Loading...
HomeMy WebLinkAbout22-51725335 Eighik Street Zephyrhills, FL 33542 Phone: (813) 780-0020 Fax: (813) 780-0021 Issue Date: 11/08/2022 REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. 2301��� Complete Plans, Specifications add fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. zz CANT SIGNATURE PEVMITOFFICE J T- V PERMIT ES IN 6 MONTHS WITHOUT APPROVED INSPECTION ,1111111111111111 J1111 ip 0 1) *I i I.• 813- -0020 City of Zophyrhills Permit Application Fax-813-780-0021 Building Department Date Received 11 /72022 Phone Contact far Permitting 813-304-9090 9 1 1 1 / 1 1 1 1 1 I I I Owner's Name DAVID CARRERAS Owner Phone Number 8132677479 Owner's Address 3184 KRESTERBROOKE LN ZEPHYRHILLS, FL 33540 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number y Fee Simple Titleholder Address JOB ADDRESS 3184 KRESi ERBROC)KE LN ZEPNYRNiLLS, FL 33540 LOT# 82 SUBDIVISION HI®DEN RIVER PARCEL ID# 24-26-21-0100-00000-0820 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED e NEW CONSTR L.�I ADD/ALT [ q� SIGN DEMOLISH INSTALL REPAIR PROPOSED USE SFR COMM OTHER TYPE OF CONSTRUCTION BLOCK tJ FRAME STEEL DESCRIPTION OF WORK Installation of roof -mounted photo -voltaic system. BUILDING SIZE SQ FOOTAGE HEIGHT x BUILDING $ 61 248 VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL- AMP SERVICE PROGRESS ENERGY W.R.E.C. =PLUMBING $ t� =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION A t GAS ROOFING SPECIALTY ice'' OTHER , FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO ' BUILDER SIGNATURE Address ELECTRICIAN SIGNATURE Address PLUMBER SIGNATURE Address MECHANICAL SIGNATURE Address OTHER SIGNATURE Address IlIIIII RESIDENTIAL e COMPANY REGISTERED - COMPANY REGISTERED 997 MORRISON DR STE 200 CHARLESTON, SC 29403 COMPANY REGISTERED COMPANY REGISTERED COMPANY REGISTERED �CURREI Y l N ;;�FE. License # E::��� Palmetto Y / NSolar LLC FEE I Y License #ECi 3QQ9095 ��� Y/ N FEE CURREN Y I N License # Y ( N FEE CURREI License # Y ! N FEE cuRREP< Y ! N License # i l I l l l l l l l l l l l l l l l l l l l l l l l l l Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O�W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projects Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w! Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. AN commercial requirements must meet compliance Attach (2) sets of Engineered Plans. -PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) > Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-7 2° City of Zephyrhills Permit Application Fax-813-7 21 Building Department NOTICE of DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive than County regulations, The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBIL17TES: if the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor Is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. if the owner or intended contractor are uncertain as to what Licensing requirements may apply for the Intended work, they are advised to contact the Pasco County Building Inspection Diuision—ii tatg Section at 727-84T8009. - Furthermore, if the owner has hired a contractor or contractors, he ie advised to have the torts) sign portions of or 8101 this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not property licarcard and is not entitled to permitting privileges in Pasco County. TRANSPORTA71ON IMPACTAITILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned erstands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specifier( In Pasco County Ordinance number 89.07 and 90.07, as amended, The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. it is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer impact fees are due, they must be paid prior to permit issuance in accordance* with applicable Pasco County ordinances, CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as arnendledy it valuation of work is $2,500.00 or more, i certify that I, the applicant, have been provided with a copy of theFlorkar Construction Lim Protection Gut " prepared by the Florida Deperanant of Agriculture and Consumer Affeks. If the applicant is someone other that the , I caddy that I have obtaineda copy of the above described document and promise in good faith to deriver it to the "owner" prior to cow merit, CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work wilt be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection -Cypress Elayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. Southwest Florida Water management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses, Army Corps of Engineers -Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks, US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways, I understand that the following restrictions apply to the use of fill. - Use of fill is not allowed in Flood Zone `Xr unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone °"A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stern wall. If fill material is to be used in any area, I certify that use of such fill will not: adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth In this affidavit prior to commencing construction, I understand that a separate permit may be required for electrical work, plumbing, signs, welts, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall Issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit Is suspended or abandoned for a period of six (6) mouths after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. a " it * tl TO t 0 "R OR AGENT CONTRACTOR WNE c _SWC-uoiathEbmmtosamrrecis r- nreii? Y�.{ Notary Public tdo_npajMeNnrds0Cco.sb INSTR# 202223260 OR BK PG Page 1 of 1 10/28/2022 10:44AM Rept:25IB248 Rec:10.00 DS:0,00 IT:0.00 Nikki AlvarexSowtes, Esq,, Pasco County Clerk & Comptroller Permit State of FLORIDA Parcel ID No 2A-26-21-0100-00000-0820 County of PASCO THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following Information is provided In this Notice of Commencement: 1 Description of Property: Parcel Identification No. 24-26-21-0100-00000-0820 Street Address: 3184 KRESTERBROOKE LANE, ZEPHYRHILLS, FL 33S40 2. General Description of Improvement HIDDEN RIVER PHASE ONE B PB 76 PG 077 LOT 82 INSTALLATION OF ROOF MOUNTED PHOTO VOLTAIC SYSTEM 3, Owner Information or Lessee information lithe Lessee contracted for the improvement: CARRERAS DAVID 3184 KR& RBROOKE LN ZEPHYRHILLS, FL 33540 Address CRY State Interest in Property: OWNER Name of Fee Simple Titleholder N/A (if different from Owner listed above) Address CRv State 4, Contractor_ PN^u+=TToso�aa�.c 1505 KING SXT, STE 200 N. CHARLESTON Sc Address City State Contractor's Telephone No.: 855-339-1831 N/A 5. Surety Address Amount of Bond: S 8, Lender: N/A Name Lender's Telephone No.: CRY Telephone No.: CRY State State 7. Persons within the State of Florida designated by the owner upon whom notices or other documents may be served as provided by Section713.13(1)(a)(7 III ridaStatutes: Aaaress Telephone Number of Designated Person: 8. In addition to himself, the owner designates N/A Site of to receive a copy ofthe Lienor's Notice as provided in Section 713.13(1)(b), Florida Statutes. Telephone Number of Person or Entity Designated by Owner: 9. Expiration date of Notice of Commencement (the expiration date may not be before the completion N construction and final payment to the contractor, but will be one year from the date of recording unless a different date is specified): IA WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE .DOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under penalty of perjury, I declare that I have react the foregoing notice of commencement and that the facts stated therein are true to the best of my knowledge and belief STATE OF FLORIDA COUNTY OF IX�A'l3r(itX Miami PATY064 :r Signature of Owner or Lessee, or Owner's or Lessee's Authorized OfficerlDirectorfPannertManag er OWNER Signatory's TRlefOffrce The foregoing instrument was ackngwted ed before me this 25th October 22 David Carreras day of , 20 _, by as Kner (type of authority, e.g., officer, trustee, attorney in fact) for N/A (name dy on behalf of whom instrument was executed). Personally Known [] OR Produced Identification EV Notary Signature DRIVER LICENSE Type of Identification Produced Name (Print) Jose G batlo __......_._.. Notarized online using audio -video communication WW"',$ „y�S`f" pose catuear. o y, }, war x Pvbk sr ce t Nro fa dry, mm ewrces wpd ata/bes/n oticecommen cement_pe053048 October 4, 2022 RE: Project Address: Design Criteria: [0114,121111• Applicable Codes = 2020 FLBC/FLEBC 7th Edition, 2020 FLRC 7th Edition, 2018 IEBC/IBC, ASCE 7-16 and 2018 NDS Risk Category = 11 Wind Speed = 150 mph, Exposure Category C, Partially/Fully Enclosed Method Ground Snow Load 0 psf Roof 1 & 2: Roof DL 7 psf, Roof LUSL = 20 psf (Non-PV), Roof LUSL = 0 psf (PV) Roof 3 & 4: Roof DL = 7 psf, Roof LUSL = 19 psf (Non-PV), Roof LUSL = 0 psf (PV) To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Existing roof structural framing has been reviewed for additional loading due to installation of Solar PV System on the roof. The structural review applies to the sections of roof that is directly supporting the Solar PV System. Based on this evaluation, I certify that the alteration to the existing structure by installation of the Solar PV System meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, the Solar PV System assembly (including attachment hardware) has been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed the requirements set forth by the referenced codes. Installer shall verify existing roof framing (including connection) is in suitable condition and does not exhibit any signs of structural damage or deficiency. Installer verification of the mounting planes noted above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report. Sincerely, I I I I I I / I// I Z 040", � O �0 3270 DAfi1J1y,ignA%S, S. M. Mehdi-**"M. Mdhdi Zomoro to D 022.1 Zomorodian- 0 %TATE OF iQ1_ d 40RID1." NlAk-� This item has been electronically signed and sealed by Mehdi Zomorodian, SERE. on the date and/or time stamp shown using a digital signature. Printed copies of this document are not considered signed and sealed and the signature must be verified by a 3rd Party Certificate Authority on any electronic copy. Barun Corp 1 Design and Engineering 1610.202,4506 1 chftk@baruncorp.corn I mvw,baruncorP,corn 118 Urnits of Scope jj,,L)r - — AT L91, tsqg! u, existin s structr',Ts.� hos beer) reviewed based on the ossumption that it has beer, original"y designed and const"ricteiiI peY 0opropriate i,oules. Pre structorch crotlesis of the subiect property is bused on the Prowded site Survey dwta, The calctulutwins prodoced for this ,strucfti.re's ossessroeirt are onlY-for the rooffi-ritirrag supporting the Prc-Posed P'Vivstaflotion referenced tra the Starr npedplunset and were rnad e ocroal i ng ,a generavy recognized shrucairal anislosis stanv(oro.s and arocedures, All PV rrioduiez, mcking and attocll�enent components shal/ be desigried and instufledper n7unufacturet's approved guidehoes and s1pecifications, Tfwse plani isre not storripedfo! 3N ater leakage or exisring fja , rotiy,� to olie structural component that was not occessed during tne she sutvey,Pri0r, to conunencet-nent Of I wol"k, the P`stotear inz, lifer should vwify that the ecei ting roof and connect�(Xo; are if -,suet oble condiflon and/ inspectfrarning of on the 1 10 ter trficotion letter ond in' jorrn the Engineer csf Record of any discre.pancies prio,r to instehlrhorn. The installer shoudd also, check for otry dwinages such os water OT'Omagp, CrGoked firwining -,it inforn, - of Record of xisting defii6encies which ore uoitnoi - etc, ai the Engineer onsiX,or were not observable during the If I rrie of survey and have not been included �n this s--sere ctf work, Any change in the scope r)f the work show, not be accepted unless sucf? change', addition, or deletionis qpsiroved in advance and in writing be he Ennir, ted, , eerefecor - Barun Corp, 1 Design and Engineering � 610,202-4506 - chrisk@bawncorp.rcorn, 1 \AAvv,!.b@r�,,ncorp.com 2/8 Existing Roofing Material Weight Composite, Shingle Roof, Jl Layer(s) = 2.50 psf Underlayment Weight = 0.50 psf Plywood/OSB Sheathing Weight = 1.50 psf Framing Weight = 0.73 psf No Vaulted Ceiling = 0.00 psf Miscellaneous = 1.50 psf Total Roof 0sad Load... R-E3L= fi.70 psf. Roof Live Load Lo = 20.0-0 psf Member Tributary Area At < 200 ft' Roof 1 & 2 Pitch 18' or 4/12 Tributary Area Reduction Factor RI = 1.00 Roof Slope Reduction Factor R2 = 1.00 Reduced Roof Live Load, Lr = Lo (RI) (R2) Lr = 20.00 osf Ground Snow Load pg= 0.00 psf Effective Roof Slope 18, Snow Importance Factor Is = 1.00 Snow Exposure Factor Ce = 1.00 Snow Thermal Factor Ct = 1.10 Minimum Flat Roof Snow Load pf-min = 0.00 psf Flat Roof Snow Load Pf = 0.00 psf Roof Slope Factor Cs -roof = 100 cloped Roof Snow Load on Roof Slope Factor Barun Corp I Design and Engineering 1610,202,4506 1 chrisk@baruncorp,com 1 i+VvAvv.baruncorp,corn 3/8 Roof Dead Load (DL) = Roof Live Load (Lr) = Roof Snow Load (SL) = (DL + Lr)/Cd = (DL + SQ/Cd = Maximum Gravity Load = 630 I I ON Load Increase (%) =-49.54%�UK psf psf psf psf psf Dsf Barun Corp 1 Design and Engineering 1610,202,4506 1 chrisk@barui-�corp.com 1 vvvvvv baruncorp,corn 4/8 NOTF� * Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC #7: 0.6DL + 0.6WL is used, Barun Corp 1 Design and Engineering 1610,202,4506 1 chrisk Ca.,baruncorp com i wwwbari-Incorp,com, 5/8 !PV Panels Weight - - ------- Hardware Assembly Weight 2.50 ps 0,50 ps, E• y. V ��Ianels W—eight 01119'"NUM Existing Roofing Material III Weight 01 2,50 psf Underlayment Weight 0.50 psf Plywood/OSB Sheathing Weight 150 psf :Framing Weight I = 0.73 psf No Vaulted Ceiling = 0.00 psf Miscellaneous = 1.50 psf ota oo iea Loa• Roof Live Load Lo = 20.00 psf Member Tributary Area At < 200 ft' Roof 3 & 4 Pitch 23' or 5/12 Tributary Area Reduction Factor RI = 1.00 Roof Slope Reduction Factor R2 = 0.95 Reduced Roof Live Load, Lr = Lo (111) (112) Lr = 19.00 psf Ground Snow Load pg = 0.00 psf Effective Roof Slope 23' Snow Importance Factor Is= 1.00 Snow Exposure Factor Ce = 1.00 Snow Thermal Factor Ct = 110 Minimum Flat Roof Snow Load pf-min = 0.00 psf Flat Roof Snow Load Pf = 0.00 psf MW Slone Factor Roof Slope Factor Cs-PV = 0.78 Sloped KOOT SnOW Load on PV Panels Barun Corp 1 Design and Engineering 1610,202,4506 3 cchnsk@barumcorlp com 6/8 m9ra".1"IM11711101 Roof Live Load (Lr) Psf Psf Psf IN ME K Load Increase N --47,589,,, 0 Barun Corp i Design, and Engineeringj 610,202,4506 1 chrn;k@baruncorp.com I mrmv,baruncorp,corr, 7/8 NOTE� - Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC #7: 0.6DL + 0,6WL is used. Barun Corr) 1 Design and Engineering 1 6,10,202A506 chrisk@bare nl corn I ovp,,v.baruncorp,com 8/8 October 4, 2022 RE: Project Address: Design Criteria: - Applicable Codes = 2020 FLBC/FLEBC 7th Edition, 2020 FLRC 7th Edition, 2018 IEBC/IBC, ASCE 7-16 and 2018 NDS - Risk Category = 11 - Wind Speed = 150 mph, Exposure Category C, Partially/Fully Enclosed Method - Ground Snow Load = 0 psf - Roof 1 & 2: Roof DIL = 7 psf, Roof LUSL = 20 psf (Non-PV), Roof LUSL = 0 psf (PV) - Roof 3 & 4: Roof DIL = 7 psf, Roof LUSL = 19 psf (Non-PV), Roof LUSL = 0 psf (PV) To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Existing roof structural framing has been reviewed for additional loading due to installation of Solar PV System on the roof. The structural review applies to the sections of roof that is directly supporting the Solar PV System. Based on this evaluation, I certify that the alteration to the existing structure by installation of the Solar PV System meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, the Solar PV System assembly (including attachment hardware) has been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed the requirements set forth by the referenced codes. Installer shall verify existing roof framing (including connection) is in suitable condition and does not exhibit any signs of structural damage or deficiency. Installer verification of the mounting planes noted above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report. Sincerely, 1 0 E Nj' #tily ,gj� 9; 93270 S. S. M. Mehd :" M. WWI ZomoM Da,L:�OZ Zomorodia OF 0 - 4 0 R.I.D SIONM- This item has been electronically signed and sealed by Mehdi Zomorodian, SERE, on the date and/or time stamp shown using a digital signature. Printed copies of this document are not considered signed and sealed and the signature must be verified by a 3rd Party Certificate Authority on any electronic copy, Barun Corp I Design and Engineering 1 610.20Z4506 j chnsk@baruncorp com 1 AmAmbaruncorp com 1/8 Ths, exiS,ung structure has been review ea' based on the assurnistian thot, it has beer, orofinafly designed end constroVed per oppioptirste odes- Fhe strocturol analysts q cubJect Propertil is based or, the orcri,"'deo' site sul-vey bran, The calculations producedfor this Sr,"!,'Cotre I S Ccoo'SSment me ool by v m ,for the roofframrig supporting the proposed PV installation referenced it, theStoped plonseand were t r0ade according to generally reco'grozed structural 000ltrsis standards ond procedures, All PV modules, racking and ottachment comPor,ents sho,11 be designed and �nshslled per rrianufacuirer's approved ipuidelines; and specificaVons, these pians ate nor stompedfor rvorer leakolle or existing darnage to the structural cornponent that mas not accessed during the site survey,Pnor to commencen-tent (sf work, the PI/system, iotaller should verify that the existing roqfond connections ore in stntable condition and inspect frorriiu�g noterf on the cert7ricatirsn letter and iqforrn the Engineer of Record of tiny discrepancies prico to installation, 7-he installer should olso chock for Guy domoges such as wistre damage, cracked firarning, etc, ano' inform the Eng' ;neer of Record of existing deficiencies which are unknown Onctlot were not observable during the time cf survey and have not been included in this scope o ' f work. Any change in the scope f,:>f the work sha/I not beaccepted unless ctrch change, addition, o� deletion is approved in advance and in otfiting by the Engineer ofRecofo. Barun Corp I Design and Engineering 1610,202,4506 1 chrisk@baruncorp,coo Ivoiest,barUncorp.com 2/8 MWIMAM116A Existing Roofing Material Weight Composite Shingle Roof 1 Layer(s) = 2.50 psf Underlayment Weight = 0.50 psf Plywood/OSB Sheathing Weight = 1.50 psf Framing Weight = 0.73 psf No Vaulted Ceiling = 0.00 psf Miscellaneous = 1.50 psf Total Roof Dead Load R-DL = 6.70 psf Roof Live Load Lo = 20.00 psf Member Tributary Area At < 200 ft2 Roof 1 & 2 Pitch 18' or 4/12 Tributary Area Reduction Factor R1= 1.00 Roof Slope Reduction Factor R2 = 1.00 Reduced Roof Live Load, Lr = Lo (RI) (112) Lr = 20.00 psf Ground Snow Load pg = 0.00 psf Effective Roof Slope 18, Snow Importance Factor Is = 1.00 Snow Exposure Factor Ce = 1.00 Snow Thermal Factor Ct = 1.10 Minimum Flat Roof Snow Load pf-min = 0.00 psf I Flat Roof Snow Load I Pf = 0.00 psf I Barun CorLIP 1 Design and Engineering j 6 10,202,4506 1 chnsk@taruncorp cor-n I vvww barUncorp,mm 3/8 Roof Dead Load (DL) = Roof Live Load (Lr) = Roof Snow Load (SL) = (DL + Lr)/Cd (DL + SL)/Cd Maximum Gravity Load 9,70 R , , W 1 0 gig INI , . IN I MEMO I WE I I. � I 'I'll, 21.36 Psf Psf osf Psf PSf PSf Barun Corp I Design and Engineering 1610,202,4506 j " chdsk@,�,barLj'I(, .Op Corll I vvlvw. baruncorp,com 4/8 Psf Psf osf Psf PSf PSf Barun Corp I Design and Engineering 1610,202,4506 j " chdsk@,�,barLj'I(, .Op Corll I vvlvw. baruncorp,com 4/8 NOM - Wind calculation is based on ASCE 7-16, 29.4 - C&C, LC #7; 0.61DL + 0.6WIL is used, BaWn Corp 1 Design and Engineering i 610,202A506 i chrisk@banuncorp.com 1 mvvv,baruncorp.(,,.on) 5/8 &WWAMOMAW14"' Existing Roofing Material Weight Composite Shingle Roof 2.50 psf Underlayment Weight = 0.50 psf Plywood/OSB Sheathing Weight = 1.50 psf Framing Weight = 0.73 psf No Vaulted Ceiling = 0.00 psf Miscellaneous -koo- = 1.50 psf T otal Dead Load R-DL 6.70 psf i Roof Live Load Lo = 20.00 psf Member Tributary Area At< 200 ft' Roof 3 & 4 Pitch 23' or 5/12 Tributary Area Reduction Factor RI = 1.00 Roof Slope Reduction Factor R2 = 0.95 Reduced Roof Live Load® Lr = Lo (111) (112) Lr = 19.00 psf Ground Snow Load pg = 0.00 psf Effective Roof Slope 23' Snow Importance Factor Is= 1.00 Snow Exposure Factor Ce = 1.00 Snow Thermal Factor Ct = 1.10 .Minimum Flat Roof Snow Load pf-min = 0.00 psf Flat Roof Snow Load Pf = 0.00 psf Raof Slope Factor Cs -roof = 1.00 Sloped Roof Snow Load on Roof ps-roof = 0.00 psf BaIrUn Corp I Design and Engineer ng 610,202 4506 1 chrisk@'D baruncofp,com I w,,",%v.banuncorp.COrT1 6/8 Roof Dead Load (DL) = Roof Live Load (Lr) = Roof Snow Load (SL) = MI, Psf Psf Psf Load Increase (%) =1 -47,58% JOK 7 8, BcIrUn Corp 1 Design and Engineering 1610,202,4506 1 chrisk@barUncorrp,com Psf Psf Psf Load Increase (%) =1 -47,58% JOK 7 8, BcIrUn Corp 1 Design and Engineering 1610,202,4506 1 chrisk@barUncorrp,com NOM o Wind calculation is based on ASCE 7-16, 29.4 - CRC, LC #7: 0,60L + 0,6WIL is used. Ban Corp 1 Design and Engineering 1 6,10,202A506 1 ch(isk@)baruncorp. corn 1 Avvv,,,baruncorp.com 81/8