HomeMy WebLinkAbout92-2386
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit
N<! 238sA
6 --;;l. - 7> ,;L
Datla
~~ ELE~ PL~M~L
::~:::,~,:~e:?9'?w!9 22J~~~ -
Parcell.D. #
Sewer Conn
Water Conn:
Water Meter:
T.I.F.'s:
Zoning: Energy Code:
Description of Wor( Rcz. - ~
Radon Gas:
NO OCCUPANCY BEFORE C,O.
FINAL
Complete Plans, Specifications and Fee Must Accompany Application. C.O,
All work shall be performed in accordance with City Codes and Ordinances.
DATE
Inspector
:~;~~~~.
Company _
Address
Telephone#
Valuation or
Contract Price /, 9' / 6 - crt)
City License Registration # . ,-:3
State Certified License#
&:.~~9-
(~U1LD~ ~ E~L__
Ftr. Tp. Servo
Pre SLB Rough In
Lintel Meter Can
FRM. Const, Pole
Insul. CL Pool
WL Pre-Meter
Final
PL U M'8+N.G..
---...~~
MEC~L
----,.
Breakers
Ducts Insl.
Compressor
Final
SLB
Tub Set
Water
Sewer
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15,001 shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
C. Repairs or corrections not made when inspection called,
d. Work not ready for inspection when called,
e. Permit not posted on job site,
f, Plans not at job site,
.g, Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
..~
'\
CASEY & BOB. S ROOFJ:NG
Casey Bowden
Robert Eldridge
ROOFING CONTRACT
788-9474 Lic.#006409..
782-12.37
Dear Sir:
We propOSe to furnish all labor to complete the
roofin9 job. All labor & material on bad wood not included.
in the estimate.
All material will be paid for. uPOn the si'ilnin9 of con-
tract. Casey & Bob's wi 11 except check.. and pay for the
material. this is so YOU will be able to recieve contractors
price. - It ~....s III ~ _...1 '-} e..
/1 /7
Job Location ~2</7 9' /lLe.,
Cost of material_$ 9/~7, & $---
Cost of labor _'it:/0eJ. C)O
Any bad wood indicated .rye;
Not included!
All labor must be paid for uPOn completion of services.
unless. otherwise. stated on line below.
"YOU. THE BUYER. HAVE THE RIGIrI' TO CANCEL THIS TRANSACTION
AT ANY TIME PRIOR TO MIDNIGIn' OF THE THIRD WORKING DAY ArrER
THE DATE OF THIS TRANSACTION.
You. are hereby authorized to all work necessary to lIlY
roof. I undrestand that all bad wood is not incl uded. and
balance will be paid uPOn COIDPletion of services.
HOMEOWNER
t.( ~U"'&. 1- '1 C--