HomeMy WebLinkAbout92-2887
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit
N<!
2887/3
Date Jt2 -3/ - ?:l
~
Pmp'~Y OW"". ~1f.~ <-~~~
Job Address: c 1 tJ - "-
EL~L
P~
ME~ Sewer Conn
Water Conn:
Water Meter:
T.I.F.'s:
Parcell.D. #
Zoning: Energy Code:
Description of worr-;I(..o ~ A~
Radon Gas:
FINAL
DATE
NO OCCUPANCY BEFORE C.O,
Complete Plans, Specifications and Fee Must Accompany Application. C.O,
All work shall be performed in accordance with City Codes and Ordinances.
Inspector
Permit Fee
Signature
Company
Address
Telephone#
;J.-.S-: crv
p#, 64-( ~
Valuation or
Contract Price ! ~ c:;--zJ. d()
City License Registration # ....5.~
State Certified License#
~~~dl
. BUILDING--" - ELEb<lnCAL ~
- - ----
Ftr. Tp. Servo SLB
Pre SLB Rough In Tub Set
Lintel Meter Can Water
FRM. Const. Pole Sewer
Insul. CL Pool Final
WL Pre-Meter
Final
~L
----.
Breakers
Ducts Insl.
Compressor
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
C. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called,
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
-~
RC05671
~ ~o..- ~~
~D~-~~
----
PREMIER
Suncoast Roofing, Inc.
Your Re-Roofing Specialist
Don't wait 'till it leaks I
782-6094
. New Roofs' Roof Coating' Built Up Roofs
NCOAST ROOFING, INC.
K. Ryman. President
J. Brown. Vice President
37325 Hwy. 54 W.
Zephyrhills. FL 33541
5 S.R. 54 WEST
HILLS"FL 33541
13) 782-6094
I if'
I & COMMERCIAL 'ROOFING
~~~ # RC 0061648
INSURED & BONDED
PROPOSAL TO:
L)f h.fr .Ii/! tJ.ft
3 '(Oil-II ,111 II vt..
PHONE #: 7'??f-7'1,}~ DATE:/Z-/7-f<
JOB NAME:
============================================================
WE HEREBY S~MIT 'THE FOLLOWING,SPECIFICATIONS &'ESTIMATE
FOR THE COMPLETION OF THE FOLLOWING:
COMPLETE TEAR-OFF AND HAUL AWAY OF EXISTING SHINGLES.
BAD PLYWOOD REPLACED AT A COST OF $ JtJ,CJC1 PER SHEET.
INSTALLATION OF NEW 2X411 LUMBER,@ $1.50 PER LINEAL FT
INSTALL
r;U
NEW VALLEY METAL.
INSTALLA TI ON OF 2- J "- / - J (( NEW LEAD BOOTS THROUGH ROOF.
INSTALL NEW 15LB FELT.
INSTALLATION OF NEW DRIP EDGE AROUND PERIMETER.
INSTALLATION OF NEW 20 /..((/1' FfJt'/S' SHINGLES.
ALL DEBRIS REMOVED FROM THE JOB SITE.
"
FIVE YEAR LEAK WARRANTY.
ALL MATERIALS AND LABOR FURNISHED.
~vJ1.f.:;tI( ..1/~Ul l/-c1trr- Jf/cI;t'.
TOTAL BID: $ 1 ~CCJ.. C/(J
PAYMENT~PON COMPLETION
~~
~1l tht<w
f own, V.P. '. ONTRACTOR
Premier SUncoast f. g, Inc.
OF JOB.
DATED: \? -'2. S-l'2-
DATED:F
/ 2/~/:JZ-