Loading...
HomeMy WebLinkAbout92-2386 BUILDING PERMIT CITY OF ZEPHYRHILLS (813) 788-6611 Permit N<! 238sA 6 --;;l. - 7> ,;L Datla ~~ ELE~ PL~M~L ::~:::,~,:~e:?9'?w!9 22J~~~ - Parcell.D. # Sewer Conn Water Conn: Water Meter: T.I.F.'s: Zoning: Energy Code: Description of Wor( Rcz. - ~ Radon Gas: NO OCCUPANCY BEFORE C,O. FINAL Complete Plans, Specifications and Fee Must Accompany Application. C.O, All work shall be performed in accordance with City Codes and Ordinances. DATE Inspector :~;~~~~. Company _ Address Telephone# Valuation or Contract Price /, 9' / 6 - crt) City License Registration # . ,-:3 State Certified License# &:.~~9- (~U1LD~ ~ E~L__ Ftr. Tp. Servo Pre SLB Rough In Lintel Meter Can FRM. Const, Pole Insul. CL Pool WL Pre-Meter Final PL U M'8+N.G.. ---...~~ MEC~L ----,. Breakers Ducts Insl. Compressor Final SLB Tub Set Water Sewer Final Driveway REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a charge of Fifteen and 00/100 Dollars ($15,001 shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction. C. Repairs or corrections not made when inspection called, d. Work not ready for inspection when called, e. Permit not posted on job site, f, Plans not at job site, .g, Work not accessible. The payment of inspection fees shall be made before any further permits will be issued to the person owning same. ..~ '\ CASEY & BOB. S ROOFJ:NG Casey Bowden Robert Eldridge ROOFING CONTRACT 788-9474 Lic.#006409.. 782-12.37 Dear Sir: We propOSe to furnish all labor to complete the roofin9 job. All labor & material on bad wood not included. in the estimate. All material will be paid for. uPOn the si'ilnin9 of con- tract. Casey & Bob's wi 11 except check.. and pay for the material. this is so YOU will be able to recieve contractors price. - It ~....s III ~ _...1 '-} e.. /1 /7 Job Location ~2</7 9' /lLe., Cost of material_$ 9/~7, & $--- Cost of labor _'it:/0eJ. C)O Any bad wood indicated .rye; Not included! All labor must be paid for uPOn completion of services. unless. otherwise. stated on line below. "YOU. THE BUYER. HAVE THE RIGIrI' TO CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGIn' OF THE THIRD WORKING DAY ArrER THE DATE OF THIS TRANSACTION. You. are hereby authorized to all work necessary to lIlY roof. I undrestand that all bad wood is not incl uded. and balance will be paid uPOn COIDPletion of services. HOMEOWNER t.( ~U"'&. 1- '1 C--