P,"perty own..~ die . ~o
Job Address: ,? ~'-~~"" ;;..:",~-
Parcell.D. #
Sewer Conn
Water Conn:
Water Meter:
T,I.F.'s:
Zoning: Energy Code:
Description of wo~ y.A -<.~
R, adon G~r
/.Lr:L tr)OA ~
/ /
L.kr~~P- /)~-,
// -I~' '7::,::)
. J ,-........
FINAL -
DATE
NO OCCUPANCY BEFORE C.O.
Complete Plans, Specifications and Fee Must Accompany Application.
All work shall be performed in accordance with City Codes and Ordinances.
c.o.
DATE
Inspector
City license Registration # .5;L?
State Certified License#
:~;~~:;:e ~1:JA: ':2r-.
Company
Address
Telephone#
Valuation or
Contract Price
9'..S-o . CTD
~~
~
~l
---.
PlO'MBwG
-----.-
-~AL
--------
Ftr.
Pre SLB
lintel
FRM.
Insul. CL
Wl
Tp. Servo
Rough In
Meter Can
Const. Pole
Pool
Pre-Meter
Final
SlB
Tub Set
Water
Sewer
Final
Breakers
Ducts Insl.
Compressor
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
c. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
~
AARK CONSTRUCTION
FIRE & WATER DAMAGE RESTORATION CONTRACTORS
3924 West Crest Avenue Tampa, Florida 33614
(813) 876-0838 1-800-741-7638
FAX # (813) 876-5881
09-09-92
Estimate Name: Heritage Villas / Zephyrhills
Address: 39073-1 Heritage Circle
Zephyrhills, FL 33540
Phone:(813) 783-2275
Contact: Dimension One Associates Home Phone: (904) ,731-7516
Address: 8380 Baymeadows Road - St. 14
Jacksonville, FL 32256
Type-Of-Loss: LIGHTNING
File Number: 92-8-05-001
Thank you for the opportunity presented to AARK Construction to submit
our estimate to repair damages caused by a recent lightning~trike. We have
estimated the repairs needed as closely as possible, however, due to the
nature of damage of this nature it is possible that further hidden damage
maY.De uncovered during the repair process. Should additional damage be
noted, we will notify all involved parties before proceeding with repairs to
allow time for examination.
Following is our detailed estimate. Please contact us if you have any
question as to pricing or scope of repairs.
AARK CONSTRUCTION
Heritage Villas / Zephyrhills
09-09-92 Page: 2
Room: Bedroom - Front LxWxH: II' 6" x 10' 0" X 8' 0"
Subrooml: Bathroom LxWxH: 8 ' 9" X 6' 0" x 8' 0"
Subroom2: Kitchen LxWxH: 8' 6" x 8' 3" x 8' 0"
848 SF Walls 238 SF Ceiling 1,086 SF Walls & Ceiling
238 SF Floor 31 SY Flooring 107 LF Base
DESCRIPTION
UNITS
REMOVE
REPLACE
TOTAL
--------------------------------------------------------------------------------
I
Drywall repa1r - Minimum charge 1 EA@ 195.89 = 195.89
Seal then paint the walls &
kit/bath ceilings (2 coats) 904 SF@ 0.30 = 271. 20
Paint baseboard - one coat - 107 LF@ 0.28 = 29.96
Paint door or window opening
(per side) 4 EA@ 15.28 = 61.12
Light fixture Detach & reset 2 EA@ 11. 85 = 23.70
Heat register Detach & reset 2 EA@ l~ .05 = 8.10
Exhaus.. fan - Detach & reset 1 EA@ 10.45 = 10.45
--------------------------------------------------------------------------------
-------------------------------------------------------------'-------------------
Area Total:
600.42
Exterior
DESCRIPTION
UNITS
REMOVE
REPLACE
TOTAL
--------------------------------------------------------------------------------
220 lb - composition shingles
13
SQ@
82.90 =
1,077.70
NOTE: We have allowed for replacement of the roof shingles over the
section of structure where the lightning entered the roof. If a repair
were done rather than the entire area, it would be extremely noticeable
due to color difference between the old and new. We have calculated for
roofing over the existing shingles rather than removal of the old. Should
removal be demanded, we would gladly provide this service, however, an
additional charge would be necessary.
-.?- ><.
f',. t..- { (1/7-><
t-O 0
Framing repair - Minimum
charge - roof sheathing
1
EA@
75.00 =
75.00
R&R Drip edge
24
LF@
0.12 +
0.95 =
25.68
Heritage Villas / Zephyrhills
AARK CONSTRUCTION
Exterior - Continued
09-09-92 Page: 3
DESCRIPTION
UNITS
REMOVE
REPLACE
TOTAL
R&R Soffit
--------------------------------------------------------------------------------
metal
22
SF@
0.11 +
2.10 =
48.62
R&R Fascia
metal - 6"
24
LF@
0.11 +
2.10 =
53.04
Area Total:
--------------------------------------------------------------------------------
-------------------------------------------------------------~------------------
1,280.04
General
DESCRIPTION
UNITS
REMOVE
REPLACE
TOTAL
--------------------------------------------------------------------------------
Phone wire - Repair/replace 1 EA@ 185.00 ::! 185.00
Electrical repair - Minimum
charge 1 EA@ 63 . 31~ = 63.34
Permit and fees 1 EA@ 150.00 = 150.00
Area Total:
..
--------------------------------------------------------------------------------
---------------------------------------------------------------------------------
398.34
SUMMARY
Subtotal Items
Overhead
Profit
----------------
@
@
10%
10%
2,278.80
227 . 88
227.88
Grand Total
----------------
$2, 731~.56
----------------
----------------
Grand Total Areas:
81~8 SF Wall s
238 SF Floor
238 SF Ceiling
31 SY Flooring
1,086 SF Walls & Ceiling
107 LF Base
. .-,<t{"'"
'.
Heritage Villas / Zephyrhills
Area:
848 SF Walls
238 SF Floor
AARK CONSTRUCTION
Recap By Room
238 SF Ceiling
31 SY Flooring
Bedroom - Front
Area:
Exterior
Area:
General
Subtotal Items
Overhead
Profit
Grand Total
..
@
@
09-09-92
1,086 SF Walls & Ceiling
107 LF Base
SUMMARy
600.42 26.34
1,280.04 56.17
398.3/. 17.48
----------------
10%
10%
2,278.80
227.88
227 . 88
----------------
$2,734.56
----------------
----------------
Page: 4
Heritage Villas/ Zephyrhills
Description
------------------------------
GENERAL DEMOLITION
DRYWALL
ELECTRICAL
PERMITS AND FEES
FRAMING & ROUGH CARPENTRY
HEAT, VENT & AIR CONDITIONING
LIGHT FIXTURES
PAINTING
ROOFING
SOFFIT, FACIA, & GUTTER
AARK CONSTRUCTION
Recap By Category
Total Dollars
7.9ft
19'5 . 89
258.79
150.00
75.00
8.10
23.70
362.28
1,100.50
96 . 60
09-09-92 Page: 5
%
0.35
8.60
11.36
6.58
3.29
0.36
1.04
15.90
ft8 . 29
4.24
------------------ ------
Subtotal O&P Items
Overhead @ 10%
Profit @ 10%
Grand Total
..
2,278.80 100.00
227.88
227.88