Loading...
HomeMy WebLinkAbout92-2742 BUILDING PERMIT CITY OF ZEPHYRHILLS (813) 788-6611 Permit N~ 2742E i Date 1/ -07 -9 cJ- 0UILoIV E~ PL~ MEC~ P,"perty own..~ die . ~o Job Address: ,? ~'-~~"" ;;..:",~- Parcell.D. # Sewer Conn Water Conn: Water Meter: T,I.F.'s: Zoning: Energy Code: Description of wo~ y.A -<.~ R, adon G~r /.Lr:L tr)OA ~ / / L.kr~~P- /)~-, // -I~' '7::,::) . J ,-........ FINAL - DATE NO OCCUPANCY BEFORE C.O. Complete Plans, Specifications and Fee Must Accompany Application. All work shall be performed in accordance with City Codes and Ordinances. c.o. DATE Inspector City license Registration # .5;L? State Certified License# :~;~~:;:e ~1:JA: ':2r-. Company Address Telephone# Valuation or Contract Price 9'..S-o . CTD ~~ ~ ~l ---. PlO'MBwG -----.- -~AL -------- Ftr. Pre SLB lintel FRM. Insul. CL Wl Tp. Servo Rough In Meter Can Const. Pole Pool Pre-Meter Final SlB Tub Set Water Sewer Final Breakers Ducts Insl. Compressor Final Driveway REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction. c. Repairs or corrections not made when inspection called. d. Work not ready for inspection when called. e. Permit not posted on job site. f. Plans not at job site. g. Work not accessible. The payment of inspection fees shall be made before any further permits will be issued to the person owning same. ~ AARK CONSTRUCTION FIRE & WATER DAMAGE RESTORATION CONTRACTORS 3924 West Crest Avenue Tampa, Florida 33614 (813) 876-0838 1-800-741-7638 FAX # (813) 876-5881 09-09-92 Estimate Name: Heritage Villas / Zephyrhills Address: 39073-1 Heritage Circle Zephyrhills, FL 33540 Phone:(813) 783-2275 Contact: Dimension One Associates Home Phone: (904) ,731-7516 Address: 8380 Baymeadows Road - St. 14 Jacksonville, FL 32256 Type-Of-Loss: LIGHTNING File Number: 92-8-05-001 Thank you for the opportunity presented to AARK Construction to submit our estimate to repair damages caused by a recent lightning~trike. We have estimated the repairs needed as closely as possible, however, due to the nature of damage of this nature it is possible that further hidden damage maY.De uncovered during the repair process. Should additional damage be noted, we will notify all involved parties before proceeding with repairs to allow time for examination. Following is our detailed estimate. Please contact us if you have any question as to pricing or scope of repairs. AARK CONSTRUCTION Heritage Villas / Zephyrhills 09-09-92 Page: 2 Room: Bedroom - Front LxWxH: II' 6" x 10' 0" X 8' 0" Subrooml: Bathroom LxWxH: 8 ' 9" X 6' 0" x 8' 0" Subroom2: Kitchen LxWxH: 8' 6" x 8' 3" x 8' 0" 848 SF Walls 238 SF Ceiling 1,086 SF Walls & Ceiling 238 SF Floor 31 SY Flooring 107 LF Base DESCRIPTION UNITS REMOVE REPLACE TOTAL -------------------------------------------------------------------------------- I Drywall repa1r - Minimum charge 1 EA@ 195.89 = 195.89 Seal then paint the walls & kit/bath ceilings (2 coats) 904 SF@ 0.30 = 271. 20 Paint baseboard - one coat - 107 LF@ 0.28 = 29.96 Paint door or window opening (per side) 4 EA@ 15.28 = 61.12 Light fixture Detach & reset 2 EA@ 11. 85 = 23.70 Heat register Detach & reset 2 EA@ l~ .05 = 8.10 Exhaus.. fan - Detach & reset 1 EA@ 10.45 = 10.45 -------------------------------------------------------------------------------- -------------------------------------------------------------'------------------- Area Total: 600.42 Exterior DESCRIPTION UNITS REMOVE REPLACE TOTAL -------------------------------------------------------------------------------- 220 lb - composition shingles 13 SQ@ 82.90 = 1,077.70 NOTE: We have allowed for replacement of the roof shingles over the section of structure where the lightning entered the roof. If a repair were done rather than the entire area, it would be extremely noticeable due to color difference between the old and new. We have calculated for roofing over the existing shingles rather than removal of the old. Should removal be demanded, we would gladly provide this service, however, an additional charge would be necessary. -.?- ><. f',. t..- { (1/7->< t-O 0 Framing repair - Minimum charge - roof sheathing 1 EA@ 75.00 = 75.00 R&R Drip edge 24 LF@ 0.12 + 0.95 = 25.68 Heritage Villas / Zephyrhills AARK CONSTRUCTION Exterior - Continued 09-09-92 Page: 3 DESCRIPTION UNITS REMOVE REPLACE TOTAL R&R Soffit -------------------------------------------------------------------------------- metal 22 SF@ 0.11 + 2.10 = 48.62 R&R Fascia metal - 6" 24 LF@ 0.11 + 2.10 = 53.04 Area Total: -------------------------------------------------------------------------------- -------------------------------------------------------------~------------------ 1,280.04 General DESCRIPTION UNITS REMOVE REPLACE TOTAL -------------------------------------------------------------------------------- Phone wire - Repair/replace 1 EA@ 185.00 ::! 185.00 Electrical repair - Minimum charge 1 EA@ 63 . 31~ = 63.34 Permit and fees 1 EA@ 150.00 = 150.00 Area Total: .. -------------------------------------------------------------------------------- --------------------------------------------------------------------------------- 398.34 SUMMARY Subtotal Items Overhead Profit ---------------- @ @ 10% 10% 2,278.80 227 . 88 227.88 Grand Total ---------------- $2, 731~.56 ---------------- ---------------- Grand Total Areas: 81~8 SF Wall s 238 SF Floor 238 SF Ceiling 31 SY Flooring 1,086 SF Walls & Ceiling 107 LF Base . .-,<t{"'" '. Heritage Villas / Zephyrhills Area: 848 SF Walls 238 SF Floor AARK CONSTRUCTION Recap By Room 238 SF Ceiling 31 SY Flooring Bedroom - Front Area: Exterior Area: General Subtotal Items Overhead Profit Grand Total .. @ @ 09-09-92 1,086 SF Walls & Ceiling 107 LF Base SUMMARy 600.42 26.34 1,280.04 56.17 398.3/. 17.48 ---------------- 10% 10% 2,278.80 227.88 227 . 88 ---------------- $2,734.56 ---------------- ---------------- Page: 4 Heritage Villas/ Zephyrhills Description ------------------------------ GENERAL DEMOLITION DRYWALL ELECTRICAL PERMITS AND FEES FRAMING & ROUGH CARPENTRY HEAT, VENT & AIR CONDITIONING LIGHT FIXTURES PAINTING ROOFING SOFFIT, FACIA, & GUTTER AARK CONSTRUCTION Recap By Category Total Dollars 7.9ft 19'5 . 89 258.79 150.00 75.00 8.10 23.70 362.28 1,100.50 96 . 60 09-09-92 Page: 5 % 0.35 8.60 11.36 6.58 3.29 0.36 1.04 15.90 ft8 . 29 4.24 ------------------ ------ Subtotal O&P Items Overhead @ 10% Profit @ 10% Grand Total .. 2,278.80 100.00 227.88 227.88 $2,734.56