Loading...
HomeMy WebLinkAbout23-6277I Name: DAVID &KAREN MARSHALL Address: 162 Commodore Ln GALAX, VA 24333 lllff�,, INSTALLATION PARK MODEL 13 X 37.4 Mobile Home/Park Model/RV Setup Fee Mobile Home - Mechanical Fee it of Zephyrhills Ellla 10.1001" 5335 Eighth Street Zephyrhills, FL 33542 PRKMDL-006277-2023 Phone: (813) 780-0020 Fax: (813) 780-0021 Issue Date: 06/13/2023 Permit Type: Park Model Class of Work: Park Model Building Valuation: $107,390.00 Electrical Valuation: $1.00 Plumbing Valuation: $1 00 Total Valuation: $109,792.00 Total Fees: $200.00 Amount Paid: $200.00 *2te Paid: 6/13/2023 8:45:06AM Contractor: ITIME inARTET-T-&7VRY"---A'1 & SET UP INC Im REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. 14tice: It 244ifia,* to tWe reioruire-rteits of be additional restrictions aDDlicable to this DroDertv that vr� 710W accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.6. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE PE IT 6FFicEf) PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIOR CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Fax-8113-780-0021 ;Z -) '7 Building Department Date Received Phone Contact for Permitting Owner's Name WOO 00 X4ftW1N,#,4ex_ Owner Phone Number Owner's Address Owner Phone Number Fee Simple Titleholder Name r Owner Phone Number Fee Simple Titleholder Address I JOB ADDRESS ra—.94v 4.hegr LOT # �W44441W9F 0 SUBDIVISION le' 0 __+-WPARCEL ID# 0400— V4::;'1VV (OBTAINED FROM PROPERTY TAX NO "CE) WORK PROPOSED NEW CONSTR ADD/ALT L J 12 INST REPAIR SIGN 0 DEMOLISH PROPOSED USE OTHER E_ TYPE OF CONSTRUCTION BLOCK FRAME BLOCK FRAME EL STEEL STE DESCRIPTION OF WORK WW A410 A�,& 9 AxAC -,Akoe�i, S BUILDING SIZE I /-V'f)C QFOOTAGE[� HEIGHTE2e� kxv k*-W kkw. CqL1Lx4LAL4L�kk4L4Lk BUILDING I& I it XIL t1xkCkk4L1Lx4L1Lk�L I VALUATION OF TOTAL CONSTRUCTION 0 f E:?]ELECTRICAL D AMP SERVICE �' PROGRESS ENERGY W.R.E.C. EZIPLUMBING EnMECHANICAL 1$ VALUATION OF MECHANICAL INSTALLATION Et� =GAS 0 ROOFING SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS I FLOOD ZONE AREA DYES NO BUILDER COMPANY I'Mkile Awllfey _111W.Sewle SIGNATURE REGISTERED Y N FEE CURREN Y N Address License # ELECTRICIAN _-� OMPANY j 4#40W.9 4ttFEE CURREN� 10EGISTERED L YN SIGNATURE -aft7;F 'Vf'xJ;W#V Srr Address License # PLUMBER COMPANY 1x1" ~Vol IM"MRAW Iwo SIGNATURE REGISTERED LCaN_j FEE CURREN Address L.6 •gar I License # MECHANICAL COMPANY 1C"_A':66S Ay- WA11C A';f e011,91ii47A0i1 0-, —11 C SIGNATURE REGISTERED /N FEE CURREN Y N Address License # OTHER COMPANY SIGNATURE REGISTERED LYIN -FEE CURREN =:� Address License if RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & I clumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW Construction. Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (AIC upgrades over $7500) — Agent (for the Contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (Plot/Survey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-180-0020 City of Zephyi Permit Application Fax-813-780-0021 Building Department NOTICE F DEED RESTRICTIONS: The undersigned understands that this permit maybe subject to "deed" restrictions" which maybe more restrictive I than Coun y regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICEN ED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be re uired to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractorimay be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply1for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the 'contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitlerI to permitting privileges in Pasco County, TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transoortation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance, Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law —Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner, I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the "owner' prior to commencement, CONTRACTORISIOWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regul ring construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understan that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take a be in compliance. Such agencies include but are not limited to: Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Be heads, Weiland Areas, Altering loy Watercourses. Army Corps of Engineers -Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways. I understandI that the following restrictions apply to the use of fill: 1 Use of fill is not allowed in Flood Zone W" unless expressly permitted. If the fill material is to be used in Flood Zone "A', it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other insU Ilations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorizer by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of,, ix (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed nioety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered WARM G TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYIN TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING, CONSULT FLORIDA JURAT (F.S. 11 T03) r P OWN IR AGe9FFiCONTRACTOR4/_L, ?PIZ 2r Subscribed before t is .be firmed b wth' and swoni (or at and sworn � (or affirmed) by 20YAAWIV- by W o is/a rsorwilyk ow t me or has/have produced &WAV. e 0 W ynally known t In /have produced WW��� identification. as identification. as L) vr/s �T/`Notary Public Notary Public Commission No, Commission No. N—ameof r0arry typed, printed or —stamped —Name —of—Notarytyped, printed or -stamped ELAINE J MORRIS Notary Public - State Of Florida AX ELAINE J MORRIS Notary Public - State of Florida Commission # HH 346934 40,* Commission # HH 346934 MY Comm. Expires Mar 11, 2Q27Qr c RMy Comm. Expires Mar 11, 2027 Bonded through National Notary Assn. Bonded through National Notary Assn, INSTR#2023089730OR BK PG2972 Page 1 of 1 05/18/2023 10:19 AM Rcpt: 2584835 Rec: 10.00 DS: 0.00 IT: 0,00 Nikki ALy — sli so �4ldniy jerk 8cSop taller Permit No Parcel ID No ' rev ('� ✓ ti — NOTICE OF COMMENCEMENT State of � s4 County of E.i THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement �ry 1 Description of Property Parcel identificabon No. - 2 General Description of Improvement information if the Lessee contracted for the improvement Address City State `r X Interest in Property /f Name of - Simple Titleholderr 4 Contractor Contractors Telephone No 13 5 Surety Name Address lam/ City State Amount of Band $ _ 104 Telephone No iP 6 lender Name 6 /4 AA I Address City State Lender's Telephone No 7 Persons wittim the State of Florida designated by the owner upon whom notices or other documents may be served as provided by Section 713.13(1)(a)(7), Florida Statutes" of Name / e off - - —.. .. --- --- — Address _ _ Cdy State Telephone Number of Designated Person 8 In addition to himself, the owner designates Iyliq of _ to receive a copy of the 1-tenors No ce� provided in Section 713 13(1)(b), Rondo Statutes To]ephono Number of Parson or Entity Designated by Owner IYI 9 Expiration date of Notice of Commencement (the expiration date may not be before the completion of construction and final payment to the contractor, but will be one year from the date of recording unless a different date is specified) ✓�,(� WARNING TO OWNER. ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713 13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT Under penalty of perjury, I declare that i have read the foregoing notice of commencement and that the facts stated therein are true to the best of my knowledge and belief STATE OF FLORIDA" PASC c - COUNTY OF PASCO Si n�awre of Owner or L©s ""'or Owner's or Lessee's Authorized Off r irec or artner/Manager aa',/e signatory's TiillefOtfice / 7 ®"' The foregoing instrument was acknowledged before me this ay of 4-� 20Z by as r ,�(typo of authority, e g , officer, trustee, attorney in fact) for (name o on behalf of whom instrument was executed) r Personally Known n Oft roducad identif :<� Notary Signature � r Type of Identification Produced Name (Print) EM E J MORRISc - State of Floridaon k HH 346934pires Mar 11, 2027tional Notary Assn wpdata/ /notioecommencement_pc053W �State Of FlIorida, COUntY Of Pasco �sb �n• This is to certify that the foregoing is a r true and correct copY of the document ` = pn filcl or of public record in this office. W' css mY ildni rrti +ffir io6 seat this y of & Comptroller Nik4 �. P` ,Go oty; �l y. ..__.. A-DePutY Clerk ti I a I T�EVIEVV DAT CITY OF ZEP PLAN EXAMH R, H VLY Wl I'H 77L PREV, -HNI" NXTIONAL ELECTRIC CODE, AND THE',CITY OF ZEPfAYRHlU-,5 ORDINANCES 1 Acc� 7,-11" 20'—l' *Pxft \ offiff— BEEIRM LMNG RWM E 3LAND 0 z IWCHEN NO Dwrs below STACK W4PANTRr /BFY L-----PR/A *Std TV TV 37'-4" Model: 2641 SITE BE411- - - - - - - - - - -- --it ff fl If ff - FLONA QNLY (& PIER POINT LAYOUT (PIERS 0 1-SEAM & CENTERLINE WITHOUT PERIMETER FOUNDATION) ----------------- - 0_r-j 1-10-1 7_G# 770-# PIER POINT LAYOU L�xAq2lm_wy_p=- = �`w SEE INSTALLATION MANUAL SEE INSTALLATION MANUAL SEE INSTALLATION MANUAL TABLE 6 , FIG. 10 TABLE 5 , FIG, 9 TABLE 5 , FIG. 9 & 10 THIS DOCUMENT IS SUBJECT TO CHANGE IMTI-IOUT NOTICE OR OBLIGATION. FOR PROPER SETUP AND SITE INSTALLATION REFER TO THE INSTALLATION MANUAL, 2) ALL ASPECTS OF THE FOUNDATION CONSTRUCTION ARE PERFORMED ON -SITE AND ARE SUBJECT TO THE REQUIREMENT'S OF THE LOCAL AUTHORITY HAVING JURISDICTION, 3) THE PIER SPACING SHOWN IS SUGGESTIVE ONLY. THE ACTUAL PIER SPACING, AND FOOTING SIZE IS TO BE DETERMINED BASED ON *THE ACTUAL SITE CONDITIONS, ROOF LIVE LOAD ZONE AND SOIL BEARING CAPACITY, REFER TO THE INSTALLAION MANUAL FOR FURTHER DETAILS. MAXIMUM PIER SPACING AT MAIN BEAMS IS TO 10'-W o,c. STATE OR LOCAL INSTALLATIONS REQUIREMENTS MAY BE MORE STRfNGENT,,r-------*R 261-91-1 V-1 T2 4-0 1 _12TO-1 25-1 29-2'-i 77-0# lyzewmwo NO Transoms �t�k o/of 1211/2018 TOAll! Steel Telescoping Lateral Arm Manufacturers FROM: 1,`vayne, Jordan, 01)erationt, Services Manager, Man ufactured,Housing Secticir Honda Department of High Safety and Motor Vehicles I A DATE: AUPUst 6, 2018 SUBJECT: Elimination of Requirement for Supplemental Frame Ties and Stabilizer Platc-, at Ail Stec, I elescoping Lateral Arm Locations I he Department has reviewed some concerns expressed by several of the steel telescoping late ,a; arm manufacturers regarding the Department's requirement to install supplemental frame tie,. Jabilizer pli)tw, on the steel telescoping lateral arm systems. it an abondarice of caution, the Department required supplemental frame ties /stabilizer plate, tit ,-,ach lateral arry-i location in June of 2002. After researching data from m storm reports, the Departnwn-, ha,s found no evidence of the need for these supplemental frame ties/stabilizer plates. With thr, 111formation ir, mind, the Department will discontinue the requirement for the supplemental fraw- plates at each lateral arm location, 'V'aflufacttirer s who wish to change their installation instructions to remove this requirement, rntv,t 1,4!,t ongmeering report showing, the whole house Test without the use Of 'IUPPt t'MvfII,I ranle tiub/stabilizer plates. Upon receipt and review of the engineering report, the Depprtmerit wdl wmnve the requirement for supplemental frame ties/stabilizer plates. Each manufacturer will h(- 110tified w;tt)ir) two weeks of receipt of the engineering report. These reports must be sent to wiv ,jTtfmtI(,-,n at 5701 East Hillsborough Ave, Suite 2228, Tampa, Florida 33610. if the need arises. in the future, the Department may impose additional requirements to the � I eie%(opmg lateral arm systems with a change to Florida Administrative Code Buie 15C 1, :r K R� u, or a , ? � S, . to i d -41 121112018 ` ` |7 ^orSwan Ave oHohenwald, Twsn4o2 (800)284-7437ww~.o!i*u,nschno|ogiesznmFax (y3/)79a'uu�� � ENGINEERS STAMP ENGINEERS STAMP1. SPECIAL CIRCUMSTANCES: if the following conditions occur - STOP! Contact Oliver Technologies at 7-800-284-7437: , �*' , 1=10 4 �o�em����appmv�kmghu�ina!�bei��|��r��erDigmmAmBTn eedeoresqoae ube()|ngh om te ' diagram for appropriate pier height atsupport location orcut and drill 1.5" squaretubetoacbieveappnopdate(ength . , " PIER l 5O PIER HEIGHT 1.25" l.SO � <40"Min. - 450yWax.> Tube Length Tube Length ana.nia(.s*z)mv|e (4U°Min. - 60"kAaxj Tube Length Diagram A 5. Install (2) of the 1,50" square tubes (E 0 8"tubel ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment, 0.Place I-beam connector (Rloosely mnthe bottom flange ofthe I-beam. 7(ForUiagram&|nsta|�dmn)8ideth�se\�ctedl.25"tubeU�intoal.5O"tube(Banda1tachto�beammmnnectors(Randfasten|oose|y ' h h selected �e (E)tmthe �beamconnectors (F)and fasten loosely with bolts w�thbo|tan�nut�(For0�gmmBinst�Uation)���c the �e � u s and nuts. 8Repeat steps 8through 7tucreate the ^V"pa�ernufthe squaetubes loosely inplace. 9'Using standard hand tools tighten all nuts and bolts. (For Diagram Ainstallation only, secure l.25"and l.58^tubes using fbur(4)1 /4"-14x3/4"self-tapping screws inpre-drilled hu|esJ ^ar Swan Ave * Hohenwald, TIN 38462 * (Vnn) 284-7437 * wwv^nxvr,techno|ng/rsznm ° Fax (oan 796-881 1 - OLIVER TECHNOLOGIES, INC. FLORIDA INSTALLATION INSTRUCTIONS FOR THE MODEL I 101 "V" SERIE!j ALL STEEL FOUNDATION SYSTEM MODEL 11n1"V"(Steps 1-14) LONGITUDINAL ONLY: Follow Steps 1'g LATERAL ONLY: Follow Steps 1-3 and Stepsno-n* ENGINEERS STAMP FOR CONCRETE APPLICATIONS: Follow Steps l5-18 ENGINEERS SIAMP SPECIAL CIRCUMSTANCES: If the fo!lowingconditiomcccur-STOP! Contact Oliver Technologies at7-800-284-7437: a) Pier height exceeds 40^ dRoof eaves exceed l0^ e)Location iswithin l5UOfeet nfcoast b)|engtholhome exceeds 7d' d)SidceaUheight exceed 9b^ INSTALLATION _OF GROUND PAN Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C), Place ground pan (C) directly below chassis I-beam. Press or drive pan firmly into soil until flush orbelow soil then install pier per manufacturer's instructions orper Florida Regs. 'PECIAL NOTE: The longitudinal "V" brace system may also serve as a pier under the home and should be loaded as any othei pici- |tisnecommendedthatafte,|eve|ingpieo'aodpne-th\od|nch(l/3'')befoehomeis|uvvenedcomp|ete|ynn,opico'comp|cte »�eps4through9below then remove jacks. Model IlV1 L~V") 1110TE;WHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUMOF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED� SOIL TEST PROBE SHOULI-) «-- USEDTooETEnM/wsCOnnECTTvPEQp*mC*onpERSO|L[LaSS|p|CxnOw.|FPxO8GTESTnGxD|wGSxnEaETvvssm1r5marsxsFOoTxmCoonwt`n aEUSED, |rPROBE TEST READINGS ARE BETWEEN 27a& 35uA*FOOT ANCHOR MAY 8EUSED. USE GROUND ANCHORS WITH DIAGONAL rIFS "Vwo STAB 0ZEnPLATES EVERY 5nr.vEKn[xLnESARE ALSO REQUIRED ONHOMES SUPPLIED WITH vEKO[ALT|ECONNECTION POINTS (PER FLORIDA, n[/�./ Choose one of the approved longitudinal tube installations; either Diagram A or B. Then select the correct square tube (E) lencith diag,amfor appropriate pier height atSupport location orcut and drill 1j^square tube toachieve appropriate length. 140'Min.- 45'Max.) Tube Length Tube Length (40' Min. - 60' Max.) Tube Lp;ngilr o:aaramA Install (2) of the 1 .50" square tubes (E) into the "U" bracket (J), insert carriage bolt and leave nut loose for final aCfjUStrr1ent. 6.Place |'beamconnector (F) loosely onthe bottom flange ofthe I-beam. (For Diagram A installation) Slide the selected 1.25" tube (E) into a 1 .50" tube (E) and attach to I-beam connectors (F) and fast en !-ot)uk, "r|dhbo|1and nut. (For Diagram Dinstallation) Attach the selected 1.5^tubes (E)tnthe I-beam connectors (F) and fasten loosely ^"i\h[�r|;` and nuts. 3�Repea steps bthmugh7oocreate the "V'pattern cfthe Square tubes loosely in place. 9, Using standard hand tools tighten all nuts and bolts, (For Diagram A installation only, secure 1 .25" and 1 .50" tubes using four(4) 1 /4"-14 x 3/4" self -tapping screws in pre -drilled holes.) THE MODEL 11o1 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATESTHE NEED FOR STABILIZER PLATES & FRAMETIES. NOTE: THE USE OFTH|SSYSTEM REQUIRES VERTICAL TIES SPACED AT5'4"� FOUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPTWHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. Install ,cmaningvertical tie -down straps and zrgruundanchors per home manufacturer's instructions. NDT�Conted�eanchnm mbes�edaccording tosoUtorque condhiun,Any manu�cture�sspec�cetonsfor s�cwaUand`cv�adsinex/os�nf4`0UO|hs� ,eqviven5'mnchorper Florida Code, ,i 'e{ectthe correct Square tube brace (H)length for set-up lateral transverse atsupport location. The lengths come ineither On'". �I^lengths. (With the l]O"tube as the bottom tube, and the l.25^tube asthe inserted tube.) I install the 1.50 tra nsverse -brace (H) to the ground pan connector (D) with bolt and nut. Slide 1.25" transverse brac6 into the 1.50" brace and attach to adjacent I-beam connector I I with bolt and nut. 14. Secure 1.50" transverse arm to 1.25" transverse arrn using four (4) 1 /4" - 14 x 3/4" self -tapping screws in.pre-drilled holes. ' ---�� *arSwan Ave xnxonw^m.Tw»o4az (800)284'7437e wvvw.onve,zechnn|ogies.cpmFax <9a1>r9o'no1` INSTALLATION USING CONCRETE RUNNER FOOTER |5�xconcrete mnner, footermstab may be used inplace of the steel ground pan, a>The concrete shall beminimum 2500psi mix b) A concrete runner may be either longitudinal or transverse, and must be a minh-num of 8" deep with a minirnurn width of 16 inches longitudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see bekml). c) Footers must have minimum surface area of44lsq. in. (i�. 21"squane)'and must beaminimum of8^deep. d) (fafull slab isused, the depth must bea4^minimum . Special inspection of the system bracket installation isnot required. Footrj-, must allow for atleast 4"from the concrete bolt to the edge ofthe concrete. NOTE: The bottom ofall footings, pads, slabs and runners must beper local jurisdiction. 16� When usIng Part# I 101-W-CPCA (wetset) simply install the bracket in runner/footer OR When installing in cured concrete Use Part# \O1'D-[P[A(dryset}.The llUT(dryse0[Abracket |sattached tothe concrete using (2)5/8^ Yconcretrwedgebults(Simpsonp*,�» Jl6Z300H5/8''X3''orPowers equiva|ent).Place the LAbracket indesired location. Mark bolt hole locations, then usingaS/8''Uia'ne',e' masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of the holes. Place wedge bolts into drille hu|es'thenpbcel|Ul(dryset)[8bmcketontowedgebo|tsandstartwedgebo}tnuts.Takeahanumerandhght|ydrivethewedgebo|ts down byhitting the nut (making sure not tohit the top ofthreads unbolt) --Lop qf concrete. Cornp|etebytightening nuts- 17, For wet set (part # I 10 1 -W-TACA) installation simply install the anchor bolt into runner/footer. For dry set installation (part V 1101'D-:-1 A["\ mark bolt hole locations, then using a5/8^diam.masonry bit. drill ahole toaminimum depth of3" Make sure all dust and concrete i�; blown out ofthe hole. Place wedge bolts (Simpson part #576230OH5/8^X3^orPowers equivalent) into (D) concrete dry tranneoe connector and into drilled hole. If needed, take a hammer and lightly drive the wedge bolts down by hitting the nut (making SUre noV to hit thelopofthreads onbo|d'then remove the nut 18.When using part#llQ1[VVV(wetset)orl101[VD(dgoet)'install per steps l7&l8. mutes, l.UENGTH OFHOUSE US THE ACTUAL BOX SIZE 2.[-�'=LOCATION OFTRANSVERSE BRACING ONLY 3 LOCATION OFLONGITUDINAL BRACING ONLY 4.TRANSVERSE AND LONGITUDINAL LOCATIONS ALL WIDTHS AND LENGTHS U9TO5Z ALL WIDTHS AND LENGTHS OVER 52'nJ8O^ HOMES WITH 5/1lROOF PITCH REQUIRE: PER FLORIDA REGULATIONS 6 systems for home lengths up to 52'and 8 systems for homes over 52'and up 80'. PATEmToO634150&OTH[RPATENT PENDING KevisiooO8/79/11 �11W f 467 Swan Ave 9 Hohenwald, TN 38462 • (800) 284-7437 www,olivertechnotogies,com Fax (931) 796-8811 ASSEMBLY (1 AND 1 25" TU TUBE F "V" BRACE 14" CONNFCTOR " V-W.R&LQc psmuflm• F'r# mmmmmml��� Em P PATENT# 6634150 & OTHER PATENT PENDING Page z 7 o^Pan xa~.erw H -Transverse Arm C -Ground Pan I -Transverse Arm, I-Bearn Connector / Cement Block / ommv / o=x �j "-Concrete Connector c'Concrete o rooter it v"''nrv^ x-Transverse Arm Part ,nwIN ,*`- omxm« l�moamv Bolts Florida approved 4'groundanchors may beused inall locations except where home manufacturers specifications for sidewoU straps are inexcess cf4,0O0|bs.The»ylocations require a5'anrhur.Per Florida code. [= GROUND PAN /CONCRETE FOOTERDRRUNNER D = GROUND PAN CONCRETE U BRACKETS TRANSVERSE CONNECTOR (connects with grade 5 - 1/2"x 21" 1/2"carriage bolt and i1t.10 E=TELESCOPING VBRACE TUBE ASSEMBLY (1.5^TUBE BOTTOM AND 1 .25^TUBE INSERT) OR1.5~TUBE p=~x~BRACE |-BEAKxCONNECTOR ASSEMBLY H=TGLESCOP|N6TRANSVERSE ARM ASSEMBLY TRAkISVERSE ARM I -BEAM CONNECTOR (connects with grade 5 -1/2"x 2" 1/2"carriage bolt and nut) /=vPAN BRACKET (connects with grade 5-1/2^xZ^l/2^ca,,\ogebolt and nut) /-Tmnmersexnn I-BeamCon n-rransvemexnn /Top (12sl ' nvunm0.5l Q Pan Transverse Connector / Concrete Transverse Bracket p-"rarare]-aeam :"/^nmmA,m nm~oww-C,m~°0",­ `~ � ` C GrOuo",^" /Concrete r==r, ' �—an '----� ' / an C�uncmtrvBracket � s'"Vrara/ervuc(/.5l P/TENT# 663416O&OTHER PATENT PENDING Revision QIU/2_3�1_' ammm Installation Instructions for ABS Pads For use on all Mobile and Manufactured Homes, including HUD approved Home's and Modular Building GENERAL INSTRUCTIONS: Patent #55()3500 and other patents pending 1 ; All f.),adswe 10 be installed IL -It Side down, ribbed side up, i 11c, ground unit erthe Paris S11F)"Id be leveled as smooth as Possible with all vegetation removed. Pads to be Placed on fully cF)njpa,­jrjj Undisturbed soil, at or below the frost -line or otherwise protected from the effects of frost. Refer to NCSBCS/ANSI A225 1 j Pad Spacing will be determined by the manufactured homes' written set -LIP instructions or any local or state codes 'fit open cells between the fibbing on the upper side of the pads may be filled with soil or sand after installation to prevent any oil ,agnant water in the pads. 5 A Pocket penetrometer may be used to determine the actual soil bearing value. If no Sort testing equipment is available -use an assiinneci sa,t ' value Of 1000 lbs, I Square foot, 6 All pad sizes shown are nominal dimensions and may vary up to 1/8". [he Maximum deflection in a single pad is 5/8" measured from the highest point to the lowest point of the top face (NOIE Actual test results were less than 5/8'") PR(I leads are 1110 same when using single stack or double Stack blocks. !,he Inaxinlunt load at any intermediate soil value may be determined as the average of the next lower and next higher so,[ vz)jtjt� kat)Wbelow Iv. If bee home- n1anufacturer shows soil densitte n flit- ob niamial s greater than 3000 lbs. When using ABS pads, do not exceed 3000 lbs, sort pier spacings ptq',,: PAD SIZE Oval 16" X i 8_r), 'Oval 17' X 22" Oval 17,5x Oval 17.5" X 25.5- )Val I I x 29" Oval ID NO. 1055-23/AIT-06-100C 1001 1055-22/AIT-06-1003 1 FIA it--ii-6iiA PAD SIZE ID NO. Squ@re,16x 16" 1 055-14/AIT-06-100,5 4 (rare .5 185' 10554 Scioare 20' x 90' 1055-71A17- Square 24" Y 24" 1065-131AIT-0 Concrete blocks are required to be double blocked.- , � D AREA A_ 1000PSFSOI 2000 PSF SOIL 288 sifin. S. 4000 lbs, 360 s in, 2500 lbs. 5000 lbs. s 2667 lbs, . �660 lb& S• 000,14s�tit 576 Sq. in. SC, S 8000 lbs, IM 4694 lbs. _91 Ibs. PAD AREA- 1000 PSF SOIL 2000 PSF SOIL 1785 lbs, 3560 lb 1 - 7;j'7 ri 50 Itis, ,7 tbs. 4000 1b �& 8000 Ibs. - 3000 PSF SOI 6100,0111Iles . 7500 lbs, aoo lbs-, 900 lbs. 12000 lbs 3000 PSF SOIL 5 3 33 1 b 7100 lbs. 0250 ibs Ib5 Any ABS pact configuration may be Used to replace a home manufacturer's recommended concrete or wood base pad I" ALABAMA ONLY: The 23,25- x 31-25' ID91055-20 may not be installed in the State of Alabama. [-'OF the State ol'Alabama all A13S Pacts Shall not have more than 3/8- deflection, See chart below for details on COTrOr;t inslallation ... Alabajvi:a EXAMPLE: '16'x 80'section {Alabama I PAD SIZE 1000 PSF on YJ 2000 PSF Oval 16" X, '18 5" 24" Val 11 22 5161, Oval, —17-5--k' Ovall7_5'x,1_5a Oval 2l" x 29" il-'It " ',9 veiftavhvi (4J9a Sq- lu Pm M Ckalwi SPUX BotbmReceivcrW/*8X *WaWgratOffAccew Skirdug vVer 36" Ff must bave e $crew w oc vatmg smd W OC W/belt r2d P=dtobeArX24'Ifib- V AmPzdfhwAl=wu= to prevent Wwout 3a 5T m Phone Stock #: Date: WINTER HAVEN R.V. 24691 Hwy, 27 LAKE WALES, FLORIDA 33859 (863) 439-7576 - Fax (863) 439-6844 Buyer Name: (Last) IZ4 (First) (Middle) Co -Buyer Name: (Last) (First) klAiddle) Address: e_t �IilTi I State: Be nty: Zip: Ef��-Buyer DOB: Co -Buyer DOB: H4'Mj&� 3 Buyer D.L. #: Co -Buyer D,L, #: Buyers insurance Cc PLEASE ENTER MY ORDER FOR Demo El Lienholder Address YEAR Ac_ COL11;R4Z INTERIOR 41e�� EXP. DATE STATE _N1_1LEAdE__ —EFE—LIVERED ON OR ABOU T 100_1_h�;o Buyer Email: OF VEHICLE Co -Buyer Ernai DEALER INSTALLED OPTIONS 2 As TOTAL REGISTRATION TAX L SS TRADE-IN ALLOWANCE (-) PLATE FEE TRADE DIFFERENCE TRADE-IN DATA PUBLIC SAFETY VEHICLE FEE YEAR MAKE MODEL BODY TRANSFER TAX MOTOR VEHICLE SALES TAX VIN TITLErFRANSFER FEE LI NAME STATE/DEPUTY FILING FEE SERVICE CONTRACT ADDRESS LIEN RECORDING FEE MAINTENANCE CONTRACT LICENSE LICENSE ESP, PLATE # STATE DATE WHEELAGE TAX OTHER STATE & LOCAL SALES TAXES MILEAGE TRANSMISSION NOW TRANSIT TAX DOES YOUR TRADE-IN HAVE A BRANDED TITLE OR INSURANCE SALVAGE HISTORY? YES NO 0Z M/ e;e-* DOCUMENT M INISTR ADMINISTRATION FEE a3THE POLLUTION CONTROL EQUIPMENT ON YOUR YES j No J OPTIONAL ELECTRONIC OPTIONAL EL TRADE-IN INTACT AND IN OPERATING CONDITION? RANSFER FEE T TR Dealees Disclaimer of Warranty TOTAL LICENSE & FEES Unless the vehicle is sold with a separate written dealer warranty or the SUBTOTAL dealer enters into a service contract with the buyer, the vehicle is sold "AS IS", Dealer expressly disclaims all warranties, either express or LESS AMOUNT SUBMITTED WITH ORDER Implied, including the implied warranties of merchantability and fitness for a particular purpose, The entire risk of the quality and performance PLUS BALANCE OWING TO LEINHOLDER ON TRADE IN of the vehicle is with the buyer. Important- A manufacturer warranty may apply, The front and back of this CONTRACT comprise the entire CONTRACT affecting this purchase, The DEALER will not recognize any verbal agreement, or any otter agreement or understanding of any nature, You certify that you are 18 years of age or older and acknowledge receiving a copy of this contract. The terms of this CONTRACT were agreed upon and the CONTRACT signed in the IMPORTANT: THIS MAY BE A BINDING CONTRACT dealership on the date noted at top of this form. AND YOU MAY LOSE ANY DEPOSITS IF YOU DO NOT PERFO!!1CCORDING TO ITS TERMS. NOTICE OF SALESPERSON'S LIMITED AUTHORITY. This contract is not valid unless signed and accepted by Sales Manager or icer of Dealership (DX Accepted (9) _ �C � V hLe t � a Buys,, Sipature A,ceplmg Tems Qf CoWwl 11NO I mff 116%01r- I W# 1j IN %J UM E)r\ 1 W%j &.or rk'n I mr*jw rage I of #4/14/2021 11:05 AM Rcpt: 2287109 Rec: 18.50 DS: 273.00 IT: O00 Nikki Alvarez-Sowles, EPasco County Clerk & Comptroller Prepared by and return to: Jeanne M. Burger., For Meridian Title Company, Inc. ;A?-_V-*dUA*V culao Dade City, FL 33525 352-567-1241 File Number: 21-03-71JB SALES PRICE: $39,000.00 [Space Above This Line For Recording Data] This Warranty Deed made this 12th day of April, 2021 between Hubert Toney and Rita S. Toney, husband and wife, Individually and as Trustees of the Toney Family Living Trust dated May 18, 1993, and any amendments thereto whose post office address is 309 Kaitlyn Lane, Kings Mountain, NC 28086, Grantor, and David W. Marshall and Karen N. Marshall, husband and wife whose post office address is 162 Commodore Ln, Galax, VA 24333-5631, Grantee: (Whenever used herein the terms "grantor" and "grantee" include all the parties to this instrument and the heirs, legal representatives, and assigns of individuals, and the successors and assigns of corporations, trusts and trustees) Witnesseth, that said grantor, for and in consideration of the sum of'rEN AND NO/100 DOLLARS ($10.00) and other good and valuable considerations to said grantor in hand paid by said grantee, the receipt whereof is hereby acknowledged, has granted, bargained, and sold to the said grantee, and grantee's heirs and assigns forever, the following described land, situate, lying and being in Pasco County, Florida to -wit: 14 fig 11qQ W11A 1014 M, W FTV . w. N O� Parcel Identification Number: 24-26-21-0060-00000-1670 Together with all the tenements, hereditaments and appurtenances thereto belonging or in anywise appertaining. To Have and to Hold, the same in fee simple forever. And the grantor hereby covenants with said grantee that the grantor is lawfully seized of said land in fee simple; that the grantor has good right and lawful authority to sell and convey said land; that the grantor hereby fully warrants the title to said land and will defend the same against the lawful claims of all persons whomsoever; and that said land is free of all encumbrances, except taxes accruing subsequent to December 31, 2020, zoning and/or restrictions imposed by governmental authority, and easements, restrictions and reservations of record, if any, however this reference shall not serve to reimpose same. rel-W71—am In Witness Whereof, grantor has hereunto set grantor's hand and sea] the day and year first above written. Signed, sealed and delivered in our presence: Al k�6 Witness4l Sign: Print Witness #1 Name "C\ Witness #2 Sign: Print Witness #2 Nam,\\�(-�\"( State of NortWarolina Court Toney Family Lijing T ust dated May 18,1993 and an T I ndlm nts tt reto Hu e L oneyjlndigdual �d as Co -Trustee Rita .-Toney, Itidivivally )nd as 6"Trustee The foregoing instrument was acknowledged before me by means of [X] physical presence or [j online, notarization, this C� day of April, 2021 by Hubert Toney and Rita S. Toney, husband and wife Individually and as Trustees of the Toney Family Living Trust dated May 18, 1993, and any amendments thereto, who [�are personally known or have produced as identification, V [Notary Seal] Notary P ic Printed Name: My Commission Expiies: X I Var, arty Deed - Page 2 DoubleTime" -egend Street (Labels) -- Parcel (Lines) Subdivision 13 (Boundaries and Labels) Parcels (Clickable Info) Blocks (Boundaries and Labels) Lot (Labels) Lot (Lines) 4/17/2023, 1:54:21 PM M"To !150 ii u2avltilj� mm I ] HIM= You must display the green permit and city building permit (if applicable) so that it can be viewed from the street prior to starting any project. _,2� fn Name- Project # -dA9L Lot r Address 4Z_ Q You have been approved for your lot improvement request by the Board of r. Mw�&,P,rs. Please be sure t notes or changes with this approval. if any of the boxes are checked below, you need to address these issues before proceeding with your project or when your project is completed. . y City building permit: Always check with the city to see if a permit is necessary. 0 Call DIG (811) if you are doing any ground work. Provide lot improvement committee with a copy of the city permit and drawings. When the project is completed, ou must return the green permit sheet inal inspection. if there are any changes in your plans, a change for must be submitted before-- ---"', you can continue your project. If you have any questions or concerns about your project, please contact the lot improvement committee or the Board of Directors. Procedure for Lot Improvement Requests (Please refer to the "Rules and Regulations") Permit No-Z All lot improvement requests must be submitted no later than Wednesday by 2:00 to be processed on the following committee meeting day. I All requests are to be submitted in the Emerald pointe office or Chairman of the Lot Improvement Committee. The Chairman or committee member will review the request, visit the site if necessary t#- clarify improvements and will present it to the Lot Improvement Committee for their review on a weekly basis. 2.Anyrequest which is NOT filled out properly, will be returned to the applicant without an action being taken. 2.Afterthe Committee has recommended approval ordenial ofthe request, itvviUbepresented1o0heBnardof Directors for their approval or denial , Board will meet once a week for the lot improvement applications. 4Thenewill baNOone day approvals orlast minute approvals. Request may take 7to14days for appropriate review and consideration, ( if necessary) thus giving the Committee and Board members time to review and consider the request inathorough manner. 53he original request will be dated and signed as approved or denied, and after being copied the original will go into to the members file and the copy returned to the Lot owner by the Board of Director liaison or the Chairman ofthe committee. 63he committee will follow up on requests to determine that the request as presented and approved is being adhered to. 7.Any permit will be ACCEPTED FOR APPROVAL between October 15 and March 31 of each year, however, each owner must understand and know there must beenough members mf the Committee toreview and recommend tothe Board for their approval. 8Any changes made on a previously approved project must be resubmitted before beginning the changes. Amended permit will beissued atthe time mfapproval. 9,lt is recommended that property owners of major improvements or new construction projects request an appointment with the lot improvement committee to review plans and answer any questions that may arise. 10. All aDDlications submitted must have locations of their citv/ well water shutoffs. As the owner of Lot # J 46 7 1 understand the Lot Improvement Committee and/or the Board of on the Lot Improvement Request. OF ZEPHYRHILLS, PASCO COUNTY, OR STATE OF FLORIDA CURRENT BUILDING CODES.All 2ermits must be posted visible to the street. -r-/ All lot improvement requests must be submitted no later than Wednesday by 2:00 to be processed on the following committee meeting day. All permits must be posted visible to the street. Date Recd 4/ / /I/ el !2 LOT IMPROVEMENT REQUEST Permit No,13/ To: EPPOA Lot Improvement Committee & Board of Directors From 5 Lot#/Address: W(0-1) 31 (pact kl Ws J1 335,40 14 Phone number where you can be reached: 4. r�2 V.,,o We request ZPPOA approval for construction, addition to our installation, on the following: Shed ( )Lanai ( )RV Port XPark Model ( ) Cottage ( )Concrete Slab ( ) Pavers Concrete Painting ( ) RV Skirting ( ) Landscaping ( )Pet enclosure ( ) other All requests for construction/additions/remadeling are required to have a complete, detailed/sketch, to include footprint, setbacks, front elevation, back elevation, left & righ side elevation and top elevation. All elevations must include all sizes and locations of windows and doors, with length, width and height of the overall structure. Park models are to include pamphlet with pictures. In addition, all requests require and must include the full description, including color of siding, trim, shutters, doors, pavers and concrete painting if applicable. "PRIOR TO BEGINNING CONSTRUCTION" a copy of the Zephyrhills building permit and a copy of the completed engineering plans must be RETURNED to the 'LOT IMPROVEMENT COMMITTEE", these will be returned to you for construction. Upon completion of your construction a complete copy of the engineering drawings of the structure, (as built) permits, inspections and final permit approvals must be returned to the Emerald Pointe Lot Improvement Committee for Office filing. Pet enclosure must follow guidelines for size, height and location. ALL RE2UESTS MUST COMPLY WITH CURRENT REQUIRED PERMITS FROM THE CITY OF ZEPHYRHILLS, PASCO COUNTY, OR STATE OF FLORIDA CURRENT BUILDING CODES. Colfivez",ts: Lot Owner's Signature Date 4 / / �7 Lot Improvement Form 1. Must be submitted on standard lot improvement form, and pet will be at the discretion of the Board of Directors. 2. Must be temporary wire enclosure not to exceed 35 Sq. Ft. with panels height not to exceed 42" and should be constructed in a circle, square or octagon shape. 3. Location of the temporary enclosure must be shown on the lot layout in the lot improvement form. 4. Dog feces must be picked up and disposed & urine washed from area daily if placed on concrete. 5. If enclosure is placed on grassy area it must be moved or taken down daily. Enclosure must be removed for grass cutting contractors. 6. Food and water must be removed daily, or if owner leave the park. 7. Pet owners should remain outside when pets are using enclosure and are responsible for their pets at all times. 8.et owners that do not follow the guidelines can be subject to a violation notice and fine. W.- � 36' Permit No 0� 5ft Setback I x i TYPICAL 36'' 68' LOT wilt 26x 631 MAX Concre N -05ft— �Setback j 5ft Setback M Lot# Address; Owner: Date:- -10 ft Setback front Inside of Curb to building 15 ft Setback to coach. I MEMMMOMM Date ReCdj/Lq/ -I LOT IMPROVEMENT REQUEST PerMit NO 0,3 efl"' timprovement ttee: g Reccumiends Approval Date / f t ! Reccumends Denial Date_/_/ Remarks: Board of Directors Approval Date q f /_ Date Denied f f oa d m rs : /677 ----- C$ Remarks: n u permits must be gosted visible to the street DRAWINGS/SKETCHESSEE ATTACHED w ALL REQUIRED, 517/2019 ammumm ENIERALD9 POEN1.i_.. RIIRWW https:/twww.emeraldpointervresort.org/resort-map-21 111