HomeMy WebLinkAbout92-2559
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit
N<1 2559-1f
?,-/j~7~
Date
~~~
Pwperty Owne" {"-::;;; ~
Job Address: (] 90--.5 - - ~'- -a. O.A..te-
~L
Sewer Conn
Water Conn:
Water Meter:
T,I.F.'s:
Parcell.D. #
Zoning: Energy Code:
Description of work-X.o --1 ~
Radon Gas:
NO OCCUPANCY BEFORE C.O.
FINAL
Complete Plans, Specifications and Fee Must Accompany Application. C.O.
All work shall be performed in accordance with City Codes and Ordinances.
Inspector
Pe,m;, Fee cI1i--- vYt
S;gnaMe .~ <<~r
Company _
Address
Telephone#
Valuation or
Contract Price
/70-0. crD
/
City License Registration # <....S-g-
State Certified License#
Ftr.
Pre SLB
Lintel
FRM.
Insul. CL
WL
Tp. Servo
Rough In
Meter Can
Const. Pole
Pool
Pre-Meter
Final
SLB
Tub Set
Water
Sewer
Final
Breakers
Ducts Insl.
Compressor
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
c. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
...
PREMIER SUNCOAST ROOFING, INC.
37325 S.R. 54 WEST
ZEPHYRHILLS, FL 33541
(813) 782-6094
RESIDENTIAL & COMMERCIAL ROOFING
LIC # RC 0061648
INSURED & BONDED
PROPOSAL TO:
Mt'j:) C@ J? eY'J
"3 Cf 0)' J )'-rl/ live-
PHONE #:
DATE: '1-l, q 2.
JOB NAME:
------------------------------------------------------------
------------------------------------------------------------
WE HEREBY SUBMIT 'THE FOLLOWING SPECIFICATIONS & ESTIMATE
FOR THE COMPLETION OF THE FOLLOWING:
COMPLETE TEAR-OFF AND HAUL AWAY OF EXISTING SHINGLES.
BAD PLYWOOD REPLACED AT A CO'ST OF $ 'JOO/} PER SHEET.
INSTALLATION OF NEW 2X411 LUMBER @ $1.50 PER LINEAL FT
INSTALL Q~~ NEW VALLEY METAL.
INSTALLATION OF (~ NEW LEAD BOOTS THROUGH ROOF.
INSTALL NEW 15LB FELT.
INSTALLATION OF NEW DRIP EDGE AROUND PERIMETER.
INSTALLATION OF NEW 10 1 Car fltJ1j{iSHINGLES.
ALL DEBRIS REMOVED FROM THE JOB SITE.
FIVE YEAR LEAK WARRANTY.
ALL MATERIALS AND LASOR FURNISHED.
/I de! (/.e i7d' rr N~ i.
TOTAL BID: $ J leO_C),)
PAYMENT DUE UPON COMPLETION OF JOB.
W.(JL~TRACTOR
DATED:
AC C EP TED :rYh Cl.f~ --P ~ CY'fLCJ .!vIA
OWNER SIGNATU ~
DATED: