HomeMy WebLinkAbout22-5222 (2)it of Zephyrhill s
5335 Eighth Street
Zephyrhills, FL 33542
ELCMISC-005222-2022
Phone: (813) 780-0020
Fax: (813) 780-0021
Issue Date: 11/15/2022
yfflivilmoi- - !IMMU12
1011
..........
entities such as water management, state agencies or federal agencies.
1111MIF111111111 1!111! 1711
MOM=
accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O.
NO OCCUPANCY BEFORE C.O.
ONTRACP70-!RTIS9�IGUR PE IT OFFICEV
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
ra I i! MU
2 "0"01 Jj
76 North Meadowbrook Drive
Alpine, UTf4004
office (201) 874-3483
swysaling@w0mali/gconoult/og.00m
Re: Engineering Services
Smith Residence
38763 Vulcan Circle, Zephyrhills, FL
8. 100 kW System
ToWhom |t May Concern:
1 Site visit documentation identifying attic information including size and spacing of fram�agw
for the existing roof structure.
2, Design drawings of the proposed system including a site plan, roof plan and connection
details for the solar panels. This information will be utilized for approval and construction
of the proposed system.
Roof Framing:
Assumed ^oncenter. All truss members
are constructed orzx4dimensional lumber.
Roof Material:
Composite Asphalt Shingles
Roof
14degreea
Attic Access:
Inaccessible
Foundation:
Permanent
Dead Load
° Live Load =20po (reducble)—Opsfatlocations ofsolar panels
• Ground Snow Load =Opaf
• Wind Load based onASCE7-18
o Ultimate Wind Speed = 140 mph (based on Risk Category ii)
Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance
with the FBC 2020 (71h Edition) including provisions allowing existing structures to not require
strengthening if the new loads do not exceed existing design loads by 105% for gravity elements
and 110% for seismic elements. This analysis indicates that the existing framing will support the
additional panel loading without damage, if installed correctly,
Based on the above evaluation, this office certifies that with the racking and mounting specified, the existin*
roof system will adequately support the additional loading imposed by the solar system. This evaluation is ir.
conformance with the FBC 2020 (Th Edition), current industry standards, and is based on information supplied
to us at the time of this report.
Should you have any questions regarding the above or if you require further information do not hesitate to
V"SLING
CO
CONSULTMG