Loading...
HomeMy WebLinkAbout23-7106City of Zephyrhilis 5335 Eighth Street Zephyrhills, FL 33542 Phone: (813) 780-0020 Fax: (813) 780-0021 ELCMISC-007106-2023 Issue Date: 10/27/2023 REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. =Trl" M-1110111 1111111ROMT _1711 T , FIT171M Complete Plans, Specifications add fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. L CONTRACTOR SIGNATURE PE IT OFFICEt) PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER i 813-780-0020 City of Zephymills Permit Application Fax-813-780-0021 Building Department Date Received Phone Contact for Permitting 1( I * * It It x a a i a V W a I It 9 a a W It f a Owner's Name Kirklan Jobe Owner Phone Number 917-627-6685 Owner's Address7657 Broad Pointe Dr., Zephyrhills, FL 33540 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address JOB ADDRESS 7657 Broad Pointe Dr., Zephyrhills, FL 33540 LOT# 32 SUBDIVISION Zephyr Lakes Sub PARCEL ID# 35-25-21-0160-01100-0320 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR F__1 ADD/ALT SIGN DEMOLISH R INSTALL = REPAIR PROPOSED USE SFR F__] COMM OTHER F-R-657-Vo--OnTS`oar one s�� TYPE OF CONSTRUCTION BLOCK = FRAME STEEL DESCRIPTION OF WORK Install of 16 roof mount REC405W solar panels and 16 Enphase microinverters BUILDING SIZE ^mm I SO FOOTAGE 318.62 HEIGHT [:= W VIV W-Ir-W k WXV -U-X, XVVIE V VIE -It Irit v It X_ E: W 't x x XW_x XXV-X-Ar X'V XXV V It VIF-WIL T-VV t_V_x X_kV_X_VW_V V It XV W1 BUILDING I $ 32782.35 1 VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL 1 $ 1500.00 AMP SERVICE PROGRESS ENERGY = W.R.E,C. =PLUMBING 1$ =MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION =GAS ROOFING SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA =YES NO BUILDER COMPANY ADT SOLAR LLC - Joseph Chevalier SIGNATURE REGISTERED ­J Y/N FEE CURREN Y/N Address 13135 Drane Field Rd #11, Lakeland, FL. 33811 License # CVC57068 ELECTRICIAN COMPANY ADT SOLAR LLC - Ronnie Padgett L SIGNATURE REGISTERED YIN FEE CURREN L_X_LN_j Address 3135 Drone Field Rd#11, Lakeland, FL,33811 License # L EC13001242 PLUMBER COMPANY SIGNATURE REGISTERED L_YLN] FEE CURREN Address License # MECHANICAL COMPANY SIGNATURE REGISTERED LYIN FEE CURREN Y/N Address F_ License# OTHER COMPANY SIGNATURE REGISTERED Y/N FEE CURREN Ey= Address License # RESIDENTIAL Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans w/ Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projects COMMERCIAL Attach (2) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans wl Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction, Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Notice of Commencement is required. (A/C upgrades over $7500) Agent (for the contractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (copy of contract required) Reroofs if shingles Sewers Service Upgrades A/C Fences (PloVSurvey/Footage) Driveways -Not over Counter if on public roadways..needs ROW 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to 'deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County, TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law —Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs, If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the "owner' prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, WaterWastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses, Army Corps of Engineers -Seawalls, Docks, Navigable Waterways, Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone W" unless expressly permitted. If the fill material is to be used in Flood Zone "X, it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension, If work ceases for ninety (90) consecutive days, the job is considered abandoned. FLORIDA JURAT (F.S, 117,03) OWNER OR AGENT Subscribed and sworn to (or affirmed) before me this by Who is/are personally known to me or has/have produced as identification. Public Commission Name of Notary typed, printed or 111111112WW ZIL"Ilgimmm !P Subscribed and sworn 1,1 kAftqC_e —as identification. 4jotl�C—Notary Public Commission No. Name of Notary typed, printed or stamped LINDSAY BATEMAN 4 MISSiOn # HH 430664 ExPires August 7, 2027 NT oocuSignEnvelope |o:u0000nc4-osoe-4*o1-ABrz-4aonaoopaoB1 CUSTOMER INFORMATION INSTALLATION LOCATION Homeowner Name: Kirklan jobe Address: 7657 Broad Pointe Dr Spouse or Co -Owner Name: N/A City: zephyrhills State: FL —] Zip- 33540 MailingAddress: 7657 Broad Pointe or Location on Property: Roof City: zephyrhi I Is State: FL Zip: 33540 SYSTEM INFORMATION Email: ki rk] an112@yahoo. com Estimated 11t Year Production: 9160 kWh This Home Improvement Contract ("Agreement")isentered into on9/Z5/2O2] ("AgreementDate")byADTSolar LLC (f/k/aMarc Jones Construction, LL[and 8unpro)("ADTSo|ar,""us"or"we")and the oustomer(s)listed above ("[ugomer" or "you") (ADTSo|ar and the Customer may be referred to together as the "Parties") for the sale and installation of the photovoltaic solar system ("PV System") described below, and if applicable, energy storage device ("Battery"), (collectively, the ,System") at the Installation Location listed above ("Property") upon the terms and conditions set forth in this Agreement including attachments, all of which are incorporated into this Agreement. You are entitled to a completed copy of this Agreement signed by both you and AQT Solar before any work begins. The Agreement Date above is the date on which the last party signed this Agreement. Please read the entire Agreement and ask any questions you may have. The contract price (the "Contract Price")is 34 282 35 consisting of 34 202 35 for your PVSystem and any Additional Work asdefined below, N/A —for your Battery, N/A —for your re-roo8ng,and for your insulation, including sales tax, ifapplicable. The Contract Price issubject toany change orders agreed to in writing by both you and ADT3o|ar. No federal or state incentives, rebates, or tax credits were used todetermine the Contract Price, 2.2 Description of the System and Estimated Description of Significant Materials to be Used and Equipment tobeInstalled (the "K4ateha|s"): SITE DESIGN Note: This des 'iin i's su ec to redesigns due to unforeseen obstructions, size restrictions, or other reasons. be approved by the homeowner. Customer Initials: a. Solar cortractv.04h> - ADT3olar LL[ (f/k/a Marc Jones Construction, LLC and Sunprn — License # EC13012486, sC13001242CVC57068, [CC133I329,4492 Eagle Falls Place, Tampa, FL, 33629,86G-599-3635;Corporate Offices located atZBGeneral Patton, Covington, LA7o433 oonuSionEnvelope ID: -^o72-4ae03ooF35B1 terms, & conditions. Insulation: If you have selected to include insulation as part of this project, the Scope of Work will include the following — Adding blown -in fiberglass insulation to an aggregate total of 13.25 inches (R-38 equivalent) which may include existing insulation levels. Ventilation baffles will be installed as needed to maintain airflow. 2.2 Work to be Performed & Standard Components Our work (the "Work") under this Agreement: design the System, secure basic building and electrical permits as needed ("Pennits^),install the System onthe Property, perform any Additional Work listed below, cleanup and remove debris and materials, complete and submit utility interconnection documents, coordinate building, electrical, and utility inspections required for operation of the System. No other work is included unless expressly stated elsewhere in this Agreement. Standard components ("Components") used inthe Work include a production monitor, racking and mounting components, wiring, and conduit, small SysteM Adder < 7 W size system 2/4 Additional materials and extra work required to prepare your Property for the System, and which ygu must complete at your expense prior to us beginning our Work ("Customer Preparations^): 3A This Agreement ER IS [] IS NOT contingent on you obtaining approval for financing by a third -party lender. 32 FINANCED PURCHASES: If you are paying a portion of the Contract Price in cash and financing the remainder, O OO ofthe Contract Price will bepaid incash, and $ 34282.35 will be financed through othird-party lender. The Contract Price only includes the amount wecharge for the System and the Work. |fyou obtain financing from athird party, your agreement with your lender will determine the total amount you owe tothem and your payment schedule, and may include interest, fees, finance charges, A[H fees, UCC removal and refUngfeey' orother charges. This Agreement does not contain the terms of your financing agreement with your lender. If both Parties agree to ADT Solar performing Work, you will be responsible for payment of the Contract Price and your other obligations in this Agreement even if you do not secure financing. You are not required to use any particular lender to finance any or all of the Contract Price. ADT Solar is not affiliated with any lender and does not arrange or broker loans. If you choose to finance the Contract Price, carefully read any agreements and disclosure forms provided by your lender. If you have any questions about your financing agreement, contact your lender before signing acontract. Solar Contract v.04(s) AoTSdar uI (f/k/a Marc Jones Construction, UIand sunpro) —Ucense# Ec13012486, sc13001242 CVC57068 ovounignEnvelope ID: ec000004-aeoa-44o1-Aorz-4oaoaoop000I C.3 I XJ 3.3 If you are purchasing the System with cash, ADT Solar requires a down payment and progress payments according tuthe schedule below. Down Payment: (3O%) -DueuponsigningnfthisAgreement 111|nstoUment: (60%) -Amount due atthe commencement ofinstallation Final Payment: (10%) - Due upon completion of installation and passing of utility and/or local authority inspection, as applicable, but before interggan9cting Late Payment: If ADT Solar does not receive any of the above payments within ten (10) days of their due date, ADTSo|ar may charge you z late fee equal to the lesser of(i) one-and-a-halfpercent (1.5%) per month on the amount past due, or (ii) the maximum amount permitted under applicable law. This late fee is not an interest charge, finance charge, time -price differential, or other charge of a similar nature. 3.4 Pavment of Taxes: You acknowledge and agree that you are responsible for paying any applicable personal property oradvalorem taxes onyour System. 4.2 ADT Solar will install the System within a reasonable amount of time after you sign this Agreement. We will schedule the installation of your System at a mutually agreeable time and date. 42 : 3O-6Odays from the Agreement Date. 4.3 Approximate Completion Date:3O-12Ddays from the Agreement Date subject topermissible delays as defined inthis Agreement. 4.4 The above Installation Timeline is an estimate and maybe adjusted as provided inthis Agreement, including for delays due to late payments, Customer Preparations, undisclosed, unforeseen, subsequently arising conditions, additional work required to make the Property suitable forthe System, or delays caused by local permitting authorities, homeowners' associations, or other third parties. ADT Solar will be deemed to have started work under this Agreement on the date the first Permit is applied for. After your System installation is complete, additional time will be required for your utility to approve and connect your System tothe electrical grid. Additional terms and conditions are contained in Attachment 1, and warranties are contained in Attachment 2. 61 Good Faith Efforts. The Parties agree to make a good faith effort to resolve any dispute informally. If you have any concerns, please contact ADT5o|mr's customer service department at 1-866-508-1890or with a detailed statement of your concern. If the Parties cannot reach a resolution within 45 days afteryou notifyADTSolar of the dispute, either party may commence a formal proceeding pursuant to the process detailed below. For any pnoperty, installation, or performance concerns, or to perform any work as may be required by applicable law, you must allow us access to Solar Contract v.04(s)-ADTSolar LLC(f/k/ Marc Jones Construction, LLCand 3unpno)—License #EC13O12486 EC13001242 CV[57068 DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B903ODF35B1 x 4 inspect the System and, to the extent helpful, the Property or any other property, data, information, or materials related to the matter. 6.2 ARBITRATION: If the Parties are unable to resolve a dispute informally, you and ADT Solar agree that any dispute arising out of or relating to any aspect of the relationship between you and ADT Solar will be resolved exclusively by arbitration except as specifically provided below. The arbitration, including the selection of the arbitrator, will be administered by the American Arbitration Association ("AAA") under its Construction Industry Arbitration Rules and Mediation Procedures, as supplemented by the Consumer Due Process Protocol (collectively, the "AAA Rules"), rather than in a court before a judge or jury. The location of the arbitration shall be the AAA office closest to the Property unless otherwise agreed to by the Parties, and the arbitration shall be administered by a single neutral arbitrator. The Parties may pursue all claims and remedies available under this Agreement in the arbitration. This agreement to arbitrate all disputes includes claims arising before this Agreement, such as claims related to statements about our products and services. You and ADT Solar grant the arbitrator the exclusive authority to resolve any dispute related to the interpretation, applicability, or enforceability of these terms or formation of this Agreement, including the arbitrability of any dispute and any claim that all or any part of these terms are void or voidable. The arbitrator has authority to allocate all or part of the costs of the arbitration, including the fees of the arbitrator, filings fees, expert witness fees, costs, expenses, and attorneys' fees to the prevailing party. Attorneys` fees awarded to ADT Solar for collection of any amounts due shall not exceed 20/ of the amounts awarded to ADT Solar. The arbitrator's decision will be final and may be entered and enforced in any court having jurisdiction. arbitrator6.3 The + any legal or equitable relief that a courtr order BROUGHTgrant under this Agreement. HOWEVER, THE ARBITRATOR WILL NOT HAVE AUTHORITY TO MAKE ANY RULING OR AWARD APPLICABLE TO ANY CLAIMANT OTHER THAN YOU OR ANY TRANSACTION OTHER THAN YOURS. ADT SOLAR AND YOU FURTHER AGREE THAT ALL CLAIMS AND DISPUTES WILL BE AN INDIVIDUAL BASIS, AND PARTIES WAIVERIGHT TO BRING OR PARTICIPATE IN A CLASS ACTION, PRIVATE ATTORNEY GENERAL, OR REPRESENTATIVE ACTION ("CLASS ACTION WAIVER"). THE ARBITRATOR HAS NO AUTHORITY TO CONSIDER OR RESOLVE ANY CLAIM OR « ISSUE ANY RELIEF ON ! CLASS, COLLECTIVE,r x ARBITRATOR OBTAINS EXPRESS CONSENT FROM ALL PARTIES. YOU MAY ALSO BRING INDIVIDUAL DISPUTES IN SMALL CLAIMS COURT. NOTWITHSTANDING THIS PROVISION, IF A COURT OF COMPETENT JURISDICTION FINALLY DETERMINES THE CLASS ACTION WAIVER TO BE INVALID, OR UNENFORCEABLE, THEN YOU AND ADT SOLAR AGREE THATNOT BE j AND THAT ARBITRATION AGREEMENT SHALL BE VOID IN ITS ENTIRETY WITHOUT EFFECT ON THE REMAINDER OF THIS AGREEMENT. 6.4 YOU AND ADT • A' AGREE THAT THIS AGREEMENT TO ARBITRATE DOES NOT APPLY TO ANY CLAIM WHERE THE AMOUNT • •f + COURTCLAIMS r WHERE M RESIDE, PROVIDED, HOWEVER, THAT YOUAND 4r SOLAR AGREE THAT ANY SUCH CLAIMS MAY BE BROUGHT ONLY ON AN INDIVIDUAL BASIS AND NOT AS A CLASS ACTION. 6.5 YOU HEREBY ACKNOWLEDGE TH! r ARE VOLUNTARILY AGREEING ARBITRATE ANY AND ALL DISPUTES ARISING OUT OF OR RELATING TO THIS AGREEMENT, YOU ARE WAIVING YOUR RIGHT TO BRING AN ACTION IN COURT OTHER THAN CLAIMS BROUGHT IN SMALL CLAIMS COURT, AND YOU ARE AGREEING TO ARBITRATE ON AN INDIVIDUAL BASIS AND NOT AS PART OF A CLASS. Solar Contract v.04(s) - ADT Solar LLC (f/k/a Marc Jones Construction, LLC and Sunpro) — License # EC13012486, EC13001242, CVC57068, CCC1332319, [Office Address], 866-599-3635; Corporate Offices located at 233 General Patton, Covington, LA 70433 ovoosignEnvelope ID: l*e72-4ee03ooF35o1 You can obtain more information about arbitration and the AAA Rules online at www.adL,,or or by calling 1-80O-77D-7879orany AAA office. Customer Signature: 7. Addresses for Notices: Any notices provided to Customer under this Agreement shall be sent to the Mailing Address or the Customer's email address indicated at the top of this Agreement. Any notices to ADT Solar under this Agreement shall be sent to: ADT Solar LLC, ATTN: Customer Service, 233 General Patton, Covington, LA 70433. 8. Severability: In case any one or more of the provisions, or portions of a provision contained in this Agreement or any other documents referred to herein or executed in connection with this Agreement or otherwise, should be invalid, illegal, orunenforceable /n any respect, the validity, legality, and enforceability ofthe remaining provisions contained herein and therein shall not in anyway be affected thereby. It is the Parties' intention that ifany such provision, or portion thereof, is held to be illegal, invalid, orunenforceable, this Agreement shall be modified to affect the original intent of the parties as closely as possible to be legal, valid, and enforceable. 9.1 A0TSo|ar provides you an industry -leading Power Production Guarantee to ensure your PV6ysbem performs as expected, 9.2 Based onthe Site Design above, your PVSystexn isestimated to produce9 kWh (the "Estimated Vt Year Production") in the first 12 months following the date on which your System is fully activated (the "Operational Date")and isestimated toproduce 222253 kWh over the first 25 years following the Operational Date (the "PPG Term") according to the following schedule: PPG Year Estimated Annual Production PPG Year Estimated Annual Production Year 13 8889 kWh 9.3 For each "PPG Year,"shown above, ADTSolar guarantees that the PVSystem will generate atleast 95% of the Estimated Annual Production for that PPG Year (the "Guaranteed Annual Production"). This schedule assumes a degradation rate of 0.25% per year. 3u|nr Contractxo4(s) - ADT Solar UI (f/k/a Marc Jones Construction, LL[ and sunpn,) — License # sC13012486 E[13001242 cvC57068, oovuSx nsnvelop°m:ocuuoun4-oEos-4^ol~^ar2-^6ynunopnso1 8.4 If the PV System does not produce the Guaranteed Annual Production for any PPG Year, and you notify us of your request for a review within 1 year of the end of that PPG Year, ADT Solar will pay you $0.10 per kWh ("PPG Rate") of the difference between your System's Actual Production and the Guaranteed Annual Production for that PPG Year. 9.5 "Actual Production" means the amount of electricity produced by your System, To calculate the Actual Production, we will use the data provided by the monitoring system installed with your System or if such data is not available, we will estimate the Actual Production by commercially reasonable methods. 9.6 For example, if your Guaranteed Annual Production for a PPG Year is 10,000 kWh, but your Actual Production for that PPG Year is only 9,000 kWh, we would multiply the difference (1,000 kWh) by your PPG Rate ($0.10/kVVh)'which equa|s$1OO. 9.7 Your Estimated Vt Year Production, Guaranteed Annual Production, and this PPG are based on the Site Design above. If there are any adjustments to your Site Design pursuant to a written change order, your Estimated 1*Year Production, Guaranteed Annual Production, and this PPG shall be automatically adjusted according to the final installed System design. See Section 11 below for more details. This PPG is also subject to the additional terms and conditions contained in Attachment 2. 9.8Overproduction: ADT Solar does not charge you for any energy your System generates in excess of the Guaranteed Annual Production, and any such overproduction will be credited against future underproduction. 10.Nute About Extra Work and Change Orders: Extra Work and Change Orders become part of the Agreement once the change order is prepared in writing and signed by the Parties prior to the commencement of work covered by the new change order. The change order must describe the scope of the extra work or change, the cost to be added or subtracted from the Agreement, and the effect the change order will have on the schedule of progress payments or the completion date. You may not require ADT Solar to perform extra or change order work without providing written authorization prior to the commencement of work covered by the new change order. ADT Solar's failure to comply with the requirements of this paragraph does not preclude the recovery of compensation for work performed upon legal or equitable remedies designed to prevent unjust enrichment. 11. Site Designs @& Revisions: The Materials, Components' Estimated 1stYearProducLiun' and PPG are estimates based on the preliminary Site Design of your System contained in Section 2.1 above. ADT Solar may perform additional reviews of the Site Design, including site visits to the Property to verify feasibility of the System design. You will have the opportunity to review and approve any revision to the Site Design (each revision, a "Revised Site Design"). Revised Site Designs that do not reguire a change order: Revised Site Designs that meet all nfthe following criteria will not require the Parties to execute a change order: (a) no change in the Contract Price, and (b) no change in the Materials provided or Work performed, and (c) do not result in a reduction of the Guaranteed Annual Production by more than 10%. However, in the event a Revised Site Design results in a reduced Guaranteed Annual Production and a change order is not executed along with the Revised Site Design, the PPG will not be reduced; it will remain the same as with the last approved Site Design. You will have business days from your receipt nfa Revised Site Design to request any changes; otherwise you will be deemed to have approved it. We may begin installation of your System if you have given your written, deemed, or verbal approval of any Revised Site Design, including verbal approvals given onthe day oforwithin 5days prior tothe installation date, Revised Site Designs that will require a change order: Revised Site Designs that donot meet all of the criteria above must be accompanied by a written change order, signed by both you and 4DT5obr, before we will proceed with Solar Contract v.04(s) - ADT Solar LLC (fyk/a Marc Jones Construction, Ul and \unpno) — Licenxe# EC1301I486, Ec13001242, CVC57068 000 monsnvampom: 2c30000*-3soe-44cI-AB72-4o903noF35a1 any further Work. The change order may result in an adjustment to the Contract Price. The Estimated 1st Ye PriWuctiot I Guar;�-,iteecl Annual Pro se__a_ �-,: .1 and change order. If you request a Revised Site Design after ADT Solar has requested, applied for, or received permits or other authorizations based on an approved or deemed approved Site Design, you will be responsible and separately invoiced for any costs associated with requests or applications for new or revised permits or other authorizations caused by the Revised Site Design. 12. Governing Law and Venue: This Agreement shall be governed by the law of the state in which the Property located, and venue shall be the county/parish where the Property is located, except that the arbitration clause Section 6 above shall be governed by the Federal Arbitration Act. I Agreement Date or, if you are 65 years of age or older, you may cancel this Agreement within 15 business da, after the Agreement Date. Please review the attached notice of cancellation forms for an explanation of 1yo right to cancel. 14. No Tex Advice: ADT Solar makes no representation about and takes no position on the tax consequences of this Agreement, the Work, or the System. A dispute regarding the tax implications of this Agreement or the System shall not affect the validity of the Agreement. For more information, see Attachment 5 ' Homeowner's Guide to the Federal Solar Tax Credit. 15. Entire Agreement: This Agreement supersedes any prior understandings, agreements, or representations by or between the Parties, written or oral, to the extent they related in any way to the subject matter hereof. 16. Successors: This Agreement shall be binding upon and shall inure to the benefit of the Parties and their respective successors, assigns, heirs, purchasers, and representatives. Attachment 1—Terms &Conditions Attachment 2 — Limited Warranties and Additional Terms & Conditions for the PPG and Batteries Attachment 3—Notice ofCancellation Forms Attachment 4—Legal Notices Attachment G—Homeowner's Guide tothe Federal Solar Tax Credit Attachment 6-8E|ASolar Purchase Disclosure Addendum — Homeowner's Guide toBattery Storage Solar Contract xO4(s) -ADTSolar UI (f/k/a Marc Jones Construction, LLC and Sunpno) — License # EC130I2486, E[13001242Cvc57068 000uSx ns^vawpem: 1 NOTICE TDCUSTOMER: Do not sign this Agree nent if blank. You are entitled toacopy ofthe Agreement atthe time you sign, You, the buyer, may cancel this transaction at any time prior to midnight of the third business day (or fifteenth business day if you are 65 years of age or older) after the date of this transaction. See the attached notice ofcancellation form for explanation ofthis right. Signature: Date: 9/25/2023 Contractor: ADTSolar LLC(f/h/aMarc Jones Construction, LUCand Sunpro) Signature: zessa eoades Title: Date: 9/25/20I3 233 General Patton 71 Covington, LA 70433 Solar Contract xo4(s) - ADTsn|ar UI (fyk/a Marc Jones Construction, LLC and 3unpno) — License # sc13012484 ECI3001242 CVC67088, oncuoignEnvelope ID: /-Ae72-4o903ooF35o/ IX Attachment I The Parties agree these Terms QConditions are incorporated into the Agreement as though they were set forth fully therein. Capitalized terms not otherwise defined herein shall have the same meanings as those set forth in the Agreement. 1. ADT Solar will obtain any necessary basic building and electrical Permits atADT So|ar'scost. Customer isresponsible for obtaining any other permits or authorizations, including homeowners' associations and planning, zoning, architectural, or historical preservation commissions. ADT Solar is not responsible for any delays caused 6ypermitting authorities, utilities, or regulators. Any deadlines, including those in the Installation Timeline, shall be automatically extended tocompensate for any delays caused by permitting authorities, utilities, regulators, or other third parties not reasonably within our control. 2. You are responsible for the structural integrity of the Installation Location, including structural or electrical modifications necessary to prepare your Property for the System, and including any Customer Preparations. ADT Solar is not obligated to begin or continue any Work if Customer Preparations are not complete or if Property conditions are not suitable for performing the Work. You agree that ADT Solar is not responsible for any known or unknown Property conditions. The Contract Price assumes that existing roofing materials (except to the extent that the Contract Price includes re -roofing) and structural supports will be adequate to carry the load of all e4uipmenttobeinsta||edandworktobedone under this Agreement. If any modification of roofing materials and/or reinforcement ofexisting structural supports isrequired and isnot otherwise specifically stated and charged for inthe Agreement, ADT Solar will be entitled to a change order providing an increase to the Contract Price and an extension of the Installation Timeline. Roofing leaks or compromised roof decking/materials that are not identified during the design phase may become apparent during installation. If these conditions are discovered, we will notify you to discuss the issue. ADT Solar will not have any obligation to make any repairs or perform any work necessary to make the Property feasible for installation of the System unless included inthe Additional Work above oras executed inamutually agreeable change order, 3. ADT Solar is not responsible for and bears no |iati|hY for the malfunctioning of existing electrical equipment at the Property, including but not limited tnthe mein electrical service panel, any major electrical devices, orany other fuses orsimilar devices. You will provide I10'vo|1 electrical power from the existing distribution system on the Property for hand-held portable power tools atnocost toADT Solar. 4. Unless otherwise specifically stated |nthe Agreement, the Work to be performed by ADT Solar specifically excludes installation of critter guards; roof repair or support; trenching; removal ordisposal ofhazardous waste not placed there by us; removal or replacement of rotted, rusted, or insect -infested structures; correcting errors byCustomer nrother contractors not under our control; tree trimming, removal, or relocation; trimming of landscape materials; structural, cosmetic, or electrical work; and relocation or installation of water, gas, sewer, electric, or communication lines. 5� ADT Solar provides you with a25-YearPower Production Guarantee in Section 9 of the Agreement Net savings may vary based onhome location, home age Solar contractv.04(s) -AoTsolar uI (fyk/a Marc Jones Construction, LLC and Sunpm) — License # EC130I2486 Ec13001242CV[57068 CC[l33z319,[Office Addre,s]'866-599-S635; Corporate Offices located otJ33General Patton, Covington, b^7U433 oocvaignEnvelope ID: zoaoonn4-aEoE-*4ol~Aer2-4anonoorono1 0 icj i and construction, system size, incentive and rebate programs, net metering policies, your changing energy consumption, utility rates, and fuel costs. Net metering and other utility or solar policies may change atany time. You are responsible for knowing and understanding the net metering, avoided cost, or other programs offered by your ud|i4/ regarding excess electricity generated by your System. We design our systems to save money over the long term and to offset all or most of your current electricity consumption, and we guarantee the System'oproduction for 2Gyears through the PPG. However, ADT Solar does not guarantee savings or that your utility bill will bereduced to$0.OD. Agreed and accepted by: VA '�Cu-gl:Wer Initials) 6. Customer shall take all reasonable measures 10prevent nvershading or other interference with the operation and production of the System. Customer must also provide a safe wmrksite with access to electrical power and water. Customer shall assist ADT Solar in responding to requests for information from any permit -issuing authority, any government body, or agency orasotherwise needed toperform the Work, and any requests by any third -party finance company. 7. Batteries: Any Battery incorporated into the System bintended to draw 100ofits charge from the PV System. It is not intended to discharge electricity back tothe utility grid. The Battery can provide backup power only to a selected set of essential circuits and may not power your entire Property. Loads powered by the Battery, and the length of time the loads can be powered, are dependent upon the charge of the Battery at the time of grid outage, the maximum discharge rate ofthe inverter, and the Battery discharge settings as determined bythe Customer. Customer will need to self -manage their consumption patterns and load for both back-up and self -consumption applications. 8. Incentives, Rebates, & Tax Credits: DI You may qualify for tax credits, rebates or other incentives related to your System ("Incentives") offered by federal, state, or local governments, your utility provider, or others. ADT Solar does not own or control any Incentives related to your System, and ADT Solar makes no representation, warranty, or guarantee about the nature, existence, oravailability nfany Incentive or whether you will qualify for any Incentive. You are solely responsible for completing and submitting any paperwork or information required to obtain any Incentive. We agree to provide you with reasonable support and documentation required for you to apply for Incentives. Neither ADT Solar nor your utility make any representations or warranties concerning the tax implications of any bill credits provided toCustomer. Agreed and accepted by: _2�vtZ(Q_04lwer Initial 91 You hereby grant to ADT Solar and its employees, agents, and contractors the right to reasonably access all of the Property as necessary between the hours of7:OOemand 6:0Opm,Monday through Saturday to perform the Work nr address our rights and obligations under this Agreement. 9.2. In the event Customer authorizes ADT 3o|ar's access to the Property through adjacent properties for any reason, Customer is required to obtain written permission from the owner(s) of the adjacent properties for such use, and Customer agrees to be solely responsible for and to defend, indemnify, and hold ADT Solar harmless from, any and all forms of liability that may arise out of or relate tosuch use. Solar Contract v.04(s)-ADT Solar UI(fyk/ Marc Jones Construction, LL[and Sunpno)—License #EC13OII486 EC12001242CVC57068, 000uSo nsnvowpom:cou000c4-asoE-44ol-^or2-4Be0000posa1 10. Customer agrees toallow ADT Solar the right tomonitor Customer's electricity consumption and System production, and grants ADT Solar permission to view and access such data. ADT Solar may also receive information about you from other sources, such as equipment manufacturers and utility companies. ADT Solar will not share your data with third parties except tothe extent necessary to fulfill obligations under this Agreement or in an anonymized or aggregated format. 11. All materials delivered tothe Property, regardless ofwhether incorporated into the System, are and will remain the property of ADT Solar until such time asthe Contract Price |spaid infull, Title tothe System shall transfer 10you after ADT Solar completes installation of the System and you make final payment. Notwithstanding the foregoing, after delivery of the System equipment and materials tmyour Property, you bear risk nfloss tothe System for all causes ofloss not covered bythe Limited Warranty (as set forth in Attachment 2). However, you will not bear any risk of loss for damage directly resulting from ADT So|a/s negligent actions oromissions orwillful misconduct. ADT Solar retains all ADT Solar -owned intellectual property rights on any of the equipment installed in your System including, without limitation, patents, copyrights, trademarks, and any data generated by ADTSo|ar's monitoring system. 12. Customer agrees and acknowledges that ADT Solar will incur costs and expenses preparing to perform the Work, designing the System, obtaining permits and approvals, and acquiring Materials and Components after this Agreement is signed. If Customer cancels this Agreement after the 3-day cancellation period (or 15-daycancellation period ifyou are age G5oro|der), Customer agrees to pay to ADT Solar, as liquidated damages and not afee, either (a) $3,000or(b) I0Y6 ofthe Contract Price, whichever isless, within seven (7) business days of providing ADT Solar with notice ofCustomer's decision toterminate this Agreement. Customer agrees that this amount is reasonable based onthe anticipated or actual harm caused by the termination, actual out-of-pocketcosts incurred, the difficulties of proof of loss, and the inconvenience or non -feasibility of otherwise obtaining an adequate remedy. Customer may not terminate this agreement, except as provided by Section 13 below, after any Materials have been installed on the Property. 13. ADT Solar may, upon 10days' written notice toCustomer, terminate this Agreement for breech, failure of Customer to agree to any change order deemed byADT Solar 10 benecessary, failure ofCustomer topay any amount due, bankruptcy of Customer, any failure by the Customer tocooperate inthe installation process, if Customer Preparations are not completed, or if the Property Condition is not suitable to perform the Work. Customer may terminate this Agreement upon written notice lfADT Solar does not commence orcomplete work within the time periods inSection 4ofthe Agreement, and Customer will beentitled to a refund ofany down payment orother payments made towards the Work. However, Customer shall remain liable tzADT Solar for any work performed. 14. In addition toits rights inSection 13above, and without limiting any ofADT So|ar'sother rights and remedies, upon any breach by Customer, including any failure ofCustomer topay any amount due, ADT Solar shall have the right, tothe fullest extent allowed by law, to: (m) pursue a stop work order atthe Property; (b) stop any more work from being done attheProperty until the breach iacured and abond isposted bythe Customer for any amounts payable under this Agreement; (o) recover all amounts due under this Agreement for services provided through the date of termination including interest atthe rate ufI.SY6per month orthe highest rate allowed by applicable |evv, whichever is less; (d) require you to return the System at your expense and/or make the Property Solar Contract v.04(s) ADT Solar 4I(fyk/a Marc Jones Construction, LLC and 3unpno) — License# EC13012486EC13001242CV[57068 oo^aignEnvelope ID: uca000c4-ueoe-44nl-Aoru-4anu000paoB1 �, available touotoremove the System; (e)disconnect, turn oft or take back the System by legal process or self-help (if legally available), provided ADT Solar does not disturb the peace or violate the law (you agree that ADT Solar will have access to your Property and permission to enter your Property in ordertudisable and/or remove the System until such time asADT Solar ispaid infull and title tothe System passes toyou);(f)report such non -operational status ufthe System toyour utility, informing them that you are no longer net metering; (g) charge you a reasonable fee for reconnecting the System toyour utility or turning your System back on after it is disconnected or turned off; and (h) any other legal remedies including, without limitation, mechanic's 15. Lien Releases: If a lien should be placed on your Property by ADT Solar, upon satisfactory payment for any portion of the work performed, made by Customer, furnish to Customer a full and unconditional release from any potential lien claimant claim or mechanics' lien authorized 16. Insurance: ADT Solar carries commercial general liability and workers' compensation insurance for all employees. 17. Each Party agrees to indemnify, defend, and hold harmless the other Party and its employees, officers, directors, agents, and assigns from any and all third -party claims, actions, costs, expenses (including reasonable attorneys' fees and expenses), damages, liabilities, penalties, losses, obligations, demands, and liens of any kind arising out oforrelating toits breach ofits obligations under this Agreement. Neither Party will be required to indemnify the other Party for such other Party/sown negligence, willful misconduct, or fraud. 18. Exercise of Reasonable Care: ADT Solar will exercise reasonable care not to damage your Property during installation of the System. In the reasonable efforts to repair such damage at ADT Solar's cost. 19. Force Maeure: Except with respect to any payment obligations hereunder, both Parties shall be excused for delay in the performance of any obligations hereunder tothe extent that such delay iythe result oforattributed toaforce majeureevent ("Force K8ajeure Event"). For purposes of this Agreement, aForce K4ojeureEvent means any cause beyond the affected Partys reasonable control including but not limited to acts of God such as storms, fires, floods, lightning and earthquakes, sabotage ordestruction byathird party ofuSystem, war, riot, acts of a public enemy or other civil disturbance, or a strike, walkout, lockout or other significant labor dispute, interruptions in delivery of supply mfparts urraw materials, the issuance ofany new utility requirements, trade association, or government Laws. 20. Limitation of Lia�jljjy THIS AGREEMENT SHALL BE LIMITED TO DIRECT, ACTUAL DAMAGES ONLY. BOTH PARTIES AGREE THAT IN NO EVENT SHALL EITHER PARTY BE LIABLE TO THE OTHER FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE, EXEMPLARY, SPECIAL OR INDIRECT DAMAGES, INCLUDING WITHOUT LIMITATION (a) PHYSICAL OR MENTAL PAIN AND SUFFERING OR EMOTIONAL DISTRESS DAMAGES; (b) COSTS OF TEMPORARY SHELTER, TRANSPORTATION, FOOD, MOVING, STORAGE, OR SIMILAR INCIDENTAL DAMAGES OR EXPENSES; (c) LOSS OF USE, LOSS OF OPPORTUNITY, LOSS OF FAIR MARKET VALUE, LOSS OF RENTALVALUE, LOSS OF FINANCING, OR SIMILAR Solar Contract v.04(s} -ADTso|ar LLC (fyk/a Marc Jones Construction, LLCond Svnpno) — License# BC13012486 EC13001242 Cv[57068 DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B903ODF35B1 Additional a. Conditions the Power Production (PPG) it Batteries The Parties agree this Attachment 2 is incorporated into the Agreement as though it was set forth fully therein. Capitalized terms not otherwise defined herein shall have the same meanings as those set forth in the Agreement. ADT Solar may assign or transfer these Limited Warranties to a third party. This warranty gives you specific legal rights, and you may also have other rights which vary from state to state, • Al &ITIMIL 1 •• •. Ina 1 ,.Now--x•.ffid"Im!Ix F x + L:1 •x 14 ol 1 + 1> 1 x i } r x. , 1 1. +. INSTALLATION.Al PURPOSE, CONDITION, DESIGN, CAPACITY, SUITABILITY OR PERFORMANCE OF THE SYSTEM OR ITS •• a •MTMTfJ1T1J1ffS• • s • -• • X• • • apply to you. IMAIVI-70: Subject to certain limitations stated below, we provide the following limited warranties (collectively, the "Limited Warranties") for your System and our Work: 25-Year Limited Workmanship Warrantv ("Workmanship arranty"): ADT Solar warrants that the System will be installed in a good and workmanlike manner according to the reasonable standards of care and diligence generally practiced by solar installation companies when installing residential photovoltaic systems of a similar size and type as the System in the geographic region where the Property is located and pursuant to the manufacturer's instruction, applicable law, and requirements of the local permitting and inspection authorities and your utility. 10-Year Limited Roof Leak Warranty ("Roof Leak Warrant1+" : If you are in compliance with all your obligations under the Agreement, for a period of 10 years beginning on the Operational Date, ADT Solar warrants your roof against water infiltration at each roofing penetration made by ADT Solar in connection with the installation of the System and the surrounding area within a 3-inch radius of each such penetration (collectively, the "Covered Roof Areas"). Manufacturer's Warranties for Products and Materials, ("Manufacturer's Warranties"): The major Materials and Components of your System — panels, inverters, racking and mounting system, and monitoring device — all have Manufacturer's Warranties. Following installation of the System, ADT Solar will provide you with copies of all relevant Manufacturer's Warranties for the components of your System. Solar Contract v.04(s) - ADT Solar LLC (fjk/a Marc Jones Construction, LLC and Sunpro) — License # EC13012486, EC13001242, CVC57068, CCC1332319, 4492 Eagle Falls Place, Tampa, FL, 33619, 866-599-3635; Corporate Offices located at 233 General Patton, Covington, LA 70433 ovcuoignEnvelope ID: oc000no*-3Eme-4*c/-Aoru-4oeoaooFanB1 t�� �� w UPON RECEIPT OF PAYMENT IN FULL UNDER THIS AGREEMENT, ALL WARRANTIES THAT ARE PROVIDED BY MANUFACTURERS OF EQUIPMENT USED IN THE SYSTEM WILL RE TRANSFERRED DIRECTLY TO YOU. YOU UNDERSTAND THAT ADT SOLAR HAS NO RESPONSIBILITY WITH RESPECT TO SUCH WARRANTIES OTHER THAN TO TRANSFER THEM TOY0U� Exclusions from Warranties The Limited Warranties and the PPG do not applyto any lost power production, damage, repair, replacement, loss orcorrective action required due toany ofthe following: __'��u���wustomerInitials) 1� Any actions performed or materials used or installed by anyone other than ADTSolar or its approved service providers, including repairs, alterations, movement, ormodification 10the System orany portion nfthe System for any reason; 2. Destruction or damage to the System, including any Battery, or its ability to safely oreffectively produce or store powerthat is not caused by ADTSolar or its approved service providers in the course of performing its obligations under this Agreement (for example, any damage that is the result of natural disasters, vegetation, tree limbs, orgolf ball strikes), or the actions of persons or parties not within our reasonable 3. Your negligence or failure to properly operate or maintain the System or to take appropriate action to minimize any damage as soon as reasonably practicable, including any failure to dean the System as needed and according tomanufacturer's instructions; 4. Ordinary wear and tear, including cosmetic defects; 5. Power or voltage surges caused by someone other than ADT Solar or its service providers, including a grid event; G. Theft, removal, or disabling of the System or the production monitoring device; 7. Damage resulting from mold, fungus, and other organic pathogens; & Shrinking orcracking ufgrout and caulking; 9. Fading of paints and finishes exposed tosunlight; in particular, ADTSolar is not responsible for ensuring repaired or replaced shingles or other roofing materials match other sections of the roof that have become discolored orfaded; 10� Pre-existing and/or underlying failures ofthe roof; 11. Earthquake, fire, flood, hail, soot, salt damage, or other weather conditions or other acts of God; 12. Any damages or losses covered by your homeowner's insurance policy or any other insurance policy; 13, Damages resulting from condition ofthe Property; 14. Damage from pests urrodents; 15. Snow covering orasnow load damaging the System; 16 Systems with the type or serial number(s) altered, removed, or illegible; 17. Any otherwise covered claims of which you do not notify ADT Solar within 30 days of your discovery of the basis for the claim. Solar Contract v.U4($ -ADTSo|ar Ul(fyk/a Marc Jones Construction, LLcand Sunpm) —Ucense# EC13012486, sc13001242CVCS7068, onouSNnEnvelope ID: coaoonc4-3Eoe-4*c1+oru-4eyoxoorano1 11U I The Limited Warranties and the PPG provided in this Agreement will be voided entirely by any of the following: 1. Your gross negligence oryour intentional damage tothe System; Z. Your breach of or failure to perform your obligations under the Agreement and/or the Limited Warranties, including but not limited tnany failure toreport system damage orfailure, not cooperating with usorany third party to assist in the assessment of or repairs to the System, or failure to properly operate the System in accordance with the owner's manual or manufacturer's instructions; 3. Any actual or attempted installation, repair, alteration, replacement, movement, change, or modification to the System made by anyone other than ADT Solar or its approved service providers, or 4. Improper use oroperation; 5. Any violation of Manufacturer's Warranty; G. Energizing your System without utility's prior written consent to operate and ADT Solar's express, written consent. In addition to the above, the PPG requires that you have and maintain active electrical service and internet connection. If at any time you fail to provide electricity or internet connection, or ADT Solar is unable to monitor the System remotely for any reason, Actual Production during that period will be estimated by ADT Solar using reasonable means. Actual Production will be adjusted to include electricity that ADT Solar estimates would have been produced during any time periods when the System is shut down or producing less power due to a transmission grid failure, at your request, or due to your failure to perform any of your obligations under the Agreement. You agree to notify ADT Solar immediately upon your discovery that the The PPG shall not apply to any production issues that arise from: 1. Shading from foliage that is new growth or is not kept trimmed to its appearance as of the date the System was installed or shading from structures built or modified after the System was installed; 2. Shading from materials covering the System, including but not limited to snow coverage, dust debris, leaves; 3. Accidents, alterations, or damage to the System (for example, golf ball strikes or fallen tree limbs); 4. Grid failures, grid events, or other utility interruptions that disable or interfere with the normal operation nfthe System; 5. Manufacturer's defects, damages, performance issues, reporting issues, or any other condition for which you do not promptly give us notice in writing within 30 days of the date you first become or reasonably should have become aware ofthe circumstances giving rise tosuch issues; 6. Any of the items included in the statement of exclusions from the Limited Warranties or circumstances that will void the Limited Warranties above. Solar Contract v,04(s) -AoTSolar UI (f/k/a Marc Jones Construction, LLC and Sunpno) — License# E[13012486, EC13001242, CVC57068, ovcmoanEnvelope ID: ucnnonc*-3Eos-44nI`Aerz-4onoonoFauB1 , , Co I Any actual or attempted installation, repair, alteration, replacement, movement, change ormodification 0o the System made by anyone other than ADT Solar or its approved service providers, or without ADTSo|ar's prior written consent will automatically void the PPG. Having an incorporated Battery as part of your System will not affect the PPG. A Battery incorporated into the System is designed to draw its charge from the PV6ystem' simply storing the energy produced by the PV System for discharge according toits programming. If the System performs better than the PPG (i.e., the Sysem's Actual Production is greater than the Guaranteed Annual Production during the PPG Term) then this surplus energy is yours at no additional cost. Selling)(our ProDerltv and Transferring the PPG and the Limited Warranties If you sell your home, the PPG and the Limited Warranties (except as applicable, any Manufacturer's Warranties with different provisions) are transferrable tothe new owner ifyou provide written notice toADT Solar within 30 days of the sale of the Property, pay a $250 transfer fee, and notify us of the date of the sale and the new owner's name and contact information, Transfer shall not be effective until the new owner signs a written acknowledgment accepting all of the terms and conditions of this Agreement. If you have financed your System, contact your lender for any additional restrictions. Vv+�'Cgaomer Initials) To ask a question regarding the Limited Warranties, the PPG, or this Agreement, you may call ADT Solar at 1- 833.409.1007. To submit a claim or provide any other notice under the Limited Warranties, the PPG, or a notice to transfer, you must send us the request in writing, certified or registered first-class mail, post prepaid, with n return receipt requested, or nationally recognized courier service requiring signature for receipt, tothe following address: ADT Solar LLC ATTN:Warranty Claims &Transfers 233 General Patton Covington, LA7O433 To notify you regarding aLimited Warranty, the PPG, o,this Agreement, ADT Solar may send you anotice in writing inthe manner described above, ortothe email ormailing address provided in the Agreement or any subsequent contact information that you provide to us. The Parties agree that any emailed document shall be deemed anoriginal document. Claim Process If ADT Solar receives a claim under a Limited Warranty or PPG from you, ADT Solar will review your claim and notify you within 1Sbusiness days whether your claim iscovered. |fADT Solar cannot make this determination without inspecting the System, ADT Solar will send an employee, contractor, or agent to your Property within 15 business days of the date ADT Solar receives your claim, and ADT Solar will then notify you within 10 business days of the visit as to whether your claim is covered by a Limited Warranty or the PPG, Solar [ontractxO4hJ ADT Solar UI (f/k/a Marc Jones Construction, LLC and Junpnz) — License # EC13012486 EC13001242, CVC57058 DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B9030DF35B1 If your claim is covered by a Limited Warranty or the PPG, ADT Solar to either (1) pay you the required amounts under the PPG, or (2) make the repair or replacement under the Limited Warranty within a reasonable period of time, at no cost to you. ADT Solar may use new or reconditioned parts to make repairs. The warranty period will not be extended, nor will a new warranty period begin, upon any repair or replacement conducted under this warranty. ADT Solar will use commercially reasonable efforts to replace parts with the same type of equipment but may substitute materials or types of equipment if necessary. Any equipment substitution will not change our PPG obligations. Additionally, at ADT Solar's option (but at no additional cost to you), ADT Solar may elect to make cosmetic repairs that are not covered by the Limited Warranty or to upgrade or add to any part of the System to ensure that it performs according to the PPG. If your claim is not covered by a Limited Warranty, you may request that ADT Solar make the repair or replacement at your cost and expense. ADT Solar will send a representative to your Property to provide you with a price quote for the requested services. You may then elect whether to have ADT Solar provide the requested services at the quoted price. The System may only be moved by ADT Solar, and only in order to permit you to renovate or repair the ProXeMvjaQrAour requestand knour exyense. ADT Solarr a re%resentativeto 0our Pro,-tertktto yrovide you - quote forg the System.You electADT Solarr System at the quoted price. [... ACTUALOR ATTEMPTED i i REPAIR, .PAR ALTERATION, REPLACEMENT, MOVEMENT, CHANGE, OR MODIFICATION TO THE SYSTEM MADE BY ANYONE OTHER THAN ADT SOLAR OR ITS APPROVED SERVICE PROVIDERS, OR WITHOUT ADT SOLAR'S PRIOR WRITTEN CONSENT Customer Signature: - �/110— Solar Contract v.04(s) - ADT Solar LLC (fjk/a Marc Jones Construction, LLC and Sunpro) — License # EC13012486, EC13001242, CVC57068, CCC1332319, [Office Address], 866-599-3635; Corporate Offices located at 233 General Patton, Covington, LA 70433 oocuanEnvempe ID: 1 Agreement Date: 9/25/202] You may cancel this transaction, without any penalty or obligation, within three (3) business days from the above date or, if you are 65 years of age or older, you may cancel this Agreement within fifteen (15) business days after the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within ten (10) days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller atyour residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. if you do make the goods available to the seller, and the seller does not pick them up within twenty (20) days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract, To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice, or any other written notice, or send a telegram to the following address no later than midnight of the third business day (or fifteenth business day if you are 65 years of age or older) following the Agreement Date: AQTSolar LLC ATTN:Customer Service 293General Patton Covington, LA 70433 I hereby cancel this transaction. (Date) (Customer's Name) (Customer's Signature) Solar CuntractvV4(d - ADTSo|ar UI (f/k/a Marc Jones Construction, LLC and 3unpn) — License # ECI3012486 EC13001242CVC57068, CCC13323I9'4492Eagle Falls Place, Tampa, FL, 33619\866-599-g63S;Corporate Offices located at233General Patton, Covington, LA7U433 oncuSx nEnvmvn°m:zoaoonc4-aeoE-44n1-ABr2-4soouoopuuo1 ATTACHMENT 3 Agreement Date: 9/25/ZD2] You may cancel this transaction, without any penalty or obligation, within three (3) businessdays from the above dote or, if you are 65 years of age or older, you may cancel this Agreement within fifteen (I5) business days after the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within ten (10) days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. Ifyou cancel, you must make available tothe seller atyour residence, insubstantially asgood condition aswhen received, any goods delivered to you under this contract or sale, or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make the goods available to the seller, and the seller does not pick them up within twenty (20)days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract, To cancel this transaction, mail or deliver a signed and dated copy ofthis cancellation notice or any other written notice, or send a telegram to the following address no later than midnight of the third business day (or fifteenth business day Kyou are 65years ofage orolder) following the Agreement Date: AUTSolar LLC ATTN:Customer Service 2B3General Patton Covington, LA 70433 I hereby cancel this transaction. ME (Customer's Name) (Customer's Signature) Solar [ontmctv.04(s) - AoTsolar UI (f/k/a Marc Jones Construction, LUC and 3unpno) — License # EC13012486Ec1300I24I CVC57068 DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B903ODF3561 1 Nothing in this Agreement is a "Notice to Owner" as that term is defined by Florida construction lien laws. If you are provided by other person,♦lar will provide of partial payments. As of the date of this Agreement, ADT Solar does not use subcontractors for the installation of • 101, ! c !1.' M + ! ►� ! •k! # ! !. M 1 WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED + YOU ! AN Owner Name: Ki rkl an ]obe The Florida Public Service Commission has adopted rules regarding insurance requirements for solar systems. Your utility company has interpreted those rules to mean that owners of a solar system which is 11.6kW DC / 10.0 kW AC or larger, including those owned by residential customers for their own use, Solar Contract v.04(s) - ADT Solar LLC (f/k/a Marc Jones Construction, LLC and Sunpro) — License # EC13012486, EC13001242, CVC57068, CCC1332319, [Office Address], 866-599-3635; Corporate Offices located at 233 General Patton, Covington, LA 70433 DocuBign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B9030DF35B1 t tyq to the utility that they have sufficient financial means to self -insure in that amount. If you do not, the utility can prevent you from interconnecting to the grid; interconnection is required for your solar system to operate. FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS: ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES. Date: 9/25/2023 Solar Contract v.04(s) - ADT Solar LLC (f/k/a Marc Jones Construction, LLC and Sunpro) — License # EC13012486, EC13001242, CVC57068, CCC1332319, [Office Address], 866-599-3635; Corporate Offices located at 233 General Patton, Covington, LA 70433 DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B903ODF35B1 WHAT IS A TAX CREDIT? federal tax credit reduces your federal income taxes due by $1,000. WHAT IS THE SOLAR INVESTMENT TAX CREDIT? • The investment tax credit (ITC) is a tax credit that can be claimed on federal income taxes for 30% of the (PV) system price. • There is no maximum amount that can be claimed. WHAT ARE THE ELIGIBILITY REQUIREMENTS TO CLAIM THE INVESTMENT TAX CREDIT? Your solar system might be eligible for this tax credit if you meet all of the following criteria: • Your solar PV system is "placed in service" on or after January 1, 2022. • The solar PV system is located at a residential location in the U.S. (but not necessarily your primary residence). • You own the solar PV system (i.e., you purchased it with cash or through financing). • The solar PV system is new. The ITC can only be claimed on the "original installation" of the solar equipment. • The solar ar ajhconnicted to the Wd o irid or mobile solar aDDlications are not eliclible). Note. a fixed foundation mo)jbz WHAT IS THE DIFFERENCE BETWEEN A TAX CREDIT AND A TAX REBATE? It's imi)ortant to understand that this is a tax credit, not a rebate. Tax credits offset the balance of tax vou owe to the governmen-li .4 IN W-- 1 0-1 01 111101 161111 000 Imp' I - Mew dFINIffn (5T i owe enough taxes to take full advantage of this credit. 1 "4111 00- OWN WRITANIP, 'I FAQs WHAT IF THE TAX CREDIT EXCEEDS MY TAX LIABILITY? WILL I GET A REFUND? This is a nonrefundable tax credit, meaning you will not get a tax refund for the amount of the tax credit that exceeds your tax liability. However, you may be able to carryover any unused amount of tax credit to the next tax year. CAN I USE THE TAX CREDIT AGAINST THE ALTERNATIVE MINIMUM TAX? Yes. The tax credit can be used against either the federal income tax or the alternative minimum tax. HOW DO I KNOW IF I WILL BE ABLE TO USE THE TAX CREDIT? OMNI I 0: III "Ado, WIN 0-01M-61 1111111111111TI Homeowner Signature: Date: 9/25/2023 DocuSign Envelope ID: 2C30DOC4-3EDE-44CI-AB72-4B903ODF35B1 This disclosure is designed to help you understand the key terms of your purchase of a solar electric system ("System"). It is not a substitute for your purchase contract ("Contract"), loan or any other documents associated with this transaction. Information presented below is subject to the terms of your Contract. Read all documents carefully so you fully understand the transaction. For more information on becoming a smart solar consumer please visit www.seia.orci/consumers. To better understand the cost of the electricity produced by your System, please refer to the separate form, SEIA@ Solar Purchase Disclosure Addendum — Estimated Cost Per kWh. PROVIDER: INSTALLER: WARRANTYIMAINTENANCE PROVIDER Address: Address: (if Different from Installer/Provider): ADT Solar LLC ADT Solar LLC 233 General Patton 233 General Patton Address: Covington, LA 70433 Covington, LA 70433 Tel.: Tel.: 985-882-7200 Tel.: 985-882-7200 License # (if applicable) License# (if applicable): ECI 3012486, State/County Contractor License #: Email: EC13001242, CVC57068, CCC1332319 EC13012486, EC13001242, CVC57068, Email: info@gosunpro.com CCC1332319 Email: info @gosunpro.COM CUSTOMER: Kirk Ian 3obe Customer ID: 3956568 System Installation Address: 7657 Broad Pointe Dr, zephyrhills, FL, 33540 Customer Mailini Address: 7657 Broad Pointe Dr, zephyrhillS, FL, 33540 Email: ki rkl an12@yahoo.com Contract Date: 9/25/2023 *NOTE: YOU ARE ENTERING INTO AN AGREEMENT TO PURCHASE A SOLAR ELECTRICITY GENERATING SYSTEM. YOU WILL OWN (NOT LEASE) THE SYSTEM INSTALLED ON YOUR PROPERTY, Mpurchase Your price: 34282 - 35 Amount you owe Provider at Contract signing: Your System: $ 0.00 X WILL be financed List of any credits, incentives or rebates El WILL NOT be financed; or included in the above purchase price: Amount you owe Provider at the commencement 0 Financing of System UNKNOWN to Provider of installation: $__NZ.A_ NOTE: If your System is financed, carefully Amount you owe Provider at the completion of read any agreements and/or disclosure forms N/A installation: provided by your lender. This statement does not contain the terms of your financing You will make a final payment to Provider at the agreement. If you have any questions about following time (e.g. interconnection): your financing arrangement, contact your *NOTE: Not everyone is eligible for such finance provider before signing a Contract. Incentives or can fully use them. Consult PER LOAN TERMS and for the your tax professional or legal following amount: $ 34282.35 professional for further information. SEIA I Solar Purchase Disclosure v. 2017 @ Solar Energy Industries Association DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B903ODF35B1 a i:i in Approximate Start Date: 90 days from the date the Agreement is signed ❑ YOU are or N PROVIDER is responsible for submitting a or 12/24/2023 _(date). 7 System interconnection application. 7 Approximate Completion Date: 120 days from the date of the Agreement is signed or 112 3/2024 (date). • The estimated size of your System is: E_4BD_ kW DC • Estimated gross annual electricity production in kilowatt-hours (kWh) from your System in Year 1: 9160 • Estimated annual electricity production decrease due to natural aging of the System: 0.25 % • System location on your property: Roof • Connectivity: The System N WILL ❑ WILL NOT be connected to the electric grid, • At the time of installation, your local utility N WILL ❑ WILL NOT credit you for excess energy your System generates. The rules applying to such credit are set by your jurisdiction. "System maintenance" refers to the upkeep and services required or recommended to keep your System in proper operation. System maintenance ❑ IS N IS NOT included. You are required to perform the following System maintenance: SEE OWNER'S MANUAL "System repairs" refers to actions needed to fix your System if it is malfunctioning. System repairs 11 ARE ❑ ARE NOT provided by the MATERIALS MANUFACTURER _(e.g. Provider, Installer, Other). If System repairs ARE included, the coverage periods for each hardware component of your System (in years) are: SEE MANUFACTURER WARRANTY If System repairs ARE included, the coverage periods for the labor/workmanship for each component of your System (in years) are: -25-YEAR LIMITED WORKMANSHIP WARRANTY PROVIDED BY PROVIDER. SEE CONTRACT TERMS AND CONDITIONS FOR DETAILS Please review your Contract for additional information about any warranties on the System installation and equipment. Note that equipment warranties for hardware are not required to include labor/workmanship. Your Contract may be assigned, sold or transferred by Provider without your consent to a third party that will be bound to all the terms of the Contract. If such a transfer occurs, you will be notified if this will change the address or phone number to use for system maintenance or repair requests. ;Your roof 0 IS EEI IS NOT warranted against leaks from the System installation for 10 years by PROVIDER (e•g• Provider, Installer, Other). Provider is providing "you with a: ❑ Performance guarantee for — years 0 Production guarantee for 25 years El No guarantee of performance or production Underperformance or underproduction will be remedied as follows: SEE POWER PRODUCTION GUARANTEE IN ESTIMATE. I YOU are responsible for property taxes on property you own. Consult a tax professional to understand any tax liability that may result from t Contract, ct. Your entering the Contract, SEIA 0 Solar Purchase Disclosure v. 2017 @ Solar Energy industries Association DocuSign Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B9030DF35B1 win ili� ill 11�1 11,111 '!ill!"! !!ill! 111i 1, Jill, '111 Provider N HAS 1:1 HAS NOT given you a financial savings estimate based on your purchase. If provided, the savings estimate was calculated based on: 0 Your estimated prior electricity use 7 E:1 Your actual prior electricity use 11 Your estimated future electricity use Such savings estimate assumes: • Your System will last 25 - years • A current estimated utility electricity rate of 0. 21931 during the first year with estimated utility rate increases of 3.5% _percent annually. Provider based these estimates on the following source(s): Homeowners Description of Will Bills, US Department of Energy, Equipment Manufacturer(s) N If your local utility is providing you credit for excess electricity your System generates, that the utility will continue to credit you based on 11 ESTIMATED FUTURE El CURRENT utility electricity rates 0 The following costs, expenses, rebates, incentives: NOTE: It is important to understand that future utility electricity rates are estimates only. Your future utility rates and utility rate increases may vary. Provider El IS 0 IS NOT guaranteeing these savings. If Provider is guaranteeing savings, underperformance will be compensated as follows: You may sell or assign any renewable energy certificates or credits (RECs) that you own from producing renewable solar energy to a third party (which may be t the Installer) depending on the laws of your state. Under the terms of your agreement, you have AGREED [:] NOT AGREED to assign or sell your RECs to a third -party. If you do sell or assign your RECs to a third party as part of the Contract or in the future, you will not own the RECs to resell, v use or claim, and a third party may have the right to claim clean, green or renewable energy based on its purchase of the RECs from your System. In may jurisdictions, you may have to surrender some or all of your RECs to receive state, local or utility incentives. 111111 ''I'l 1 '' l I I'' I Ill Ill Will 111, 1111111 In addition to any rights you have under state or local law, you 0 HAVE El DO NOT HAVE the right to terminate your Contract without penalty within three (3) business days of the transaction date 9/25/2023 by notifying Provider in writing at the above address. 0i i FM 111111 I ! 1, zzz Provider 0 DOES 0 DOES NOT abide by and agree to be bound by the SETA Solar Business Code and its complaint resolution process. For more information about the SETA Solar Business Code and complaint resolution process, please visit www.seia.orq/consumers or email SETA at consumer @s �iaor lin ii mom= Actual utility rates may go up or down and actual savings may vary. For further information regarding rates, you may contact your local utility or the public regulation commission that regulates your utility provider. Tax and other state and federal incentives are subject to change. Requirements to interconnect to the grid, which is required for your system to operate properly and for you to obtain any utility bill credits or incentives, are established by the rules of the public regulation commission or other governmental authority regulating your utility and may be obtained from either the commission or your utility provider. Battery systems, if purchased with your solar system, can provide backup power only to a selected set of essential circuits, and may not power your entire Property. Loads powered by the Battery, and the length of time the loads can be powered, are dependent upon the charge of the Battery at the time of a grid outage, the maximum discharge rate of the inverter, and the Battery discharge programmed settings as determined by the Customer. Customer will need to self - manage their consumption patterns and load for both back-up and self -consumption applications. Envelope ID: 2C30DOC4-3EDE-44C1-AB72-4B9434DF35B1 �X4 vr#m w M. fMml SYSTEM DETAILS Certificate Of Completion Envelope Id: 2C30DOC43EDE44ClAB724B9030DF35BI Status: Completed Subject: Solar Closing Documents for Kirklan Jobe Source Envelope Document Pages: 27 Signatures: 6 Envelope Originator: Certificate Pages: 2 Initials: 7 Docs Team AutoNav: Enabled 3049 Executive Way Envelopeld Stamping: Enabled Lehi, LIT 84043 Time Zone: (UTC-07:00) Mountain Time (US & Canada) production @9 osolo. io IP Address: 34.172.114.152 Status: Original Holder: Docs Team Location: DocuSign 9/25/2023 5:06:43 PM prod uction@gosolo. lo Status: Original Holder: Docs Team Location: DocuSign 9/25/2023 5:06:47 PM DAAS@gosolo.io Signer Events Signature Timestamp Jesse Roades Sent: 9/25/2023 5:06:46 PM jesse.roades@mysafehaven.com Titan Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Kirklan Jobe kirklan112@yahoo.com Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Signature Adoption: Drawn on Device Using IP Address: 73.67.16.119 Signed using mobile Signature Adoption: Drawn on Device Using IP Address: 108.5,180.97 Signed using mobile Viewed: 9/25/2023 5:07:07 PM Signed: 9/25/2023 5:07:35 PM Sent: 9/25/2023 5:07:38 PM Viewed: 9/25/2023 5:23:49 PM Signed: 9/25/2023 5:27:08 PM In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Docs Team L Sent: 9/25/2023 5:06:47 PM prod uction@gosolo. io I _ED Viewed: 9/25/2023 5:06:47 PM Security Level: Email, Account Authentication Signed: 9/25/2023 5:06:47 PM (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/25/2023 5:06:47 PM Certified Delivered Security Checked 9/25/2023 5:23:49 PM Signing Complete Security Checked 9/25/2023 5:27:08 PM Completed Security Checked 9/25/2023 5:27:08 PM Payment Events Status Timestamps Friday, October 13, 2023 Castillo Order #: C-55595 Contractor ADT Solar 4492 Eagle Falls Place, Tampa, FL 33619 RE: Roof mounted PV system Kirklan Jobe Residence 7657 Broad Pointe Dr, Zephyrhills, Florida, 33540 To Whom It May Concern, Castillo U'Agineering C:A3ii L0 ENIGNEERING SERVICES, LIC. 407-289-2575 YerT2`VV,CASTl LOPE,t ONO 6(. ,,o Dana Cent. Commons Su, to 270 Structural Engineering Certification Upon reviewing the as -built conditions provided by the contractor, I, Ermocrates Castillo PE# 52590 an engineer licensed pursuant to Chapter 471, certify that the installation of the modules is in compliance with FBC: Residential 2020 7th Ed., Chapter 3 and that the building structure will safely accommodate wind, lateral and uplift forces, and equipment dead loads. The member forces in the area of the solar panels are not increased by more than 5%; thus, the stresses of the structural elements are not increased by more than 5%. Therefore, the requirements of Section 807.4 of the 2020 FBC-EB are met and the structure is permitted to remain unaltered. The solar array will be flush -mounted and parallel to the roof surface. Thus, it is concluded that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case. Because the increase in lateral forces is less than 10%, this addition meets the requirements of the exception in Section 807.4 of the 2020 FBC-EB. Thus the existing lateral force resisting system is permitted to remain unaltered. After adequate review, the existing roof framing has been determined to be adequate to support the imposed loads without any additional structural upgrades. A. Site Visit & Documentation A site visit was performed by the contractor to identify the size and spacing of the existing roof's framing structure. The roof is evaluated for a module count of 16 modules B. Existing Structure Roof Style Hip Roof Type Asphalt Shingle Roof Height 25 It Rafter Type Southern Pine Rafter Size 2x6 Rafter Spacing 24 in O.C. Roof Slope 5/12 (22.62 deg) C. Governing Codes FLORIDA RESIDENTIAL. CODE, 7T14 EDITION 2020 (FRC) FLORIDA PLUMBING CODE, 7TH EDITION 2020 (FPC) FLORIDA BUILDING CODE, 7TH EDITION 2020 (FBC) FLORIDA MECHANICAL CODE, 7TH EDITION 2020 (FMC) NATIONAL ELECTRICAL. CODE 2017 (NEC) ASCE 7-16 FLORIDA FIRE PREVENTION CODE, 7TH EDITION 2020 (FFPC) D. Design Criteria Wind speed (ult): 140 mph Wind speed (asd): 108 mpb Risk category: II Exposure: B Ground snow load: 0 psf . Attachment Spans The solar panels shall be mounted in accordance with the most recent installation manual. Considering the wind speed, risk category, exposure, roof slopes, snow load, seismic load, size and spacing of framing members, and condition of the roof, the span tables provided by the manufacturer is not applicable and so the contractor what install the mounting system no greater than the below attachment spans: Non Exposed Modules I Cantilever I Exposed Modules I Cantilever Zone 1 Attachments at 41 in O.C. with 2 rails 13 in Attachments at 34 in O.C. with 2 rails 11 in Zone V Zone not applicable in l lip roofs - Zone not applicable 4) Rip roofs Zane 2e Attachments at 36 in O.C. with 2 rails 12 in Attachments at 24 in O.C. with 2 rails 8 in Zone 2n Zone not applicable in [lip roofa - Zone not applicable in Hip roof Zane 2r Attachments at 32 in O.C. with 2 rails 11 in Attachments at 21 in O.C. with 2 rails 7 in Zone 3e Attachments at 32 in O.C. with 2 rails 11 in Attachments at 21 in O.C. with 2 rails 7 in Zone 3r lonc not applicable in flip roofs - ZOTIe 310t,`Wplicable a=t Hip roof Castillo Engineering Services, LLC takes no responsiblity for the installation of the system. The contractor has supplied the as - built conditions and shall cease construction and notify Castillo should any discrepancies between the provided as -built conditions and the condition described in this letter be found. The design and engineering of the racking, mounting, waterproofing, fire pathways and setbacks, electrical system and system labels are the responsibility of others. The contractor must adhere to the spans provided within this letter and all connections to the existing roof must adhere to industry standard and per manufacturer's most recent installation instructions. Digitally PE Certification:signed b No. 52590 ~'" Ermocrates '9�•. STATE OF 4/ E Castillo e,��%c<oRi'D NSW t•The -tom has been 91e t! Ily signed f�". andseaipd by Ermocratas C st ilo, Pt` and a� on the Date and/or TOO stdnp shown i �.F using the Drgtai Sgnature Printed mules of this document are not consdead signed and sealed and the gnatulba mual be ve mad an Ermocrates Castillo, PX anyeiectron G. Copies...:. Florida License # 52590 —04' 00 ' WIND LOAD CALCULATIONS FOR MODULES INSTALLED ON ROOFS WITH A HEIGHT LESS THAN 60' SITE INFORMATION FFFBC VERSION 2020 RISK CATEGORY If MEAN ROOF HEIGHT (ft) 25.0 EXPOSURE CATEGORY B ROOF LENGTH (ft) 43.9 ROOF SLOPE 5 /12 ROOF WIDTH (ft) 41.9 ROOF SLOPE (°) 22.6 'ARAPET HEIGHT (ft) 0.0 ROOF TYPE HIP MODULE LENGTH (in) 71.7 ULTIMATE WIND SPEED 140 mph MODULE WIDTH (in) 40.00 NOMINAL WIND SPEED 108 mph MODULE ORIENTATION PORTRAIT EXPOSURE FACTOR (Ce) 1,000 MODULE AREA (sq. ft,) 19.92 TEMPERATURE FACTOR (Ct) 1,000 3ROUND SNOW LOAD (psf) 0.0 IMPORTANCE FACTOR (i:) 1.000 DEAD LOAD (psf) 3.0 SLOPE FACTOR (Cs) 0,910 SLOPED ROOF SNOW LOAD (psi) 0.0 Ko 0.850 EFFECTIVE WIND AREA (ft) 19-9 Kz_ 1.000 3ROUND ELEVATION (ft) 98.0 Ka 0.996 dVHZ NO K� 0.665 VELOCITY PRESSURE (q) _ .00256*KEKZK,&V` VELOCITY PRESSURE(ASD) 17.0 psf OF PRESSURE COEFFICIENT 41.9' * 10% = 4,19' ZONE WIDTH A 4 FT 25' * 40% - 10, ZONE 2 WIDTH N/A (FOR {°) <7') ZONE 3 WIDTH N/A (FOR (°) < 7°) NAL PRESSURE COEFFICIENT ZONE 1 0.580 -1.098 ZONE 1' 0.580 X ZONE 2e 0.580 -1.593 ZONE 2n 0.580 X ZONE 2r 0,580 -1.770 ZONE 3e 0,580 -1770 ZONE 3r 0.580 X JAL PRESSURE COEFFICIENT DESIGN PRESSURES ROOFZONE DOWN UP 1 16.0 -18.6 psf 1' 16.0 X psf 2e 16.0 -27.0 psf Module allowable uplift pressure 75 psf 2n 16.0 X psf Module allowable down pressure 75 psf 2r 16.0 -30.0 psf 3e 16.0 -30.0 psf 3r 16.0 X psf ARRAYFACTORS ARRAY EDGE FACTOR (EXPOSED) 1.5 SOLAR PANEL PRESSURE EQUALIZATION 0.68031 ARRAY EDGE FACTOR (NON -EXPOSED) 1 FACTOR ADJUSTED DESIGN PRESSURES xpose . xpose 1 16.0 -19.0 -16.0 psf 1' 16.0 X X psf 2e 16.0 -27.6 -18.4 psf 2n 16.0 X X psf 2r 16.0 -30.6 -20.4 psf 3e 16.0 -30.6 -20.4 psf 3r 16.0 X X psf ATTACHMENT MODEL Fiashloc Duo (Deck) ATTACHMENT STRENGTH 165 Ibs ?R/SEAM SPACING 24 in NO. OF RAILS Exposed: 2 Non. Exp: 2 ROOF ZONE DOWN UP (Exposed) UP (N. Exposed) SPANS (E) SPANS (N.E) 1 163.3 160.9 163.3 Ibs 34 in 41 in 1' 0.0 X X Ibs X in X in 2e 143.4 164.7 164,7 Ibs 24 in 36 in 2n 0.0 X X Ibs X in X in 2r 127,5 160.1 162.7 Ibs 21 in 32 in 3e 12T5 160.1 162.7 Ibs 21 in 32 in 3r 0.0 X X Ibs X in X in L] En Castillo GC11 gilnele'ring SOLAR DONE UGHT JOBS RESIDENCE CASTILLO ENGINEERING SERVICES, LLC LEA # 28345 1060 MAITLAND CENTER COMMONS, 6 SUITE 271.480 kW DC STC ® 4.640 kW AC PV SYSTEM MAITLAND, FL 32751 TEL: (407) 289-21 5 ER ... RATES E. CASTILLO - FL PE 52590 I -CO-PYRIGHTE-D BY 7657 BROAD POINTE DR, CASTILLO ENGINEERING SERVICES, LLC ZEPHYRHILLS, FL 33540 REVISIONS DESCRIPTION 1 DATE 11 REV r. NEW= FIII ­ Sheet where Section. ....... section is located Detail ID Letter Elevation ...... A�' X Sheet where section is located Detail ID Letter Detail ...... Sheet where section is located Detail ID Letter Detail I! (Enlargeci'�ian­;­ Area to be enlarged Sheet where section is located Keyed Notes ...... Keyed note designation I on applicable sheet Ground Terminal ..... Grounding Point/rod.... r Solar Panel ......... or 00— -Module with Source Circuit number Combiner Box CB AC Disconnect.......... ACD Main Distribution MDP Panel ...................... Fuse ............ Overcurrent Breaker Inverter Transformer ............. Automatic ............... ATS Transfer Switch Vent, Attic fan 0 (Roof obstruction) PV Roof Attachment Trusses Conduit Fire Access AC Alternating Current ACID AC Disconnect APPROX Approximate AWG American Wire Gauge BAT Battery CB Combiner Box DC Direct Current DISC Disconnect (E) Existing EL Elevation EQ Equal GP Generation Panel JB Junction Box MCB Main Combiner Box MFR Manufacturer MID Microgrid Interconnect Device MIN Minimum MISC Miscellaneous MDP Main Distribution Panel (N) New NAVD North American Vertical datum OCPD OverCurrent Protection Device POCC Point Of Common Coupling PV Photovoltaic SF Squarefoot/feet STC Standard Test Conditions SD Soladeck TBD To Be Determined Typ Typical UNO Unless Noted Otherwise Um Utility meter VIF Verify In Field WP Weather Proof 3122� M� This system is a grid -tied, PV system, with PV generation consisting of 16x405 Rec Solar: REC405AA PURE BLACK (405W) Modules with a combined STC rated clic output power of 6,480W. The modules are connected into 16 ENPHASE: IQ8PLUS-72-2-US Microinverters with a combined AC output power of 4,640W The inverter has electronic maximum power point tracking to maximize energy captured by the PV modules. The inverter also has an internal ground fault detection and interruption device that is set to disconnect the array in the event that a ground fault that exceeds one ampere should occur. The inverter has DC and AC disconnect integrated system and labels are provided as required by the National Electrical Code. When the sun is shining, power from the PV array is fed into the inverter, where it is converted from DC to AC. The inverter output is then used to contribute i to the power requirements of the occupancy. If PV power meets the requirements of the loads of the occupancy, any remaining PV power is sold back to the utility. When utility power is available, but PV power is not available, building loads are supplied by the utility. PV Modules ....... Microinver-ters---Lr- -- -J F Junction Point of Box Utility Connection Figure 1: PV System Block Diagram Utility Meter The inverter meets the requirements of IEEE 1547 and UL 1741. FALL PROTECTION: ANCHORAGES USED FOR ATTACHMENT OF PERSONAL FALL ARREST EQUIPMENT MUST BE INDEPENDENT OF ANY ANCHORAGE BEING USED TO SUPPORT OR SUSPEND PLATFORMS, AND CAPABLE OF SUPPORTING AT LEAST 5,000 POUNDS PER EMPLOYEE ATTACHED, OR MUST BE DESIGNED AND USED AS FOLLOWS: • AS PART OF A COMPLETE PERSONAL FALL ARREST SYSTEM WHICH MAINTAINS A SAFETY FACTOR OF AT LEAST TWO. • UNDER THE SUPERVISION OF A QUALIFIED PERSON ADDITIONAL INFORMATION 0 29 CFR 1926 SUBPART M, FALL PROTECTION. OSHA STANDARD. 0 1926.502, FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES ® 1926.502(D)(15) 40�0" — RAILS IN THIS POSITION UNO REC SOLAR: REC405AA PURE BLACK (405W) MODULES ALLOWABLE/DESIGN-PRESSURE PSF DOWN PRESSURE 75 UPLIFT PRESSURE, 2 RAILS 1 75 Castillo Engineeling SOLAR DONE RiOHT" CASTILLO ENGINEERING SERVICES, LLC COA428345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-2575 ERMOCRATES E. CASTILLO- FL PE 52590 i COPYRIGHTED BY CASTILLO ENGINEERING -SERVICES, LLC F REVISIONS ,F DESCRIPTION DATE REV PROJECT INSTALLER ..... ...... Digitally signed by Ermocrat( s E Castil area e Date: 2023.%1 ma 16:20:01 PROJECT NAME W 0� q C) 'It L0 0 Z W C0 W Z — LL 0 - U) a— U) j W 0 LLJ 0 M 0 CL LO W (0 N SHEET NAME NOTES AND DESCRIPTION -SHEET SIZE ANSI B 11 " X 17" FSHEET NUMBER - ------ -- - ---- ROOF PLAN WITH FIRE SETBACKS A-ol AND PROPERTY LINES SCALE: 1/16" = V-0" 77 1-1001 (N) (16) ENPHASE: IQ8PLUS-72-2-US MICROINVERTERS ROOF #2 F (07) REC SOLAR: REC405AA PURE I BLACK (405W) MODULES - ------ 24'-410 'A Qoit (N I - --------- (N) ENPHASE IQ COMBINER BOX (N) ALTERNATIVE POWER SOURCE AC DISCONNECT/ RAPID SHUTDOWN (DISCONNECT 1 OF 2) (E) SERVICE POINT AND UTILITY METERING (E) MAIN SERVICE DISCONNECT/ MAIN DISTRIBUTION PANEL (D Z F— LIJ U) > X cy) w FIRE ACCESS AND PATHWAYS L — PER NFPA 1, 11.12222 N 491-611 1" IMC, RMC, LFMC, EMT OR - EQUIVALENT CONDUIT RUN E BROAD r O I N T E DR5 2 DETAIL A (N)SOLADECK S A-01 SCALE: 1/8" = l'-O" AA ROOF #1 (09) REC, SOLAR: REC405PURE I • 2-STORT T-0" RIDGE ,7A cas-01110 Engineering SOL.R DONE 91GHT, CASTILLO ENGINEERING SERVICES, LLC COA421-1 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND ' FL32751 TEL: (4071289-257 1 ERMOGRATES E. CASTILLO - Fl- RE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION , DATE REV PROJECT INSTALLER signed by ErmocratE s E Castill Date: 2023.10A sr 16:20:02 PROJECT NAME c) C) L) L0 W cv) 00 w Z— LL 0 r) W o cl� Llj 0L m T 0 Lo LJJ (o N NUMBER OF MODfLES = 16 ffiOaVLES MODULE TYPE = REC SOLAR: REC405AA PURE BLACK (405W) MODULES MODULE WEIGHT = 45.19 LBS / 20.5 KG. MODULE DIMENSIONS = 71 .7" x 40.0" = 1992 SF UNIT WEIGHT OF ARRAY = 227 PSF N w (49) PV ROOF ATTACHME!' 36" & 41 " 0, MA (SEE SHEET S-02 F4 ATTACHMENT DETA" 4 ROOF # TILT - 22 AZIM. - fl 1 MODULE LAYOUT S-01 SCALE: 1/8" = V-0" E ROOF ROOF ROOF TYPE NO OF ARRAY AREA ROOF AREA AREA COVERED TILT AZIMUTH TRUSS TRUSSES MOD'ULES I SIZE SPACING #1 ASP HALT SHINGLE] 9 (sq.Ft,) 179.25_ (Sq. Ft) 422.36 BY ARRAY 42.44 22.6' 90' 2"X6" 24" O.C. #2 ASPHALT SHINGLE 7 i 139.42 383.37 36368 7 22.6' 270' 1 2"X6" 24"OC. L—TOTAL PLAN VIEW 16 1 318.67 1 1802�. 74 17 --------- ... 411-911 ow-1 0 0 I ROOF#1 TILT AZI M. 22 0 MMASN1201 0 2 L'%M- -AfREFORPI X'tJ MICROINVERTERS mom STRUCTURE PROPERTIES • ROOF FINISH: SHINGLE ROOF • MEAN ROOF HEIGHT: 25 FT • ROOF SLOPES: 22.6' • PRE-ENGINEERED TRUSSES • WOOD SPECIES: SYP • TRUSS SIZE: 2"X6" • TRUSSES SPACING: 24" O.C. • ROOF SHEATHING: 7/16" OSB 2) ROOF ATTACHMENTS TO ROOF `DECK SHALL BE INSTALLED AS SHOWN IN SHEET S-02 AND AS FOLLOWS FOR EACH WIND ZONE: NON -EXPOSED MODULES EDGE EXPOSED MODULES 1 WIND ZONES SPAN CANTILEVER SPAN CANTILEVER -ZONE 1 3 -5' 11- 11 - - -------- -- - ol - 1 ll ZONE 1x X x X ZONE 2e V - 0' ZONE2n X X X X - --- -------- -- ----- ZONE 2r 2'- 8" 0'- 11" V-9" 0'- 7" ZONE3e 2'- 8" ol -111, 1'_9" '' 0- T — ------- - - - - ---- ---r ZONE3r X X X SEE SHEET S-02.1 FOR SUPPORTING CALCULATIONS. WINE• vxw_* NOW= W-11 1011 oxf Iva Igo ml 091 WIV-11 29 1 mg-wil! LEGEND WIND ZONE I (TYP) WIND ZONE 2e (TYP) WIND ZONE 2n (TYP) WIND ZONE 2r (TYP) WIND ZONE 3r (TYP) WIND ZONE 3e (TYP) casd Engineery'll SOLR DONE RXGHT° CASTILLO ENGINEERING SERVICES, LLC COA428345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-2575 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS -DESCRIPTION I _D­AT_­E1_RB PROJECTINSTALLER signed by: SFarE of ErmocratE s E Castill Date: 2023.10A 16:20:02 ui cr c) o Lo C) z W M [_ Cr) LLI LL 0 - U) U) _j w 0 w 0� 0 3 LQ W (o N SHEET NAME MODULE LAYOUT N w E S 'M 2h2 (E) BACK YARD (07) REC SOLAR: REC405AA PURE BLACK (405W) MODULES S-01.11 SCALE: 1/8" = V-0" *�.'* M*� R 1 1' 2e 2n I 2r 3e 3r 9 �1 0� 27.6 0-T-30.6 7 30.6 0 Module Size 1 19.92 j5q. ft. Exposed modules Partial 1 1' 2e 2n I 2r�3e 3r Pressure P1 7.25 0 12.67 0 0 0 0 24.47 FOR NON -EXPOSED MODULES V 2e 2n 2r 3e 3r 16 0 1&4 0 20.4 20.4 0 Module Size 19.92 Sq. ft. Non -Exposed modules Partial 1 11 2e 2n 2r 3e 3r Pressure P2 13.75 1 0 0 0 6.17 0 0 17.36 P3 P4 17.77 16.26 0 0 0 J 0 0 3.66 0 0 0 16.47 16.81 P5 19-92 0 0 0 0 0 0 16.00 P6 15.30 0 1 0 0 14.62 0 0 17.02 FOR EDGE MODULES 19 0 27.6 0 30.6 1 30.6 0 17___] Module Size :� 19.92Sq. ft. Edge Modules 1 V 2e 2n 2r 3e 3r Partial Pressure P7 6.03 0 12.40 0 1 1.500 G 25.22 P8_ 7.52 0 12.40 0 0 0 0 24.35 P9 P10 3.37 2.50 0 0 12.40 12.67 0 0 4.15 4,75 0 0 0 0 26.77 27.23 P11 7.25 1 0 1167 0 0 1 0 0 1 24.47 MIKE MIN 11111111N,01,10 ROOF #1 (09) REC SOLAR: REC405AA 2h2 DISTANCE: 1'- 0" 0.5h DISTANCE: 12'- 6" NOTE: PARTIAL PRESSURES OF THE WIND ZONES ON ALL MODULES HAVE BEEN VERIFIED AND ARE WITHIN THE ALLOWABLE PER THE MANUFACTURER SPECIFICATION, INSTALLER SHOULD FOLLOW THE LAYOUT TO AVOID HIGHER ZONAL PARTIAL PRESSURES. ANY CHANGES IN LAYOUT SHOULD BE REPORTED BACK TO THE ENGINEER OF RECORD. LEGEND M1 EXPOSED MODULE EDGE MODULE NON- EXPOSED MODULE MISSING MODULE MIN. MODULE EDGE DISTANCE LINE MODULE EXPOSURE LINE WIND ZONE I (TYP) WIND ZONE 2e (TYP) WIND ZONE 2n (TYP) WIND ZONE 2r (TYP) WIND ZONE 3r (TYP) WIND ZONE 3e (TYP) Castillo EngineedIng SOLAZ DON� PISHT� CASTILLO ENGINEERING SERVICES, LLC COA # 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND ' FL 32751 TEL: (407) 289-2575 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION DATE I REV PROJECTINSTALLER signed by Ermocrab s E Castil Date: 2023.10.' 16:20:03 LLJ CD C) W I,_ U-1 7 _j ILL U) EL U) 0 Dc' 0 IL w N FSHEET NAME ____ PARTIAL PRESSURE AND MODULES EXPOSURE SHEET SIZE ANSI B 11" X 17" SHEET NUMBER S-01.1 [c] 1-7 r-1 u u 114 Lj I 61101 W-11 -.4 S-02 1 ATTACHMENT DETAIL S-02 SCALE: 1" = V-0" ATTACHMENT DETAIL (ENLARGED VIEW) SCALE: 1 "=3" —11 /AL I SHINGLE muur EMBEDMENT LAG SCREW 3.-FRONT VIEW S-02 SCALE: NTS C,asfillo Engirt -caring cering 10LAR DONE RMHT1 CASTILLO ENGINEERING SERVICES, LLC COA # 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-257 EW�.RATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS T DESCRIPTION DATE REV PROJECTINSTALLER signed by: Ermocrate s E Castillo Date: 2023.10A6 16:20:03 ii 139 '140 ISO 140 Iva .'r hmp: nz: 35O i. xaaurs are � snasg�x �- s++s* '� sx i3an5 S-aa fo Lv� c �a sx s>rc xass 3 3. xsY � a2 r saxdor zee Gass camxr tx• z x'r talc 170 am a8: caassax::ma. 4ISO . xearaim, , ruav ssas sas �zgama*. 5. area 'za `exy: da*rauax �zeasda�.e bias = �.�a3:.::. ULMPAWTE LEE.S,CN ¢' »D SPEEDS (lia,.r FOR RiS K CATIEGORY H Bs,+4z.C. INGS AND OTHIER STRUC19URES VIAND LOAD CALCULATIONS FOR MODULES INSTALLED ON ROOFS WITH A HEIGHT LESS THAN 60' SITE INFORMATION FBC VERSION 2020 RISK CATEGORY (I MEAN ROOF HEIGHT (ft) 25.0 EXPOSURE CATEGORY B ROOF LENGTH (R) 43.9 ROOF SLOPE 5 /12 ROOF WIDTH (ft) 41.9 ROOF SLOPE (°} 22.6 PARAPET HEIGHT (ft) 0.0 ROOF TYPE HIP MODULE LENGTH (in) 713 ULTIMATE WIND SPEED 140 mph MODULE WIDTH (in) 40,00 NOMINAL WIND SPEED 108 mph MODULE ORIENTATION PORTRAIT EXPOSURE FACTOR (C.) 1,000 MODULE AREA (sq. 1.) 19.92 TEMPERATURE FACTOR (Cc) I.000 GROUND SNOW LOAD (psf 0.0 IMPORTANCE FACTOR (Ls} t000 DEAD LOAD (psl) 3.0 SLOPE FACTOR (Cs) 0.910 SLOPED ROOF SNOW LOAD (psl 0.0 KD 0 850 EFFECTIVE WIND AREA (e) 19.9 Kn 1,000 GROUND ELEVATION (1I) 98.0 Ka 0.9% HVHZ NO K2 0.665 DESIGN CALCULATIONS VELOCITY PRESSURE (q) = .00256'KEKzKzTKDV VELOCITYPRESSURE(ASD) 17.0psi WIDTH OF PRESSURE COEFFICIENT 41.9' . 10% = 4.19 ZONE WIDTH A 25"' 400% = Icl ZONE 2 WIDTH ZONE 3 WIDTH EXTERNAL PRESSURE COEFFICIENT ZONE 1 0.580 -1.098 ZONE T 0.580 X ZONE 2e 0.580 -1.593 ZONE 2n 0.580 X ZONE 2r 0.580 -1.770 ZONE 3e 0.580 -1.770 ZONE 3r 0.580 X INTERNAL PRESSURE COEFFICIENT I ROOF ZONE 1 1' 2e 2n 2r 3e 3r Y EDGE FACTOR (EXPOSED) Y EDGE FACTOR (NON -EXPOSED) DOWN 16.0 1&0 16.0 16.0 1&0 1&0 16.0 UP -18S X -27.0 X -30.0 -30.0 X 1 1&0 -19.0 1' 16.0 X 2e 1&0 -27.6 2n 16.0 X 2r 16,0 -30.6 3e 16.0 -30 6 3r 16.0 X DESIGN PRESSURES PSf PSI PSI Module allowable uplillpressure PSI Module allowable down pressure psf PSI 75 psf 75 psf SOLAR PANEL PRESSURE EQUALIZATION &68031 FACTOR DESIGN PRESSURES I. Exposed) -16.0 psf X psi -18.4 pst X psi -20.4 psi -20A psi X ost 4 FT ATTACHMENTS USED ATTACHMENT MODEL Flashloc Duo (Deck) N/A (FOR (°) < 7°) N/A (FOR (°) < 7°) ATTACHMENT STRENGTH 165 MAX DESIGN LOADS ALLOWABLE LIMIT MAX SPAN TO 72 in RAFTERfSEAM SPACING 24 In NO- OF RAILS ROOF ZONE DOWN UP (Exposed) UP (N. Exposed) SP 1 163.3 160.9 163.3 Ds 1' 0.0 X X Ds 2e 143.4 164.7 164.7 lDs 2n 0.0 X X Es 2r 127.5 160.1 162.7 Ds 3e 12T5 160.1 1621 bs 3r 0.0 X X Ds M 2 Non. Exp: 2 (E) SPANS (N.E) 34 in 41 in X In X in 24 in 36 in Xin X in 21 in 32 in 21 in 32 in Xin Xin Casfillo 'k Engineering SOLAR DONE RIIsSHT^. CASTILLO ENGINEERING SERVICES, LLC COA # 283 5 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITIAND, FL 32751 TEL: (407)289-2575 ERMOCRATES E. CASTILLO - FL PE 52590 • �4 ,. s,R;E of Ermacral o. +�g3JONAi��Gs..4 ('� S. E lJastL Date: -72 2023.10 m 16:20:04 PROJECT NAME W O L0 W Z LL W _3 Q W 0' 02_ C-0 I'- _ l� - ENPHASE: IQ8PLUS-72-2-US: MICROINVERTERS Q CABLES<1 I to € ao w� T, [� REC405AA PURE BLACK ip �. - (405W) MODULES '�>------ --------------------- 96 BARE CU WIRE PROTECTED PER NEC 250.64(B) (N)SOLADECK 600 V, NEMA 3R UL LISTED ` 2111�11 ij 21 f�II FACTORY INSTALLED 10A OR 15A BREAKER FOR THE ENVOY (2) 10/2 ROMEX RUN IN ATTIC OR (2) #10 AWG THWN-2 - RED (2) #10 AWG THWN-2 BLACK EGC #10 AWG THWN-2 GND IN 1" IMC, RMC, FMC, LFMC, EMT OR EQUIVALENT CONDUIT RUN (2) #10 AWG THWN 2 RED (2) #10 AWG THWN-2-BLACK EGC #10 AWG THWN-2 GND IN 1" IMC, RMC, FMC, LFMC, EMT OR EQUIVALENT CONDUIT RUN (N)JUNCTION BOX 60OV, NEMA 3R UL LISTED PROVIDE GROUNDINGELECTRODE EXISTING SERVICE GROUNDING I I ELECTRODE PER 690.47,. ..i .i # lklm owl 011 • • • .• r • ENCLOSURESMETAL 1 (N) ALTERNATIVE POWER SOURCE AC DISCONNECT/ RAPID SHUTDOWN: (N) 125A ENPHASE IQ COMBINER 4/4C 240V, 30AMP RATED, (X-IQ-AM1-240-4) OR (X2-IQ-AM1-240-4C) [WITH NEMA 3R, UL LISTED UPTO (4) 2-POLE BREAKERS, IQ GATEWAY AND LOCKABLE AND NON -FUSIBLE INTEGRATED LTE-M1 CELL MODEM) (DISCONNECT 1 OF 2) L1 n L1 - L1 �7_ _ LZ L2, _, 1 U - I l � G I y G G I t� 1 y j (3) #10 AWG THWN-2 1) #10 AWG THWN-2 GND- 1�pi IN 1" PVC, IMC, RMC, LFMC, (7 RTRC, LFMC, EMT OR EMT �J CONDUIT RUN 20A/2P 21 0 TO UTILITY GRID �- (E)BI-DIRECTIONAL UTILITY METER .. - 71 1-PHASE, 240V (E) MAIN SERVICE DISCONNECT/ MAIN DISTRIBUTION PANEL, 200A RATED, 240V (E) MAIN BREAKER 20OA/2P,240V (N) MAIN BREAKER 200A/2P.240V 12 L_ n 30Al2P SOLAR ARRAY (6.480 KW DC STC - 4.640 KW AC) (16) REC SOLAR: REC405AA PURE BLACK (405W) MODULES I, (02) BRANCHES OF 08 MODULES NOTE: 1. SUBJECT PV SYSTEMS HAS BEEN DESIGNED TO MEET THE REQUIREMENTS OF THE NEC 2017, AND THOSE SET FORTH BY THE FLORIDA SOLAR ENERGY CENTER CERTIFICATION, INCLUDING MAXIMUM NUMBER OF MODULE STRINGS, MAXIMUM NUMBER OF MODULES PER STRING, MAXIMUM OUTPUT, MODULE MANUFACTURER AND MODEL NUMBER, INVERTER MANUFACTURER AND MODEL NUMBER, AS APPLICABLE. 2. ALL PANELS DOWNSTREAM OF LOAD SIDE INTERCONNECTION TO BE PROTECTED BY PREEXISTING OR ADDITIONAL OCPD PER NEC 408.36." 3. REFER SHEET NUMBER DS-06 FOR LOAD CALCULATION, INTERCONNECTION 120% RULE - NEC 705.12(B)(2)(3)(b) UTILITY FEED + SOLAR BACKFEED 200A + 30A =230A BUSS RATING x 120% 200A x 120% = 240A (N) AC DISCONNECT 240V, 200AMP RATED, NEMA 3R, UL LISTED, LOCKABLE & FUSIBLE WITH 2O0A FUSES (DISCONNECT 2 OF 2) m 1 ( I J 2; . 1L21 r- EXISTING GROUNDING _ _ _- (E) INTERIOR PANEL ELECTRODE SYSTEM l 200A RATED, 240V (3) 2/0 AWGTHWN-2 CU (1) #6 AWG THWN-2 GND IN 2" PVC OR EMT CONDUIT RUN FEEDER PER NEC 310.15(B)(7) ELECTRICAL LINE DIAGRA-m Engineering SOLAR DONE &IGHT'" CASTILLO ENGINEERING SERVICES, LLC COA 8 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407)289-2575 ERMOCRATES E. CASTILLO - FL PE 525W COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION I DATE REV I PROJECT INSTALLER x' ' M° 5z sc signed by: Ermocrate :,FStgA,.d. U s E Castill Date: 2023.10.1 16:20:05 PROJECT NAME wo c (Y} a_ o I- Cr) N SHEET NAME MIN- AMBIENT TEMP. 'F MAX, AMBIENT TEMP. 'F' 117, CALCULATED MAX. Voo CALCULATED MIN ASP NUMBER OF CONDUITS CIRCUIT I CIRCULAR MAX CIRCUIT AWS I v MILLS LENGTH CIRCUIT I #To I o38o 9.625 2.40 CipcuI r 2 #10 loaso 9.6s 2 4 E03 COMBINER OUTPUT # 1 0 l C38C 19,3 6 24 W F.-771-.7 TEMP DEBATE EASED OfI N E C TABLE 310. 1 5(S)(2)(A) CONDUIT FILL DEBATE BASED ON NEC TABLE 31 C. 1 5(8)(3)(A) MAXIMUM VOC CALCULATED USING MODULE MANUFACTURE TEMPERATURE COEFFICIENTS PER NEC 690.7(A) UNLESS OTHERWISE SPECIFIED, ALL WIRING MUST BE THHN OR THWN-2 COPPER ALL WIRE SIZES LISTED ARE THE MINIMUM ALLOWABLE MEEM IN ANY CELL INDICATES THAT THE SYSTEM 15 SAFE AND COMPLIES WITH NEC REPUIPEMENTS IN ANY CELL INDICATES A POTENTIALLY UNSAFE CONDITION INFORMATION INPUT SY SYSTEM DESIGNER INFORMATON OBTAINED FROM MANUFACTURER DATASHEETS ELECTRICAL NOTES 1ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 2ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET ENVIRONMENT. THE TERMINALS ARE RATED FOR 75 DEGREE C. 3. THE WIRES ARE SIZED ACCORDING TO NEC 110.14. 4. WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. 5WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 6. DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. 7. WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. 8. ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. 9. MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. 10. MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY -IN LUG. 11. THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE. 12. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE ENTRANCE. 13. MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. 14. RACKING CONFORMS TO AND IS LISTED UNDER UL 2701 15. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT PER NEC ARTICLE 300.6 (C) (1) AND ARTICLE 310.10 (D). 16. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET LOCATIONS PER NEC ARTICLE 310.10 (C). 17THIS SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN OF PV CONDUCTORS IN COMPLIANCE WITH NEC 690.12 18. LABELING IN COMPLIANCE WITH NEC 690.12 AND 690.56(C) IS SHOWN ON SHEET E-03. 19ALL CONDUITS TO BE INSTALLED A MIN OF 7/8" ABOVE THE ROOF SURFACE. Casfillo Engincle"Clog SOtAR COKE RIGHT' CASTILLO ENGINEERING SERVICES, LLC COA"2'345 1060 MAITLAND CENTER COMMONS, SUITE 270 MAITLAND, FL �2751 TEL: (407) 289-2575 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION DATE REV_j 1 PROJECT INSTALLER sigi STATE 0' Ern s E Enos W., � .qrjnm a A(' ') nl: ON PV SOLAR ARRAY ON ROOF ENPHASE IQ COMBINER BOX =1 I onsilli'mo LABEL LOCATION: MAIN SERVICE DISCONNECT! MAIN DISTRIBUTION PANEL, PV DISCONNECT LOCATED NO MORE THAN 3FT (I M) FROM THE SERVICE DISCONNECT (TEXT HEIGHT SHOULD BE A MINIMUM OF 3/8") PER CODE NEC 705.10 SWITCH TO THE "OFF" POSITION TO SIM_mf 10)7" AND REDUCE SHOCK HAZARD IN THE ARRAY LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: NEC 690.56(C)(1)(a), IFC 1204,5. 1 I AMASS 1:4 [wi: itim-16,; SESSION] WIM LABEL LOCATION: POINT OF INTERCONNECTION (PER CODE: NEC 705.12(B)(2)(3)(b)) LABEL LOCATION: MAIN BREAKER ENCLOSURE #2, POINT OF INTERCONNECTION (PER CODE: NEC 690.54) LABEL LOCATION: POINT OF INTERCONNECTION (PER CODE: NEC 705.12(B)(2)(3)(b)) DATA PER PANEL LABEL LOCATION: COMBINER BOX (PER CODE: NEC 690.52) LABEL LOCATION: INVERTER (PER CODE: NEC 690,52) LABEL LOCATION: COMBINER -BOX (PER CODE: NEC 690.52) LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: NEC 690.54) LABEL LOCATION: LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION POINT OF INTERCONNECTION (PER CODE: NEC 690.13(B)) (PER CODE: NEC 705.12(B)(2)(3)(b)) TURN RAPID SHUTDOWN SWITCH re *� a mJfrlfijjjffl SECTIOI�SOFTHEPVSYSTEMTHIAT ARE SHUT DOWN MEN THE RAPID DI SHIJTDOOPERATED. JAT -SEJC11ONfSOFTHEPVsYSTEmTI­_AT ARENOTS-UTDOMMENTHE SHUTDOM swITcH IS OPERATED. LABELLOCATION; AC DISCONNECT LABEL LOCATION: MAIN DISCONNECT (PER CODE: NFPA - 1, 11.12.2.1.5) LABEL LOCATION: AC DISCONNECT (PER CODE: NEC 690.56(C)(3)) LABEL LOCATION: AC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: NEC 690.54) ADHESIVE FASTENED SIGNS: - THE LABEL SHALL BE VISIBLE, REFLECTIVE AND SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED [NFPA 1, 11,12.2.11 ® WHERE REQUIRED ELSEWHERE IN THIS CODE, ALL FIELD APPLIED LABELS, WARNINGS, AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4 [NEC 1 10.21(B) FIELD MARKING]. • ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF PROPERLY ADHERED. VINYL SIGNS SHALL BE WEATHER RESISTANT [IFC 605.11.1.31 Casfillo Engine ring SOLAR DONE RiI-HTI CASTILLO ENGINEERING SERVICES, LLC COA # 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-Z5 5 E..RATES E. CASTILLO - FL PE 52590 F­ COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS -1 DESCRIPTION DATE REV PROJECT INSTALLER "J, .. :,­ %. I Big Ern s E 202110. 16:20:06 I I SHEET NAME SYSTEM LABELING SHEET SIZE ANSI B 11" X 17" - - - ------------------ SHEET NUMBER E-03 - ---------- - - Cell zype:.. 132lsatf-evtREStreterojunoti dif atcefisrfith lead .free, gapiess technology, 6.strings of 22 able in series 0.13ir} .2snmjsolargkassvait#as*Yi-refiactires>rfa: tseatmenc Glass: in accordance vrs th Eft i2350 Sacksheet: Highly resistant polymer(black) Barre......... Anodized aiuminuen(black) lunctionbo , 3-parts 3bypass diodes lead'.e2 ti''8.rated, m accoms"ce with 1EC 62790 ccani.c ors: StaubliMC4PV-KBT4,KSr4(4Cost) Cable...... 12 AV#G;4 rama) gU oho, 43, 471n (IJ -'1 2 m) ix,cOuuaroa wdth EN_',06W Dimensions- 71.7x40x1.1=n(19.9= )/1L21 x.t016x30rim(1.85rr) Weight: 45 ibs (10.5 kg) Power Output PH,, ,;i'yfi).. Watt Class `.iarh; g-(W) herninal Power Cottage - V, , -' (v) v Nominal PeeiCurrent -I_(A) Open Circuit voltage- V"' (J( Shot CircuitCturo#t e,(A) Power Density (V9Jft•) a 410 IEC 6123S:,2016,iECF,1730:2016,UL6i730 5 iEC 62804 PID 0J 5 IEC61701 SutWait 3 42.2 IEC 62716 Arnmorois Resistance 9 9,72 UL61730 Fire TypeCtass2 1 49A IEC 62782 'Dynes is Mechanical Load IEC 61215 22016 Hailstone (35r sn) it 10,42 IEC62323 k.sad-Ert+eacc.to F.OHSEU863/20155 3 20.6 ISO 14001,150 9001, IEC 45001, IEC 62941 Nominal Power Vol iage-V,_Is) 3-8.3 38.6 39.0 39A 39.0 r C NornVnalinoretCu;rer,t-i,+,,r(A) 7;77 7.79 7.82 7,83 7,85 z Open Circuit Voltage -Vy.; (V) 45.6 45.8 46,0 45.3 46.6 Shoi t Circuit Current -3,,,,(A) 838 8,39 8,40 8.41 8,42 VaLes, 4tsta<:dwdtrat cosditt-,ts(T :cis r;�as<_ NI15 usdiamaIi:74• WISgit(,0000x-J,toW! a are77'f(25Q,us.=c,1 aurrrurons,^,sad .Yratu#era*xecrf V &i-- 5:- r+•c cmpw C as Akxr m..,# ope;et rrg emp vt'F +nzszfr P5 <rar`nv'.&30ii1jsr?, ternperairre�`F i20`Cru�,(meds si,Jslin+(,i d,'e,ezxxr,,.�.e..2tarnnn kriwwer wtass{C'u,„xt xT,.sre operationatempetature 40 _+785'F Standard RECProTrust Maximum system voltage: 1000V In;taiiedbyan REC No Yes Yes SotarProfessiona( Maximum test load front); +7000Pa(t461bV/ft2)` System Size All o25 k1W 25-50(7'kW Maximum, test load(rear): - 4000 aa(835 lbs7ftlj' Product Warrants (yrs) 20 25 25 Max Seri sfuseiating 25A Power Warranty (yrs) 25 25 25 Max reverse curreut... 25r3 Labor he, ranty(yr5) 0 25 10 5e. .,tafta m a.:a: ngtnsz tens. Power inyear 1 98°l 9$y'. 98' Deli vnest Test kianrs-nt:afelyfacnri Annua(Degradation 025%a 0,25% 0.25% Powerin'sear2l, 924. 92! 92% The REC Pro'not Waraatyi=suit e aufahie cal p<re_ In.ucna.ed th-crrgh ouREC Conifrad5olar Pre e. 5t'raiirstalier Wama;ty e:or:ditionsapoy,Sam vsv<w.recgrauii.comfor .tzdeta6s Available from: Founded in 1996,RECGroup tree €€rternationaipicnaering sGiar energy company dediratedto Empowering consumers with tined, affordable solar power. As Solar`s Most Trus.ed, REC Is committed to high quality, motivation, and a low carbon footprint in the solar materials and solar parcels it manufactures. Headquartered in Ncu way with open Vartai headquarters in Singapore. REC also has regional hubs in North America, Europe, and Asia -Pacific.. T 3 iRE T3PiW , ' No,rina3Mead..irieOperattng e,mperature: 44`L(±2`C) Temperature cLefficrent of P ": CX.Z-t%/ K Temperature coefficient tent rif V ,r. 0.24 9AJ°K Temperature coefficient of l.,,". 0.04 %/-K The temperature coefficients stated are linsarva(aes Panels perpaset: 33 Panels per 40itGiz/fighcube cootainec 792(24pa(lets) PaaeIS perS3 rt trUCk: 291(27loulm,) Typical low irradiance per x"or manes of moduit, at STC, "losiatarrce(W/..) EngiCasfillo neering SOLae DONE RIGHT CASTILLO ENGINEERING SERVICES, LLC COA7#28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-2575 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION DATE REV PROJECTINSTALLER 1 z, t' ^ ", s: F. A N4 zss signed by: ECmocrate S E Castilk Date: 2023.10A E 16:20:07 PROJECT NAME Cr � d L0 W CO Cr3 a Lij T- o r_ oci r CL Casfillo i EnglneeCipg CASTILLO ENGINEERING SERVICES, LLC LLC COA # 2&U5 1420 Gateway Dr, Suite 170 1060 MAITLAND CENTER COMMONS, SUITE 270, San Mateo, CA 94404 MAITLAND, FL 32751 Dir 805 704 3226 TEL: (407) 289-2575 Fax 805 457 6104 ERMOCRATES E_ CASTILLO-FL PE 52590 WWW.reCOrOUD.COM COPYRIGHTED BY REC CASTILLO ENGINEERING SERVICES,LLC REVISIONS DESCRIPTION DATE REV Castillo Engineering Services,, LLC 2925 W. State Road 434, Suite 111,, - -- ------------ Longwood, F1 32779 ------- - PROJECTINSTALLER RE: REC Modules Max Wind Load W4, "A�WaDwlt' By San Luis Obispo, 18 February 2021 ,V ­T_ of w Ersignedmocay: rate: s E Castilic Date: To Whom it May Concern; 2023.10.1 E 16:20:07 REC Americas LLC confirms that the REC Twin Peak 3M series (RECXXXTP3M) and PROJECT NAME REC Alpha Series (RECXXXAA) modules have passed UL2703 Mechanical Load testing at a test load of +/-113 PSF utilizing four -point attachments on the long side t U-1 LO of the module. W Z _j Uj Please be in touch with the REC Technical Department if you have any questions. ZU_ a- U) _j Lij _j < T_ o Sincerely, W C13 G� 00 CLT_ 0 LID W (D N George McClellan REC Americas LLC Senior Technical Sales Manager =BENPHASE, Our newest 108 Microinverters are the industry's first microgrid-forming, software defined microinverters with split -phase power conversion capability to convert DC Power to AC power efficiently. The brain of the semiconductor -based microinverter is our proprietary application specific integrated circuit (ASIC) which enables the microinverter to operate in grid -tied or off -grid modes. This chip is built in advanced 55nm technology with high speed digital logic and has superfast response times to changing loads and grid events, alleviating constraints on battery sizing for home energy systems. Part of the Enphase Energy System, IQ8 Series Microinverters integrate with the 10 Battery, 10 Gateway, and the Enphase Apo monitoring and analysis software, Connect PV modules quickly and easily to 108 Series Microinverters using the included Q-DCC-2 adapter cable with plug-n-play MC4 connectors. `Octy when hornets with n system Controller Z mests UL 1741. - -tQ5 and iClarthst Support qnit-erows. 240V firstaffircom ore L, 108 Series Microinverters redefine reliability standards with more than one million cumulative hours of power -on testing, enabling an industry -leading limited warranty of up to 25 years. IQ8 Series Microinverters are UL listed as Pill Rapid Shutdown Equipment and conform with various regulations, when installed according to manufacturer's instructions. Easy to install Lightweight and compact with plug-n- play connectors Power Line Communication (PLC) between components Faster installation with simple two -wire cabling High productivity and reliability Produce power even when the grid is down* More than one million cumulative hours of testing Class 11 double -insulated enclosure Optimized for the latest high-powered PV modules Microgrid-forming Complies with the latest advanced grid support** Remote automatic updates for the latest grid requirements Configurable to support a wide range of grid profiles Meets CA Rule 21 (LIL 1741-SA) and IEEE 1547:2018 (UL 1741-SB) Net.: 46B Monociveha secret be mited together with pra,k,us geormams of Erin en, rvicromeem 007 San-. loa Series, etc) In the — sys"em, 02022 Enphase Energy. Air rights ntserved. Enphase, the Enphase Logo, 108 Microinverters, and other romeo, are trademarks of Enphase Energy, Inc. Data subject to change. 108SP-12A-DS-0067-02-EN- US-2022-12-02 Commonly used module pahrogs' W 235-350 235-440 Modulecompatibility 60-call / 120 half -cell 54--ceff / 108 hail -cam, 60-cell / 120 half-cefl, 66-c-0 / 132 half - cell and 72-cell / 144 half -sell MPPT voltage range V 27-37 27-45 Operating range V 16-48 16-58 Win, / Max, start voltage V 22/48 22/58 Max. input DC voltage y 50 60 Max, confirgrous input DO Current A 10 12 Max. input DO short-circuit current A 25 Max. module I_ A 20 Overvoltage class DC port If DO port backfeed current MA 0 PV array configuration I x I Ungrounded allay; No additional DC side protection required; AD side protection requires max 20A per branch circuit Peak output power VA 245 300 Max. continuous cutpLit Power VA 240 290 Nominal (L-L) voltage / range V 240 / 2' n - 264 Max. continuous output current A to 1.21 Nominal frequency H, 60 Extended frequency range In 47-68 AC short circuit fault current over 2 3 cycles Arms Max. units per 20 A (L-L) branch circuit-, 16 13 Total harmonic distortion 5% O,ervoltage class AC port Ill AC port backfiaind current, nit, 30 Fervor factor setting TO Grid -tied power factor (adjustable) 0.85 leading - O-85 lagging Peak efficiency 97.7 CEC, weighted efficiency 97 Night-time power consumption mW 60 Ems= Ambient temperature range -40'Cto -601C (-40pts,1401F) Relative humidity range 4% to 100% (condensing) DO Connector type M04 Dimensions (H x W x D) 212 mor (8.31 x 1,75 torn lag") x 30.2 tom (1.2") Weight 1.08 kg (2.38 lbs) Cooling Natural convention -no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class H double -insulated, corrosion resistant polymeric enclosure Enifiron. category / UV exposure rating NEMA Type 6 / outdoor CA Rule 21 (UL 1741-SA), UL 62109-1, IEEE 1547,,2018 (UL 1741-SB), FCC Part 15 Class B, ICES-0003 Class 8, CAN I CSA-C222 NO, 1071-01 Certifications This product is UL Listed as RV Rapid Shutdown Equipment and conforms with NEC 2014, NEC 2017, and NEC 2020 section 690.12 and C22,1-2018 Rule 64-218 Rapid Shutdowar of PV Systems, for AC and DO conductors, when installed according to manufacturer's instructions. (1) Pairing PV modules with wattage asson, the limit may react in adidtional rni loverss. See the compatfiblint, rai-lator at https:-1/link.-phase.�/�m,oduie-compatib,'fity, (2) trocrical voltage range can be ext—dicl beyond nominal if required by the atlity, (3) Limits mall vary. Ref., to lar,anhad—nas to doffrer the c..b., of moochveroce per branch in your area, IOBSP-12A-D5-0067-02-EN-US-2022-12-02 EninCasfillo GC", - I I geer SOLAR DONE RMEIT" CASTILLO ENGINEERING SERVICES, LLC CC' 9 aD45 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-2575 ERMIOGRATES E_ CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION I DATE I REV PROJECT INSTALLER Big T­ or ;4� Ern s E §W�1momill"111111111111111 * I I, PROJECT NAME W lei 0 W CY) (y) W Li Q 0 U) CL U) _J 0 W or_ _J < T 0 W cIf M 0 L0 LL1 N - --------- - --- SHEET NAME DATA SHEET Enot"I'ase riietvvcnkina, )(2-KI-W-240-4 (IEEE 1547,2018) L LISTFA) To learn more about En base offerings, visit gnphme_om 10-C-4-4C-DS-0103-EN-US-12-29-2022 The IQ 4.'!,'.0 with IQ 113'ateway and irttearated JEW, cell rnoderrr Oncli-ided only with Q Combiner 4C ')' consolidates Interconnection equipment into a sinigle enclosure It strsarnk'nes Q M;cff-jinverters and stoFage Installations by providing a consisterit, pie -wired solution for residential applicatioris. 1', of4ersup to four 2-pole hrIpift circuits and Eaton BR series busbar assembly, as= Includes IQ Gateway for connnunicatom and control 'ricludes Mobile Connect cellular moderri (CELLMODEN1 Ml -06-SP05), included onry with, 'Q Combiner 4C Includes solar shWd to inalch Enphase IQ Ballery Supports W i - Fi, Ethernet, el, , or ce I I u I a r con n, ec U v ity 0 ption a 1 AC recepta c is available for PLC In i dg,- Provides production metering and consumption Monitoring Mounts on single stud with centered brackets Supports bot artin, back and side conduit entry Allows up to four 2-pole branch circuits for 240VAC glut-ift breakers (not inclLded) 80A total PV or storage branch cimurts Durable NRTL-centified NEMA type 3R encicwure Five-year hrmied,,vanarty Two years 'abor reimbursement program coverage Included for losth the IQ Combiner SKU's UL listed Y2-Q-AM1-240-4 and X2.4Q-A?,41-240-4C comply with IEEE 1547:2018 (UL 17411 -SB, 3 � Ed,) IQ Combiner 4/4C MODEL NUMBER IQ Combinei 4C X-rQ ArAl 240-4C ard coroornp:,*n rnonitoirrg (12, 5%) ircuudes Mobiie Cto, act tailular rodem (CIELLMODEM-MI 06-sp-051 a pitoi-and-pia? X2 IQ colt 240 AC f"FFF, 15412018) indr-,striargoew coni rriodernfor Ast tems ,ip to fAvIaI;uAe irt' the no, Canada, Mexico, Puerto Rrcu, and the 'At Vn-tPP.r, Weeds "VI el-e �h'ero is adequate -co)lula' se, ex. i" the rtswipwii a,- a orve,, sora: �'Netd to onus? the IQ Battery and IQ Swern. Corrs0ef and to dreflect hevat ACCESSORIES AND REPLACEMENT PARTS (noA included, order separately) — ---------- Supported rnivoinver"ers r06, Kri, or,,; tyhi, (Do not mix 10617 Micunwerlens wof jQ8, Comanunicarions Ki� CONIMS-CELLMODEM, MI-06 Indudes C0Noiow-Kf­`,f1 Spnn' datp p'ar, CcLLNIODEM Nu Go SP 05 4G barred L1 E rAl ce?iular—nider—rieah F-year Srobril drca plan C6 LNIODEM rAl-06-Ar 05 - 4G bosedi LTE-N11 celiuflar ooden-, with 5­ypa, AIT&T do's pran BRK-20A2P�2401J-8 Orcuft breaker, 2 prile, 20A, Eams BR2206'eith herd down kil trupirort XA SOL ARSHtELD-ES RepkIcerruint so a, slield for HD Comb net 4/4C XA, PLUG-120-Z Acorsrsary wceptrtOe for Powso Urre Csrnriei tri IQ Combiner 414C (,eqwred for EPLC-01) XA0-NA: -Hb,­I2wt Hoid-drw;n k:l ffir Peonmr,_,_,if breaker ,ritrr Screws Consomptron rraotl.oring CT A to of 200A sisfit core cicYentlmnstorirters, (C V200 -SPL I TXT200-CLAM Pi ELECTRICAL SPECIFICATIONS Rating coat utwousduos. syste'n V'Intge 120,'240VAC, 60 Hz Eaton 6-R, series busbar rating 1215A Max fora motus Cu', en't mtvw; 65 A May s i£t , .,., r`t't P . ,. E4A icuif'g (owpw Psi fijoe, d,ci"" ) 9 0 A Branch 'ircuits, (so! or agd/or a' . orise� Up Ur four 2-pok E Ptort P P seos Orton bares Generonop (Daj breote" s my cro' , incIi ided) Max Iolal branchcffcim ioeakei Iotiro (truuti 80r, Gt d;S,rfbt,Did vi,lh H) Gioe-ay bfeiker ndijded iQ Galeway beraker 10A or oiAraung GEstierners/Eaton kiciuded Plod ucnor, inclerpoi C ( 200A soid coo nre-m,-tailod andvvied Is Ic Gateway MECHANICAL DATA 6 63 in) Height is 5 -16 5 in'x 15, crn121,06 in) with ciourrung bra—ets- x495cmy .8crn(14.75rnx Io Wp'ght kgf� 6 � �W Arninem lernpeneurs, range -401C to -r461C t-401F is 11i5°F) Nawfahurwection, itlu5 nezu, eld Endosure,niarrinniental raiing Outdoor, NRTLcertfipd, NEMAIcpe3fi, wAyrarbarriae construcAvel A"�,e izes 20A to SOA breake, mpiA_ 14 ro 4 ASVG C'0y-IPCF conduccr, s 60A, breaker bIand-,, inpuIr 4 tc 1/0 AWG',13PPeF coriduclors k4aIn Iug combined output, 10to 2/0 AVIG GoppeT coqdurbof� Neutaf,oidgfi,Lmd -4roVG-_0ppeiccrid'e-1G�' AW,1w fi)HOW octil code icquircenertr, fw conduclor 3fzm4l Altitude Up to 3,000inectrz (9,842 feel) INTERNET CONNECTION OPTiONS `:ELL N40DEM 3>* €-06 SP 05, CELL NIODF %4- ell 06 AT 05(ZIGbasedl-,e MI . Mluiu, Not,.tratariMob'eC,,rirE'C', Ethernet Optimal, IEEE 8022, Cal5E (or Cato U TP Etheirooronue roto Included) COMPLIANCE Cri-nplianre, IQ Gateway UL 60601-'/CANCSA 22.2 No, E1010-1 2022 Enoh Er�ergy AY 'Cnit� resc­,ed crg,'rt- subot to Cl an'rn IQ C-4 4C-DS-0103 EN-US-12-29-2022 Casfillo EIngineedog G(11�6 SOLAR DONE R10HTr CASTILLO ENGINEERING SERVICES, LLC COA # 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL (407) M2575 ERKAOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS I F_D`ESCR­1PTIO­N______ DATE REV L PROJECT INSTALLER Sign ea Erm PROJECT NAME W ne CD C) 'It LO z W C1*) MM W Z LL W DL U) _j LIJ _3 0 W 01-1 Cn 1:0 TZ o .if r-- CL LO W CD r, N SHEET NAME DATA SHEET SOLARMOUNT on all ..BUNIRAC SOLARMOUNT defined the standard in solar racking. Features are designed to get installers off the roof faster, Our grounding & bonding process eliminates copper wire arrd grounding straps to reduce costs. Z� Systems can be confila.,ured with standard or light rail to meet your design requirements at the lowest cost possible. The superior aesthetics package provides a streanilined clean edge for enhanced curb appeal, with no special brackets required for installation. Affffft.. Now Featuring - THE NEW FACE OF SOLAR RACK P P uperior Aesthetic,, i, c ka,, ge E LOSE ALL OFTHE COPPER & LUGS SMALL IS THE NEXT NEW BIG THING ENHANCED DESIGN & LAB OW TOOLS System grounding through Enehase micronevertens and trunk cables Light Rail is Fully Compatible with all SM Components Featuring Google Map Capabilities within U-Buider El Casfillo Engilnleledng G(�k SOLAR DONE RIGHT- CASTILLO ENGINEERING SERVICES, LLC COA 4 28341 1060 MAITLAND CENTER COMMONS, SUITE 270 MAITLAND, FL �2751 TEL (407) 289-257 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, ILLC REVISIONS DESCRIPTION 1 DATE I REV PROJECTINSTALLER I signed En-noc s E Ca J. 16:20:09 PROJECT NAME SHEET NAME DATA SHEET SHEET SIZE ANSI B 11 " X 17" i SHEET NUMBER �I I I ( `I I '� � 19 Stainless steel nut bonds aluminum clamp to stainless steel T-bolt 0 Serrated T-bolt head penetrates rail anodization to bond T-bolt, nut, clamp, and modules to SM rail AM s ! RAIL SPLICE BAR 0 Bonding Hardware creates bond between splice bar and each raiL section 0 Aluminum splice bar spans across raft gap to create rail to rail bond. Rail on at Least one side of splice will be grounded, Serrated T-bolt head penetrates rail anodizati to bond T-bott, nut, and L-foot to grount SM rail i RACK SYSTEM GROUND toWEEK washer dimples pierce anodized rail to create bond between rail and Lug Solid copper wire connected to Lug is routed tt provide final system ground connection. Rmn kq M WSS be USW �~' �ad b� W Casfillo Engineering SOL'.R DONE IZIGHT� CASTILLO ENGINEERING SERVICES, I-1-C COA # 28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289�-2575 ERMOCRATES E. CASTILLO -EL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION i DATE REV PROJECT INSTALLER signed Ermoc s E Ca IN, IMF. WOWN p I I go I plim pill I PROJECT NAME Ld q L0 Z W M i— M LIJ Z -j — U- 0 0 - U) 0- U) 0 Uj Uj 0 Lr) W (.0 ram - FLASHLOC'm DUO Sam U N I R Ar 15101m THE MOST VERSATILE DIRECT TO DECK ATTACHMENT BETTER SOLAR STARTS HERE FLASHLOC"' DUO is the most versatile direct to deck and rafter attachrrienil for composition shingle and rolled comp roofs, Tlhe alkin-one mount installs fast — no kneeling on hot roofs to install flashing, no prying or cutting Z� shingles, no pulling nails, Sinriply drive the required number of screws to secure the mount and inject sealant 111t0 the base. FLASHLOC's patented TRIPLE SEAL technology preserves the roof aird protects the penetration ofith a permanent pressuire seal, Kitted with two rafter screws, sealafit and hardware for maximum convenience (deck Screws of separately). Don't just divert vviater,, LOC it out! PROTECT THE ROOF nsEA a N, h-Wenqlm ?"atefpm,1f al'tadln],ml hd P,f or dr«� '20M,Mnnggla.3, 019115119FUMUMM LOC OUT WATER Hardons I S HIGH-SPEED INSTALL pfy Jrivr, the requiid mm"Der 'M Sunirl mwct seal;ml info te ,v in ,, mmatr' orassurc, FLASHLOC' DUO INSTALLATION GUIDE PRE -INSTALL: CLEAN SURFACE AND MARK LOCATION Ensure existk3g roof structure is capable of supporting loads prescribed in Flashloc Duo D&E Guide, Clean roof surface of dirt, debris, snow and 1ce. Snap chalk lines for attachment rows, Or, shingle roofs, snap hries 1/4' below upslope edge of shingle coarse. This line will be used to align the upper edge of the nnount, NOTE: Space mrwrits per span charts fourd in FLASHLOC DUO state cartification letters, STEP ONE: SECURE ATTACHING TO A HUM Place FLASHLOC DUO over rafter location aid align upper ease of ,nount with horizontal chalk line, Secure mount nith the, two (2 ) provided rafter screws AC FILL ALL PILOT HOLFS WITH SEALANT, KITACHING TO SHEATHING. Place. FLASHLOC DUO over desired location and align upper edge of mount with horizontal chalk kne. Secure mmunt with the two (2) provided rafter screws. Next, secure mount vflth four (4) deck screws by drilling through the FLASHLOC DUO deck, mount hole loGations. Unirac recommends using a drill as opposed to an innpact gun to preven! om,lighter1ing or shippinal roof sheathing, IMPOR T AN T: "M I FNS ; I S AURF! Y MACH IINAMUNT BUT 00 !,40T 0VFR7,i G iI " v CRF0,'- STEP TWO: SEAL Insert tip of UNIRAC approved sealant into port and inject until sealant exits vent'. Conti array installation, attaching rails: to mounts with provided 9-belts, Follow sealant manufaGlurer's instructions, Follow sealant manufacturer's Cold weather application guideliries, if applicable, NOTE: When FLASHLOC DUO is inistalled over gap between shingle labs or vertical joints, fiII gap/jaunt with sealant bel"fieen rnount and tipslope edge of shingle course. CUT SHINGLES AS REQUIRED: DO NOT INSIALL MF FLASHLOG SLIDER ACCROSS I HICKNISS VARIA11 IONS GREATER THAN 118" SUCH AS [HOSE MUND IN HUH DEF H HON SHINGLES, NOTE: Mon instating included rail attacker ent har6rare, torque T-bolt out to 30 Ift-lbs, NOTE: If an exploratory hole falls outside of the area covered by the sealant, flash hole accordinoy, NOTE: Read and complyrdth the Flashloc Duo Design & 1cgigeering Guide prior to design apd installation of the system, LJSF ONLY UNIRAC APPROWD SEALANTS. PLEASE GONI ACT UNIRAC FOR r'[!it LIST OF COMPATIBLE SEALAWS. ECastillo ni 111111 gneeCing SOLAR DONE RtGNT" CASTILLO ENGINEERING SERVICES, LLC COA#28345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL (407) 28912575 ERMOCRATES E. CASTILLO - FL PE 52590 signed aF Ermoc s E Ca 2023.10.1 16:20:10 PROJECT NAME W q L0 C) UJ Co F_ M W L.L U) —1 W _J T_ M M M 0 r-- 0- L0 W N Residential Standard Calculation 912511997 Kirklan Jobe Version 2M 1 L STFJ_, I Article 220A2 & 220.52 Marc Jones Construction, LLC npro Solar 2W5 General Lichbno load T815VA 0 2 Small Appliance 3,000 VA 0 1 LaurKiry circuit 1, VA 0 Gen.LoL S m AnDA Laun. Load 12,315VA IM41202313-30 3,000VA @ 100% = 3,ODO VA 9,315VA @ 35% = 3,260 VA VA @ 25% = VA STEP2 C1 Article220.50&22051 ' General Ligliting Demand Lcod 6260VA A/C Condenser& FbIedEtectric-Sp3mHeatino, Taal I 5,700 VA AHU 1 5,VA--11 Heating L 5,806VAI VA AHU 2 7`7' —Z VA V CU Load 65,5W VA VA AHU 3 VA 41 VA AHU 4 VA Greater of Heat 100% vsAIC @ 1001% 6.500 VA VA AHU 5 VA Attic k 220.53 Appltan:* Demand Load 6A88VA I Water Heater 3.500 VA I Refrigerator 1, VA Dryer DemandLoad 5.000 VA Freezer VA 1 Dishwasher 1,030 VA Range Demand Load 8.000 VA Disposal 690VA R / Hood 4WVA Service Demand 32.248 VA Microwave 1 1,630 VA i x-I, Microwave VA Dern and Load 134 A 41 MIDI Reffig VA Wine Cir VA Neutral Demand 80A Insta Hot VA Ironing Carter VA MmService Req. 150 A Jacuzzi Tub r u SprmkIerPump VA VA Min.Feedersize I -,,r Well PLup VA Min.Neutralsize 4 f Fountain P unp VA Eq.GrdingCond. 6 Elevator VA Copper Pod Equip, Panel VA 100% Demand GATES VA No Demand C Otherload VA No Demand Total A coliance Load 8,650VA 4 or more denra-id 0 751% Dfus 1001 loads 6,488 V A STEP 4 Article 220S4 EleWc Clothes Dryers 6,000 VA STEP 5 Article 22055 Electric Ranges 7,680W Cut C demand 8= or Numberofanofiances Corrkt0l) Col B demand Check Box for Gas Range Col B demand Cot B demand Col B demand Coolklop & Oven Dernar'd Load W Feel are Feeder Cii1cnM-7 (See Nan,) Continuous Non-continuours Continuous Motors Non-confinuous L ------- �L .44 — 24 1 240a Spa heater II kVA Z K3 240� 240v Pool heater 3,5 ton ------- 13 240ve—j 240v Pool! heater 5 ton _Z_ 240, 240, Pool Ught 0 ... 0 0 01 240, 240� Blower t 0 P 240b 0 0 0 ........ 0, Motor Neutral Load .the, �ad Lr 4 L----i 0 240v 0 0 the, ..d UQQQ"�QgFeEder 240v AWG Max,Unbalanced Neutral Load --v A p, TMWM—A- Neut, load En Casfillo 1 11111, gineeCing SOLnR DONE R9OHTI CASTILLO ENGINEERING SERVICES, LLC COA#2B345 1060 MAITLAND CENTER COMMONS, SUITE 270, MAITLAND, FL 32751 TEL: (407) 289-25 5 ERMOCRATES E. CASTILLO - FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES, LLC REVISIONS DESCRIPTION DATE REV L PROJECT INSTALLER C, % signea D Ermocra a ' s E Cast Date: 2023.10. 16:20:11 SHEET NAME DATA SHEET