Loading...
HomeMy WebLinkAbout93-3377 BUILDING PERMIT Property Owner: Job Address: Parcel LD. # CITY OF ZEPHYRHILLS (813) 788-6611 . / 4 ~~-- ~ PL~G ~ .9i!g}i)1\1 /l'{; ~~/& Permit N~ Date 7- 3377 tI1 :;l3-7~ B~ Sewer Conn Water Conn: Water Meter: T,I.F.'s: Zoning:_ Description of Work Energy Code: ~;. : 2 /-l / c!.. J;~~ i~ Cj);(j - .3 NO OCCUPANCY BEFORE C.O. DATE Complete Plans, Specifications and Fee Must Accompany Application. C.O. All work shall be performed in accordance with City Codes and Ordinances. DATE Valuation or Contract Price ~? t)o ~ lfolJ~ - City License Registration # .!J~ ~ (11 State Certified License# Telephone# .' Breakers Ducts Insl. Compressor Final SLB Tub Set Water Sewer Final Tp. Servo Rough In Meter Can Const. Pole Pool Pre-Meter Final Ftr. Pre SLB Lintel FRM. Insul. CL WL Driveway REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction. c. Repairs or corrections not made when inspection called. d. Work not ready for inspection when called. e. Permit not posted on job site. f. Plans not at job site. g. Work not accessible. The payment of inspection fees shall be made before any further permits will be issued to the person owning same. Pattie Electric & Refrigeration Air Condttlonlng and Eleotr1cal Contractor 39111 PATTIE RD. . ZEPHYRHILlS, FL ~.3~"fr.'. (813) 782.3319 July 18, 1993 Zephyr Haven Nursing Home 38250 "A" Avenue Zephyrhills,Fla. 33540 Re: New A/c system for Dinning area Dear Ed Morgan: Pattie Electric proposes to engineer and provide for permitting, approved and stamped by state certified PE, construction drawings of proposed new installation. In addition, we will also provide roof curb and installation. A five ton package Heat pump, manufactured by the Trane Company, will be installed on new curb. The sequence of installation will consist of making engineered drawings and having them approved by PE. Roof curb will be fabricated to support weight of unit and provide water-tite integrity. New curb will be installed in place and sealed. New A/C unit will be installed in place and electric branch circuit provided from existing electrical sub-feeder panel. After unit has been tested and checked for proper operation the old unit will be disconnected from electric and duct system. New A/c unit will be connected to existing duct system. We will remove old air handler and associated equipment from attic spaces. All work, in so far as practical, will be coordinated to provide efficient and safe installation for Nursing Home occupants. The heat removal capacity of new unit is equivalent to old, and no mention by owner representative has been made to change this capacity. New equipment will be ordered immediately upon signing of contract, Installation will begin within three working days after receipt of equipment and continue during normal hours until complete. Total cost of our services will be $8400.00 (eight thousand four hundred & 00/100) plus cost of city permit. Payment will be due upon acceptance by city inspectors. ~~~~ ~ctric Donald D. Pattie, owner EC0001268 CMC055476 ACCEPTANCE OF PROPOSAL- the above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined. Date of acceptance: 7- ~ r;'} ,- 93 Signature: 11m m. ~ SlnTlS) II: ~E 7/ftS ZEFl<<R-f\\VEX N..RS 100 HI( modify Ale syst. in dining erea fren spl it to packOJe M1IMD II: f1M( HNIII It: -,.- 1 .. H. . Hllatt -1'- .. ht 'WJf/lorM ct<<d I- rt'XF are 4 1 '0" '---1- -~~~) \_-- - - -- .. 111 5" 251 ..., --1 f ." 3" J 11Wl TctOfa Total r~t ~ity m,oco btu Airflow ~ 2O.X) t1Y ~. Del pt 55 ~ F ~essor Power 91/0 watts I D. FAn libt OCJ) IOtts ODe f(J't .,t 550 watts m 1) I11J Btu/watt raf CUI 9W.L [f [61Qf]) TO ~n: '1lH 11f \.HIT NO FfOII[( SJfGrr Nt) OJREIE R"ATlmm: INrrWTKM. msM: IWX AlV ~ ItC SIR IPS HL [( flWDD TO OOJ( Nt AIRI'IlI ~ Et.lm gm,V NIlI(l\Rl(ftllI!m (111( aHI NIl -!< \. T ~... 1~ ~ l(p Q[R) Cf mm irBtall 2x8 blocki" betMm ~ chord of trusSes tmer ~ lIlit LIfT lto IE 100 }pm &-m 0. 1)1 Dam TOTH.. IT- 50US IL ()V 7//1/9)