Loading...
HomeMy WebLinkAbout23-7021Issue ► Date: 10/10/2023 REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first rein-spection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. I I I ! 11111 11 "I'll 11 2MIMA��� ; I - I I rutwiff-f 7'1%'4VrT7r"*4'i .. ":a 1 1 1•1 accordance with City odes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGNATURE m PE IT OFFICE ITHOUT APPROVED INSPECTION 5"31111,11111 - 11111111 '' � 0 1. ROMAL60 N41,21. 'JALTJIy. #r+�� 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received 0/9/2023 1 ���Ph=ne Contact for Permittin 813 _77115 Owner's ame I Nicholas Papageorgiou Islip 7242 Ashland Dr Dr Zephyrhills, FL 33540 SUBDIVISION [Alpha Villgs EstteB PARCEL ID#[:3:5]25-21-0050-00000-031 0�� (OJETAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CON$TR ADD/ALT SIGN DEMOLISH INSTALL REPAIR PROPOSED USE SFR ED COMM OTHER rs­07R_ TYPE OF CONSTRUCTION BLOCK FRAME STEEL DESCRIPTION OF WORK Installing 20 roof mounted solar panels. Installing 20 micro inverters. One 35 Amp line side tap (7.1 kw). BUILDING SIZE SO FOOTAGE = HEIGHT =BUILDING VALUATION OF TOTAL CONSTRUCTION 10ELECTRICAL 1'19,028 AMP SERVICE PROGRESS ENERGY W.R,E,C. =PLUMBING 1$ =MECHANICAL r_____1 VALUATION OF MECHANICAL INSTALLATION = GAS ROOFING 0 SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO BUILDER COMPANY SIGNATURE REGISTERED Y/N Address License # ELECTRICIAN COMPANY Solar Energy World, LLC SIGNATURE REGISTERED FEE CURREN Address 1201 Kelsey Ln. Suite D Tampa,FL, 3W191 License# EC13009329 PLUMBER COMPANY SIGNATURE REGISTERED Address Licerse# MECHANICAL COMPANY SIGNATURE REGISTERED L_XLN J Per: CURREN I Y / N Address I License# OTHER COMPANY E;;;;� SIGNATURE REGISTERED FEE CURREN N�� Address License # RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) — Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (PloUSurvey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed' restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County, TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90.07, as amended. The undersigned also understands, that such fees, as may be due, Will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release, If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law —Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the 'owner' prior to commencement. CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers -Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks, US Environmental Protection Agency -Asbestos abatement, Federal Aviation Authority -Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone "V' unless expressly permitted, If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a .compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING, CONSULT FLORIDA JURAT (F,S. 11 T03) OWNER OR AGENT_ CONTRACTOR A. — Subscribed and sworn to (or affirmed) before me this f6b 6 Asw (or affirmetirreze this by. b Who is/are personally known to me or has/have produced Whip,, U/r_q_p has/have produced as identification. as identification. Notary Public Notary Public Commission No. Commission Not 4" 1 4�,c>Oc-f Name of Notary typed, printed or stamped Name of otary type prin e or stamps ALICE ANDRADE P(/ �§,�s Notary Public -State of Floridam Corr # GG 945509 , 4 My Commission Expires January 08, 2024 Certification ## 993583 Expires 71112024 Certified Environmentally CIIIERC Responsible Contractor Certified Contractor Solar Energy World LLC Insurance Carrier Colony Insurance Company Policy # PACES4279475 Policy Period 7j1/2023 - 7/1/2024 The potential risk of a pollution event is inherent in all construction work. Such an event can cause significant financial loss for project owners and other contractors at the site and can even impact the community and environment. Some contractors actively manage this risk, while others do not. Environmental Risk Professionals, LLC hereby certifies that the above referenced contractor has distributed protocols to avoid pollution incidents on job sites and has purchased a comprehensive pollution liability insurance policy to provide financial responsibility should an accident arise. Training — The above referenced contractor has distributed "Pollution Prevention Practices" designed to mitigate common environmental risks associated with their contracting operations. Examples of these written protocols may include, but are not limited to, the following activities: Chemical Storage Fugitive Dust Control Solid and Hazardous Waste Management Stormwater Pollution Prevention General Housekeeping Personal Protective Equipment Mold Identification and Abatement Deterring Illicit Abandonment Responding to Spills Asbestos and Lead Based Paint Insurance— Even when Pollution Prevention Practices are followed, accidents still happen. Property owners bear the ultimate responsibility for a pollution problem at their site, even if caused by a contractor working on their behalf. A contractor needs to purchase a true pollution liability policy in order to properly protect the entities for whom they perform operations. Environmental Risk Professionals, LLC has reviewed the above referenced pollution liability policy and hereby confirms that it provides the following important financial responsibility provisions: 1. A policy limit of at least $1,000,000 2. Coverage is primary and non-contributory, with the certificate holders included as Additional Insureds and carrier rights to subrogation waived in their favor 3. On -site and off -site remediation expense for pollution conditions arising from contracting operations 4. No mold exclusion on policy 5. A pollution event includes damage to natural resources 6. Coverage for transportation and disposal of pollutants 7. No limitation to sudden and accidental pollution release only V I 0 N A L S Signed Environmental Risk Professionals, LLC This certificate was issued on 6/30/2023 and serves as a matter of information only. The Certificate is only valid through the current policy period with an active policy. This certificate confers no rights upon the certificate holder and does not affirmatively or negatively amend, extend or alter the coverage afforded by the policy listed above. This certificate does not constitute a contract between the issuing insurer and the certificate holder. _.. vint c-e-r-c.com to learn more An Intro to SnapNrack TopSpeed TM with SpeedSea ITm Technology Sr�zipNraclk has created a grotind breaking systern, cotrnbit,%,inq great features and benefits we are known for, with our TopSpeed TM System and the most up to date technical innovation in the industry, thus reducing parts while driving down labor, material, and total installation costs. Designed to work with standard module frames, achieving UL 2703 Listing for Grounding/ Bonding and Fire Classification, 1,,)roviding intf"'? grated wire management, aesthetics and effective solar, moun-ithng solutiori on the mall"ket wifth T(DpSpeed TM including integrated fasteners and SpeedSea IT" Technology. Advantages of Installing the SnapNrack TopSpeed TM System Modules are installed with a minimum number of parts This elimination of parts leads to a lower estimated system cost for tlx the installer and home owner, Built in Wire Management and Aesthetics Extensive wire mariagement softstions thave beeri designed specifically for the systenni that adapts to multiple possible mounting positions, The system is designed to be aesthetically pleasing and sturdy with a skirt that provides considerable strength at the leading edge and an elegant look for those seeking high end looking systems. SnapNrack TopSpeedrm includes SpeedSeal"I"I Technology Speed Seal"' Techriology features iritegrated flashing.This el" miriates loosenirg layers of composition and removing nails with a pry bar, leading to less damage to the roof minimized potential roof leaks, and much faster installs. TopSpeed"m Mounts attach Directly to the Decking As well as all of the benefits associated with the stam,",iard SpeedSeal, TkR,,chrlolo qy TopSpeed Tm attaches to the roof sheathing and does not require rafter attachment, Sin"iply attachithe roof sheathinq rern,,,:)ves the reqUirernenit for findiing rafters atnd to 0 drilling pilot holes, creating potential rafter misses that can cause leaks. 110ble of Contents ONOMENNOMMOM Project Plans Certification Details ........ ........... ........................ . Component Details ............................. . ..... ......... Pre -installation Requirements .......................................... ... Installation TopSpeedTh1 Skirt Layout .......................... ............................... TopSpeed TM Bunt to Module Installation . ..... ............. 1 n ................ _.... . TopSpeed Mount Skirt Installation . . . .... .... .. ...... ....... 10 Wire Management .................. .. ......... .. ..... LP' Attachment meat e .. .. . . . . . . . . .. . .. . .. n_ . .. . . . . 1 Module Installation . . . . . . . . . . . . . . . . . . . . . . _. . . . 1 Grounding cifi ti .. ®®®............ . Maintaining the Grounding BondingWhen Removing a Module .. . ... . . . . .. .. . 2 Appendix : List of approved od les and MLPEs .... ........ .... ......... 25 Certification Details SnapNrack TopSpeed"" mounting system has been evaluated by Underwriters Laboratories (UL) and Listedto UL Standard 2703 for Grourtding/Ito ndinq, andl Fire Ck',,ssfficaflon, Grounding/Bonding Orily specific corripo�rwnts have been evaluated for bondin�';, at'e ideritified as being irk the ground path. The TolaSpeed"I components that have been evaluated for bonding are the Mount Assembly (Mount Clamp Top, ModUle Clamp Tower, Angle Bracket), Clamp Assembly, Universal Skirt, Universal Skirt Clamp, Ground Lugs, and Smart Clips, Universal Skirt Spacers, Mount Channel Nut, and Mount Base are not required to be bonded to the system based on the exceptions in clause 93 of UL 2703 1st Ed. Wire management clips are utilized to route conductors away from these components and must be assembled according to the instructions. This mounting system may be used to ground and/lor mount a PV module complying with UL 1703 or LJIL 61703 only when flags specific rnodule has been evalUatkad, for grounding and/or, mounfir%tg iri compliance with the included instructions. See Appendix A for the list of modules tested for use with the'TopSpeed TM System for integrated grounding. Ground Lugs have been evaluated to both UL 467 and UL 2703 Listing requirements, The following ground lugs have been approved for use: SnapNrack model 242-92202, and 11sco models GBH -4DBT and SGB-4. The following components have been evaluated for bonding as the fault current ground path: TopSpeed TM Mount Assembly, (Mount Clamp:Top, Module are Tower, Angle Bracket), Clamp Assembly, Wire Management Clips, and Ground Lugs. In order to maintain the Listing for bonding, wire management clips must be assembled to route conductors away from parts that have not been evaluated for bonding. A Listed (QIMS) and Unlisted Component (KDER3) grounding lug, SnapNrack part no. 242-92202. is attached to the rnodule frarvie flange for the nornrial attachment of a Grounding Electrode Conducto�,, which provides bonding within the system and eventual connection to a Grounding Electrode, as required by the U,S. NEC. Details of part no. 242-92202 can be found in Volume 1, Section 4, and Volume 2, Section 2, When this method is used, the grounding symbol is stamped onto the body of the ground lug to identify the grounding terminal. An alternate method of groun ding, a UL Listed (KDgro ER and QIMS) unding lug, 11sco (E34440 arid', E354420) rnodel SGB-4 is aittached to thernodule trarrw flange, When this method is used,'O"Ie grm,mdhn,g terminal is iderAH'ied by tile green colored screws of the fug", An alternate method oftrounding, a UL Listed (KDER and QIMS) grounding lug, 11sco (E34440 and E354420) rriodel GBI--4BD'r as attached to, the moduknt frarne flange thVOU't,Irltthsa huixdware and torquie values, wl"Ien this i wthod iS Used, the is klleritified by t1he green colored set screw of the lug. An alternate method of grounding, Enphase R/C (QIKH2)(QIMS2) model M250, M215 & C250 is bonded to the Listed PV module frame by the Enphase R/C (QIMS2) Model EFM-XXMM anodization piercing mounting/clarnping kit,, The total roof -mounted PV system is bonded (rnodules and microinverters) together and the assembly is bonded to ground through the :nphase RJC (QIMS2) Engage Cables, Model ETXX-240, ETXX-,208 or ETXX-27.7, when properly grounded at the service entrance. R/C (GIMS2), Dynoraxx (E357716) photovoltaic bonding device cat. no, Dynobond is an optional component that may be used with this system. The Dynobair~ device has been evaluated to provide n-iodi-Ole to rnoduhe bortcfing, Th Dylnok:'mriri device attaches to flhe flar'�,ge of iidjac(,'�-,nt t-1/ma"'lules Listed (QIMS), SnapNrack MLPE Frarne Attachment Kit model 242-02151 has been investigated to bond approved MLPE device back plates to frames of rnodules. Fire Sn,apWack IN-)pSpek,,�,&` has for a Class, A Syste�,M Fir(,') (-3.,zissification for Steep-Slorted and to sloped roofs with Type 1 and Type 2 modules. Because the system was tested at 5 inches at,)ove ti'm test roof fixture, 117c�pSpeed"' can be installed wifl-wouit any height restrictions due to System Fire Classification. See Appendix A for potential module -specific height restrictions due to vilodule temperature. The Skirt is considered an, optioriall, connponent vvith� respect to Fire C!"assification, as SnapNrack IropSpeedlri"laintains the same Fine, Classification Rating both with and without the skirt, NOTE. Modules onth an asterisk"have a fire raflnq,',� that is different from Type 1, Type 2 or, 1pe 29, SNR systems have only been evaluated for use with Type 1, Type 2, or Type 29 modules. Modules with a differemt fire type rating should be considered to not have been evaluated for Use with SNR systems with respeClt to a systenn fire rafing,. Inspection Practices NINAMMIANNURNM SnapNrack recommends a periodic re -inspection of the completed installation for loose components, loose fasteners, and any corrosion, such that if found, the affected components are to be immediately replaced. T Speed TM Mount TopSpeed TM Clamp Universal Skirt -. SnapNrack TopSpeedTM Mount SnapNrack TopSpeedTM Clamp SnapNrack Universal Skirt in double assembly including SpeedSeaITm base, assembly including including Link portrait or single landscape lengths. clamp trap, and (4) SnapNrack #14 SS bottom, Link trap, and springs, Wood Screws with 1/2" Hex Head. Wire a geme Components NOMMMMMMOOMM eoe loe ad hneoh ra, hls oe cnutr Ground Lug assembly used for attaching the Equipment Grounding Conductor on to one module or any TopSpeedIm Mount per array. 5 MLPE Frame Attachment Kit Attaches MLPEs (Module Level Performance Enhancers) and other related equipment to the module frame. 0 All TopSpeedTl 1/2" bolts; System Leveling Bolt, TopSpeed- Mount Clamping Bolt, Clamp Bolt 16 ft-lb cicieiii �46220� 'Vo, l4 a� pea , me, car anyyVjhqre� on oun Lug m, MLPE Frame Attachment Kit, MLPE Rail Attachment Kit 10 ft-lb w 6io-"Jnv Alf Enphase Frame Mounted Microinverter Bracket to Module Frame 13 ft-lb odu 6 �7' .. .. ...... I 'In-'lle P Ground Lug model SGB-4 to Grounding Electrode Conductor (4-14 SOL or STR) 35 in -lb lfw-lb- Ground Lug model GBL-4DBT to Grounding Electrode Conductor (10-14 SOL or STR) 20 in -lb r"ou), d ond46 In Ground Lug model GBL-4DBT to Grounding Electrode Conductor (4-6 SOL or STR) 35 in -lb R Site Survey MONNNNNNNHOM 0 Measure the roof surfaces and develop an accurate drawing, including any obstacles such as chimneys and roof vents. 0 If plans for the roof structure are available, verify that the plans match the final structure, 0 Identify any roof access or setback areas as required by the local AHJ, 0 Identify any construction issues that may complicate the process of locating rafters from the roof surface. 0 If you find structural pro'b, Ilems swch as termite damage or cracked rafters thatfhay coMpr6Mise the structure's integrity t. 0 Mark distance from array edge to identifiable roof feature in x and y axes. Image note., This four module array is installed in a high load configuration with three attachments per side where two modules share attachments, See highlighted area, As shown, three attachments are never required at the skirt or the top of the array, Red Tools NOWUNNOMMMOM Roof Marking Crayon or Chalk 0 Tape Measure LAYOUT INSTRUCTIONS NOMMMONNOMMOMM 1) Use a tape measure to verify that all modules will fit properly on the roof surface, ) On the roof draw the layout for the skirt installation including module gaps (recommended 0,75 inch gap), bottom corners, and locations of the two 4opSpeedTM attachments per module that clamp to the skirt. Three attachments per module is never required at the skirt. MEMO .000 is Required Tools "NOMANNORM 0 Socket Wrench/impact Driver 0 Torque wrench ti 1/2" Socket a ick.com V IN INSTALLATION INSTRUCTIONS INNOWNUM 1) Install TopSpeedTM Mounts ) Fill bath cavities on bottom S) Attach TopSpeed"' Mount to roof at locations drawn during the of TopSpeed'm Mount created by using the (4)-SnapNraek #14 Wood skirt_ layout,_ Mounts must be peedSeal" gasket with roof sealant Screws with 1/2" hex; head that are installed entirely on one course of to ensure a watertight seal: captured in the Mount. composition, MEIN= 4) Loosen Course Adjustment bolt and adjust end Mounts up or drawn until aligned with bottom edge of array as marked on the roof, then tighten the Course Adjustment bolt, 5) To set the TopSpeedT"" Mount level loosen the leveling bolt and move the clamp up or dowry, then tighten the Leveling bolt and torqu( to 16 ft-lb. INSTALLATIONINSTRUCTIONS Inammoomm ° °° 7) Universal Spacers will need to be 8) Install Universal Skirt by holding added to Mounts and Clamps where the skirt in Mount, sliding Skirt to Skirt will be installed: align with array layout marks, and damping skirt into mount. IN 0, 0, MISS 0. Required Tools KNOUNNNOWROM 0 Socket Wrench 0 Torque Wrench 0 1/2" Socket 0 Electrician Tools Materials Included NOMMOXONNONOW Smart Clips 0 (1) Smart Clip [(2) PV Wire, (1) Enphase 10 Cable] 0 (1) Smart Clip XL [(6) PV Wire, (4) Enphas e IQ] 0 (1) Wire Saver [(T) PV Wirel Smart Clip Smart Clip XL Wire Saver N r INSTALLATION INSTRUCTIONS - GROUND LUG MIRMNEWWWOMM The SnapNrack Ground Lug to be used in accordance with the National Electric Code, ANSI/NFPA 70. 1) Ground Lug (242-92202) can be 2) Run 10 - 6 AWG, solid, bare copper 3) Run bare, solid EGC from Ground attached anywhere along the module GEC into Ground Lug channel, torque Lug R to Junction Box, bond bare EGC frame or any Top Speed TM Mount near wire clamping bolt to 8 ft-lb. to <stranded EGC in Junction Box. For the Junction Box. Torque module details on installing the Junction Box clamping bolt to 8 ft-lb, reference the Junction Box Installation Manual. 1- 4,- 4) Optionally; Install Ground Lug on the Mount Landing Pad at the top of the array. Run bare copper between ground lug and Junction Box, um 1) Use 5napNrack Smart Clip 11 to 2) Use 5napNrack Smart Clip XL to manage up two PV wires inside the manage larder bundles of PV wire; up module frame while prepping out the to 6 PV wires per clip modules on the ground or installing modules on the roof. In Required Tools NUMONNINNERM Socket Wrench 0 Torque Wrench 0 1/2 " Socket Materials Included L E Rail Attachment Kit (1) SnapNrack MLPE Frame Attachment "Top (1) SnapNrack MLPE Frame Attachment Bottom (1) j1 "-1 X j " Serrated Flange Bolt SS (1) SnapNr ck Smart Clip (1) SnapNr ck MLPE Frame Attachment Coll Spring SS Materials rye SolarEdge Frame Mount Enphase Frame Mount (1) SolarEdge Optimizer/ Frame -Mounted Module (1) Enphase Mi roinv rt r Add -On (1) Enphase Frame Mount In r INSTALLATION- SOLAREDGE FRAME MOUNT 1) locate the SolarEdge optimizer 2) Install the optimizer mounting ) Connect the module leads to the with tame -Mounted Module Add plate onto the module frame and input connectors on the optimizer On at a location on the module tighten hardware to 11 ft-lbs. and manage conductors with frame that will not interfere with the `SnapNrack Swart Clips. %pSpeedTM Mounts. OEM INSTALLATION INSTRUCTIONS- E PHASE FRAME MOUNT WNWON"M 1) locate the Enphase Frame Mount bracket clamp at a location can the module frame that will not interfere with the %pSpeedTM Mounts a i i 3) Tighten the hardware to 13 ft-lbs. W f,} Materials clu napNrack ToPSpeedTM Clara'. Other MaterialsRequire ammaNINNEMMMOM (D SnapNrack Smart Clip (2-5 per module) See Wire Management section for details QSnapNrack Smart Clip XL (10-20 per array) See WireManagement section for details 1/2" Socket E INSTALLATION INSTRUCTIONS - BOTTOM ROW 1 1{f 'Vel��. 1 Zt m GROUND PATH DETAILS WINWANNIMENOW All TopSpeedTM components in the Fault current Li U U U ground path have been Certified to be used multiple times for grounding/bending. The UL 2703 Listing does not specify a maximum number of uses for the Mount, Link, or Ground Lug. Review the requirements of the National Electrical Code (NEC) Article 250 to select the Ll LJ uu appropriate Equipment Grounding Conductor size based on the short-circuit current of the PV system, When using Ground Lug R the following 1 To EGC components are part of the fault current ground path: SnapNrack, TopSpeedTM Mount GROUND PATH TM TOPSPEED CLAMP Snapback, TopSpeedT Clamp EQUIPMENT GROUNDING � TOPSPEEDTM MOUNT CONDUCTOR 4 GROUND LUG El� ARRAY SKIRT GROUNDING METHOD DETAILS 1) Flow to row module bonding ) Column to column bonding provided by bonding clips in Mount provided by Universal Skirt and assembly and Clamp assembly. bonding clips in the Clamp assembly and/car the RL Universal Link assembly. Module heights evaluated For bonding with Link Bonding Clamps: 0mm, 38mm, 35mm, 32mm, 30mm GROUNDING MARKING DETAILS UNNIMMMENUMMM The Ground Lug is marked with the ground symbol, ) Each continuous array is connected to Equipment Grounding Conductor through Ground Lug (242-9220 ) installed on one module per array. Optionally; Install Ground Lug on the Mount Landing Pad at the top of the array. INSTRUCTION FOR MAINTAINING THE GROUNDING BONDING WHEN REMOVING A MODULE FOR SERVICING CAUTION: Module removal may disrupt the bonding path and could introduce the risk of electric shock, Additional steps may be required to maintain the bonding path. Modules should only be removed by qualified persons in compliance with the instructions in this manual. Module removal is not presented as a frequently expected occurrence and will not be required as part of routine maintenance. Scenarios that could result in a disruption of the bonding path are described, for example irregularly -shaped arrays, arrays consisting of individual rows, and any other scenario where module removal could disrupt the bonding path. In most cases, the removal of a module for servicing will not disturb or break grounding continuity. If a module is to be removed that will break continuity, these are the steps that must be taken to maintain a continuously bonded SnapNrack TopSpeedTM System, Required Tools Socket Wrench Torque Wrench 1/2" Socket 7/16" Socket Required Materials IMIXISOMMON 0 4) #10 Or Larger Bare Copper Conductor 0 SnapNrack Ground Lug part no. 242-92202 0 lisco Part No, SGB-4 0 DnoRaxx Dynobond TM E N JUMPER ASSEMBLY INSTRUCTION & INSTALLATION CAUTION: m Do Not Remove the Module until the Jumper is installed 1) Identify the existing ground path at the location of module removal and choose an appropriate length of 10 bare copper to bridge the soon to be broken ground path. L---= 2) Attach one ground lug to each end of #icy bare copper wire. See recommended options below: 1. (2) SnapNrack_ round Lug part no. 242-922022 2, (2) Ilsco part no. SG-4 3. (1) DroRaxx Dyno ondT1 Example of assembled bonding jumper using () Snap rack Ground Lugs S) After Servicing the array reinstall the module and original ground 4) Service the array. With the path, Only then Remove the bonding bonding jumperinstalled, it is now jumper, safe to remove the module for service or maintenance.Caution: Do not remove the bonding jumper until original ground path is F-2 I established, ) Before the nodule is removed, attach the assembled bonding jumper, Depending on where the module will be removed and choice of ground lug, jumper attachment locations will "vary, napNrack Ground Lug part no. 242-92202 or lisco SGB®4 lugs can be attached to module frames or anywhere on the TopSpeedlm Mount. DynoRaxx Dyno ond7l' is approved and appropriate when a short bonding jumper is needed from module to module, No IF APPROVED MODULE & MLPE INFORMATION R." SnapNrack Top $peed T4 System has been tested with the following UL Listed module series: The SnapNrack TopSpeedTM System employs top -down clamps and links which have been evaluated for frame -to -system bonding, at specific mounting torques and with the specific module series listed below. All wattage values are covered. Module manufacturer approval letters can be found at www,snapnrack,com. 3 1 \t`,t�s� ..�.,,,i vie #ti\,.;.yZ, T�� o@,, !P}�'���, i u�., A �F1} i � Av: A L\ \ tl� 4... t rye,,, \A\\\ �. has ?� �,,;,..��,.a t a.. 4v �\ \1 ~`•.. '�� �y . v \ t�\.. T�v . v: � � \ A�LTv 4. t, y��� �,<,tSia���2�\.3t,v3� i �\y,.w.�,),i itt .:..�\v�TRa� .,.,xv , . a\,.x�'•,y� v\, n\ Yt 110Al4M L XXXS - t. L XXXQA -Al6 _............._....,-......e..._�......._.�.... ._._.._......._ ,....... p?�,y�p p��+dyg�# �q -.»�....,.m...._.. .......... Lf L»�Tefplpfg6.�f�4gal�6ggY�Y+- 4 ® }�, q#... }�rp� p per... 8.0.y3�dyipXy/6�5/9pAt�Pgt�Rp�s-gPg"4y _...e..... 4...,..-._._... .m. ...,...... ..�.._...� ..�.�. .�. ..�._... k.._.._..__.0.................�.H.,.,. p //��++.. tw0i ifpp0.?"k6FpSyfpRy#+ai�y@�tg✓.'r"Y L�4p+t�lptyS�f�k}y,;2 p4�51fif4y.6�PyF{il�ItPp�#�6@?�V�^ �e b�!.€�e,�rAy+XAp gYyP�'°��p pC�,.e....�..�.. L XXXd2/° S .. ..................�....._�.�.. _.. yog4��A'S�n}4?k i.6JFld\XN2T- 6 -..,...� ........ ... ....e. gp/�{y/pp�� +� 6 L XXXR`E2 -J g pgy�p/a�prq qp p;� b..0�d4XXNIK-E -VS ®B�pF,qq. }}A�aiiSXNl ,9 L4' 6-60-XXXM gqL.�6p3i�m1F4p1�l�Igy��w9TH'4`Y6 L 4-6 HPS-XXXM L 6.6 SK-XXXM ..»..»W.�} L 4.6 HIB-XXk M .u...,....�.. ,... pp�g��ii ,,AA ;;__++p; y��tq...��...^�c-^k �.q ,p .y .;,..p g#.��,e y� p,� Lpg�e ,y fig}} ��y# y�.qp Y'[6-6 OHiH-x"XRXi`R .... .. ..: , Map :. L IS-X 1p+^�I e yq? y g pl y .:RRL.ppR$�� "` Spp:��RF�'R�yY"O� 85eAi'R, I��T##i p- L R6"'$6HPWX XM Meyer Barger Meyer Burger White* Meyer Burger Slack* :... S. lof . A-XXXIMM MSXXXStS C MIS6XXXSQS MSEXXXSOSK MS XXXS SK MS XXXS S1 MISSXXXS ST.. v MSEXXXSQ5K MSXXXSS MS6XXXMMM4J MISE60A.XXX Mission Solar MIS XXXMMM6J MIS XXXSXSK MSEXXXS06W' MS XXXSXST MISXXXSAJ MISXXXSX6S � S XXXS06J MS X CXSX6V MSEXXXS06S LISNEAa-XXXhf3-6 t1S A-XXXMt3- 2 Next liner yi AlUairco i A-XX M36-lid ' Sty - XX143642 VBH XX If A03 VSHX XRAR18 V HNXXXKA 0 _ VBHXXXRA03K Panasonic VBHNXXXSA17 VPVXXX(K) VSHNXXXSAIS � EVPVXXXH VBHN32SSA17E EVPVXXXPK Phone Solar SXXXMI-2 /p PSXXXM H-2 /U XXXTP2 _ RECXXXTP2SM 72 SLK R XXXTP2- LK RECXXXTP2SM 72 SLK2 _._ REC (All may be followed by "BLK" or RSCXXXT°P M P CXXXTP M "BLACK") RECXXXTP2M 72 RECXXXTP4 — _. RECXXXTP2M 72 BLK RE XXXAAE Pure RECXXXTP2M 72 BLK2 RECXXXNP2 RECXXXTP2SM 7 S6% Seder S -4-SIBS-T'S S -40 «SMMS-HV SLA,XXX-M SS XXX-P Sllfb _ _ _ SL�iXXX P ILXXXNT a w g gN In SMA I RSB-2S-US-10 The SnapNrack name and Snat,Nrack logo we the property of SnapNrack, Inc. All Information contained in this document are the property of Snaphlrack, Inc, *1023, Snapt,lfack, Inc, All rights —erved. SNR,_I'opSp(,,ed Installation Manual_0.3 TOf'SPEED ROOF ATTACHMENT DETAIL TO W(TfD DE(X I LIII II p III EACH MOUNT HAS I" OF LEVELING CAPABILITY REFER TO SNAPNRACK INSTALLATION MANUAL FOR HARDWARE TORQUE sPEaFicA noNs FOR ATTACHMENT SPECIFICATIONS, SEE: SNR-DC-30004 TOPSPEED, ATTACHMENT DETAIL, MOUNT TO WOOD DECK" FOR MOUNT PLACEMENT SPECIFICA FIONS, SEE: SNR-4C-30005 TOPSPEED, MOUNT PLACEMENT ON SOLAR PANEU FOR BASIC SYSTEM INFORMATION SEE: SNR DC 30006, TOPSPEED, SYSTEM OVERIVEW ON COMP" FOR SPECIAL CASE INSTALLA TIONS SEE: SNR-DC-30007 TOPSPEED, SPECIAL CASE INSTALLATION" MIN i- PLYWOOD OR OSB ROOF DECK ROOF SURFACE TO BOTTOM OF MODULE HEIGHT RANGE: 3.5 - 45 IN MODULE IiEIGHT OFF ROOF: 3Y2 - 41/z IN BASE HEIGHT UNDER SCREW* .601) IN -Trip-qPFED (X4) #14 WOOD SCREWS, S.S. ROOFING MATERIAL, COMP SHINGLE, TYP. MIN 1/4" SCREW PROTRUS MIN DECK THICKNES&' 7/16- OSB 15/32- PLYWOOD I �r ROOFING MATERIAL, FULLY EMBEDED INTO WOOD DECK COMP SHINGLE, TYP. 11 'AfOOD ROOF DEDaNG, TYP. FILL "SPEEDSEAL"CAVMES Vim A ROOF SEALANT TO WATERPROOF ENT. OVERVIEW SEE INSTALLATION MANUAL FOR DETAILS ON PROPER PLACEMENT ON COURSE SunArun South LLC DESIGNER: M.AFFENMNGER SCALE: TS DRAWING NUMBER: DESCRIPTION* REV: N DRAFTER: M.AFFENTRANGER SNR-DC-30004 TOPPEED, ATTACHMENT DETAIL, MOUNT TO A ROVED sy. BYETERSON DATE: 5/27/2022 WOOD DECK APPROVED I Complete System and Product Certifications laoshive power tolranee (0 - +5W) guaranteed iEc 61z16, iEc 61730, UL61,730 High module conivendan, efficiency (up to 20.3%) ISO 900 L20i18: ISO Quality Management System ISO 14001: 2004, ISO Environment Management System Slower power degradation enabled by Low LID Mono PERC technology: first year,<2%, T56294L Guideline for module design qualification and type approval 0,55 year 2-25 OHSAS 18001. 2007 Occupational Health and Safety olld Pli3 P"Es9ie ePSSUP'ed by solar cell process optimization and careful module E3fJM 0k, selection Reduced loss lower resistive with operating current Specifications, subject to technical charges and tests_ Higher energy yield with Sower operating temperature LrI Solar reserves the right of,interpretation. Reduced hot spot risk with optimized electrical design and lower operating current: IDNG-1 Roach 801, Tower 3 Lujiazui Financial Plaza, No.826 Century Avenue, Pudong Shanghai, 200120, China Tel;+86-21-80162606 E-maik module@longi-silicon.com Wabash! www.faaebook,comPLONG Solar Note; Due to continuous technical innovation, R&D and improvement, technical data above mentioned me), be of modification accordingly. LONG have the sole right to make such modification at anytime without further notice; Demanding party shalt request for the latest dattisheet for such as contract need, and make it a consisting and binding part of lawful documentation duly signed by both parties. 2020041OVII for US-D COOrientation: 120(6x20) Junction Box: t ,three diodes �a 0.WCble4,nm2,1200mn intength C,Iass, Single glass 3.2mm onated tempered giass dl Frame: Anodized aluminum alloy frame A -A i9.5kg Diffiensiorn1755a1D 5mm I ram: Lm mloackagire 30pcs Per palms wl�t 'CiCiT left, +tmm t ,s per 2tYCP ,� 4itth-emu -klmm 7PtSpeY40`HC.. Operational Temperature: -40C-4g5C Isaimer0teput1blemnoto.0"+5 W and iscT : t3% Maximum 9 mVoltage: DC1C V(IEC/UL) Maximum Series Fuse Rohr ; 20A Nominal Operating Cell temperature: 45±2Z: Gass it Flre rig: UL 1 or 2 Ok. :040fifP0^3 M- . :R4w60HPW310M'; tE # nt 1 w^+w v open Circuit voltage (Voc/V) 40.2 ' , 373 40.A 37,9 40,6 i38,1 40.8 38,2 41.0 38A 41.2 X15 Short Oreutt Carr Ot tScfA} 1 8 1Cs 90 1133 ` 916 # t 3 23 a 16Ca 9 3id voltap at Maximum Power (VYr p/v) 34,2 31.8 34,4 '. 32,0 4,6 32,2 34.8 I 32A 35.0 32,6 35.2 318 m n Curr4nt at Maidniurn Power ( pjA) ham_, 9 10 8 8 10 27 8 23 ass t 8 D 846 52 8 43 Module Efficiency(%) 18.9 19:2 19.5 19.8 X0 20.3 iC��tlardi+��i�n�Cdridiflts)It�ai�iaric�l .-W/rrt�,�c'rCsp�rati�re��'G`r�tt��aRf1.6. '. NOCT (Nominal Operating Cell Temperature): Irradiance 800W/m?, Ambient Temperature 201C, Spectra at AM1,5, Wind at 1m/S Temperature Coreffident of Ise +0,048%/ C, Front Side Maximum Stant loading 5400Pa Temperature Coolifildent of V -0,270%/ G Rear Side Maximum Static loading 2400Pa Temperature Coefficient of prraals -0,350%/ C Haillstone Test 25mm Hailstone at the speed of 23m/s Curren Voltage Cu (L144»6014100435010) Power -Voltage Cu (tp4w60HP 360M) Clarrent=Vol Curve (I.R4-60HP01-9 ) 12 400 olltempRrst 12 [eii T¢fiR�25i<.. 10 3S0 ' ALR ONAW� i0 g modem ltrealveAN110 1 i Sid+ ^�"° 6dmWms —. 6D1+,10 a .,.. 6 ^^^dell lamp 35C eoM.P-ase 2W ,.., 20Avlms 1 s 6DO.W 4 —^Cell Temp'66C _... Cali Tamve651 1S0 c3 q aPav7m' •• . w-- -•-cell Tetnp]Sr tOQ 2 ;} S6 ....,,....,. ,. 2 29owlm= ... .. .... ....... ....... 0 1 0 0 10 20 30 40 s0 0 10 20 a0 40 so 0 10 20 30 40 so voltage rd Voltage to Voltage tv) LON01 Room 801, Tower 3 Luilazui Financial Plaza, No,826 Century Avenue, Pudong Shanghai, 200120, China Tk+86-21.80162606 F-rna€I: module +long!-sillcon,com Facebcosk: www,facebook,com/LONtai Solar Nate: Due to continuous technical innovation, R&D and improvement, technical data above mentioned may be of modification accordingly. LONG have the sole right to make such modification at anytime without further notice; Demanding party shall request for the latest dotasheet for such as contiact need, and make it a consisting and binding part of lawful documentation duly signed by bath parties. 2020041OVII for US-D Data Sheet Enphase Networking Enphase The Enphase IQ Combiner 3m with Enphase Q ` b e 3 IQ Envoy' consolidates interconnection equipment into a single enclosure and (X-1Q-AM1-240-3) streamlines Pad and storage installations by providing a consistent, pre -wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Smart Includes IQ Envoy for communication and control Flexible networking supports WI-Fl, Ethernet, or cellular Optional AC receptacle available for PLC bridge Provides production metering and optional consumption monitoring Simple • Reduced size from previous combiner • Centered mounting brackets support single stud mounting • Supports back and side conduit entry • Up to four 2-pole branch circuits for 240 VAC plug-in breakers (not Included) • 80 A total RV or storage branch circuits Durable NRTL-certified NEMA type 3R enclosure Five-year limited warranty CAL listed USTED To team more about Enphase offerings, visit enpbaw.&= ENPHASE. Enphase IQ Combiner 3 MODEL NUMBER hale 466 Connect'" LLMODEM- 3 (4Ci12-y ar data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 L,LMO EM-0 (SG/5-year data plan) microinverters, (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands„ LLM OE - i (4G based L-M/5ayedrdate plan) where there is adequate cellular service in the installation area) surription Monitoring* CT Split core current transformers enable whole home consumption metering (+/- 2.55G, * Consumption monitoring is required for Enphase Storage Systonts Wireless USS adapter Installed at the IQ Envoy. For communications with Enphase Encharr3el storage and Enphase C OMM S- 11-01 Enpower'* smart switch. Includes USO cable for connection to 1Q Envoy or Enphase IQ Comb€ner' and alknofs redundant wireless communication with Enchar e and Enpower, Circuit Breakers Supports Eaton BR210, OR215, SR22.0, E11230, P11240, PR 50, and PR260 circuit breakers, RK-IOA-2-2440 Circuit breaker, 2 pale,10A, Eaton DR210 O -13A--24CI Circuit breaker, 2,pale, 15A, Eaton BR215 ORit-20A-2P-240 Circuit breaker, 2 pole, 20 , Eaton BR220 EPL,C-01 Perrier lime carrier (communication bridge pair), quantity -Bane pair A-PLUG-1 0-3 Accessory receptacle for power Line Carrier in 10 Combiner 3 (required for PLC.01) Replacement 10 Envoy printed circuit beard (PCB) for Combiner 3 �++gA"EN��m-gPCB�A-3 ��uu gg�qq +�+§g�gypp Rating Continuous duty System voltage '120/240 VAC, 60 Liz Eaton SR series bu bar rating 125 Max. continuous current rating (output to grid) 66 A Max. fuse/circuit rating (output) Branch circuits (solar and/or storage) Lip to four 2-pole Eaton Bly series Distributed Generation ((3) breakers only (not included) Max. continuous current rating (input from PV) 64 Max. total branch circuit breaker rating (input,) BOA of distributed generation t 90eA with 10 Envoy breaker included VMC�HANICALDATA l f u ensieans (1afii j 49.S x 37.5 x Weight 75 kg (16,51 Ambient temperature renge 4011 C to +4€ Cooling Natural core Enclosure environmental rating Outdoor, NR' Wire sizes 20 A to 50 60 A break Main lug el Neutral an AlwAvt rr iir 6 erne (19. "'x 141,15" ar 6.63')' 1laighf is 21 "6"' ( 3.5 vino wrlth rrltat niin btaoke'ts). (400 to 11 -- ) Ion, plus heat shield .ertified, NEMA type 3R, polycerbonate construction ire ker inputs: 14 to 4 aA O copper conductor )ranch input: 4 to 1/0 APA3 copper conductors bined output: 10 to 2/0 AWG upper conductors round; 14 to 1/0 copper conductors riwal code ieouirer eats for conductor si ina. Integrated fir: Fi 802 11b,"girt Ethernet Optional, 302,3, Cat5E (or Cat 6°) IJTP Cellular Optional, CELLMO EM-01 (3G) or CE rr nt innim4ar rernet cable (Trot Included) U E -03 (C) or LLtv1t1DEM-iv11 (C based LTE-M) Compliance, Combiner UL 1741, C,AN/CSA C22.2 No.1071, 47 CF , Part 15, Class S< ICES 003 Production metering: ANSI C12.20 accuracy class 0,5 (PV production) Compliance, IQ Envoy UL 60601-11CANCSaA 22,2 No. 1010-1 " To leery more about Enphase offerings, visit ilknpho4otgom 0 2018 Enphase Energy tali rights reserved. Enphase, the Enphase logo, IQ Combiner 3, and other trademarks or service names are the trademarks of Enphase Energy, Inc. 2019-11-04 3 ENPHASE. Data Sheet Enphase Microinverters F-Zegion: AMERICAS PRELIMINARY Enphase The high-powered smart grid -ready Enphase Its 7 Series MlcroinverterSTM with Integrated IQ an + IVIC4 connectors dramatically simplify the installation 7, process while achieving the ig UZA Z>y,'Dtk51 It Microinverters efficiency. with Integrated IVIC4 connectors Part of the Enphase IQ System, the IQ 7, and IQ 7+ Microinverters integrate with the Enphase IQ EnVOyTM' Enphase IQ Battery'm, and the Enphase Enlighten TM monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install Lightweight and simple Faster installation with improved, lighter two -wire cabling Built-in rapid shutdown compliant (NEC 2014, 2017, & 2020) Productive and Reliable Optimized for high-powered 60-cell /120-half-cell and'72-cell /144-half-cell PV modules. More than a million hours of testing Class 11 double -insulated enclosure UL listed Smart Grid Ready Complies with advanced grid support, voltage and frequency ride -through requirements Remotely updates to respond to changing grid requirements Configurable for varying grid profiles Meets CA Rule 21 (UL 1741-SA) F To learn more about Enphase offerings, visit enphase.com Enphase IQ 7 and IQ 7+ Microinverters with Integrated MC4 Connectors PRELIMINARY INPUT DATA (DC) IQ7-60-M-US 10PLU-72-M-US Commonly used module pairings' 235 W - 350 W 2 5 W - 440 W + Module compatibility 60-cell PV modules only 60-cell /120`half-well and 72- cell /144-half-cell PVmodules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V _. 37 V 27 V - 45 V Operating range 16 V - 48 V 16 V - 60 V Min/Max start voltage 22 V / 48 V 22 V / 60 V Max DC short circuit current (module Ise) 15 A 15 A Overvoltage class DC port II II DC port backfeed current 0 A 0 A PV array configuration 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IC 7 Microinverter ICE 7+ Microinverter "'VeW oZfi 62 pcoW ' 0 UA 4 9 UA Maximum continuous output power 240 VA 290 VA „Nomin , #°v oltagels~$rrgez ,, ��.� �� . 24,0 V � . .. ; � 208 VJ .: , 240-V_I ' 2`i V 4 V� 18 `2: �§'VV I"2 4 .. 1133 229 �V . . Maximum continuous output current 1.0,4 1246 V) 1.15 A ( Ci8 V) 1.21 A (240 V) 1,39 A (208 V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC<short circuit fault current over 3 cycles 5,8 Arms " 5.8 Arras Maximum units per 20 A (L L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoitage class AC port Ill AC port baekfeed current 18mA 18mA Power factor setting 1.b 1,0 Power factor (adjustable) 0.85 leading... 0.85lagging 0,85 leading ... 0.85lagging EFFICIENCY a@240 V (70 208 V @240 V @208 V P a3c e ti 3 n ..., 97.6 % 97,6 Y. 97. ° 97,3 a CEC; weighted efficiency 97.0 % 96.5 % 97.0 % 96.5 °/Q MECHANICAL DATA Arnbtent temperature range» -40° to+65 C { 40°F to+19°F) 40°C to65�C (`40° to+149°F) Relative humidity ranee 4%to 100% (condensing) DC Connector tyow, Stan bII made IVIC4; Dimensions (HxWxD) 212 rnm x 175 mm x 30.2 mm (without bracket) Weight 1.1 k (214llds�)' Cooling Natural convection - No fans Approved forwet locations Yet Pollution degree PD3 Enclosure Glass I I double -insulated, corrosion resistant polymeric enclosure Environmental category 1 UV exposure rating NEMA Type 6 / outdoor FEATURES �,,, ,� C•s municat9on ...,.., . .. ..., Power Line Communication (PLC} Monitoring EnlightenManagerand MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy, Disconnecting means the AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect means; requiredby NEC 690 and 22.1-2018 Rule 6�4.220, Compliance CA Rule 21 (UL 1741-SA) UL, 62109-1, UL_1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced MAC raga see the compatibility ca,culator at I p fl n lla F 4 L I URS�t1Q !i QCY2 � 2. Nominal voltage range can be extended beyond nominal if required bylhe utility. 3. Limits may vary. Refer to local requirements to definethe number of microinverters per branch in your area, Note: Adapters t and 2 are qualified per UL subject 9703. Adapter 3 requires installers to field Install their choice of connector. To learn more about Enphase offerings, visit enphase.com {r., se IQ 7, Errph€kse IQ 74. Enpl ase IQ C? r+tr r Er,phasc Enlighten, Enphase Energy. All EnDniase: the Encl logo, Enphase 2071 rights resetved, ase a l: f,'nphase IQ Et,voy and other u ad_r7,arvs or servi e nerves are ttre *Iradcmt srks of Enphase Fn" r_t t e Data slkjoct to change. 30 MA+-2021 Optimized installation with HD -Wave technology I Specifically designed to work with I Extremely small power optimizers I Record -breaking efficiency I Built-in module -level monitoring I Fixed voltage inverter for longer strings I Outdoor and indoor installation I Integrated arc fault protection and rapid shutdown for .1 Optional: Revenue grade data, ANSI C12,20 NEC 2014 • 2017, • article 690.11 and •"t Class 0,5 (0.5% accuracy) I UL1 741 SA certified, for CPUC Rule 21 grid compliance solaredge.com 3800 @ 240V 1 6000 @ 240V 1 11400 @ 240V i Rated AC Power Output 3000 S000 1 7600 10000 1 VA 3300 @ 208V 5000 @ 208V i 10000 @ 208V Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA 3300 @ 208V 5000 @ 208V 10000 @ 208V AC Output Voltage Min.-Nom.-Max, V Val, (211 - 240 - 264) �ACOUtpUt Voltage Min,-Nom.- Max. i (183 - 2(R,8 - 229) Vac AC Frequency (Nominal) 59.3 - 60 - 60.5M j Hz Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A Current @240V i Maximum Continuous Output 16 24 48,5 A Current @208V GFDI Threshold 1 A Utility Monitoring, Islanding Protection, — Country Configurable Thresholds Yes INPUT DC Power @240V 11800 15500 —M—aximum _�650 7750 1 9300 17650 1 W Maximum DC Power @208V 15500 W 5100 i 7750 Transformer -less, Ungrounded Yes Maximum Input Voltage 480 Vdc Nominal DC Input Voltage 380 400 Vid c Maximum Input Current @240Vo) 8,5 T_ 13S 16,5 20 1 27 30.S Adc Maximum Input Current @208V(" 9 13.5 27 Ado T Max. Input Short Circuit Current 45 Adc Reverse -Polarity Protection Yes Ground -Fault Isolation Detection 600ko Sensitivity 992 Maximum Inverter Efficiency 99 % CEC Weighted Efficiency 99 99 @ 240V %98 5 @ 208V Nighttime Power Consumption < 2.5 W ADDMOINAL FEATURES Supported Communication Interfaces RS485, Ethernet, DgBee (optional), Cellular (optional) Revenue Grade Data, ANSI C12,20 Optionalrr� Rapid Shutdown - NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect 2017 69012 STANDARD COMPLIANCE Safety UT1741, UL1741 SA, UL1699B, CSA C22.2, Canadian AFCI according to TIL M-07 Grid Connection Standards [EEE1547, Rule 21, Rule 14 (HI) Emissions FCC Part 15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size AWG Range 1" Maximum 14-6 AWG 1' Maximum /14-4 AWG DC Input Conduit Size I # of Strings 1" Maximum / 1-2 strings / 14-6 AWG 1" Maximum / 1-3 strings / 14-6 AWG AWG Range Dimensions —rt'sip '�Safety Switch 17.7 x 14,6 x 6.8 / 450 x 370 x 174 213 x 14,6 x 7.3 / 540 x 370 x 185 (HxWxD) I min Weight with Safety Switch 22110 1. —/11, 4 262 119 38,8/17,6 Noise < 25 <50 dBA Cooling Operating Temperature Range Protection Rating Natural Convection -13 to + 140 / -25 to + 60f (-40°F / -40°C opt NEMA 4X (Inverter with Safety Switch) '4 For other regional settings please contact SolarEdge support a'A higher current source may be used; the inverter will limit its input current to the values rated Revenue glade ;nverter P/N_ SExxxxH-US000NIRC2 For power de-? ating informaron refer to: https://wwwsolaredge.com/sites/default/fles/se-temperature-derating-note-t)a.pdf -40 version P/N: SPxxvxH-US000NNU4 0 Soko Edge Technologies, Inc, All rights reserved. SOLAREDGE, the Soladage logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks ofSolarEdge Technologies, Inr, All other trademarks mentioned herein are trademarks of their respective owners. Date: 03/2019/V01/ENG NAM, Snb)act to change without nonce, 'F / 'C * Functionality subject to inverter model and firmware version solaredcge.com solar . =ee :- Power Optimizer For Residential Installations S440,S500 Rated Input DC Power', 440 1 500 W Absolute Maximum Input Voltage (Voc) 60 Vdc MPPT Operating Range 8-60 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 15 Adc Maximum EfFaeney 99.5 % Weighted Effciency 98.6 % Ovelvoltage Category 11 OUTPUT DURING OPERATION Maximum Output Current 1, Adc Maximum Output Voltage 60 Vdc OUITPUT DURING„ STANDBY (POWER OPTIMIZER ISCONNE TE FROM INVERTER oil INVERTER OFF} Safety Output Voltage per Power Optimizer + 1 Vdc' STANDARD COMPLIANCE EMC FCC Part 15 Class B,1EC61000-6-2, IEC61000-6,3, CISP[t11, EN-55071 Safety IEC62109-1 (class II safety), UL1741 Material " UL94 V-O, UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-OS INSTALLATION i SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x N) 129 x 155 x 30 mm Weight (including cables) 655 / 1.5 gr/ lb Input Connector MC42 Input Wire Lengtl? 01 In Output Connector MC4 Output Wire Length ,+) 23, (-) 010 Operating Temperature Range" 40 to +85 G Protection Rating IP68 / NEMA6P Relative Humidity 0 -100 % ::. (1) Rated power of the module at STC will rot exceed the PowerOptimizer Rated Input DC Power Modules with upto":+S% power Tolerance are allowed (2) For other connector types please Contact SolarEdge .'. (3) For ambient temperature above +70'CJ+158°E.power de -rating is applied. Reterto Power OcitimiZ@Ps Temperature De-Rafn Technical Nolteformore details MInImUm String Length 5440, 5500 8 16 18 (Power-0ptimizers)-- Maximu n Strang Length (PawecOptimize ) 25 50 Maximum Nomina` powel per St Ingh% 5700 11250in 12750`1r W Parallel Strings of Different Lengths or Orientations Ves (4) If the inverters rated AC power s maximum nominal power: per string, then the maximum power per string will be a No to reach up to the inverters maximum input DC.. " power Refer to: https,//www.solaceage_comtsitesldefaultlfiiestse-power-opt mizer single-string-design-application-note;odf (5) For the 230/400V grid it Is allowed to install up to 13,50OW per string when the maximum power difference between each string is 2,000Vd (6) For the 277/480V grid. it s allowed to install up to 15,Oo0W per string when the maximum power difference between each string is 2,OOOW (7) It is not allowed to m)x s-series and P-senes Power Orath>iue s in new installations U Soiaredge Technologies, Inc. All rights reserved. SOLAREDG6, the Solaralge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of Sale edqe Technologies, Inc. � A All other trademarks mentioned herein are trademarks of their respective owners. Date: 12/2021 DS-000091-1.2-ENG. Subject to change without notice. V { ttlx� yg, R �t ti V ti 1`l, i ! ! solaredge.com Z3 r 11=0 W-W 0 0 Power Optimizer P370 / P401 / P404 / P485 / P500 / P505 Rated Input DC Power') 370 400 405 485 Soo 505 W Absolute Maximum Input Voltage 60 80 125 80 83 Vdc (Voc at lowest temperature) MPPT Operating Range 8-60 12 S - 80 12,5-105 8-80 12,5-83 Vdc Maximum Short Circuit Current (Isc) 11 1175 11 10.1 14 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 Overvottage Category 11 OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum —output Current Ach: -- Maximum Output Voltage 60 85 60 85 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR,$OLAREDGE INVERTER OPF) -Safety output voltage per Power mizer 1 ± 0.1 Vdc OptiSTANDARD COMPLIANCE EMC FCC Part 15 Class S, 1EC61000-6-2, IEC61000-6-8 Safety IEC62109-1 (Aclass 11 safety), UL1741 PoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc L29xlS3x29.5 129xl$3x42,5/S,l 129x159x49.5/S.1 129x1S3x3. 129 x 162 x 5915.1 x mm Dimensions (W x L x H) P/ S.1 x 6 x 1.16 Wmm x 6 x 13 x 6.2 x 1.9 /S.lx6xl.3 6A x 2.3 /in Weight (including cables) 655/1.5 775/1.7 845/1.9 7S0/1.7 1064 23 gr/lb Input Connector MC4(1) Single or MC49) Dual MC400) Input Wire Length 0,16 0,52,0.9 2�95A T-- - 0-16 —m /—ft Output ­`Conn.,t.,----'-'-- MC4 Output Wire Length 12 f 19 rn/ft Operating Temperature Range -40 to + 85 -40 to + 185 C /.F Protection Rating IP68 -Relative Humidity 0-100 of (1) Rated power of the module at STC will not exceed the optimizer "Rated Input DC Power". Modules with up to +5% power tolerance are allowed (2) For other connector types please contact SolarEdge (3) For dual version for parallel connection of two modules use the P485, In the case of an odd number of PV modules in one string, installing one P485 dual version power optimizer connected to one PV module is supported, When connecting a single module, seal the unused input connectors using the supplied pair of seals Minimum String Length Maximum Nominal Power per Stdngm 5700 $250 112! Parallel Strings of Different Lengths or Orientations Yes (4) It is not allowed to mix P404/P4$5/P505 with P370/1`401jP500 in on, string (5) The P370/P401/P500 cannot be used with the SE3K three phase inverter (available in some countrie; refer to the three phase inverter SE3K-SEI0K datasheet) (6) Exactly 10 when using SE3K-RW0I0BNN4 (7) If the inverters rated AC powers maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power. Refer to: https//www. solaredge,com/sites/defauh/files/se-power-optimizer-single-string-design-application-note.pdf (8) For the 230/400V grid: it is allowed to install up to 13,500W per string when the maximum power difference between each string is 2,OOOW (9) For the 277/480V grid: it is allowed to install up to 15,OOOW per string when the maximum power difference between each string is 2,OOOW 0 S.I.,Edge Technologies, Ltd, All rights reserved. SOLAREDGE, the SofarEdge logo, OPTIMIZED V $OLAREDGE are trademarks or registered trademarks ofSolarEdge Tachoolovies,loc, All othertrademarks mentioned herein are trademarks of their respective —,,a.. Date; 02/2020/02/ENG ROW. Subject to change without m,tica C E - Specifications subject to technical changes and tests, LON(e SvIar reserves the right of interpretation, N WNG1 Poslillive power tolerance (0 - +5W) guaranteed High module converston efficiency (up to 203%) Slower power degradation enabled by Low LID Mono PERC technology: first year <2%, 0.55% year 2-25 Solid PID resistance ensured by solar cell process optimization and careful module BOM selection Reduced resistive loss with lower operating current Higher energy yield with lower operating temperature Reduced hot spot risk with optimized electrical design and lower operating Current Room 801, Toever 3, Lujiazua Financial Plaza, No,826 Century Avenue, Pudong Shanghai, 200120, China 'el: +86-21-80162606 E,rntvl: moduleftrigi-sillcon,com Facetccok. wervv.facebook,eom/U)NGl Sole, Note: Due to continuous technical innovacon, R&D and improvement, technical data above mentioned may be of modification accordingly, LONGi have the sole right to make Such modification at anytime without further notice; Demanding party shall request for the latest dwasimet 'or such as contract need, and make it a consisting and binding part of lawful documentation duly signed by both parties, 2020041OVI I for US-D Current-VoNsage Curve JLR4-6 12 1 10'7gcN17 .a p 4 CO T..V-7S r, 0 0 20 20 In Voltage, (v) Al ToWNW, L,vth: ±ziim Width ±2­ Hritt±Imm Mrdivxtcrm Cell Orientation: 120 (WO) Junction Box: 11"68,three diodes Output Calaltn 4mm', 1200mm in length GkooS(ngleglinis 3,2mm coated tempered glass Frame; Arsedeed aluminum OW frame v0sighic: 19,5ke Dirriefulon: 1755x1D3W5mm Padmi Spots per pallet Mass per 20'GP Moss per 40`HC 4W Coil Mp,$r ligo — 10DUarl 20 300 WWI-' 40OW/ 200 ISO 100 so L 0 40 so 0 10 20 so 40 so Voltage M Operational T.AC— c Power Outputliblenince,, 0 - +5 Vic Voc and lsc`Vslenarpac±3V. Ma)dmum System Voltage: DCIOO(YV REML) Maximum Series Fuse Rafire. 20A Nominal Opainating Cell Temperattinn 45±2 C safty class: Class 11 Fire Wfig; UL type I or 2 0 10 20 30 40 so Voltage (v) Room 801, Tower 3, Lujjazui Financial Plaza, No.826 Century Avenue, Pudong Shanghai, 200120, China LONOI Tel:+86-21-80162606 E-mail: rnodule@kantil-sillcorccom Facabooka euvw.facel000k.corryLONG Solar Note: Due to continuous technical innovation, R&D and improvement, technical data above mentioned maybe of modification accordingly, LONG have the sole right to make such modification at anytime without further notice; Demanding party shall request for the latest datasheet for such as contract need, and make it a consisting and binding port of lawful documentation duly signed by both parties, 2020041OVI I for US-D JAMES A. CLANCY PROFESSIONAL ENGINEER 601 ASBU Y AVENUE NATIONAL PARK, ICJ 08063 (856) 358-1125 FAX: (856) 358--151 Construction Code Office Date: October 4, 2023 Re: Structural Roof Certification Subj: Papageorgiou Residence, 7242 Ashland Drive, Zephyrills, FL 33540 We have provided a review of the house roof construction of the abovenamed property in regards to verifying the capacity of the existing roof for installation of a new Solar Panel Array. We have found the residence to be of wood frame construction bearing walls with a wood framed roof system. Arrays are of 2x4 @ 24" o.e, trusses and is sheathed with 1/z" ext-ply and a single layer of asphalt shingle roofing. The wood framed roof structure bears directly upon the framed exterior wall system. The existing members meet FBC 7TH EDITION 2020, LOADING CODE (ASCE 7-16), WOOD DESIGN CODE (NDS 2015) design span ratings with sufficient capacity to carry the 4#/sf additional load imposed by the proposed solar array per the details below. Installation of solar rack systems shall be as follows: The unified panel assembly shall be supported on Rail -Less SnapNRack Topspeed Mount and SnapNRack Topspeed clamp providing an average of 2.5 mounting feet per module. Mounting feet shall be screw anchored through roof and directly to rafters or roof deck below. Foot attachment points to rafters shall be staggered each row with (4) # 14 wood screw Stainless Steel fasteners. Modules may be installed in portrait or landscape. Refer to project drawings for placement. Foot attachment to roof shall be fastened 16-32" o.c. at corners and 48" o.e. through the field. When installed per the above specifications the system shall meet the required 145 MPH wind load and 0 PSF ground snow load requirements. Should you have any further questions or comments please feet free to contact our office. This review is for structural review only and does not express or imply any review of the roofing materials for weather tightness, condition, or lifespan. Review of the roofing materials should be performed by the installing contractor or a certified roofing professional. Respectfully, James A. Clancy I t - i W) 4 Professional Engineet` r eku 1 +ATF °a °' FL License # 64848 „•' ' p ` ON AL 4 ttir'l1'Ey1 S 14'-8" Segment Name Tilt Azimuth Module Count R1 19.9 271.2 20 N (t S KEY FIRE SAFETY ZONE TPATHWAYS FROM LOWEST ROOF EDGE TO VIA RIDGE PROVIDED PER R324.6.1 V6" PATHWAYS PROVIDED ON BOTH SIDES OF RIDGE PER R324.6.2 PLAN VIEW TOTAL ROOF AREA: 2147 SOFT SOLAR ARRAY AREA: 393.2 SOFT THE SOLAR ARRAY IS 18.3% OF THE PLAN VIEW TOTAL ROOF AREA NOTES: 1. THE SYSTEM SHALL INCLUDE [20] LONGi Green Energy Technology Co Ltd LR4-60HPB-355M. 2. SNAPNRACK TOPSPEED WILL BE INSTALLED IN ACCORDANCE WITH SNAPNRACK INSTALLATION MANUAL 3. REFER TO STRUCTURAL DRAWING FOR SECTIONS MARKED AND ADDITIONAL NOTES. PROPOSED PV ARRAY LOCATION Solar Energy World Because Tomorrow Matters Solar Energy World LLC. 14880 Sweitzer Lane Laurel, MID 20707 (888) 497-3233 This drawing is the property of Solar Energy World Inc. The information herein contained shall be used for the sole benefit of Solar Energy World. It shall not be disclosed t others outside the recipient's organization, in whole or in part, without the written permission of Solar Energy World, except in connection with the safe and ase of the respective Solar Energy equipment. T;Iditf A/ A, C1 t % lvfAl TE 4 - or OR k 0 /ONAL TAMPED AND SIGNED FOR STRUCTURES ONLY Reialana REV DESCRIPTIONS BY DATE PicTteo By: Garrefj Connors sn 101412023 9:58 AM Nicholas Papageorgiou (IGS) 7242 Ashland Dr, Zephyrhills, FL, 33540 7.1 kW FL1 6163 DTK A 04—OCT-2023 AS NOTED A05%J11 KEY FIRE SAFETY ZONE LADDER ROOFANCHOR EXCLUSION ZONE • 1 � Anchor distance Working distance along from leading edge roof edge (from perpendicular) 6' & 10' 9191, 15' 11' 7" 20' 13' 3" 25' 14'-6n 30, 16' 35' 17' Zee Pleaseo. Hazards d.. I I I I Solar Energy World Because Tomorrow Matters Solar Energy World LLC. 14880 Sweitzer Lane Laurel, MD 20707 (888) 497-3233 o This drawing is the property of Solar Energy World Inc. The information herein contained shall be used for the sole benefit of Solar Energy World. It shall not be disclosed to others outside the recipient's organization, in whole or in part, without the written permission of Solar Energy World, except in connection with the sale and use of the respective Solar Energy equipment. - Skamp �t�R,itl;'filfl��. i 1 .4 NO r4 � r 'r 1 CAP E : r 'STAMPED AND SIGNED FOR STRUCTURES ONLY REV DESCRIPTIONS BY j DATE of -- -- Ported Hy,: Go- refit Connors on 7014./2023 0:58 AV P.opcx rtan» «w rta.a.. '.. Nicholas Papageorgiou (IGS) 7242 Ashland Dr, Zephyrhills, FL, 33540 7.1 kW FL16163 by DTK 04—OCT-2023 s� AS NOTED AU0j UTII I7Y A, >U41N cnl Aa nr NOTE: EQUIPMENT LOCATION PLAN IS APPROXIMATE, EXACT LOCATION TO BE VERIFIED WITH INSTALLATION CREW AND HOME OWNER AT THE TIME OF INSTALLATION. Solar Energy World Because Tomorrow Matters Solar Energy World LLC. 14880 Sweitzer Lane Laurel, MD 20707 (888) 497-3233 IXe Jafmar This drawing is the property of Solar Energy World Inc. The information herein contained shall be used for the sole benefit of Solar Energy World. It shall not be disclosed to others outside the recipient's organization, in whole or in part, without the written permission of Solar Energy World, except in connection with the ..Is and use of the respective Solar Energy equipment. sm„a, ' L I' <y 'No, fi446 i y t = . ff �j f I (�����k 1 A 'STAMPED AND SIGNED FOR STRUCTURES ONLY aevmwne REV DESCRIPTIONS BY DATE 01 - -- I _- _..._. L Plotteo 81: Garrett Connors on 10/4/i023 4:58 A.dd r,oF«e rams ew seam. Nicholas Papageorgiou (IGS) 7242 Ashland Dr, Zephyrhills, FL, 33540 7.1 kW FL16163 � DTK snma 04—OCT-2023 =wb AS NOTED E001 DETAIL A Scale: NTS OLAR PANEL TOPSPEED MOUNT ASSEMBLY 6PHALT SHINGLES )N PLYWOOD P14 WOOD SCREWS, S.S. FULLY EMBEDDED INTO WOOD DECK SPRUCE PINE FIR (SPF) CERTIFIED TRUSS TOP CHORD ,n 2X4 DIAGONAL WEB MEMBER 0 24" D.C. (TYP.) 2X4 TRUSS TOP CHORD 0 24" O.C. (TYP.) ROOF RIDGE A S1 — — — — — — — -- — — — - — — — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — — 2X4 TRUSS BOTTOM CHORD 0 24" O.C. 27'-6" STRUCTURAL SECTION S1 Scale: 1/4" =1'-O" NOTES: 1. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF FLORIDA BUILDING CODES: FRO 2017, FEC 7TH EDITION 2020, FLORIDA FIRE PREVENTION CODE 7TH EDITION 2020, LOADING CODE (ASCE 7-16), WOOD DESIGN CODE(NDS 2015) AND LOCAL REQUIREMENTS. 2. LOAD CRITERIA PER : • EXPOSURE CATEGORY "B" GROUND SNOW LOAD, Pg = 0 PSF LATERAL LOAD RISK CATEGORY"ll" • ULTIMATE DESIGN WIND SPEED = 145 MPH MAX. CANTILEVER BEYOND SOLAR RAIL BRACKET = 16" 3. SOLAR PANELS AND RACKING SYSTEMS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATION. 4. FOLLOW ALL LOCAL AND FEDERAL SAFETY REQUIREMENTS. Solar EnergyWorld Because Tomorrow Matters Solar Energy World LLC. 14880 Sweitzer Lane Laurel, MD 20707 (888) 497-3233 This drawing is the property of Solar Energy World Inc. The information herein contained shall be used for the sole benefit of Solar Energy World. It shall not be disclosed to others outside the recipient's organization, in whole or in Part, without the written permission of Solar Energy World, except in connection with the sole and use of the respective Solar Energy equipment. sty 0 fS Zr '0 4, No 7 Jp % R,-TATE 01C I �J4 V 4. ZONAL "STAMPED AND SIGNED FOR STRUCTURES ONLY REV DESCRIPTIONS BY, DATE 01 Scllet� Clnno-s or ICI112023 9 5B AM Nicholas Papageorgiou (IGS) 7242 Ashland Dr, Zephyrhills, FL, 33540 7.1 kW FL1 6163 DTK 04—OCT-2023 sew AS NOTED S 0 (4) 1 P Para �� � s 3 v t UTILITY w ' h,-,. BI-DIRECTIONAL a 0 i ELECTRIC METER %TATEE1 STRING OF 10 MODULES ..................... 5 — — — --- r-------------i i 1 _ 1 _ 1 j SE600OH-USRGM (240V) �------------ +........................................ ® }-- -- -- 6000W, 99% CEC POWER POWER POWER ; 240AC, 25A OPTIMIZER OPTIMIZER = OPTMIZER S500 S500 _ SS00 j I + + j 1 STRING OF 10 MODULES j ; -- D UTILITY AND MAIN SOLAR jAC DISCONNECT j ' AMP RATING: 60A VOLT RATING: 240V o 0 0 _ SA FUSED i1 + 1 + 1 _ + I 6 7 i-- — ------ ® ........................... _............ - ------ �— O Cl— _ POWER POWER POWER OPTIMIZER = OPTIMIZER OPTIMIZER S500 S500 S500 I I L2 � 2 TRANSITION 3 f MODULE SPECIFICATION BOX N MODEL NO. Longi LR4-60HPB-355M; ----- -- -- PEAK POWER 355 W(DC); - - - — - RATED VOLTAGE (VMPP) 34.60 V; $ - -- -- -- O jI -N Ll L2 RATED CURRENT (Imp) 10.27 A OPEN CIRCUIT VOLTAGE (VOc) - - V i SNORT CIRCUIT CURRENT (Isc) 11.25 A ExISTING� --------------------- MAXIMUM SYSTEM VOLTAGE 1000VDC GROUND MAIN SERVICE PANEL OptiITliZer Specifications 150A, 240VAC, 1PH, 3W+G OPT_I_MIZER_MODEL __ S500; \ !, �THREE LINE DIAGRAM MAXIMUM DC VOLTAGE _ - 60 V!, ' scale: Nn WIRE/CONDUIT SCHEDULE ARRAY TAG DESCRIPTION WIRE SIZE/TYPE NOTES 1 Panel to Optimizer #10 PV WIRE 2KV RATED Integrated 2 Optimizer to Transition Box #10 PV WIRE 3 Transition Box to DC Disconnect #10 Cu THHN/THWN-2 DC Disconnect to Inverter NA Integrated 4 Inverter to AC disconnect #8 Cu THHN/THWN-2 5 AC Disconnect to Interconnection Point #6 Cu THHN/THWN-2 6 Equipment Grounding Conductor #8 Cu Bare Copper Wire 7'Equipment Grounding Conductor #8 Cu THHN/THWN-2 8 Grounding Electrode Conductor #8 Cu 9 Grounding Electrode Conductor #8 Cu GENERAL ELECTRICAL NOTES: NEC2017 1. EQUIPMENT USED SHALL BE NEW, UNLESS OTHERWISE NOTED. 2. EQUIPMENT USED SHALL BE UL LISTED, UNLESS OTHERWISE NOTED. 3. EQUIPMENT SHALL BE INSTALLED PROVIDING ADEQUATE PHYSICAL WORKING SPACE AROUND THE EQUIPMENT AND SHALL COMPLY WITH NEC. 4. COPPER CONDUCTORS SHALL BE USED AND SHALL HAVE INSULATION RATING 60OV, 90-C, UNLESS OTHERWISE NOTED. 5. CONDUCTORS SHALL BE SIZED IN ACCORDANCE TO NEC. CONDUCTORS AMPACITY SHALL BE DE -RATED FOR TEMPERATURE INCREASE, CONDUIT FILL AND VOLTAGE DROP. 6. ALL CONDUCTORS, EXCEPT PV WIRE, SHALL BE INSTALLED IN APPROVED CONDUITS OR RACEWAY. CONDUITS SHALL BE ADEQUATELY SUPPORTED AS PER NEC. 7. AC DISCONNECT SHOWN IS REQUIRED IF THE UTILITY REQUIRES VISIBLE -BLADE SWITCH. 8. EXPOSED NON -CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AS PER NEC. 9, LINE SIDE INTER -CONNECTION SHALL COMPLY WITH NEC 10. SMS MONITORING SYSTEM AND IT'S CONNECTION SHOWN IS OPTIONAL. IF USED, REFER TO SMS INSTALLATION MANUAL FOR WIRING METHODS AND OPERATION PROCEDURE. 11. ASHRAE FUNDAMENTAL OUTDOOR DESIGN TEMPERATURES DO NOT EXCEED 47°C IN THE U.S. (PHOENIX, AZ or PALM SPRINGS, CA) 12. FOR LESS THAN 9 CURRENT -CARRYING CONDUCTORS IN ROOF MOUNTED SUNLIGHT CONDUIT USING THE OUTDOOR TEMPERATURE OF 47°C 12.1. 10AWG CONDUCTOR ARE GENERALLY ACCEPTABLE FOR MODULES WITH AN Isc OF 9.6 AMPS WITH A IS AMP FUSE. Wire sizing for OCPD Ex(Isc*(1.25)(I.25)(# of strings in paralell)= wire ampacity or using NEC table 690.8 OPPORTUNITY PROJECT P116163 DATE DRAWN 10/04/2023 DRAWN BY 0TK DMS #: REV. ;U1141 K FFPC 11. 12.2,1.1.6 .. .. .... ..... . tNARNING PHOTOVOLTAIC POWERSOURCE ALL SOLAR CONDUITS 10' SPACING TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN CONDUCTORS OUTSIDE THE ARRAY. CONDUCTORS WITHIN THE ARRAY REMAIN FNFR('17Fr) IN Si ]NJ I('HT INVERTER FFPC 11.12.2.1.1.1,2 690.56(C)(1)(B) UTILITY DISCONNECT, MAIN SOLAR DISCONNECT, 690.13(C) PHOTOVOLTAIC 'DISCONNECT FOES UTILITY OPERATION UTILITY DISCONNECT WARNING: DUAL POWER SOURCE '.SECOt<f6 SOURCE IS PV SVSTEN 690.59 ELECTRICAL PANELS FFPC 11,12.2.1.4, NEC 205,12(D)3 ALL SOLAR JUNCTION BOXES 690.35(F) LABEL INFORMATION LABEL SCHEDULE TAG DESCRIPTION/LOCATION CODE REFERENCE PAGE 1 Conduit IFC 605.11.1.4, 690.31(G)(3)(4) E001 2 DC Disconnect - DC PV Power Source NEC 690.53, 690.56(C)(1) E001 3 Inverter - Shock Hazard 690.56(C)(1)(B) E001 4 PV AC Disconnect - System Parameters NEC 690.54 E001 5 AC Disconnect - Utility Disconnect NEC 705.12(B)(2), 690.13(B) E001 6 Electrical Panel - Dual Power Source NEC 690.54, 690.13(B) E001 7 Warning: Electric Shock NEC 705.12(B)(3)(4) E001 t I I If I C ....... Al, No � 13,41Ui N-, W i-ae tk J- -_0 �j "10RIT)P" SN FFPC 11.12.2.1.1.1.1, 690.56(C)(1)(A) 7 0 5.12 (B) (2) (3) (C) INFORMATIONAL NOTE: LABELS TO COMPLY WITH NEC1 10.21 (B) Ld L fA 0 OPPORTUNITY PROJECT FL16163 DATE DRAWN 10/04/2023 DRAWN BY Dix DNS III: RM SHEET E3