HomeMy WebLinkAbout93-3335
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit
N4? 333513
b -;ls-?~
Date
~ El~, PlUM~
Pmperty Owne' V~a!:
Job Address:.:??..:?1 0 -
MECHA~ Sewer Conn
Water Conn:
Water Meter:
T,I.F.'s:
Parcell.D. #
Zoning: Energy ~ode: -
De,e';p"on of wo~,i2 ~- _ /j~
Radon Gas:
NO OCCUPANCY BEFORE C.O.
FINAL
DATE
Complete Plans, Specifications and Fee Must Accompany Application.
All work shall be performed in accordance with City Codes and Ordinances.
c.o.
Inspector
~
City License Registration #
State Certified License#
?~- +3g/
Pe'm;t F~~ /
Signatu 5
Company
Address
Telephone#
Valuation or J
Contract Price ~;;Z g-~~--, r?)
~~r
Ftr.
Pre SlB
Lintel
~lrAl
.~
_____MECHANiCAL
------
Breakers
Ducts Insl.
Compressor
Final
FRM.
Insul. Cl
Wl
SlB
Tub Set
Water
Sewer
Final
Tp. Servo
Rough In
Meter Can
Const. Pole
Pool
Pre-Meter
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
c. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
Proposal Contract
~
Ryman Construction Incorporated
37325 S.R. 54 W.
Zephyrhills, Florida 33541
(813) 782-0825- CBC # 035134 FAX (813) 788-6773
TO:
Mrs. Dorothy Hanko
39310 8th Ave.f
zephyrhills, Fl. 33540
DATE: 6-25-93
I hereby submit specifications and estimates for:
Reslope rear section
Remove Aluminum framing
Install new 2" x 6"
Install new ~" plywood
Install new base sheet
Heat torch a white rubber roof
I Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of:
ONE THOUSAND TWO HUNDRED EIGHTY FIVE------00/1~ars ($ 1 ,285.00
Payment to be made as follows
upon completion
All material is guaranteed to be as specified. All work to be completed
in a workmanlike manner according to standard practices. Any altera-
tion or deviation from above specifications involving extra costs will be
executed only upon written orders, and will become an extra charge
over and above the estimate.
Authorized
Signature
Note: This proposal may be
withdrawn by us if not accepted
within days.
Acceptance of Proposal - The above prices, specifications and conditions are
satisfactory and are hereby accepted, You are authorized to do the work as specified, Pay-
ment will be made as outlined above,
Signature
Date of acceptance
Signature