813-780-0020 City of Zephyrhills Permit Application
Fax-813-780-0021
Building Department
Date Received
Phone Contact for Permittin
Ownees Name Owner Phone Number
Owe nr's Address S,6),) "'O"w'nler Phone Number
Fee Simple Titleholder Name Owner Phone Number
r-------------------------------------------------------------------------------------------
Fee Simple Titleholder Address
I
JOB ADDRESS
LOT #
SUBDIVISION PARCEL 1D#
I . 'I'..- 'PERN TY TAX OTICE)
(Gore-E
WORK PROPOSED NEW CONITR E11] ADDIALT SIGN
INSTALL REPAIR
DEMOLISH
PROPOSED USE SFR COMM OTHER
TYPE OF CONSTRUCTION E=] BLOCK Q FRAME STEEL
DESCRIPTION OF WORK
BUILDINGSIZE SQ FOOTAGE HEIGHT
=BUILDING VALUATION OF TOTAL CONSTRUCTION
=ELECTRICAL r LF AMP SERVICE PROGRESSY W E.C.
33 =-5
PLUMBING $ 7
=MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
=GAS ROOFING E:] SPECIALTY = OTHER
FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO
BUILDER A444""" 4 COMPANY
[:�Y/N �FEECUR�RENY�/N��
SIGNATURE
Address lsr,, N 61 1311e,311 K�0111A rL71V_V_1T1 License #
77
ELECTRICIAN :AE,
COMPANY
SIGNATURE ttrk",, J,�ff;pj)V IC, REGISTERED Y/N FEE CURREN T;N0.....
Address G ti,31 1/ f l 4 Pal License #
'A:'U'4eV_1 PLUMBER COMPANY /016-
SIGNATURE 47,1 REGISTERED Address V` License #
'17u.1
MECHANICAL COMPANY 14 ba
SIGNATURE 1,
-R D Y/N FEE CURREN Y/N
4�1 Dw-
Address license #'
OTHER COMPANY
SIGNATURE REGISTERED FEE CU�RRENY I RI��
Address License #E=__=��
RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Penult for now construction,
Minimum ton (10) working day's after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Slit Fence installed,
Sanitary Facilities & I dumpster, Site Work Permit for subdivisionsAarge projects
COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms, R-O-W Permit for new construction.
Minimum ten (10) working days after submittal date, Required onsito, Construction Plans, Stonawater Plans w/ Silt Fence installed,
Sanitary Facilities & 1 dumpster. Site Work Permit for all now projects. All commercial requirements must meet compliance
SIGN PERMIT Attach (2) sets of Engineered Plans.
—PROPERTY SURVEY required for all NEW construction.
Directions:
Fill out application completely,
Owner & Contractor sign back of application, notarized
It over $2500, a Notice of Commencement is required. (AIC upgrades over $7500)
— Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (copy of contract required)
Retroofs IT shingles Sewers Service Upgrades A/C Fences (Plot/Survey/Footage)
Oriveways-Not over Counter if on public madways-needs ROW
813-780-0020 City of Zephyrhills Permit Application Fax-e 3-7so-ooz1
Building [department
NOTiCE of DEED RESTRICTIONS: The undersigned understands that this permit maybe subject to "deed" restrictions" which maybe more restrictive
than County regulations. The undersigned assumes responsibility for compliance with any applicable dead restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSiBILITIES: If the owner has hired a contractor or contractors to undertake work, they
may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and
contractor may be cited for a misdemeanor violation under state law. If the owner or Intended contractor are uncertain as to what licensing requirements
may apply for the intended work, they are advised to contact the Pasco county Building inspection Division —Licensing Section at 727-847-80o9.
Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractors) sign portions of the "contractor Block" of this
application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not property licensed and is
not entitled to permitting privileges in Pasco county.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or
expansion of existing buildings, as specified in Pasco county Ordinance number W07 and 90-07, as amended. The undersigned also understands, that
such fees, as may be due, will be Identified at the time of permitting. It is further understood that Transportation impact Fees and Resource Recovery
Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final
power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County WateUSewer Impact fees are due, they must be paid prior
to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as n ended), If valuation of work is $2,500.00 or more, I certify that 1, the applicant,
have been provided with a copy of the "Florida Construction Lien Law --Homeowner's Protection Guide" prepared by the Florida Department of
Agriculture and Consumer Affairs. If the applicant is someone other than the "owner, i certify that I have obtained a copy of the above described
document and promise in good faith to deliver it to the 'owner' prior to commencement.
CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with
all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as
indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all
laws regulating construction, County and City codes, zoning regulations, and land development regulations in jurisdiction I also certify that I
understand that the regulations of other government agencies may apply to the intended work, and that if is my responsibility to identify what actions I
must take to be in compliance. Such agencies include but am, not limited to:
- Department of Environmental Protection -Cypress Eayheads, Wetland Areas and Environmentally Sensitive
Lands, Water/Wastewater'Treatment.
- Southwest Florida Water Management District -Wells, Cypress Sayheads, Wetland Areas, Altering
Watercourses.
- Army Corps of Engineers -Seawalls, Docks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental health Unit -Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency -Asbestos abatement.
- Federal Aviation Authority -Runways.
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone "V' unless expressly permitted.
4 If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to Till the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less than one (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to
commencing construction. I understand that a separate permit may be required For electrical work, plumbing, signs, yells, pools, air conditioning, gas, or
other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as
authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall Issuance of a permit prevent the Building Official from
thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become Invalid unless the work
authorized by such permit is commenced within six months of permit issuance, or R work authorized by the permit is suspended or abandoned for a
period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to
exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered
abandoned.
WARNING TO OWNER; YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING ICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
l N 10r
e t ._
Who friars personally known to me or has/have produced lhljitz,isl ar yaerszat lhfw tit rne,or haslhave produced
identification, as identification.
r
Notary Public �� / 4 A �� Notary Public
Commission No...° Commission
Name of Notary typed, printed or stamped blame o No typed, pn or star
=Public ate of FloridaGOa 35879423
4o v A Notary Public state of Florida
Kara Hewlett
orvub�F Expires 07/28t2023 358734
DWhwy Agreement that Vwe haw
..,,.rI *a,���� w xoreaswby
t�ral! 4a� oantt+da� can this purclr�se �r�cssraeane tcesd is ��&r�aE�da��d wd �c�crstatnti try
Sales Tax
rnyfenu uricl d ersl 9gar cusx (n} ireEa ,That n 4rctntarsn Ecf ar ftP b# paid ims full When the
G�ii7�aafB
x
Optional Tax
fiUS-TOTAL Including tax
'!{$.) f'S'i�t9$y and Exclusions, $'$,) �tltatts of$£6r�tage,::aYBd
�3p on at Non -Taxable Options
,*
19.) Dispute Resofution on the reveme side of this agreement.
Year Make _ Size
� N
Model # Bedrooms nl Baths
TMe t.Serial #Color
uyer � ��, Other
1.) Loan on new home closes
.} C.O. issued on new homey
slamt, (Lender)
Equity In owned land lieu of own down payment.
Cash As Agreed payable
...,........_.�.. t in Tr ite-In
�..... ..�,
Buyer is responsible For any a dditlrrnal payoff amount due ab.,,e the
balance due -o on trade-in as stated and any back taxes or fees.
Total Cast Non -Taxable Options
Seller may credit to Buyer any payoff a ' unt that Is less than the amount
CASH PURCHASE PRICE
shown as trade -ire balance due, but only If . � � �a . €
e-lsa Allowance
awed on Et'aCE�^P13,
REMARKS.
1:.... fit, Bal. Due on at'kQi+e-
i Tf3T! CC ITS
ii a€ asla ale pia
�
ISGrlpt94?Yt tSi tll� t1iCt F`�alBl $d �°
11
All Inclusive Permitting, LLC
July 14, 2022
City of Zephyrhills
Attn: Building Department
5335 81- St
Zephyrhills, FL 33542
Please find enclosed the building permit application for a new mobile horq,e,,,,tb
be placed at 37624 Landis Ave, Lot 95.
If anything is needed, please let me know,
0
Thank you,,
"I /
t�o
'aula Rus ton I-/
(352) 566-3006
PO BOX 3184, DUNNE11ON, FL 34430
T(352) 566-3006 1 (352) 566-3029
-MAI
-A-UIN'LLU", j-'IMUMNiw� IAIL
For use on all Mobile and Manufactured Homes, including
HUD approved Homes and Modular Building
Patent #5503500 and other patents pending
GENERAL INSTRUCTIONS-
1, All pads are to be installed flat side down, ribbed side up.
2. The ground under the pads should be leveled as smooth as possible with all vegetation and debris removed. Pads to be placed on evenly
compacted soil, at or below the frost line unless otherwise protected from frost by controlling the temperature and/ or moisture content of the soil
underneath the home.
3. Pier & pad placement will be determined by the manufactured homes' written set-up instructions or any local or state codes.
4. Center blocks on ABS pad and complete pier.
5. The open cells between the ribbing on the upper side of the pads may be filled with soil or sand after installation to prevent any accumulation of
stagnant water in the pads,
6. A pocket penetrometer may be used to determine the unconfined compressive strength of the soil. If no soil testing equipment is available --
use an assumed soil value of 1000 lb& / square foot.
NOTES:
1. All pad sizes shown are nominal dimensions and may vary up to 1/8".
2. The maximum deflection in a single pad is 5/8" measured from the highest point to the lowest point of the top face.
(NOTE: Actual test results were less than 5/8")
3. Pad loads are the same when using single stack or double stack blocks.
4. The maximum load at any intermediate soil value may be interpolated between the next lower and next higher soil values given in the table
below.
5. Any ABS pad configuration may be used to replace a home manufacturer's recommended concrete or wood base pad.
6. Steel Piers.- All pads are tested with steel piers on 1000 PSF soil density unless otherwise noted. If required, attach with
2" #12 x Y2." hex tech screws, Minimum Pier Base 7 1/4". Multi -Pad configurations require a minimum 9 1/4" pier base,
7. Available pads tested on 2000 PSF soil capacity using steel piers are: ID#1055-14, 1055-9,1055-7 and 1055-13.
8. If soil capacities exceed 3000 psf, use the 3000 psf soil values from the table.
9. Any pad may be stacked directly on top of an identical pad. The second pad should also be installed fiat side down. Such a configuration
provides the same allowable load capacity as the single pad.
PAD SIZE ID NO. PAD AREA 1000 PSF 1500 PSF 2000 PSF 2500 PSF 3000 PSF
PAD SIZE ID NOPAD AREA 1000 PSF 1500 PSF 2000 PSF 2500 PSF 3000 PSF
Indicates that Piers are required to be double blocked
EXAMPLE: 16'x 80'section (Alabama only)
PAD SIZE
1000 PSF
2000 PSF
Oval 16" x 18.5"
--TW7-
Oval 17" x 22"
TV
TV
Oval 17.5" x 22.5"
4T"
WO"
Oval 175' x 25.6"
_QYaL21!&22L_
415"
__AT_
8*0"
ESIMIM
Revised 07,01 .2020
1 11 111 I'llilli�I J�li i'1 11111111 11111! 111 Will 11
1H 211"W"'Wimu'"'g, FI
Soil Bearing
Maximum
Ass Pad Types
8" Coll Block
Value
Load
Oval 16" x 18.6" Pad 2.00 Square Feet ID # 1055-23 32"x 18,5'
Single Stack
1000 IN� / sq. ft.
4000 tbs,
Oval 32" x 18,5" Pad Configuration (03) 4,00 Square Feet Pad Configuration
Double Stack
2000 tbs. I sq, ft,
8000 lbs. *
Oval 17" x 22' Pad 2.50 Square Feet to# 1056-16 34'x 22'
Single Stack
1000 lbs, / sq. ft,
6000 lbs,
Oval 34" x 22" Pad Configuration (03) 5.00 Square Feet Pad Configuration
Dpupie Stack
2000 lbs. I sq. ft. i
10000 lbs, *
Oval 17.5'x 25,5" Pad 3-00 Square Feet ID # 1055-17 35"25,5'
Sir gle Stack
1000 lbs, / sq. ft.
6000 tbs.
Oval 35' x 25,6' Pad Configuration (03) 1 6.00 Square Feet Pad Configuration
Double Sta
2000 W& / sq. ft.
12000 tbs, *
*Concrete blocks are only rated at 8000 pounds, 8001 pounds and higher must be double stacked.
�0
STEP 1 - 17" x 22" ABS Pad STEP 2 - (2) 17" x 22" ABS PADS STEP 3 - Complete Assembly
(34" x 22"' Configuration) 34" x 22" Multi -pad Configuration
MEMO
1. General instructions (on reverse) apply to all multi — pad configurations.
2. The 32" x 18.5" pad configuration is formed by using (3) 16" x 18.5" ABS Pads. Place (2) 16" x 18.5" side by side, and place
(1) 16" x 18.5" on top, laid in the opposite direction to the bottom pads,
1 The 34" x 22" pad configuration is formed by using (3) 17" x 22"ABS Pads. Place (2)17" x 22" pads side by side, and
(1) 17" x 22" pad on top. The top pad is laid in the opposite direction as the bottom pads.
4. The 35" x 25.5" pad configuration is formed by using (3) 17.5" x 25.5"ABS Pads. Place (2) 17.5" x 25.5" pads side by side, and
(1) 17.5" x 25.5" pad on top. The top pad is laid in the opposite direction to the bottom pads,
STATE SPECIFIC NOTES:
TEXAS; 17.5" x 22,5" ID #1055-21 and 23.25" x 31.25" ID #1055-20 may not be installed in the State of
Texas. ID#1055-26 may not be used in conjunction with metal piers.
CALIFORNIA: Use an assumed value of 1000 lblsq. ft. unless engineering and calculations are provided.
ALA BAMA - For the State of Alabama all ABS pads shall not have more than 3/8" deflection, See chart on
page one for details on correct installation in Alabama. The 23.25" x 31.25" lD#1 055-20 may
not be installed in the State of Alabama.
I
M
Sep 23, 2020
B28twingunam
zom
L—CJ il
f
ICC-ES Evaluation Report ESR-4552
Reissued April 2020
This report is subject to renewal April 2022,
&wW.1cc:1s.qrS (800)423 .6587 1 (562) 699-0543 A Subsidiary of the International Code CouncP
1
DIVISION: 3100 00—EARTHWORK 2.4 Pads;
Section: 3160 00—Special Foundations and Load
Bearing Elements ABS Pier Pads are used to distribute concentrated loads
from the pier to the area of soil under the pad and are
REPORT HOLDER: intended for use with manufactured housing constructed
under 24 CFR Section 3280 and installed in accordance
OLIVER TECHNOLOGIES, INC. with 24 CFR Section 3285.
OLIVER TECHNOLOGIES ABS PIER PADS
PAD MODELS. 1055-7, 1055-9, 1055-13, 10554 4,
106546,106647,1066-20,1055-21,1055-22, 1055-
23,1055-26.
OLIVER TECHNOLOGIES ABS PIER CAPS. MODEL
NUMBER. OTI CB1 AND OTI CB2
OLIVER TECHNOLOGIES ABS SHIMS MODEL
NUMBER- 2410
1.0 EVALUATION SCOPE
Compliance with the following standard:
HUD Title 24 CFR Part 3285 Model Manufactured Home
Installation Standards
* Section 3285.306
* Section 3285.312
Property evaluated:
Vertical load bearing capacity of ABS Pier Pads, Caps and
Shims when used as part of a foundation system for
manufactured housing.
2.0 USES
2.1 General:
Oliver Technologies, Inc. ABS Pier Pads, Caps and Shims
are used as part of a foundation footing to distribute
concentrated loads from the frame rail of a manufactured
housing unit, through a pier and distribute the load to the
underlying soil,
2.2 Shims-
ABS Shims are used to distribute concentrated loads from
the frame rail of a manufactured housing unit, to the top of
the pier cap.
2.3 Caps,
ABS Pier Caps on top of the CMU pier are used to distribute
concentrated loads from the frame rail of a manufactured
housing unit, to the top of the pier.
3.0 DESCRIPTION
mlnr��
Oliver Technologies, Inc. ABS Pier Pads, Caps and Shims
are injection molded products and are manufactured using
black ABS and PC/ABS materials. Pier Pads are intended
to be used as footings for manufactured housing as
described in 24 CFR Section 3285.312(a)(3). The pad has
one smooth side intended for contact with the soil and one
side with patterns of ribs designed to stiffen the pad and
transfer load from a pier erected on top of the pad to the soil
the pad bears on. See Figure 1 e Pads are available in sizes
as described in Table I. Pad Caps are intended for use on
top of CMU piers for manufactured housing as described in
24 CFR Section 3285.304(b). Pier Caps are 71/4 inches
wide by 141/2 inches long by 11/2 inches tall. See Figure 2.
Shims are intended for use in manufactured housing on top
of CMU piers and pier caps as described in 24 CFR Section
3285,304(c). Shims are wedge-shaped 31/2 inches wide by
6 inches long and 1 inch deep at the thickest end. Shims
have interlocking texture on adjacent faces when installed,
See Figure 3.
3.2 Materials:
Oliver Technologies, Inc. ABS Pier Pads, Caps and Shims
are injection molded parts using ABS and PCIABS materials
complying with the manufacturer's specifications.
4.0 DESIGN AND INSTALLATION
4.1 Design:
The scope of this report is limited to evaluation of ABS Pier
Pads, Caps and Shims for use in manufactured housing unit
foundation systems. Details related to incorporation of the
product beyond that scope are the responsibility of the
registered design professional. See Table I and 2 for ABS
pier pad models and maximum load capacities for single
and double CMU piers. See Table 3 for maximum allowable
loads for pier Gaps and shims. The combinations of use
between caps, shims and pads is limited to the least
capacity found in the design tables and the design is the
responsibility of the registered design professional.
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not spec ifaulty addressed, nor are they to be construed 01 as an endorsement of the subject q('the report or a recommendation for its use. There is no warrant by [CC Evaluation Service, LLC, express or implied, izv 13
to any fending or other matter in this report, or as to any product covered by the report. 03
Copyright 0 2020 ICC Evaluation Service, LLC. All rights reserved.
NEMMM
0 ESR-4552 I Most Widely Accepted and Trusted Pa 2 of
4.2 Installation:
General: Oliver Technologies, Inc. ABS Pier Pads, Caps
and Shims must be fabricated, identified and erected in
accordance with this report, the approved construction
documents and the applicable code. In the event of a
conflict between the manufacturer's published installation
instructions and this report, this report governs. Approved
construction documents must be available at all times on the
jobsite during installation,
4.2.1 Oliver Technologies, Inc. ABS Pier Pads may be
used to provide a manufactured housing unit foundation
footing to distribute concentrated pier loads to the
underlying soil. Pier pads shall be used with the flat side
bearing on the soil and the ribbed side facing up. Pier pads
may be used on soils with unconfined compressive strength
between 1000 and 3000 psf. The soil under the pad must
be flat and level, and all vegetation must be removed from
the area. Pads may be used with single- or double -stack
CMU pier system when the pier is centered on the pad and
the pad orientation is as designated in the manufacturers
installation instructions, Use of pier pads stacked in
combinations is beyond the scope of this report.
4.2.2 Oliver Technologies, Inc. ABS Pier Shims may be
used with or without ABS Caps or code -prescriptive pier
caps. Shims must be used in pairs and must be driven in
tightly so that they do not occupy more than 1 inch of vertical
height in accordance with 24 CFR Section 3285.306.
Opposing ABS Pier Shims may be installed in a range of
configurations, Shims may range between fully interlocking
along the entire length of the opposing shims to no gap
between thinnest ends,
4.2.3 Oliver Technologies, Inc. ABS Pier Caps may be
in acco ance with 2A CFR Section 3285.306 and this
report. The maximum gap between shims when driven
together may not exceed 1 inch and must be used in pairs
5.0 CONDITIONS OF USE
The Oliver Technologies, Inc. ADS Pier Pads, Caps and
Shims described in this report comply with, or are suitable
alternatives to what is specified in, those codes listed in
Section 1.0 of this report, subject to the following conditions:
5.1 Product is produced and labeled in a manufacturing
location identified in this report under a quality control
program with inspections by ICC-Es.
5.2 Installation must comply with this report, the
manufacturer's installation instructions and the
approved construction documents.
53 The design pier load may not exceed the lesser of
the Pier Pad capacity, the unconfined compressive
strength of the soil, or the pier capacity.
5.4 The design pier load must not exceed the capacity of
the Pier Cap when used, The design pier load must not
exceed the Pier Cap capacity. Where required by the
authority having jurisdiction, manufactured housing
unit structures using Pier Caps must be designed by a
registered design professional to ensure allowable
loads are not exceeded. Pier Caps are designed for
use on 8-inch square end regular CMU blocks. Pier
Caps used on single block piers must be centered over
the top block with the entire perimeter bearing on the
block. Pier Caps used on double stacked blocks must
span the joint between the blocks and the perimeter
must be bearing on the blocks.
&5 The design pier load must not exceed the capacity of
the Pier Shim when used independently. The design
pier load must not exceed the lesser of the Pier Shim
capacity or Pier Pad Cap capacity when used together.
Where required by the authority having jurisdiction,
manufactured housing unit structures using Pier Shims
to fill the gaps between a pier and the frame must be
designed by a registered design professional to ensure
allowable loads are not exceeded. Pier Shims must be
used in pairs, fully supported along the bottom surface
by the pier. Total height of the gap filled by a Pier Shim
set must not exceed 1 -inch.
5.6 ABS Pier Pads, Caps and Shims, when installed, must
be shielded from direct exposure to UV light.
5.7 ABS Pier Pads are rated for the loads listed in Tables
I and 2 for use on soils having unconfined
compressive strength from 1000 psf to 3000 psf,
Actual soil bearing strength must be verified at the
depth of installation.
5.8 Pier and Pier Pad spacing is the responsibility of the
registered design professional and must be specified
in the written set-up instructions provided by the
housing manufacturer.
5.9 In freezing climates, the footing pad must be installed
below the frost line or be otherwise protected from the
effects of frost heave as permitted in 24 CFR Section
3285.
5.10 ABS Footing Pads, Pier Caps and Shims must not be
used to resist lateral or uplift loads.
5.11 ABS Footing Pads, Pier Caps and Shims have not
been evaluated for resisting or transmitting seismic
loads
5.12 ABS Footing Pads, Pier Caps and Shims must not be
field modified.
6.0 EVIDENCE SUBMITTED
6.1 Quality control manual.
6.2 Report of structural load tests.
7.0 IDENTIFICATION
7.1 Each eligible product or bundle of product shall be
permanently marked to provide the following
information:
7.1.1 LTA's Certification No. OVTO30316-72 or NER-1016
or ICC-ES ESR-4552.
7.1.2 Manufacturing Facility.
7.1.3 Production Lot/Batch information required for
traceability to plant quality control records.
7.2 The report holder's contact information is the following:
OLIVER TECHNOLOGIES, INCORPORATED
467 AN AVENUE
HOHENWALD, TENNESSEE 38462
ESR-4552 I Most Widely Accepters and Trusted Page 3 of 4
Maximum Pier
Load (Ibf)
Dimensions
Soil Unconfined
Compressive
Stren
th(psi)
Model
(in. x in.)
12ier "type
1000r4170A
00
2000
3000
1055-7
20 x 20
Single CMU
2780A5560A
8000c
1055-9
18.5 x 18.5
Single CMU
2380A570A
4760A
7090°1055-13
24 x 24
Single CMU
4000A000A
8000A
8000c
1055-14
16 x 16
Single CMU
1780A
670A
3560A
5340A
1055-16
17 x 22
Single CMU
2500A
37504
5000A
7500A
1055-17
17.5 x 25.5
Single CMU
3000A
4500A
6000A
8000c
1055-20
23.25 x 31,25
Single CMU
4650A
687011
6870E
72308
1055-21
17.5 x 22.5
Single CMU
2650A
3975A
5300A
7950A
1055-22
21 x 29
Single CMU
4020A
6030A
8000c
80000
1055-23
16 x 18
Single CMU
2010A
3015A
4020A
6030A
1055-26
24 x 24
Single CMU
4000A
6000A
6270E
627011
For SI: 1 inch = 25.4 men; 1 psf = 47.9 Rllm2,
AAllowable load is limited by area of the pad on the rated unconfined compression strength soil,
BAllowable load is limited by the pad capacity with a safety factor of 2.5.
cAllowable load is limited by the CMU pier.
TABLE 2—ABS PIER PAD MODELS AND MAXIMUM LOAD CAPACITY WITH DOUBLE CMU PIER
Maximum Pier Load (Ibf)
Dimensions
Soil Unconfined
Compressive Strehgth(psf)
Model
(in, x in.)
pier Type
1000
1500 2000
3000
1055-7
20 x 20
Double CMU
2780A
4170A 5560A
8340A
1055-9
18.5 x 18.5
Double CMU
2380A
3570A 4760A
709011
1055-13
24 x 24
Double CMU
4000A
6000A 8000A
11„96013
1055-14
16 x 16
Double CMU
1780A
2670A 3560A
5340A
105 -16
17 x 22
Double CMU
2500A
3750A 5000A
7500A
1055-17
17.5 x 25.5
Double CMU
3000A
4500A 6000A
9000A
1055-20
23.25 x 31.25
Double CMU
4650A
68708 9300A
13950A
1055-21
17.5 x 22.5
Double CMU
2650A
3975A 5300A
7950A
1055-22
21 x 9
Double CMU
4020A
6030A 8040A
12060A
1055-23
16 x 18
Double CMU
2010A
3015A 4020A
6030A
1055-26
24 x 24
Double CMU
4000A
6000A 8000A
12000.
For SI: 1 inch = 25.4 mm; 1 pet = 47.9 Ntm2,
AAllowable load is limited by area of the pad on the rated unconfined compression strength soil,
sAllowable load is limited by the pad capacity with a safety factor of 2.5.
cAllowable load is limited by the CMU pier.
'CABLE S PIER CAP AND SEAMS DESIGN LOAD CAPACITYA
For SI: 1 IV = 4A5 K
Mote: Maximum Component Load does not consider combination with Fier bads.
AAII Design Loads based can a Safety Factor of 2.5. All loads were applied to caps and shims wing a 2.69-inch-wide member, simulating an
M10 Frame.
"Design Loads limited by Shim capacity
c Limited by CMU pier capacity
I ESR-4552 I Most Widely Accepted and Trusted Page 4 of 4
FIGURE I —TYPICAL PIER PAD (17.5 INCH X 22>5 INCH), RIB SIDE UP, LABELING EMBOSSED IN PART
_ Ilk r� Ir �T
H Iit t I11 Nk tIt R
FIGURE "COP AND BOTTOM OF PIER HI
Date Permitted .
Builder Name/Owner Name _ P � � ��
5dereontrol #
County Parcel No.
SubDiv,
k
1
Address/Location-
Classification/Type
of use r
TRANSPORTATION IMPACT FEE Rate:
,r
Sq. Ft Unit: C
Exempt 0Yes El No How Determined
Impact Fee Amount Zone No.
Tom:
R
t
SCHOOL IMPACT FEE
Account (056) Single -Family Detached House Amount $
(057) Mobile Home
(058) Other Residential
Z
(123) Collection Fee
Exempt Yes No How Determined.
7,
PARKS AND RECREATION FEE
Land Account Land Credit Land Total
Recreation Account Recreation Credit
Recreation Total
x
Zone
Total Amount $� ,
Exempt =Yes No How Determined
LIBRARY FEE
Land Account Land Credit
Land Total
�
Facility Account Facility Credit _
Facility Total
aw
Exempt Yes No How Determined
Total Amount
RESOURCE FEE
FRU
"
Total Amount
Prepared By Checked By
NO CERTIFI TE DP O CUPANY WILL RE ISSUED DR FINAL INSPECTION
PERFORMED UNTIL THE TOTAL AMOUNTS LISTED HAVE
BEEN PAID AND REC IPTED FOR BY A CENTRAL PERMITTING'OFFICE OF PASCO COUNTY
ACKNOWLEDGEMENT BELOW DOES NOT IMPLY ACCEPTANCE OF CONCURRENCE, BUT SIMPLY REECEIPT OF A COPY OF THIS
FORM, PLACING THE BUILDING OWNER ON NOTICE OF THIS ASSESSMENT AND
THE CONDITIONS OF PAYMENT FOR SAME,
DATE
RECEIVED BY
RECEIPT NO DATE
BY