HomeMy WebLinkAbout91-1470
STATE OF FLORIDA
City of Zephyrhills
#~/1~
Type of Permit
PASCO COUNTY
BUILDING DEPARTMENT
1-813-788-6611
Permit N~ 14 7 O~
Date .1/- ..~-7 J
~G
~ ~ING
~CAL
Property Owners Name:
Job Address:
1:f$~ ~ ~/~<
Legal Description:
Sub.Div.
Lot
Blk.
Zoning CI:
Description of wor~~
;>? 6rFs
L)--<'i
1 >>"1
'yJ.u _ ,6Jlll:6
-
Energy Code Readout:
i&
w ,.~~
I'
Complete Plans, Specifications and Fee Must Accompany Application
OCCUPATIONAL LICENSE #
Jo8~~
,
~~9D
:~:~ATUR~~
COMPANY
ADDRESS
TELEPHONE #
Estimated Cost:
#l
All work shal! be performed in accordance
with the above and all City Codes
and Ordinances.
C~jU!:L 0~
ELECTRICAL' . . M~~
Tp.Serv.
Rough In
Meter Can
Canst. Pole
Pool
Pre-Meter
Final
~~
... BUlL ~
Ftr.
Pre SLB
Lintel
FRM.
Insul.CL
WL
PL~
./'"
SLB
Tub Set
Water
Sewer
Final
Breakers
Ducts Insl.
Compressor
Final
Driveway
Reinspectlons: When extra inspection trips are necessary due to anyone of the following reasons, a charge of ten ($10.00)
dollars shall be made for each trip.
(a) Wrong Address
(b) Condemned work resulting from faulty construction
(c) Repairs or corrections not made when inspection called for
(d) Work not ready for inspection when called.
The payment of reinspection fees shall be made before any further permits will be issued to the person owning same.
.-.-
Rental Rehabilitation Program
City of.Zephyrhills, Florida
Unit: 38839 5th Avenue, Zephyrhills, FL 33540
Project Number: 91-1/RR-Z
OWner: Atkins (Group Home)
Proposed Improvements:
(1) replace 30-feet of roof (west side)
remove existing shingles, replace
(2) Replace. all jalousie windows/screens
(six in family rm. with plain glass)
CD
Install necessary GFIs (8) includes
exterior'3kitch~n and~athrooms and
~t double/sink; relocate light switch
l.n purple bath.tc'c'r<il)! f'l!'fi'
(4) Replace back hall door, back bedroom
door (with solid. wood doors)
(5) Install 7 fluorescent light covers
(6) Build cabinet over fuse boxes in
playroom or replace panel
(7) Construct security fence (wood) at
meter box, ac unit in back yard
Total Bid
,
Cost $d, '"'' nl"i -
Cost $ Ii ~ 551 00
Cost $ 11'1 00
Cost $ 590.00
Cost $ 140.00
Cost $ 1 11).00
Cost $ 420.00
$7,921.00
3?>S- DO
1:7.58'"{ O~
1
b / 7 I, G"'L:>
J
5;mL"Y..1 ~htJ/-::m77T
c:::
-----
--------- ---