Loading...
HomeMy WebLinkAbout22-5222 (2)it of Zephyrhill s 5335 Eighth Street Zephyrhills, FL 33542 ELCMISC-005222-2022 Phone: (813) 780-0020 Fax: (813) 780-0021 Issue Date: 11/15/2022 yfflivilmoi- - !IMMU12 1011 .......... entities such as water management, state agencies or federal agencies. 1111MIF111111111 1!111! 1711 MOM= accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. ONTRACP70-!RTIS9�IGUR PE IT OFFICEV PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION ra I i! MU 2 "0"01 Jj 76 North Meadowbrook Drive Alpine, UTf4004 office (201) 874-3483 swysaling@w0mali/gconoult/og.00m Re: Engineering Services Smith Residence 38763 Vulcan Circle, Zephyrhills, FL 8. 100 kW System ToWhom |t May Concern: 1 Site visit documentation identifying attic information including size and spacing of fram�agw for the existing roof structure. 2, Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. Roof Framing: Assumed ^oncenter. All truss members are constructed orzx4dimensional lumber. Roof Material: Composite Asphalt Shingles Roof 14degreea Attic Access: Inaccessible Foundation: Permanent Dead Load ° Live Load =20po (reducble)—Opsfatlocations ofsolar panels • Ground Snow Load =Opaf • Wind Load based onASCE7-18 o Ultimate Wind Speed = 140 mph (based on Risk Category ii) Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the FBC 2020 (71h Edition) including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly, Based on the above evaluation, this office certifies that with the racking and mounting specified, the existin* roof system will adequately support the additional loading imposed by the solar system. This evaluation is ir. conformance with the FBC 2020 (Th Edition), current industry standards, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to V"SLING CO CONSULTMG