembled and lubricated
Design Assistant NABCEP Certified Training
o from rough layout to fully Earn free continuing education credits,
r ¢ C r;
engineered system For free while learning more about our systems
Go to Go bu
7
..-%�'" ��""�, ��c- ,��=� ..�', .. ,.,-.-=„�.-..:.M. .. ✓. .?; � ,�-�`.'"-= �^ .,..ram �F% .,�..-'" . .r: .,r~-. ,. ,- .---. "Ps�"�. F. ., tY :r., ,�> ;. ,xw-"K;wu-.,-- ., �: � r - .� �.,-a-,�, w. ,..;.�r^,�-�'�*.�-�-: r"�� �� Y,�%� :mow."-=^. .��%r'` .,m., ,,.=��ir �`- ✓~,. ,.�,..,�`r>: ,..,�.,; ,.� -`�i .Y,-�'c�.�.z;��
_ � � _ _ a`r� s t ^ ���� x-� ���� �F � �.. ,. � �.. � ,f �.y_ r< ,✓ .c�" sue',. �r-�.'
>.�:-= :� �� .,_:��'" -.�� /�" �� »-�.�.. �.-, -� r „�,- <w=. r�'.�.- ,sue _.= :r'-.�� ✓',.�.
..�r,-
RT-MINI is suitable for
mounting any rail system
with a conventional L-Foot.
Dual bolt design: M8 or 5/16 13
for L-Foot & 1/4" for EMC
1CC
ICC ESR 3575
Now for more details
858-935-6064
Engineered to ASTM D 1761 (Standard Test Methods for Mechanical Fasteners in Wood)
Components
RT2-00-MINIBK
PAT: PENDING
MINI base :20 ea.
Screw: 40 ea.
Extra RT-Butyl : 10 ea.
RT-Butyl is Roof Tech's flexible flashing
used in 550,000 residential PV systems
for the last 20 years. It is the first PV
mounting system with Flexible Flashing
certified by the ICC.
Metal Flashing Retrofit
Shedding water?
100% Waterproof
) testing UV testing (7500 hrs.)
Dimensions in (mm)
o 3 1/2 (90)--
2 (50)
Rafter installation
Deck installation
r 1,E
es 3 ! "
P.E. Stamped Letters available at www.roof-tech.us/support