Loading...
HomeMy WebLinkAbout92-2376 BUILDING PERMIT Permit 237~ Date 5-27-~)~ ./ P ~ CITY OF ZEPHYRHILLS (813) 788-6611 N<! Property Owner: Job Address: Parcell.D. # ~-' P~ -CJ;frY~:A (k, ~"sewer Conn Water Conn: Water Meter: T.I.F.'s: Zoning: Description of Work ~~~ ~ Radon Gas: ~- Cj 1- FINAL to-3.. q DATE NO OCCUPANCY BEFORE C.O, Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. C,Q, DATE Valuation or Contract Price ~ /;rttJ{); ~ Signature Company Address Telephone# City License Registration # State Certified License# [ PLU M Breakers Ducts Insl. Compressor Final Tp. Serv. Rough In Meter Can Const, Pole Pool Pre-Meter Final SLB Tub Set Water Sewer Final Ftr. Pre SLB lintel FRM, Insul. CL WL Driveway REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a charge of Fifteen and 00/100 Dollars ($15.001 shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction, c, Repairs or corrections not made when inspection called. d, Work not ready for inspection when called. e. Permit not posted on job site, f, Plans not at job site, g, Work not accessible, The payment of inspection fees shall be made before any further permits will be issued to the person owning same, .-----------------..--------- ---.---. _._---~-- /O;lC PREMIER SUNCOAST Ro~i~~G, INC. [I,'clef'.' ~t1'1a THvr'j. J:t1.? I" 1~&1(1 37325 S.R. 54 WEST ZEPHYRHILLS, FL 33541 (813) 782-6094 RESIDENTIAL & COMMERCIAL ROOFING LIC # RC 0061648 INSURED & BONDED PROPOSAL TO: ~,'(. h lltl15lr} 3Si10C( 5tJVfh ,Av(. PHONE #: I 8 J'~ :;tt;J.. DATE: JOB NAME: ============================================================ WE HEREBY SUBMIT 'THE FOLLOWING SPECIFICATIONS & ESTIMATE FOR THE COMPLETION OF THE FOLLOWING: COMPLETE TEAR-OFF AND HAUL AWAY OF EXISTING SHINGLES. BAD PLYWOOD REPLACED AT A COST OF $ J~./'J/"j PER SHEET. INSTALLATION OF NEW 2X4" LUMBER @ $1. 50 PER LINEAL FT INSTALL 011 NEW VALLEY METAL. INSTALLATION OF a II NEW LEAD BOOTS THROUGH ROOF. INSTALL NEW 15LB FELT. INSTALLATION OF NEW DRIP EDGE AROUND PERIMETER. INSTALLATION OF NEW 2{J YCtl/ FvttJf). SHINGLES. ALL DEBRIS REMOVED FROM THE JOB SITE. FIVE YEAR LEAK WARRANTY. ALL MATERIALS AND LABOR FURNISHED~ TOTAL BID ~ $ I FtJt.J. cJ (J ~. PAYMENT DUE UPON COMPLETION OF JOB. DATED: Z;-'-f \' - (i 2 CONTRACTOR DATED: ACCEPTED: OWNER SIGNATURE