Loading...
HomeMy WebLinkAbout25-923004 26 21 0260 00000 0700 Name: DONALD PAGE lmr;1104�tmwjmi� I F TT Phone: (813) 838-5224 Plermit Type: Electric Service Replacement/W, Class of Work: Add/Alter Residential Building Valuation: $55,903.10 Electrical Valuation: Mechanical Valuation: Plumbing Valuation: Total Valuation: $55,903,10 Total Fees: $319.52 Amount Paid: $319,52 Date Paid: 1/13/2025 10:36:56AM 6834 Shelby Lynn Way Contractor: TESILA ENERGY OPERATIONINC REINSPECTION FEES: (c) With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c) the local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or first reinspection, whichever is greater, for each subsequent reinspection. Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permit required from other governmental entities such as water management, state agencies or federal agencies. I I 111 11 1 111 1 1 111 111 11 Jill 1111; 1 !11111 1 111 111 1 Ilyll lc11!111111 z;T"T1ZTZ-1 III'lls accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. NO OCCUPANCY BEFORE C.O. CONTRACTOR SIGN PE IT OFFICE PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTIO CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CAZD-F20M WEATHF-2 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department Date Received .me= 111111201111MM I com . . op`jw Owner's Name Donald Page Owner Phone Number 1(813)838-5224 Owner's Address 16834 Shelby Lynn Way, Zephyrhills, FL 33542 Owner Phone Number Fee Simple Titleholder Name Owner Phone Number Fee Simple Titleholder Address I JOB ADDRESS 6834 Shelby Lynn Way, Zephyrhills, FL 33542 LOT # 70 SUBDIVISION PARCEL ID# 1 04-26-21-0260-00000-0700 (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED NEW CONSTR ADD/ALT SIGN DEMOLISH e INSTALL REPAIR PROPOSED USE SFR Comm OTHER E_ TYPE OF CONSTRUCTION O BLOCK FRAME STEEL = F_ DESCRIPTION OF WORK Installation of Roof Mounted PV System. and Energy Storage System 1 Storage Unit BUILDING SIZE 1 932 = SQ FOOTAGE HEIGHT =BUILDING VALUATION OF TOTAL CONSTRUCTION =ELECTRICAL �$ = AMP SERVICE PROGRESS ENERGY W.R.E.C, =PLUMBING 1$ =MECHANICAL VALUATION OF MECHANICAL INSTALLATION = GAS ROOFING SPECIALTY = OTHER FINISHED FLOOR ELEVATIONS =_ FLOOD ZONE AREA =YES NO BUILDER COMPANY SIGNATURE REGISTERED Address ELECTRICIAN COMPANY SIGNATURE REGISTERED Address I PLUMBER COMPANY SIGNATURE REGISTERED Address I MECHANICAL COMPANY SIGNATURE REGISTERED Address OTHER COMPANY SIGNATURE REGISTERED Address License # L Y/ N FEE CURREN License # LIIN__j I N FEE CURREN License # Y/N Y/ N --E CURREN License# Y Y/ IN CURREN Ucense # Y I N RESIDENTIAL Attach r 1) Plot plans i Iset with 1 drurno drive) of Building Plans, (I I Set of Energy Forms R-0-rV Permit for nevv C;onsructlon Minimum thiny,30) vorking days after submittal date Required onsite, Construction Plans Storrowater Plans w/ Sit Felice nsbared Sanitary Facilities & 1 dumlpster Site Work Permit for subdivisions/large projects COMMERCIAL Attach (I set 1 thumb drive) complete sets of Building Plans plus a Gfe Safety Page (1) set of Energy Forms_ R 0-iP/ Permit for new consh Minimum thirty (30),,vorking days after subinittal date Required onute Construction Plans Stori-riviater Plans w/ Silt Fence Installed. Sanitary Facilities & I dumpster Site Work Permit for all new projects All commercial requirements must meet compliance SIGN PERMIT Attach (2) sets of Engineered Plans SURVEY required for all NEU/ 0011SITI-odon T gs Directions: Fit out application completely. Owner & Coniractoi Sigh DaCK Of dppllCal[011 notarized If over $5,000, a Notice of Commencement is required, (A/C upgrades over $7,500) Agent (fo[ the contractor) or Power of Attorney 'for the owner) mould be someone with notarized letter from owner autrionzing aVnie OVER THE COUNTER PERMITTING (Front Front of Application Only)Reroole If sningles Servers Service Upgrades Fences 'Plot/Survey/Footage) Driveways -Not over Counter,if on public roadways needs ROV] NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division —Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law —Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the "owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection -Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, Water/Wastewater Treatment. Southwest Florida Water Management District -Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers -Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative Services/Environmental Health Unit -Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency -Asbestos abatement. Federal Aviation Authority -Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone "W unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension_ If work ceases for ninety (90) consecutive days, the job is considered abandoned. F:_OMDA JURA l[ S K"'ff OWNER OR ALIEN C s nr or d be`cr n nis ! o Fe -.teerso a . < o,- to ie or -as/,have pcoduceo as +dentif cation Notar 4 s iIc „sH1431914334 N � era =?t Urta ry ^_;ipr a or med or stamped CONTRACTOR_ _ 5 bsc, bed and vc� edl �r �y vac as it t c lro sure gersor a� v K-omr e or has,la,e .,.-eouced In Person as Nd #A- 3A8334 Kvle Kelleher Name of Notary :vped. printed or stamped --- KYLE KELLEHER Notary Public State of Florida �< Commission # HH 384334 My Comm. Expires Apr 9, 2027 Bonded through National Notary Assn. INSTR#2025004490 OR BK11140 PG3062 Page 1 of 1 01/10/2025 09:05 AM Rcpt: 2781655 Ree: 10.00 DS: 0.00 IT: 0.00 Nikki Alvarez-Sowles, Esq., Pasco County Clerk & Comptroller Permit No. Parcel ID No 04-26-21-0260-00000-0700 NOTICE OF COMMENCEMENT State of Florida County of Pasco THE UNDERSIGNED hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713. Florida Statutes, the following information is provided in this Notice of Commencement: 1. Description of Property: Parcel Identification No, 04-26-21-0260-00000-0700 LINKS AT CALUSA SPRINGS PIS 81 PG 074 LOT 70 Street Address. 6834 Shelby Lynn Way, Zephyrhills, FL 33542, US 2, General Description of Improvement installation of Roof -Mounted Photo -Voltaic System and Testa Powerwall(s) 3, Owner Information or Lessee information if the Lessee contracted for the improvement: Donald Ray Page Jr. 4. 0 6, Name 6834 Shelby Lynn Way Address Interest in Property: Homeowner Name of Fee Simple Titleholder: N/A (If different from Owner listed above) NiA Address Contractor: Tesla Energy Operations, Inc. Name 5012 Joanne Kearnev Blvd. Contractor's Telephone No (813) 460 - 7640 Surety: NIA Name N/A Address Amount of Bond: $ NIA Lender'. WA Name NiA Address Lender's Telephone No.: NiA Zephyrhills FL State ALA NfA City State Tampa FL City State WA N/A City State Telephone No.. N/A N/A N/A City State 7. Persons within the State of Florida designated by the owner upon whom notices or other documents may be served as provided by Section 713. 13(1)(a)(7), Florida Statutes. WA Name N, A N, A N; A Address City State Telephone Number of Designated Person: MA 8. In addition to himself, the owner designates N,A of IJI to receive a copy of the Lienco's Notice as provided in Section 713. 13(1)(b), Florida Statutes. Telephone Number of Person, or Entity Designated by Owner- NA 9. Expiration date of Notice of Commencement the expiration date may not be before the completion of construction and fine; payment to the contractor, but will be one year from the date of recording unless a different date is specified): WARNING TO OWNER. ANY PAYMENTS MADE BY THE OWNER .AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTE —3_ PART t_ SECTION 713.13. FLORIDA STATUTES, AND CAN REST LT IN YOUR PAYING .DICE FOR IMPROVEMENTS TO YOUR PROPERTY A NOTOE OF COMMENCEMENT (MUST BE RECORDED AND POSTED ON TrE JOB SITE BEFORE THE FIRST INSPECTION- IF YOU INTEND TO 013TAIN FINANCING, CO-NSULT yyl -1 YOUR LENDER OR 41, ATTORNEY BEFORE COMMENCING AORKOR REi QRDiNG YOUR NOTICE OF COMMENCEMENT Under bena ty ofpetUn', t decaie T=at I nave read the 'orego rg nonce of come. e��:.ement and that the facts stated therein ara'nme to the hest of m+,/ Lno%vledge and relief S-AT0, F CR'CA rlcra:ra {n� �i�r , COON OF C-ange blgnat n _r4:ne[ yr Lessee. at 0,vner s or Lessen s A I-otfzad 3fficer ^.hector Paitnei 'Manager X Online Noia-zai on ri G-neo,.vne r 8igoat i , � --,flef 1, 82025 Conalo <aig Pa. e Jr The roregoing last _ mww ent as avmoledged before vet his._ ay o` . _ _ ov -,- ovmer .t . e.. ti ,t, o fr� - :-t -I Donald Ray Page Jr. tiQ 31 J-Vi U ;C 2. =�te"t Car Or ce f d, n,m ca r EMIVIA RYLAND V ar o rt tic f V n a m_ �t An, mn,is�ian Ao 20r13Sa ---- Joe o, 3,1 vor. y g o.��ce _see. a 01 n_v ,n ,aL., -- :.na reofoai`.= or oehaJ U`,..har-Inst.ment ,ys eKecttecl,. ik ..a Cr*e Notarial Act Performed by Audio visual communication wpdata. bes,noficecommencement_pc053048 Version #98,2 - 1 RU NAS January 8, 2025 Project/Job 4 3352898 Protect Address: AHJ Tesla Operations Center m3mmamEm Page Residence 6834 Shelby Lynn Way Zephyrhills, FL 33542 Zephy,hills City Tampa Applicable Codes --- Structure: 2023 FBC-EB: PV: 2023 FBC (8th Edition), ASCE 7-22, and 2018 NDS Risk Category = 11 Wind Speed = 140 man (3-s Gust - Vult), Exposure Category C, Directional Procedure for Rooftop Solar Panels Ground/Roof Snow Load = 0 cat MPI: RDL = 9 psf, RLL = 18.5 psf MP2: RDL = 9 cat, RLL = 18.5 lost MP3: RDL 9 psf, RLL - 18.5 psf Note: Per IBC '613.1; Seismic check is not required because Ss = O057 < 0,49 a,d Seismic Design Category (SDC) = A < D To WIom It May Concern, A st ucturil evaluat or of oading was conducted for The above address based on ti-e design cilteria listed above, Based on this eva,uaton, I cert:fy tt,,a,, the alteration to tre existmq structure by :nstalivon of :-e PV system, wr th upgrades specified in the p'ars, ineets the Prtase. r,,otrve corn;lanceequl,eme,,ts of V,e coolcameex;st'!,g bui!dinq e".r, au i ding prov:sions adopted, efere,c�,d above, i �ne DV moduie as y inciUdli,q aistar cjotfs Succoltzr-q ,, �,a,e been re, :eIlvecl to iDe ac,�crdance wt�. 1,e manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. i e �V ass-. j -ch",=3" sc ca., a ota'-ed i- V-e r) a"'s, Q, 3�,&' e"< St )of i,a,-,-; ng e s I, zwii,),e --ardit,o,- ald, uoes no-, e,�, a-,i s qrs I-�� s,�-u ��a -aqe na�, d ni o' 'n,.i t o, sla:�at,c- —t) ��, 'e" -1 t '31 -11 e, T oos, o,c, �.� .�o�nrne�,ce, 01- omv,, s � T U , -3 3 it j DE sc�h 'd s.� ... e -i: ,"qnq I �, q 3 a �, , r, t ,, I),s ej - e , o t d c, c� e, � �-i c t I- , , , , Abe De - Vera THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED 13Y A13L DE V1,RA O\ 2045-0 1-09 11RINT'ED COPIES OF PlIS DOCUMENT ARE NOT CONSIDERED SIGNED AND S1 ALED. SIGNATURE NIUST 13E VERIFIED 0�'A'.') FI ECTRONTC COPIFS, 901 R N G F AV E N 1: E F R F , \ I ONT, CA 94538 STRUCTURAL EVALUATION & HARDWARE DESIGN RESULTS SUMMARY TABLES Design Standard ASCE 7-22 Risk Category II Table 26.9-1 Ultimate Wind Speed V-Ult 140 mph Fig. 26.5-113 Exposure Category C Section 26.7 Ground Snow Load pg Figure 7.2-1 MP Specific Design Information .. .. .. .. MP Name Applied Wind Zone MP1 WZ1 MP2 WZ1 MP3 WZ1 Wind Pressure -19.9 jest -18.1 psf -19.9 psf v X-Spacin 72" 72" 72" X-Cantilever 24'' 24'' 24" Y-Spacin 41" 41" 41" c Y-Cantilever NA NA NA J Uplift DCR 82.3% 74.2% 82.3% X-Spacing 48'' 48'' 48'' X-Cantilever 16- 16" 16" Y-Spacing 74" 74'' 74" a° Y-Cantilever NA NA NA Uplift DCR 99.2% 89.4% 99.2% Layout Staggered Applied Wind Zone Staggered ,.�..,r.,w,. , .,., ..r. Staggered "7"'K :�.... 'R Wind Pressure -31.1 psf -25.1 psf -31.1 psf y X-Spacing 48'' 48'' 48'' X-Cantilever 19" 23" 191, Y-Spacing 4V 41- 41- ro Y-Cantilever NA NA NA Uplift DCR 88.8% 70.7% 88.8% X-Spacing 24" 24'' 24'' X-Cantilever 101, 13'' 10" Y-Spacing 74" 74" 74" o. Y-Cantilever NA NA NA Uplift DCR 80.2% 63.8% 80.211% Layout Staggered Staggered Staggered Applied Wind Zone :;;;;,.;: 4Yi;",;:;., . Wind Pressure 37.2 psf 25A psf 37 2 psf 0 X-Spacing 2 7 48".. 24...... Cantilever is 23'' 15 Y-Spacing 41" 41 41" a Y-Cantilever NA NA NA Uplift DCR 63 5 r 7C 7?'° 33 5 X-Spacing 24"' 24" 4 24" X-Cantilever 9" 9 T �— Y-Spacing 74" �4". 74" o° Y-Cantilever NA NA NA Uplift DCR 96.6% 63.81 96.6 Layout Staggered Staggered Staggered 1. X and Y are maximums that are always relative to zhe structure training that supports the PV- X is across framing members and Y is along r`ra wing mernbers. 2. Where present, the green and red hatching in Applied Wind Zone rows corresponds to ,hatching on the Site Plan page of the plan set. MP Name MP1 MP2 MP3 Member Member Impact Memo impact Memo : impact Evaluation Results Check OK G peck OK Che- k Qi< Donald Page 6834 Shelby Lynn Way 8138385224 Tese.Inc. nf3SUODeer Creek Road, Palo Alto, CA, B43U4 888-785-2489 Installer Tes|aEnergy Operations, Inc. of881 Page Avenue, Fremont, CA04538 FLEC130O0228 System and Purchase Price Description ofthe Project endDesuiptionnftheSignifioantK8atehe|s1obeUaedandEquipmenttobe|netaUed Solar System $41,783.10 17�03O0kVVOCSolar Panels $13.320.08 Installation, Permitting, and Other Fees $23.832-58 Balance of System $5.618.33 Mounting Hardware $2.537.31 17.O3UOkVVDiscount ($1.763�00) Low Complexity Discount ($1.763,00) PomxermoaU $10.800.00 1xPowenmaU3 $8.200.00 PovvenwaU|nabaUmtion $6.400�00 1xGateway 8000.00 Accessories $200.00 PuwenwaU + Solar Discount ($4.900.00) Pre -construction Costs $3'420.08 Structural Upgrade 'Blocks $2.940�00 Structural Upgrade 'H3Clips $48000 Taxes $0.00 Contract Price $56.003.10 Credit for Order Payment ($100OO) Amount Due $55,903.10 Schedule ofPayments Paid at Order $100.00 Due Within Ten (1D) Days mfFinal System Approval K0O Loan Amount $55'903.10 °Teslmresen/es the right toinvoice you atany time for all work completed /nthe event that you cease bDreasonably cooperate /nprogressing this job, such asbyfailing toprovide Tesla with the necessary site access Vrassistance with comp/eting permits or obtaining Permission to Operate from your utility, The schedule of progress payments must specifically describe each phase of work, including the type and amount of work or services scheduled to be supplied in each phase, along with the amount of each proposed progress payment. Solar Loan Agreement v112.0,Devembor11,2824 roula.|mc- 13180324 IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED. HOWEVER, A CONTRACTOR MAY REQUIRE A DOWNPAYMENT. Approximate Completion Date 7-90 days from the day installation begins DEMEMM Donald Page Name: Donald Page Date: 12/27/2024 7:30:28 PM +00:00 10 Name: Colby Hastings You are entitled to a completely filled in copy of this A#t*ement, signed by both you and Tesla, before any work may ♦! •• Solar Loan Agreement V1 1-2.0-December 11, 2024 Tesla, Inc- 13180324 ABBREVIATIONS I -ELECTRICAL NOTES 3URISDICTION NOTES A AMPERE AC ALTERNATING CURRENT BLDG 1, THIS SYSTEM IS GRID-INTFRTED VA A UL-LISTED BUILDING CONIC CONCRETE DO DIRECT CURRENT POWER- CONDI TI ONIN G INVERTER. EGG EQUIPMENT 'GROUNDING CONDUCTOR' T ST NG 2. A NATONALLY - R, E-il EXISTING EMT ELECTRICAL METALLIC TUBING FSB j LABORATORY SHALL LIST ALL EQUIPMENT IN FIRE SET -BACK 'GALV 'ALVANiZED GEC GROUNDING COMPLIANCE WITH ART, 1110.3, ELECTRODE CONDUCTOR GND GROUND HDG HOT 3, WHERE ALL T ERMINALS OF THE DISCONNECTING DIPPED GALVANIZED I CURRENT Imp CURRENT AT MEANS MAY BE ENERGIZED IN THE OPEN POSTION, MAX POWER Isc SHORT 'CIRCUIT CURRENT kVA A SIGN WILL BE PROVIDED WARNING OF THE KILOVOLT AMPERE kW KILOWATT LBW LOAD HAZARDS PER ART. 690,17. BEARING WALL MIN MINIMUM (N) NEW NEUT NEUTRAL NTS NOT TO SCALE OC ON CENTER PL HET 4. EACH UNGROUNDED CONDUCTOR OR OF THE MULTIWRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PROPERTY LINE POI POINT OF INTERCONNECTION PHASE AND SYSTEM PER ART. 210.5, PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS 5. CIRCUITS OVER 250V TO GROUND SHALL COMPLY STEEL STC STANDARD TESTING CONDITIONS TYR WITH ART. �. 250.97, 250.92(B). TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V 6, DO CONDUCTORS EITHER DO NOT ENTER BUILDING VOLT Vmp VOLTAGE AT MAX POWER Voc, VOLTAGE OR ARE RUN IN METALLIC RACEWAYS OR AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT ENCLOSURES TO THE FIRST ACCESSIBLE DO DISCONNECTING MEANS PER ART. 690.31(E'). 7. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. 8. MODULE FRAMES SHALL BE GROUNDED AT THE UL - LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL LISTED GROUNDING HARDWARE. 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. VICINITY MAP INDEX Sheet 1 COVER SHEET Sheet 2 SITE PLAN Sheet 3 STRUCTURAL VIEWS Sheet 4 UPLIFT CALCULATIONS LICENSE GENERAL NOTES Sheet 5 THREE LINE DIAGRAM Sheet 6 PLACARD 1. ALL WORK SHALL COMPLY WITH THE 2023 Cutsheets Attached FLORIDA BUILDING CODE (8TH EDITION), FLORIDA FIRE PREVENTION CODE (8TH EDITION). 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2020 NATIONAL ELECTRIC CODE. MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Zephyrhills City REV BY DATE COMMENTS REV A NAME DATE COMMENTS UTILITY: Duke Energy (FL) '11 Vi 11111 ii'i I CONFIDENTIALINFORMATION HEREIN JOB NUMBER- JB-3352898 00 CUSTOMER: CONTAINED SHALL NOT BE USED FOR THE Donald Page BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: DESCRIPTION: 17.63 KW PV ARRAY Andrik Ureno T S L SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Camp V4 w Flashing -insert 6834 Shelby Lynn Way 15.3 KW (AC NAMEPLATE) PV ARRAY r 1 PART TO OTHERS OUTSIDE THE RECIPIEN1'S ORGANIZATION, EXCEPT IN MODULES: I z-ephyrhills, FL 33542 13.5 KWH ENERGY STORAGE SYSTEM RESPECTIVE THE SAE AND USE OF THE RESPECTIVE (43) Hanwho Q Cells Q.PEAK DUO BLK ML-GlO.o+/TS 410 PAGE NAME- SHEET: REV: DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. Multiple Inverters 8138385224 COVER SHEET 1 1 12/19/2024 HATCHING INDICATES WIND PRESSURE ZONES, S'-';- THE S7 IF ANDOFSPACING I AND LAYOUT TABLE FOR VIORI_ N Uporcces required on box trusses crecs wit-, PV m30,es cs slown o-, detclls, uliamom CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC,, NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WTHOUT THE WRITTEN PERMISSION OF TESLA INC. AC !RELAY EEEI m D LL I MP1 1 PITCH: 24' (5:12) ARRAY PITCH: 24' (5:12) AZIMUTH: 182 ARRAY AZIMUTH: 182 E I STORY: 2 MATERIAL: Comp Shingle Stories PITCH: 240 (5:12) ARRAY PIT CH: 241 (5:12) MP2 1T AZ!MI-H: 92 ARRAY AZIMU � H: '92 --jA' : Corylp S' hingie I Ur< T : 2 Yz 01nes PITCH: 24c (5:12' ARRAY PI -CH: 24' (1: 12) 0 STATE OF 140 MP3 AZIMUIT 1H: 2 -1 ARRAY AZIMUTH: 2 y A- 40F;,I0 N MATERIAL: Comp Shingle STORY: 2 Stories ......... N 10 I. PITCH: 24' (5:12 -CH: 24 ARRAY PF (5:12) IVA MP4 AZIMUTH: 2 ARRAY AZiMUTH: 2 MATERIAL: Comp Shingle STORY: 2 Stories 70 Inv STRUCTURAL ONLY (SV LC E InvAbe t De B — — — — — _1Tf -W — — — — — — —Vera — — — — — — — — — — — -- //— ---I - THIS IFFFM HAS A S� 1111', 'N"DI G I T I y 6_ F S A D t��l LEGEND AB VE ON 202� 1 0 :D O,U RINI' ",OF THIS I I I I.— I S I I GNATUR 1 u . ST E�EA- ?6 Al�� I Ed W El ELE(TR' I I " COPIE>� I FG7), (E) UTILITY METER & WARNING LABEL 901 (JE AVE 'E F^9jNT,, C� 9453� n— INVERTER W/ INTEGRATED DC DISCO _FS 137FS & WARNING LABELS RELAY _1B"_FSB — AUTOMATIC RELAY EES CC DC DISCONNECT & WARNING LABELS AC AC DISCONNECT & WARNING LABELS F:;� DC JUNCTION /COMBINER BOX & LABELS > _18r FSl3- CL cLi ENERGY STORAGE SYSTEM FOR STAND SV ALONE OPERATION LI Id DISTRIBUTION PANEL & LABELS LOAD CENTER & WARNING LABELS DEDICATED PV SYSTEM METER RAPID SHUTDOWN STANDOFF LOCATIONS IS13 CONDUIT RUN ON EXTERIOR - - - CONDUIT RUN ON INTERIOR GATE/FENCE HEAT PRODUCING VENTS ARE RED INTERIOR EQUIPMENT IS DASHED — — — — — — — — — — - ?-E 0 r) N SITE PLAN TOTAL ARRAY AREA (SF): 932 Scale: 1/8" = 1' TOTAL ROOF AREA (SF): 3318 W- E TOTAL ARRAY AREA IS � 28.1 0 11 81 16' PERCENT OF TOTAL ROOF AREA S NUMBER: JB-3352898 00 T ER. DESCRIPIION: DESIGN: MOUNTING SYSTEM: Donald Page 17.63 KW PV ARRAY Andrik Ureno ZS Comp V4 w Floshing-Insert 6834 Shelby Lynn Way 15,3 KW (AC NAMEPLATE) PV ARRAY . MODULES, Zephyrhills, FL 33542 13.5 KWH ENERGY STORAGE SYSTEM (43) Hanwho Q Cells Q.PEAK DUO BLK ML-GlO.o+/TS 410 PAGE NAME SHEET REV. DATE: INVERTER, MUltiDle Inverters 8138385224 SITE PLAN 2 12/19/2024 r,II� �. 11�% 1 PV MODULE 5/16"x1.5" BOLT WITH 5/16" FLAT WASHER r ZEP LEVELING FOOT ZEP ARRAY SKIRT ZEP MOUNTING BLOCK ZEP FLASHING INSERT (E) COMP. SHINGLE (E) ROOF DECKING 5/16" DIA STAINLESS STEEL LAG SCREW CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF TESLA INC. 3�l ( 1GN URE LUST BE VEiiIF �iY , C RONI (LECOPIES. 901 AGE AVENUE FREMONT. CA 94538 I JOB NUMBER: JB-3352898 00 MOUNTING SYSTEM: ZS Como V4 w Flashing —Insert (43) Hanwho Q Cells Q.PEAK DUO BLK ML—G10.a+/TS 410 INVERTER: Multiple Inverters INSTALLATION ORDER LOCATE FRAMING MEMBER, MAR (1)' HOLE LOCATION, AND DRILL PILOT HOLE. ATTACH FLASHING INSERT TO 2 MOUNTING BLOCK AND ATTACH } TO FRAMING MEMBER USING LAG SCREW. INJECT SEALANT INTO FLASHING (3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE ROOF PENETRATION. INSTALL LEVELING FOOT ON TOP (4) OF MOUNTING BLOCK & SECURELY FASTEN WITH BOLT. Donald Page 6834 Shelby Lynn Way Zephyrhills, FL 33542 i • I N.S.IALL.A' ON NOTES: C I ;N) BLOCKING TC, F T TIGHT BETWEEN (E) TRUSSES AND KEEP FLUSH TO ROOF SHEATHING. ENSURE THERE ARE NO GAPS BETWEEN MEMBERS. 2. INSTALL (N) BLOCKING WITH TWO (N) A34 CLIPS, ONE AT EACH END OF ,N(N) BLOCKING. 3. NAIL (N) A34 CLIPS TO (E) TRUSSES WITH (8) (N) 8D (C.131") X 1.5° NAILS, FILLING ALL HOLES. ENSURE ALL NAILS ARE LOCATED AWAY FROM EDGE OF MEMBERS TO AVOID SPLITTING WOOD. • INSTALL (N) BLOCKING ONLY BELOW STANDOFF LOCATIONS. (E) RAFTER (N) STANDOFF SHALL LAG DIRECTLY INTO (N) BLOCKING (N) 2x6 DF#2 OR SPF#2 BLOCKING (E) JACK TRUSS OR RAFTER (BLOCKING NOT REQUIRED DOWN HERE) (N) SIMPSON A34 CUPS (2 PER BLOCK) W/ (8) (N) 8d (0.131") X 1-1/2" NAILS PER CUP (E) SHORTEST BOX TRUSS (BLOCKING REQUIRED FOR ALL LOCATIONS WHERE LAGGING OCCURS) �SV'Y SCHEMATIC DEPICTION OF MP THAT REQUIRES UPGRADES N-j NEW BLOCKING SIDE VIEW v Scale: 1/2" = V 17.63 KW PV ARRAY 15.3 KW (AC NAMEPLATE) PV ARRAY 13.5 KWH ENERGY STORAGE SYSTEM PAGE NAME: STRUCTURAL VIEWS INSTALLATION NOTES; 1. CUT (N) BLOCKING TO FIT TIGHT BETWEEN I TRUSSES AND KEEP FLUSH TO ROOF SHEATHING. ENSURE THERE ARE NO GAPS BETWEEN MEMBERS, 2. INSTALL (N) BLOCKING WITH TWO (N) A34 CLIPS, ONE AT EACH END OF (N) BLOCKING. 3. NAIL (N) A34 CLIPS TO (E) TRUSSES WITH (8) (N) 8D (0.131 ") X 1.5" NAILS, FILLING ALL HOLES. ENSURE ALL NAILS ARE LOCATED AWAY FROM EDGE OF MEMBERS TO AVOID SPLITTING WOOD. • INSTALL (N) BLOCKING ONLY BELOW STANDOFF LOCATIONS. DESIGN: Andrik Ureno SHEET: REV: DATE: 3 12/19/2024 STATE OF 10NAt. STRUCTURALONLY Digitally signed by ABE DE VERA Date: 2025-01-09 07:35:21 -08:00 THIS ITEM HAS BEEN DIGITAL[. SIGNED AND SEALED BY ABE DE VERA ON 2025-01-09 PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. 901 PAGE .AVENUE FREMONT, CA 94538 CONFIDENTIAL - THE INFORMATION HEREIN JOB NUMBER, JB-3352898 00 CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN MOLE OR IN ZS Comp V4 w Floshing—Insert PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE MODULES: (43) Hanwho Q Cells Q.PEAK DUO BLK ML—GlO.o+/TS 410 TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER PERMISSION OF TESLA INC. Multiple Inverters CUSTOMER: Donald Page 6834 Shelby Lynn Way Zephyrhills, FL 33542 [a 191 168mi J, --- - ------- "4t dre dmW4 5 Feldtive IV the blyui;tule IldmM9 Mdl bUppklltb Me 1-11. A 4b �TV�5 I TdlfHf3y fflefTIVer5 W10 T 15 aWnq flaming fneM 12". 'Whe"re, present, �,the u,,green �'and efed hatching in Applied Wind Zone rows corresponds to hatching on the Site Plan page of the plan set. DESCRIPTION: 17.63 KW PV ARRAY 15.3 KW (AC NAMEPLATE) PV ARRAY 115 KWH ENERGY STORAGE SYSTEM PAGE NAME. UPLIFT CALCULATIONS DESIGN: Andrik Urena SHEET: REV: DATE: 4 12/19/2024 6wftxq PCS Controlled Current Setting: (Panel Rating * 0.8) = 160A (200A Busbar) CONDUIT MATERIAL TYPE AND SIZE TO BE DETERMINED IN THE FIELD TO 2020 NEC STANDARDS, r- - - - - - - - - - - - - - - - - - - ---- - - - - - - - - - - - - - - r7j Emergency Stop Button (E-Stop) r—,N - Rapid Shutdown Initiation Device per Article 690.12(C) of the NEC 911V Disconnecting Means as defined in Article 100 of the NEC Connection to generation sources with 12V, IA communication wire L- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ref Qty I Description Ref Type Qty Size (AWG, Cu) EGC (AWG, Cu) Conduit Isc (ADC) Imp (ADC) Product String Module per MCI per Voc* Vmp Mounting 1 Breaker; 8OA/2P, 2 Spaces 1 PV Wire 2 #10 SEC #10 31e EMT 11.10 10.65 Ref Ref String String (VDC) (VDC) Plane 8 1 Tesic # 1841000-XX-Y: Back-up Gateway 3,0 NA for PIN 2 THWN-2/THWIN 2 JOB #10 3/4- EMT 22.20 2130 SlA 12 4 581.88 451.68 Mpi 1 Disconnect; 100A, 240vac, Non -Fusible, NEMA 3R: 2P, 2W, 3 THWN-2/THWN 2 #10 #10 3/4' EMT 11.10 10.65 E S18 12 4 581.88 451.68 Mpi C 1 Ground/Neutral Kit; 60-100A, General Duty (DG) - S2 10 4 484.90 376.40 MP2 1 Breaker, 20A/2P, 2 Spaces F S3 4 2 193.96 150.56 MP3 1 Breaker; 6OA/2P, 2 Spaces Ref Type Qty Size (AWG) Min EGC Cu) Conduit Length Imp Vmp S4 5 2 24145 188.20 MP1 (Cu) (Al) (AX, (Cu) (AI) (ft) (AAC) (VAC) 1. CONDUIT RUNS MAY BE CONDENSED DUE TO SITE CONDITIONS AND/OR 1 Eaton # BRP12NC125R: Load Center (BR Convertible), 125A, NEMA 3R, 10 kAIC, IP, — 4 THWN-2 3 #06 #04 #10 PVC Jacketed MC 1. EMT 5ft 48 240 INSTALLATION EASE. ALL CONDUIT FILLDERATES AND PROPER CALCULA11ONS D 12 spaces, 120/240 V 5 THWN-2 3 #10 #08 #10 PVC Jacketed MC 3/4- EMT 5ft 16 240 HAVE BEEN COMPLETED PER NEC CHAPTER 9, TABLE 4. 1 Eaton # BRSF125: Sub -Feed Lug Block; 125A, 2P, CLIP ON BR FRAME — 2. SOLAR SHUTDOWN DEVICE TO BE INSTALLED FOR SYSTEM RAPID SHUTDOWN I Eaton BRPHID: Breaker Hold -Down Kit; Type BR, 2P 6 THWN-2 3 #2/0 #4/0 #06 2' PVC 2" PVC 2ft - 240 I IN ACCORDANCE WITH ARTICLE 690 OF THE APPLICABLE NEC. 1 Eaton BRPHDGENBR: BR Hold -Down Kit; For Use with BRPON Load Centers 7 THM-2 1=#04 #02 1 #08 - 1EMT I 1 1/4" EMT Sft - 240 3. CONDUIT TYPE CAN CHANGE DUE TO SITE CONDITIONS AND WILL FOLLOW - THE NEC REQUIREMENTS FOR THAT CONDUIT TYPE. E 1 lTesla Powerwoll 3 [24OV] # 1707000-XX-Y 11.5 kW / 13.5 kWh 8 THWN-2 3 #2/0 #4/0 #06 2" PVC 2' PVC 2ft 240 F 1 3.8 kW Tesla Inc 1538000 -XX-Y (240V) G J 2 UNC110N BOX, 4 STRING Aoin Panel Rating (E) 200A Hanwho 0 Cells Q.PEAK DUO BLK Main Breaker .'GlOo+/TS 410: PV Mod, 41OW, 381.OPTC H (E) 200A 4 Tesla MCI, 65OV, 12A — Rating ZEP, Elk Frm, BlIk Backsht, MC4, 1kV 12 Tesla MCI, 65OV, 12A General Notes DC Ungrounded Oty 43 I 1 Eaton M22-PVT-KOl 1 508 Emergency Stop Button - NEMA 4X Inverters Vac 45.31 Panel Number No label Vmp 37.64 Meter Number 4311674 Isc and Imp are in the DC Conductor Table Service Entrance Underground CONFIDENTIAL -THE INFORMATION HEREIN JOB NUMBER: JB-3352898 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: Donald Page 17.63 KW PV ARRAY Andrik Urenci L SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Flashing —Insert 6834 Shelby Lynn Way 15.3 KW (AC NAMEPLATE) PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZA'IION, EXCEPT IN CONNECTION WTH MODULES. Zephyrhills, FL 33542 13.5 KWH ENERGY STORAGE SYSTEM THE SALE AND USE OF THE RESPECTIVE (43) Hanwho Q Cells Q.PEAK DUO BLK IV1L—G10.o+/TS 410 TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: SHEET: REV: DATE, PERMISSION OF TESLA INC. MUltiDle Inverters 8138385224 THREE LINE DIAGRAM 5 12/19/2024 Label Location: (O(|CI(CB) Per Code: 69I31/G.3 Label Location: (D[)(|NV) Per Code'. 690.1113 Label Location: (D[)(|NV) Per Code: 69033 Label Location: (AC) (POI) Per Code: 690.1113 Label Location. - (AC) (POI) Per Code 690.54 Label Location: MAIN DISCONNECT Per Code: Label Location: (OC)([B) Per Code: 690133 Label Location: (p0|) Per Code: Per Code: Label Location. - (POI) Per Code: Label Location: (POI) Per Code 705.12.13.3 Label Location: |NV Per Code: 69056([)( )b NFPA1l1Z21l1] NFPA1llZ2]'4 (AQACDisconnect K]:Conduit ([0: Combiner Box (D):Distribution Panel (DQ:D[Disconnect U(]: Interior Run Conduit (|NV):Inverter With Integrated DCDisconnect VQ:Load Center (KX): Utility Meter Label Location: (8L[) Per[od& Label Loca ion: (BL[) Per Code ZZO Labe|Lucation� (Msp) Per Code: 312,8/�3 Label Location: (MSP) Per Code 7O51Z�B.3 Label Location: (NSP) Per Code: 706.7.E Label Location: (NSP) Per Code: 7D67£ Label Location: (MSp) Per Code 706.7,E Label Location: (MSP) Per Code: 706.7.E NEC 2017 - Default Label Set Label Location: (K8SP) Per Code: 7U5, 12.B3 Label Location-, WSp) Per Code: Label Location: (MSP) Per Code: Q.PEAK DUO BLK ML-G1 0+ SERIES 385-415Wp I 132Celis Maximum MojUL-jf��� A K D K The ideal solution for: EERooftop arrays on Rooftop arrays on residential buildings commercial/industrial buildings K DUO BLK ML-G 10+ SERIES m Mechanical Specification Format 74.4in x 41.2in x 1.57 in (including frame) - --------- - ocells (1890 mm x 1046 mm x 40 mm) Weight 51.8lbs 123-5kg) Front Cover 0A 3 in (3.2 mm) thermally pre -stressed glass with anti -reflection technology Back Cover Composite film Frame Black anodised aluminium Cell 6 x 22 monocrystalline Q.ANTUM solar half cells Junction box 2,09-3.98 in x 1.26-2.36 in x 0.59-0.71 in (53-101 Own x 32-60 mm x 15-18 mm), IP67, with bypass diodes Cable 4mm'Solar cable; J+) , S2.2in 0325mm), (-) 52.2in (1325mm) Connector Staubli MC4; IP68 Breaking the 21 % efficiency barrier Q.ANTUM DUO Z Technology with zero gap cell layout boosts module efficiency up to 21 .0%. A reliable investment Inclusive 25-year product warranty and 25-year linear arramy performance warranty'. Enduring high performance Long-term yield security with Anti LeTID Technology, acells Anti PID Technology" and Hot -Spot Protect. I_ I Innovative all-weather technology (2D- Optimal yields, whatever the weather with excellent low -light and temperature behaviour. Zep compatible TM frame design High-tech black Zep CompatibleTM frame, for improved aesthetics, easy installation and increased safety. The most thorough testing programme in the industry Qcells is the first solar module manufacturer to pass the most comprehensive quality programme in the industry: The new"Quality Controlled PW of the independent certification institute TOV Rheinland, See data sheet on rear for further information. APT test conditions according to IF C/TS 62804-1:2015, method A (- I SOO V, 96m !F 23 E Electrical Characteristics POWER CLASS 385 390 395 400 405 410 415 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC, (POWER TOLERANCE +5 W/-OW) Power at MPP poll [w] 385 390 395 400 405 410 415 Short Circuit Current' Irr [A] 11.04 11.07 IIAO 11.14 1117 11,20 11.23 Open Circuit Voltage' Vr rVj 45.19 45.23 45.27 453 45.34 45.37 45.41 Current at MPP I- tA] 10.59 10.65 10-71 10.77 10.83 10.89 10.95 Voltage at MOP V-1 IVI 36.36 36.62 3688 37.13 37.39 37.64 37.89 Efficiency' 9 1%1 > 19.5 p 19.7 e20.0 > 20.2 20.5 > 207 > 21,0 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT' Power at MPP P_ [WI 298.8 2926 296.3 300.1 303.8 307.6 311.3 Short Circuit Current I,, [A] 8.90 8.92 8.95 8.97 9.00 9.03 9.05 Open Circuit Voltage vl,, IV] 42.62 42.65 42.69 42.72 42.76 42.79 42,83 Current at MPP [A'.83S 8.41 8,46 8.51 8.57 8.62 8.68 Voltage at MPP VmPP IV] 34.59 34.81 35.03 3525 35A6 35.68 35.89 'Measurement tolerances Pur, 3 %; l5c; Vc ±5 se at STC: 1 000W/rrp, 2 5 2'C, AM 1.5 according to IEC 60904-3 .'800W/m', NMOT, spectrum AM 1.5 Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98% fFornmal power do,iogfirst ye-The-fte,ma.. 9�, ex", 0,5 95 deg,ad,uprr per year. At least 93.5 % of nominal power up to 10 year,, At 1­186 % of nominal power up to 25 years, All data within measurement sc t.1-p-. Full warranties in accordance with th,, warranty terms ofthe Qc.11, sale, .,g.rua.tou of You, respective country. 'Standard term, cf g­­­ f,, the 5 PV companies with Yne Typical module inh­-, -der tow ir-s- ­r­,o,o,n highest production Pz,ny in 2021 (Fb,,,ry 2021, to STC-dil-, (25'C, It 0i:W/,) TEMPERATURE COEFFICIENTS Temperature Coefficient of L, ct [1k / KI +0,04 Temperature Coefficient of V_ Temperature Coefficient of Per, Y [%/K] -0.34 Nominal Module Operating Temperature Maximum System Voltage V111 IV] 1000 (IEC) / 1000 (UL) PV module classification Maximum Series Fuse Rating [A DCI 20 Fire Rating based on ANSI/UL 61730 Max. Design Load, Push/ Pull' lips Ift7l 85 (4080 Pa) / 85 (408() Pa) Permitted Module Temperature Max.Test Load, Push/Pull, [Ibs/ftll 128 (6120 Pal 128 J6120 Pa) on Continuous Duty ' See Installation Manual n Qualifications and Certificates UL61 730-1 & UL61 730-2, CE-compliant, Quality Controlled PV - TUV Rheinland, IEC 612te1n5t0o1.69, ,I8E9C ,2117S30l20h1,6 Patent N3­"IK, MPAr/1`C - Dus EU.S. 0 [%/Kl -027 NMOT [11 109,5.4 (43 ± 3 'C) Class It TYPE 2 -401 up to +1 85'F (-40`C up to +85'C) I wo " -Contact your Qcells SaleRepresentative for details regarding thernodule's eligibility to be Buy American Art (BAA) compliant Q(,,11° puirskj( rnn­om,zj;jq par),,.'r outmfl r-, consderaluor 01 IN qlohal erivaonnCq1t USAI � -1 9-97485r961 � 'I hq,­q­,1qco1­­ 1, � ­­d, ­r,� ocells Gateway 3 Performance Specifications Model Number 1841000-01-Y Nominal Grid Voltage `20/240 V AC Grid Configuration Split phase Grid Frequency 60 Hz Continuous Current 200 A Rating Maximum Supply 22 kA with Square D or Short Circuit Current Eaton main breaker 25 kA with Eaton main breaker' IEC Protective Class Class I Overvoltage Category Category IV Only Eaton CSR or BWH main breakers are 25 kA rated Operating Temperature Operating Humidity (RH) Maximum Elevation Environment Enclosure Type Certifications Emmissions Mechanical Dimensions 660 x 411 x 149 mm Specifications (26 x 16 x 6 in) Weight 16.4 kg (36 lb) Mounting options Wall mount AC Meter Revenue accuratc, (+/I - Communication CAN User Interface Tesla App Backup Transition Automatic disconnect for seamless backup Overcurrent 100-200 A Protection Device Service entrance rated Eaton CSR, BWH, or BW, or Square D QOM breakers Internal Panelboard 200 A 8-space/16 circuit breakers Eaton BR, Siemens QP, or Square D HOM breakers rated to 10-125A Warranty 10 years -20°C to 50°C (-4°F to 122°F) Up to 100%, condensing 3000 rn (9843 ft) Indoor and outdoor rated NEMA 3R UL 67, UL 869A, UL 916, UL 1741 PCs, CSA 22.2 1071, CSA 22.2 29 FCC Part 15, ICES 003 660 MITI �411 mm �mrn � 2023 PV HAZARD CONTROL SYSTEM Z A R D C C'N R 0 L E GiJ'PM E N T Ak N D C 0 M P 0 Ni, N S, Standarl, PVRSE Mlid cicult UL1,71,41 PVRSE --------- - -- V4 CEA4F802 V4 FF7BE4E1 a 7r. U V4 CEA4F802 PVRSS/PVRSE SR60TI SR72T1 ' SR72T2 SR72T3R PVHCS Initiator Dedicated PV system AC circuit breaker or AC disconnect switch, labeled per NEC 690.12 N/A 'PV ete PVHCS Initiator Emergency stop device (i Listed "Emergency Stop Button" or "Emergency Stop UL 5,38 or UL 60947 �Powen.vali- Power-walj) i Device" or "Emergency Stop Unit", Parts 1, 5-1 and 5-5 PVHCS Initiator On/Off Enable switch located on Powerv/all 3. when labeled as Rapid Shutdown initiator per U1741 'Power,fvali 3`1 NEC 690.12 requirements Applies to variations of this part number with suffix of two numbers and one letter. Note PVHCS installation requirements may reduce the effective equipment and component ratings below the individual equipment and component PVRSE ratings in order to achieve PVHCS shock hazard reduction requirements. PVHCS INSTALLATION REQUIREMENTS Max System Voltage 600 Vi PVHCS Maximum Circuit Voltage (Array Internal Voltage After Actuation) 165 VDC (cold weather open circuit) Max Series -Connected Panels Between MCIs: 10 OTHER INSTALLATION INSTRUCTIONS 1. An MCI must be connected to one end of each series string or mounting plane sub -array string. 2. Verification that MCIs are installed with 10 or fewer modules between MCIs shall be documented for inspection, by voltage measurement logs and/or as -built string layout diagrams. 3. For PV Inverter: The PVHCS initiator (AC breaker or switch) shall be sized and installed in accordance with NEC requirements. The specific part shall be identified on the as -built system drawings. 4. For Powerwall+ or Powerwall 3: The PVHCS emergency stop initiator shall have the following minimum ratings: Outdoor (Type 3R or higher), 12V, 1 A, and shall be installed in accordance with NEC requirements. The specific part shall be identified on the as -built system drawings. Refer to the Powerwall installation manual for further details. PV HAZARD CONTROL SYSTEM Tesla Inverter Based P\/H'—S, Consisting of Tesla Inverters, Tesla MCI and other listed comporients to create the system, 4IJAPNING 7- reduce the r,si, of,­,iu,y e,9d ali fstructions PV HAG, JRD CONTROL EQUIPMENT AND C—C!"'P-CNEN 3 S Fu,ic'i,��- Ivan'rfacturer fvlooe! No F 1­7wa,e Vers�ors Ceruficatior Standard and Checksums 6 k kY 1 5 3 8 0 D 0 V4 CEA4F802 lnve,-�e, Powenfvall+ of IBE4!El UL �41 JI-199-8 Powe,vvall T 8 kkv/ V4 FF 7 17 Testa. 7,6 kyV 1850000' V4 CEA4F802 PVRSS/Py/RSE 11,5 kVV 1707000' V1 Ox3282A1 Mid Circuit Interrupter (MCI) l Testa MCI-1 MCI-2 N/A UL 1741 PVRSE The PVHC PV modules must be listed by a NRTL to UL 1703 and/or UL 61730-1 and UL 61730-2 (excluding Class 0 PV Modules and Class 1). . ........ . 1; The PV mounting system must comply with one of the following Listed by NRTL to UL 2703 and rated for use with the specific PV modules noted above. PV Mounting System The non -certified combinations of mounting and PV modules shall be evaluated for loading, mounting and grounding per the NEC and other applicable installation codes. The following PV connectors may be used to connect to the Testa MCIs Staubb type PV-KST4/611-UR or type PV-KST4-EVO2 (male). PV Connectors Stauldli type PV-KBT4/611-UR or PV-KBT4-EV02 (female), Staubli Branch Socket PV­AZB4 and Branch Plug PV-AZS4, Connectors evaluated by an NRTL for intermatability with the connectors above. PVHCS Initiator I Dedicated PV system AC circuit breaker or AC disconnect switchlabeled per NEC N/A (PV Inverter) 690.12 requirements, 1--­­ - ____ PVHCS Initiator __ ------ ___ ---- — ---- - — ------- ------ — Emergency stop device (NISD)- Listed "Emergency Stop Button" or "Emergency Stop UL 508 or UL 60947 Parts (Powerwall+, Powerwall 3) 1 Device" or "Emergency Stop Unit". 1. 5-1 and 5-5. PVHCS Initiator On/Off Enable switch located on Powerwall 3, when labeled as Rapid Shutdown initiator UL 1741 (Powerwall 3) 1 per NEC 690.12 requirements I Applies to variations of this part number with suffix of two numbers and one letter. Note: PVHCS installation requirements may reduce the effective equipment and component ratings below the individual equipment and component PVRSE ratings in order to achieve PVHCS shock hazard reduction requirements. PVHCS INSTALLATION REQUIREMENTS Max System Voltage 600 VDC PVHCS Maximum Circuit Voltage (Array Internal Voltage After Actuation) 165 VDC (cold weather open circuit) OTHER INSTALLATION INSTRUCTIONS 1. An MCI must be connected to one end of each series string or mounting plane sub -array string. 2. MCIs shall be installed between series connected module combinations such that the PVHC Maximum Circuit Voltage after actuation is no greater than 165V under any circumstances. The installation location coldest anticipated operating ambient temperature shall be used to calculate the PV maximum voltage in accordance with NEC 690,7. 3. Verification that the MCIs are installed in accordance with 1) and 2) shall be documented for inspection, by voltage measurement logs and/or as - built string layout diagrams. 4. For PV Inverter: The PVHCS initiator (AC breaker or switch) shall be sized and installed in accordance with NEC requirements. The specific part shall be identified on the as -built system drawings. 5. For Powerwall+ and Powerwall 3: The PVHCS emergency stop initiator shall have the following minimum ratings: Outdoor (Type 3R or higher), 12V 1 A, and shall be installed in accordance with NEC requirements. The specific part shall be identified on the as -built system drawings. Refer to the Powerwall installation manual for further details. D'S 0/F--22 D-S-0023 22 n„It r• ,cal s rl non. ;.<rbe n r, uslr„ srrlle art sno- Ei tcnt supolhen Emergency -stop button V22-PVT mountmc clamp M22-A r aactolerrew M,22-1<01 Technical data General Ambient temperature Open 25 - -70 shipping classification DNV GL LR Design verification as per 1EC/EN 61439 Technical data for design verification Rated operational current for specified heat dissipation Heat dissipation per pole, current -dependent Equipment heat dissipation, current -dependent Static heat dissipation, non -current -dependent Heat dissipation capacity Operating ambient temperature min. Operating ambient temperature max. IEC/EN 61439 design verification 10.2 Strength of materials and parts 10.2.2 Corrosion resistance 10.2.3.1 Verification of thermal stability of enclosures 10.2.3.2 Verification of resistance of insulating materials to normal heat 10.2.3.3 Verification of resistance of insulating materials to abnormal heat and fire due to internal electric effects 10.2.4 Resistance to ultra -violet IUV) radiation 10.2.5 Lifting 10.2.6 Mechanical impact 10.2.7 Inscriptions 10.3 Degree of protection of ASSEMBLIES 10.4 Clearances and creepage distances G Germanischer Lloyd In A 6 Pv,d W 0,11 Pv,d W 0 Pvs W 0 Pd­ W 0 °C -25 'C 70 Meets the product standard's requirements. Meets the product standard's requirements. Meets the product standard's requirements. Meets the product standard's requirements. Please enquire Does not apply, sincethe entire switchgear needs to be evaluated. Does not apply, sincethe entire switchgear needsto be evaluated. Meets the product standard's requirements. Does not apply, since the entire switchgear needs to be evaluated. Meetsthe product standard's requirements. 04/01/2021 Eaton 132624 E02021 V77A EN 1 / 2 eee-. of app l,s, ,,c the am, r, s'.non gea; needs tu, ;r.: ahratz'. r nt ape l;, s m,l, the , svditc r ,a mods ic, L11 Technical data ETIM M Lovv poi age industrial components IEG0000 71 i Fr ont elemeni for fi i shi jo misl out ur- (ECW0381 Electric engineering, automation, process control engineering / Low -voltage switch technology / Command and alarm device / Front element for mushroom push-button actuators Iecl@sslo-0.1-27 37-12-12IAKF030014]) Colour button Red Construction type lens Round Diameter cap ,nm 38 Hole diameter men 22.5 Width opening mni 0 Height opening nim 0 Degree of protection IIPI IP67 Degree of protection INEMA) Type of button High Suitable for illumination No Switching function latching Yes Spring -return No With, front ring No Material front ring Plastic Colour front ring Other Suitable for emergency stop Yes Unlocking method Turn -release Additional product information (links) ILD4715005Z RMO.-Titan: Emergency stop buttons, Emergency stop buttons IL04716005Z RMO-Titan: Emergency stop https //es-assets.ealon.coin/DOCUMENTATION/AWA_INSTRUCTIONS/1L04716005Z2020_Ol.pdf buttons, Emergency stop buttons I1.64716W2Z RR40.-Titan System IL04716002ZRMO-Titan System https://es-assets.eaton.com/DOCUMENTATION/AWA_INSTRUCTIONS/fL04716002Z2020_09,pdf 04/01/2021 Eaton Industries Grl Imp//w .eaton.eu © 03/2021 by Eaton industries GmbH Eaton 132624 E02021 V77.0 EN Tesla Solar Inverter X z A excepnonal efficiency and eel lb:hty Z­ F e-l-, l,� ji, C C" March 24, 2023 Tel Solar Inverter Technical Specifications Electrical Spec ificat i ens: output (AC) Electrical Specifications: Input (DC) Mode; Number Output (AC) Nominal Power Maximum Apparent Power Maximum Continuous Current Breaker (Overcurrent Protection) Nominal Power Factor THD (at Nominal Power) ` S 3 8 0 0 0 - x x - Y 3.8 kW 3KW 5.7kW 76 kW 3,800 W 15,000 W S,700 W 7600 W 3,840 VA 5— 0 4 0 VA 5,760 VL,,, 7,680 VA 116 A 2 -', A 24 A 32 A, 20 A. 30 A 30 A 40 A 1 - 0.9 (leading // lagging <S% A label will be applied to the Solar Inverter indicatlng the configured amperage. MPPT 4 Input Connectors per MPPT 1-2-1-2 Maximum Input Voltage 600 VDC DC Input Voltage Range 60 - 550 VDC DC MPPT Voltage Range 60 - 480 VDC2 Maximum Current per MPPT (1,,) 13 A Maximum Short Circuit Current per 17 A MPPT l 2 Maximum current. Where the DC input current exceeds an MPPT rating, jumpers can be used to allow a single MPPT to intake additional DC current up to 26 A Im, / 34 A Is, Peak Efficiency CEC Efficiency Allowable DC/AC Ratio Customer Interface Internet Connectivity Revenue Grade Meter AC Remote Metering Support Protections 09-31 -�- 9&6% at 240 V 98.0% at 240 V 1.7 Tesla Mobile App Wi-Fi (2.4 Gl 802.11 b/g/rl Ethernet, Cellular (LTE/4G) I Revenue Accurate (+/- O.S%) Wi-Fi (2.4 GHz, 802.11 b/g/n), RS-485 Integrated arc fault circuit interrupter (AFCI), Rapid Shutdown 60 Hz, 240 V Split Phase 4 Cellular connectivity subject to network operator service coverage and signal strength. Tesla Solar Inverter Technical Specifications Mechanica-1 Spec',"'! cati ons Tam Weight 52 lb I Mounting Options Wall mount (bracket) Door and bracket can be removed for a mounting weight of 37 Jb, Operating Temperature Operating Humidity (RH) Storage Temperature Maximum Elevation Environment Enclosure Type Ingress Rating Pollution Rating Operating Noise @ 1 m -30°C to 45°C (-22°F to 113°F) Up to 100%, condensing -30°C to 70°C (-22°F to 158°F) 3000 m (9843 ft) Indoor and outdoor rated NEMA 3R IP55 (Wiring compartment) PD2 for power electronics and terminal wiring compartment, PID3 for all other components < 40 db(A) nominal, < 50 db(A) maximum Performance may be de -rated to 6.2 kW at 240 V when operating at temperatures greater than 45°C. Grid Certifications UL 1741, UL 1741 SA, UL 1741 SB, UL 1741 PCS, IEEE 1547-2018, IEEE I547.1 Safety Certifications UL 1741 PVRSS, UL 1699B, UL 1998 (US), UL 3741 Emissions EN 61000-6-3 (Residential), FCC 47CFRIS.109 (a) RFING S-SYSTEY PECI F !CATIONS 77% OO manufacturer certified as 1 yes I Dr 7ype 2 A,+�ac'h,menl rne�hc,,d t� 2,582 izt ZS COtrp Suppo�fS r- pSf,24-jr Iro--d R..up 'C 72 pS' 1-345C, reai _ode oesigr-, load J A, ZS Comp s,-Ipporls 50 ps," (24C10 Pa) iron, sioe and ip 72 psi i"�410 Pa') re a. side desiqni load rating for Landscape module orienlation Engineered for compliance withASCE 7-11115, 7-10. and 7-116wind load requirements. Zep wire management products listed to UL 1565 for wire positioning devices. ZS Cornp grounding products are listed to UL 2703 and UL 467, ZS Comp bonding products are listed to UL 27031 N istcd to U! 2703 Listed to UL 2703 are UL 258- r Driven Rain Part #850 6s,� Part #850 1628 stec tc j27�;"i a�l #31� I-,-, F1,18 Listed, ic 1l 2703 Part #850 1606 3-C Listed to UL 2703 Part #850 128 1 58C '588 sz, Listed v-, UL 2703 Per', #850 1613 C C K W111111!1111111111111111 -41 1 I�M �11 K System Technical Model Number 1707000-xx-V Specifications Nominal Grid Voltage (input & Output) 120/240 VAC Grid Type Split phase Frequency 60 Hz Nominal Battery Energy 13.5 kWh AC. Nominal Output Power (AC) 5.8 kW 76 kW 10 kW 11,5 kW Maximum Apparent Power 5,800 VA 7,600 VA 10,000 VA 11,500'VA Maximum Continuous Current 24 A 31.7 A 417 A 48A Overcurrent Protection DeviCe2 30A 40 A 60 A 60 A Configurable Maximum Continuous Discharge 15A kW Power Off -Grid (PV Only, -20'C to 25°C) Maximum Continuous Charge Current J Power 20.8 A AC 5 kW (Powerwall 3 only) Maximum Continuous Charge Current Power 33.3 A AC 8 kW (Powerwall 3 with up to (3) Expansion units) Output Power Factor Rating 0 - 1 (Grid Code configurable) Maximum Output Fault Current III s) 160 A Maximum Short -Circuit Current Rating 10 kA Load Start Capability 185 LRA Solar to Battery to Home/Grid Efficiency 89%1,4 Solar to Home/Grid Efficiency 97.5%5 Power Scalability Up to 4 Powerwall 3 units supported Energy Scalability Up to 3 Expansion units (for a maximum total of 7 units) Supported Islanding Devices Gateway 3, Backup Switch, Backup Gateway 2 Connectivity Wi-Fi (2.4 and 5 GHz), Ethernet, Cellular (LTE/4G Hardware Interface Dry contact relay, Rapid Shutdown (RSD) certified switch and 2-pin connector, RS-485 for meters AC Metering Revenue Grade (+/- 0.5%, ANSI C12.20) Protections Integrated arc fault circuit interrupter (AFCI), Isolation Monitor Interrupter (IMI), PV Rapid Shutdown (RSD) using Tesla Mid -Circuit Interrupters Customer Interface Tesla Mobile App Warranty 10 years 'Values provided for 25'C (77'F), at beginning of life. 3.3 kW charge/discharge power. 2 See Powerwall 3 Installation Manual for fuse requirements if using fuse for overcurrent protection. If enabling the 15.4 kW off -grid maximum continuous discharge power, Powerwall 3 must be installed with an 80 A breaker and appropriately sized conductors. 'Typical solar shifting use case. 5 Tested using CEC weighted efficiency methodology. The customer is expected to provide internet connectivity for Powerwall 3; cellular should not be used as the primary mode of connectivity. Cellular connectivity subject to network operator service coverage and signal strength. 2024 2024 1,11111111111spI111111, 1111 1 11 Solar Technical Maximum Solar S T C Input 20 kW Specif ications Withstand Voltage 600 V DC PV DC Input Voltage Range 60 — 550 V DC PV DC MPPT Voltage Range 60 — 480 V DC MPPTS 6 Maximum Current per MPPT ('m,) 13 A' Maximum Short Circuit Current per MPPT (Ise) 15 A' Where the DC input current exceeds the MPPT rating, a jumper can be used to combine two MPP Ts into a single input to intake DC current up to 26 A Iyn J 30 A Environmental Operating Temperature —20°C to 50°C (-4°F to 122°F) pecificati®n Operating Humidity (RH) Up to 100%, condensing Storage Temperature —20'C to 30°C (-4°F to 86'F), up to 95% RH, non - condensing, State of Energy (SCE): 25% initial Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Rating NEMA 3R Ingress Rating IP67 (Battery & Power Electronics) IP55 (Wiring Compartment) Pollution Rating PD3 Operating Noise @ 1 m < 50 db(A) typical < 62 db(A) maximum Performance may be de -rated at operating temperatures above 40°C (104'F). Compliance Certifications UL 1741, UL 9540, UL 9540A, UL 3741, UL 1741 PCS, Information UL 1741 SA, UL 1741 SB, UL 1973, UL 16998, UL 1998, CSA C22.2 No. 0.8, CSA C22.2 No. 107.1, CSA C22.2 No. 330, CSA 22.3 No. 9, IEEE 1547, IEEE 1547A, IEEE 1547.1, CA Rule No.21 Grid Connection United States and Canada Emissions FCC Part 15 Class B, ICES 003 Environmental RoHS Directive 2011/65/EU Seismic AC156, IEEE 693-2005 (high) Fire Testing Meets the unit level performance criteria of UL 9540A Mechanical Specif ications Dimensions Total Weight of Installed Unit Weight of Powerwall 3 Weight of Glass Front Cover Weight of Wall Bracket Mounting Options 1105 x 609 x 193 mm %43.5 x 24 x 7.6 in) 132 kg (291.2 lb) 124 kg (272.5 lb) 6.5 kg (14.5 lb) 1.9 kg (4.2 lb) Floor or wall mount s These dimensions include the glass front cover being installed on Powerwali 3. Kul N 609 mm 193 �mm 2024 2024 Powerwall 3 with Gateway 3 _ Whole Home Backup t r 1 , I _ Solar 9 7 Meter Grid Meter socket panel Gateway 3 Load center l Backup loads Powerwall 3 Powerwall 3 with Backup Switch _ Whole Home Backup I > I Backup Switch I Solar I Meter Grid Meter socket panel Load center 1 Backup loads Powerwall 3 Powerwall 3 with Backup Gateway l OpGn»a! � Partial Home Backup i > I Utility Meter I I Solar I 0MainI UJIL ,...Breaker �- Grid Meter load center Backup Gateway 2 Load center I 1 Non -essential Toads Backup loads Powerwall 3 2024 Powerwall 3 with Gateway 3 ' (1) Powerwall 3 with (3) Expansion units Solar � Meter �) Grid Meter socket panel Gateway 3 Load center I j Backup loads Powerwall 3 Powerwall 3 x aans3,cn 1 , I j i E Powerwall 33 Powe:"/bafs 3 Expansion FExpzansmn Powerwall Backup Switch Meter Grid Meter socket panel Load center Generation p Backup loads Solar Solar Solar Solar Powerwall3 Powerwall3 Powerwall3 Powerwall3 1 Q i r i 2024 13 Solar Shutdown Device 2 Technical Specifications Electrical NominaInput DC Current Rating (1_) Specifications Maximum input Short Circuit Current (i,,-) Maximum System Voltage (PVHCS) RSD Module Maximum Number of Devices per String Performance Control Passive State Maximum Power Consumption Warranty Environmental Ambient Temperature Specifications Enclosure Rating Compliance Certifications Information -3 A. -,000 V DC 5 Power Line Excitation Normally Open 7 W 25 years -45°C to 70°C (-49°F to 158°F) NEMA 4X / IP65 UL 1741 PURSE, UL 3741, PVRSA (Photovoltaic Rapid Shutdown Array) PV System AC Breaker or Switch See Compatibility Table below Mechanical Model Number MCI-2 Specifications Electrical Connections MC4 Connector Housing Plastic Dimensions 173 x 45 x 22 mm (6.8 x 1.8 x 0.9 in) Weight 120 g (0.26 lb) j 173 mm TA 4S 22 mm mm UL 3741 PV Hazard Control (and PVRSA) Compatibility Tesla Solar Roof and Tesla/Zep ZS Arrays using the following modules are certified to UL 3741 and UL 1741 PVRSA when installed with Powerwall+ or Tesla Solar Inverter and Solar Shutdown Devices. See Powerwafl+ / Testa Solar Inverter Raoid Shutdown: Module Selection Baser-, on -PV Haza.rdControl System Listing for guidance on installing other modules. Brand Model Required Solar Shutdown Devices Tesla Solar Roof V3 I Solar Shutdown Device per 10 modules Testa Tesla TxxxS (where xxx = 405 to 450 W, increments of 5) 1 Solar Shutdown Device per 3 modules Tesla TxxxH (where xxx = 395 to 415 W, increments of 5) Hanwha Q.PEAK DUO BLK-G5 or Q.PEAK DUO BLK-G6+ I Solar Shutdown Device per 3 modules 'Exception: Tesla solar modules installed in locations where the max Voc for three modules at low design temperatures exceeds 165 V shall be limited to two modules between Solar Shutdown Devices. January 31, 2023