Loading...
HomeMy WebLinkAbout93-3521 .. BUILDING 'PERMIT CITY OF ZEPHYRHILLS (813) 788-6611 Permit N C! _ 35218 9 -~,7- 9'..3 Date 1,/37~CJ 6S: 07:> h()'pZ) PLUMBING .30' Ql) MECHANICAL Sewer Conn "'2. 7 K'~ O"'Z> Water Conn: $5c> e d7.J Water Meter: J 6..5: (TZJ T.I.F.'s: BUilDING ELECTRICAL Job Address: Parcell.D. # C - c:J.6 - ~ - b c> - t!J 0 C9 00 .- 0 0 Zoning: Energy Code: . _ R~on Ga;r 4# De""ipt"'" of Wmk -11. "h) ;/;......(f h. ,.,e~J Jl/ ~'::J FINAL NO OCCUPANCY BEFORE C.O. Complete Plans, Specifications and Fee Must Accompany Application. C.O. All work shall be performed in accordance with City Codes and Ordinances. DATE Inspector W. A. BURGESS d$r BUilDING ELECTRICAL PLUMBING J~- Ftc, '7-L~1 ~ Tp,S.,v flAd/ SLa lel-t~ Pre SlB 10- 2-.- JJ Rough In 11-([).-1} I' I,J# Tub Set I ~ ~r '-, Lintel 't . &' Meter Can 9~7-r~ Water FRM. ~ -1 . q) . g Const. Pole Sewer Insul, CL l!t2 Pool Final 1- 7 -7~ gg Wl II-It) 4'~ __ Pre-Meter 12=15-93 OOB Final City license Registration # State Certified license# 7:J11. X"UMLA -.(,.,.1" ~,,:i~ 1/ Permit Fee ~-9 .2".5"0 SignatureL' h...c.... ~ b .~ -- ~ \Y\a..;nc.--- Company Address Telephone# c;(J'3 - IS ~ - 9()'XO Valuation or Contract Price ~~--, ~ " crt> , ~ MECHANICAL 7/ ~ Breakers . Ducts Insl./ff.t;3 1515 , Compressor Final / - 7-'(<{- ilB Driveway Sheathing 11-03-93 Bill Fi"lt..i.- /- 7 -ff 8" REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons. a charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction. c. Repairs or corrections not made when inspection called. d. Work not ready for inspection when called. e. Permit not posted on job site. f. Plans not at job site. g. Work not accessible. Vet _ 9-;2;/-9-S ~ 9-~-?3 The payment of inspection fees shall be made before any further permits will be issued to the person owning same. APPLICATIOlNl FOR PERMIT CI'IY OF ZE.'PJJYRlllLLS BUILDING DEPARl'KE'.lN1T lll<l<ER'S NAME 11/1),114,/ m flMv C;..., 5.) 76/<:- , 1'I100E_(J'/V )d;;l- f tJ,fo """ER'S ADDRESS P r),g~.....S'-'h Z~'{}'&.I4 ~/, ?J'.r?i JOB ADDRESS 37'109 LJ (... drl- W()u ~ (}t. 2f-~!YA-AI'/~ //1 LEGAL DESCRIPTION: WI(S)' 7'-l BL.OCK SUBDIVISIOIN1 W r~J 91-wovd fY)/Jrvc.'Ifl.., PARCEL LD.# IO:-;;(g~ Z/-OJ:;O-60vou- CJ7LJO k'URK PROPOSED: ~~w Construction --..Addition _Alteration _Repair _Install _Sign -"<lve _DeIIOlish PROPOSED USE: ~le F3Jilily _"IF _, of Units _MID _CoImercial _Indust. _Swia. Pool Other _Restaurant & Health Depart:lllent Approval BUILDING SIZE: x Square Fee t . Height RESIDENTIAL: COMMERCIAL : ATTAClI (2) purr PI.AHS & (2) SEIS OF BUILDUIG PI,A~S & (J) SET ENERGY FORMS. ** ATrAClI (3) SE.TS OF BUILDll1G PLAlNlS & (1) SEIT' ENERGY F'OR~IS.'l!:~ *~COPY OF CONTRACT REQIDlUl'D. FERn-ITS REQUP'$TED _BUILDING $ Valuation of Total Constnlction _ELECTRICAL AKP Service Florida P~"er Cbrp. ~.E.C. _MECHANICAL $ Valuation of Mechanical Installation _PLUMBING GAS ROOFING SPECIALTY TYPE OF CONSTRUCITO~: _Block _Frase _Steel Other FINISHED FLOOR ELEVATIm~s: FT. IS PROJECT IN FLOOD ZONY. AR~~? YES NO ***************************'l!:************~* CONTRACTOR SHCTION RUII.DY.R l '\.~ cr>>fPAWfW. ;fNf-,() ,-?1gA./A/ t;i1/s:/. -Z--c. /f /' I Sl:ate Cert:. or RcgisL fit O<-lc.Jfi"V/ Signature t!_J/. UJ.(- City *~~~: Registration;; '- *~*******************~********~~***~ ~ ~:e Cert. or Regist. * 5i . ~ CiLy License Regist.ration ****************************************** PLUMBER / 'j i / .. ~ i / / // \ t(jV\~J/ )l 0?iL- COHPANY (J. ~ q { (~~ ~~/ State Cert. or Regist. #i Cit:y I,icense Registration t1 ***********************************'l!:****** Signa ture /d-.S Signature Q COHPAlIW KiN ~...w State Cerl::. o'r: Regist;/.' it: City License Registration g *************************************** L4A-r//aK C>O~V)::J.. 71 MP..CR.MoIT CA L 0TlfY:R C01fPANY State Cert. or Regist. * Cir:y License Registration lit ****************************************** Signa ture APPLICATION APPRO''Y.o BY n<74 x1 ~ PF..&'lfIT OFFI CRR. CONDITIONS OF PERMIT AFFIDAVIT A. NOTICE OF DEED RESTRICTIONS The undersigned understands thit this perlitlay be subject tt "deed restri~tions. which lay be lore restrictive than City regulations. The undersigned assuaes responsibility for cOlplianc! with any applicable deed restrictions. B. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSI8ILITIES If the owner has hired a contracto~ or contractors to undertake work, they lay be r~Quired to be licensed in accordance with state and loeal regulations. If tlie' cMifractor is not"licensed as required by law, both the owner and contractor lay be cited for a lisdeleanor violation under state IaN. If the owner or intended contractor are uncertain as to what licensing requirelents lay apply for the intended work, they are advised to.~ontact the City of Zephyrhills Building Departlent, (8131 7BB-6611. Furtherlore, if the owner has hired a contractor or contrac~ors, he is advised to have the contractorlsl sign portions of the "Contractor Sections" of this application for which they will be responsible. If you, as the owner sign as the contractor, you are indicating that you, rather than the contractor, ",e responsible for the work. If the contractor wishes you to sign as contractor that lay be an indication that he is not pro~erly licensed and is not entitled to perlitting privileges in the City of Zephyrhills. C. TRANSPORTATION IMPACT FEES AND UTILITY CONNECTION FEE~ D. CONSTRUCTION LIEN LAW (CHAPTER 713, FLORIDA STATUTES, AS AMENDED) I certify that I, the applicant, have been provided with a copy of "Florida's Construction Lien Law - HOleowner's Protection 6uide" prepared by the Florida Departlent of Agriculture and Consuler Affairs. If the applicant is sOleone other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the "owner" prior to cOllencelent. E. CONTRACTOR'S/OWNER'S AFFIDAVIT I certify that all the inforlation in this application is accurate and that all work will be done in cOlpliance with .all applicable laws regulating construction, zoning, and land developaent. Application is hereby lade to obtain a perlit to do work and installation as indicated. I certify that no work or installation has cOlaenced prior to issuance of a perlit and that all work will be perforled to leet standards of all laws regulating construction, City codes, zoning regulations, and land developlent'regulations in the jurisdiction. I also certify that I understand that the regulations of other governmental agencies may apply to the intended work, and that it is IY responsibility to identify what actions I lust take to be in coapliance. Such agencies include but are not lilited to: _ f Departlent of Environ_ental ReQulation - Cypress Bayheads, Wetland Areas and Environlentally Sensitive Lands, Water/Wastewater Treat.ent f Southwest Florida Water ManaQelent District - Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses t ArlY Corps of EnQineers - Seawalls, Docks, Navigable Waterways . f Departlent of Health ~ Rehabilitative Services, Environaental Health Unit - Wells, Wastewater Treatlent, Septic Tanks f US Environlental Protection Aqency - Asbestos abatelent I also certify that, if fill laterial is to be used in Flood Zone "A" or "A,etc.., it is understood that a drainage plan addressing a "colpensating volule" Mill be sublitted which is prepared by a professional eng,ineer registered in the Stite of Florida prior to perlit issuance. ~ permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel alter, Dr set aside any provisions of the technical codes, nor shall issuance of a perlit prevent the Building Official frol thereafter requiring a correction of errors in plans, construction, or violations of any code. Every perlit issued shall becole invalid unless the work authorized by such per.it is cOleenced within six lonths of issuance, or if work authorized by the perlit is suspended or abandoned for a period of six lonths after the tile the work is co~~enced. One 90 day extension of tiie, lay be allowed for the perlit with fee charge of $15.00. The extension shall be requested in writing to the Building Official. An approved inspection lust be logged during each six month period, or the project will be considered abandoned. WARHIN6 TO OWNER: YtlUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR rAVING THICE FOR IMPROVEMEHTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY DEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. JOBS UNDER $2,500 IN VALUE DO NOT NEED TO RECORD AND POST A 'NOTICE OF OMMENCEHENT". dl.C;~ SIGNATURE: OIlNER R AGENT was acknowledged , 19...2L by STATE OF FLORIDA COUNTY OF Pasco The foregoing instrument before me this 9/20 STATE OF FLORIDA COUNTY oF' Pasco The foregoing instrument before me this 9/20 ~Jas ackno~d edged 19-23- by W. A. Neunamm who is personally known produced as-ident i f icat ion tak to me or ~oJho has W. A. Neunamm who is personally known to me or who has produced as identification take -------.... (td nClt~ (Signature) Mary H. Ray (Name Typed~ Printed Dr Stamped) NOTARY PUBLIC ( SignatU'l-e Mary H. RRY (N~me Typed, Printed or Stamped) tctOTARY PUBL I C CD MARYH. RAY IIYCOMMISSIOH' CC '1I411U1'111!1 December 14, 1. IClIIlED 11lRU TROY FAIN IN8UfWICI.IIC. ~tfJ/t.UI41t.~4. l~"J'~~ MARY H. RAY .'f .',~. ',"r ""CO~'~1~1ON'~1_'2I!lCPNS ,'~~?':r. C"cflmber 14, 1895 ''.:~l{.... .,.,1.......1:0 n~u TROY FAIN 1NlIUIWlCE.1HC. Ak u IYJ6I n OQCIJ~ +, . 1..0 f 1 t./ 3 '1 1- c 't 0edr~ b.r, V4lLJm70W 55; c:;d:>.~ ~s.~ 1'\ 1//:;'</ *4: L,I'~i 4~,;;> II, r:e. k ~o ,,4', <S> ther -ret;{ 119 t (~ (, ( Eu; (clc~9 .:prUtu&~ l' Eec!tl~~( Afeel.a Vl (;a ( ~tJb. C? ("ecf i r 1: r~TC?( t(37~~,P ~<O<< ~ 105~ ~(~ loSe<; COlli v>eC! flDlA Fees. Se~~ ~c:..7'9,~ ..,t:-. -- 00 ~(eF' 3..?O( - /lfe Ie (- . ( !oS. eP --r6 fa ( ::t2:sdoVl aas /7,9_{ ~15(XXfa f;~ ;t;,p<!-1 tee- #/4 ~+a( ~. ~. ~ . o'l. ?teumann eO/1dtzuction, !Inc. P.o. BOX 596 - ZEPHYRHlllS. FLORIDA 34283-0596 - (813) 782-9080 i.. ~' FLA. RM. W4lk-an Closet MASTe~ _H.. ----..." A, N ........ ''-...J ~ "- r-v o LIVING ROOM 56' ; '~ DINING BEDROOM # 2 e KITCHEN GARAGE , 'hLI i/ 01 " I Z'l 37'1 ()~ W {-J~ l-W~0~ Oil, , '. pSJ !tel- / J P. 'j}. /0 _ 21e -2/- c~ Z I) .l:;v(},:,,', ':)'7'10 ~(; ) ,J' )' .r 1P. crt. "Iteumann eon4tzuctlo>>, {Jee. P.O. BOX 596 - ZEPHYRHILLS. FLORIDA 34283-0596 - (813) 782-9080 ~. . ~, FLA. RM. W"lk-m CIUSCl MASle~.R. ......... A. N \ ......... ' '-.J :{ .I LIVING ROOM :~ 56' DINING BEDROOM II 2 e "'"" ^ f\j V , ~ KJTCHEN G !\RAGE t u 1 '7 LI .. 3 7 ~ () ~ w {- JLI l- vJ c \) t- Oil. , ';. l Z'l p!;Jftc\-1 J./J..tJ- 10 -" tc -2/- OJ to .0\iJJ\..\,1:J1,-/O , ' ~l;) ~ \ _'J..- ._--~-- -- - --.- -- -__--L.. _ ___ _ _ __._._.- ____ _ _._ _ _ _ _ _ -"'_ __-, C E i'..r f n f-l L.. F' C P IV! I PASCO COUNTY, FLORIDA CCirHF\ACTOr< .ft: NAME: W.A. NEUMANN CONST ADDR: 37409 WEDGEWOOD DR C.":;:: T ~ Z HI L LS t:~OR: F:ESOUF.:CE CHECf< Off {;CCNT 114 TOT {:)L AMOUNT: COMPNY ACCOUNl CE~TER B4~':;U -.. 3(,:::000 .... 1 ::.: II t):2~ L;::.02 A 1'1 UUt\IT 1~:ECE I VED BY ....--.-..-----.....-..:'.~.--..--..--....---.---.__.__6L,.... T TIN G DATE: 09/28/93 F'ACiE:;: J OF 1 I ::::::::UE ,Jt=F I cr:: [! RECEIP' NUMBR: 00189220 OFFICE: DADE CITY ,''',1:;' '~"I~>' ':I..M, "':.:.. ::~ DESCRIPTION/PERMl DATA DRieR .~**,i~~..* AD PASCO COUNTY, FLORIDA Permit # Date Name/Owner COlDlty Parcel # Location Classification / Type of Use lRANSPORTATION IMPACT FEE CALCULATION Rate $ Zone # Sq. Ft. / Unit Prepared by Impact Fee Amount $ The above impact fee has been established pursuant to the Pasco County Transportation Impact Ordinance as adopted by the Board of County Commissioners. This amount is payable PRIOR to the issuance of a Certificate of Occupancy or authority to utilize the permitted structure. RESOURCE RECOVERY ASSESSMENT RESIDENTIAL NONRESIDENTIAL # Units Gross Sq. Fl (GSF) Rate / ERU = 50.00 x 0.96* / Year or $0.1315 / Day ERU Assign # Assessment = (# Units) x ($0.1315) x (# Days) Assessment = (QSflx (ERU) x (0.1315) x (# Days) 100 TOTAL FEE $ TOTAL FEE $ *Discounted for Prepayment The above assessment has been established pursuant to the Pasco County Ordinance No. 89-07 and Resolution No. 89-197, as commended. TIffi ASSESSMENT WilL BE CALCULATED AT THE TIME OF ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. NO CERTIFICATE OF OCCUPANCY OR FINAL POWER RELEASE WILL BE ISSUED UNTIL THE AMOUNTS LISTED HAVE BEEN PAID AND RECEIPTED FOR BY A CENTRAL PERMITTING OFFICE OF PASCO COUNTY. Acknowledgement below does not imply acceptance of concurrence, but simply receipt of a copy of this form, placing the building permit owner on notice of this assessment and the conditions of payment for same. Date Received By -----------------------_:.._---------------------------------------------------------------------------------------------------------------------------------------- OFFICE USE ONLY lRANSPORTATION REC. # RESOURCE RECOVERY REC. # DATE DATE BY BY White Applicant Canary Trans / Finance Canary RR / Finance Pink Office Green Bldg / Insp Oepartment of Community Affairs - FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION -FORM 600A-93 Residential Whole Building Performance Method A CENTRAL 4 5 6 . i PROJECT NAME: AND ADDRESS: OWNER: tAJ I .:+. II PERMIT NO. 1. New construction or addition 2. Single family detached or Multifamily attached 3. If Multifamily-No. of units covered by this submission 4. If Multifamily, is this a worst case (yes / no) 5. Conditioned floor area (sq. ft.) 6. Predominant eave overhang (ft.) 7. Porch overhang length (ft.) 8. Glass type and area: a. Clear glass b. Tint, film or solar screen 9. Floor type and insulation: a. Slab on grade (R-value + perimeter) b. Wood, raised (R-value + sq. ft.) c. Concrete, raised (R-value) 10. Net Wall type, area and insulation: a. Exterior: 1. Concrete block (Insulation R-value) 2. Wood frame (Insulation R-value) 3. Steel frame (Insulation R-value) 4. Log (Insulation R-value) b. Adjacent: 1. Concrete block (Insulation R-value) 2. Wood frame (Insulation R-value) 3. Steel frame (Insulation R-value) 4. Log (Insulation R-value) 11. Ceiling type, area and insulation: a. Under attic (Insulation R-value) b. Single assembly (Insulation R-value) 12. Air distribution system: a. Ducts (Insulation + Location) b. Air Handler( Insulation + Location) 13. Cooling system: (Types: central-split, central-single pkg., room unit, PTAC., none) 14. Heating system: , (Types: heat pump, elec. strip, nat. gas, LP. gas, room or PTAC, none) 15. Hot water system: (Types: elec., natural gas, solar, LP. gas, none) 16. Hot Water Credits: a. Heat Recovery (HR) b. Dedicated Heat Pump(DHP) 17. Infiltration practice: 1,2 or 3 18. HV AC Credits (Type in Letter designation: CF-Ceiling Fan, CV-Cross vent, HF-Whole house fan, RS-Attic radiant barrier, MZ-Multizone) 19. EPI (must not exceed 100 points) a. Total As-Built points b. Total Base points EPI = Total As,Built points X 100 Total Base points "fioationa covered by the caloulation are in complian' with the 12a. 12b. 13a. 13b. 13c. 14a. 14b. 14c. 15a. 15b. 16a. 16b. 17. 18. 119. 19a. 19b. CLIMATE ~ D D ZONE: 4 LJ 5 6 JURISDICTION NO.: ~ CK 1. 2. 3. 4. 5. 6... 7. /'131 /. 3.3 5 Single Pane sq. ft. sq. ft. sq. ft. ft. ft. Double Pane sq. ft. sq. ft. 8a. 8b. /7? () ~ 9a. R= 9b. R= 9c. R= -_I I 70 I. ft. sq. ft. sq. ft. 1 Oa-1 R= 10a-2 R= II , , 10a-3 R= 10a-4 R= 1 Ob-1 R= 10b-2 R= Ii 10b-3 R= 10b-4 R= lla. R= 'Z..L llb. R= sq. ft. 70s sq. ft. sq. ft. sq. ft. ----=- sq. ft. ;).. ~~ sq. ft. sq. ft. sq. ft. J'I3'1 sq. ft. sq. ft. R= \,., . J~ ,,~:.jJ~19M/uncOnd) R= ~_. __ (cond.luncond.) Type: C t--^-'t Vf\..w/ SEERlEERlCOP: J v t 6D Capacity: .:; ~' Type: '-..j. HSPF/COP/AFUE: -, Capacity: . ~ ~ 0 0 () Type: r I (.~ EF: q I ::; "L- e ;:... c t./ I ), g,l -, I Il '5 ?O ! 'l -. I ( Review of plana and specifications covered by this calculation indicates compliance with the Florida Energy Code. Before construction is completed, this buik1ing will be inspected for compliance in accordance With Section 553.908. F.S. -1- BUILDING OFFICIAL: DATE: Department otCommunity Affairs. FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCT.ION 'FORMGOOA-93 Residential Whole Building Performance Method A CENTRAL 4 5 6 - , PROJECT NAME: AND ADDRESS: BuiLDER: PERMITTING CLIMATE 0 0 0 OFFICE: ZONE: 4 5 6 PERMITNO.~ JURISDlcnONNO.: ~ CK \. OWNER: /.A..) I .-:} ./1 1. New construction or addition 2. Single family detached or Multifamily attached 3. If Multifamily-No. of units covered by this submission 4. If Multifamily, is this a worst case (yes / no) 5. Conditioned floor area (sq. ft.) 6. Predominant eave overhang (ft.) 7. Porch overhang length (ft.) 8. Glass type and area: a. Clear glass b. Tint, film or solar screen ~. 9. Floor type and insulation: a. Slab on grade (R-value + perimeter) b. Wood, raised (R-value + sq. ft.) c. Concrete, raised (R-value) 10. Net Wall type, area and insulation: a. Exterior: 1. Concrete block (Insulation R-value) 2. Wood frame (Insulation R-value) 3. Steel frame (Insulation R-value) 4. Log (Insulation R-value) b. Adjacent: 1. Concrete block (Insulation R-value) 2. Wood frame (Insulation R-value) 3. Steel frame (Insulation R-value) 4. Log (Insulation R-value) 11. Ceiling type, area and insulation: a. Under attic (Insulation R-value) b. Single assembly (Insulation R-value) 12. Air distribution system: a. Ducts (Insulation + Location) b. Air Handler( Insulation + Location) 13. Cooling system: (Types: central-split, central-single pkg., room unit, PTAC., none) 14. Heating system: )' (Types: heat pump, elec. strip, nat. gas, L.P. gas, room or PTAC, none) 15. Hot water system: (Types: elec., natural gas, solar, L.P. gas, none) 16. Hot Water Credits: a. Heat Recovery (HR) b. Dedicated Heat Pump(DHP) 17. Infiltration practice: 1,2 or 3 18. HV AC Credits (Type in Letter designation: CF-Ceiling Fan, CV-Cross vent, HF-Whole house fan, RS-Attic radiant barrier, MZ-Multizone) 19. EPI (must not exceed 100 points) a. Total As-Built points b. Total Base points EPI = Total As-Buitt poinls X 100 Total Base poinls 12a. 12b. 13a. 13b. 13c. 14a. 14b. 14c. 15a. 15b. 16a. 16b. 17. 18. 119. 19a. 19b. 1. 2. 3. 4. 5. J'I3''/ sq. ft. 6.. /. 33 ft. 7. 5 ft. Single Pane Double Pane 8a. sq. ft. sq. ft. 8b. 17~ sq. ft. sq. ft. . 9a. R= {J 170 I. ft. 9b. R= sq. ft. 9c. R= sq. ft. 10a-1 R= sq. ft. 10a-2 R= II 905 sq. ft. , , 10a-3 R= sq. ft. 10a-4 R= sq. ft. y 10b-1 R= --=-sq. ft. 10b-2 R= /I ;).J8 sq. ft. 10b-3 R= sq. ft. 10b-4 R= sq. ft. lla. R= '"L.1- / '13'1 sq. ft. llb. R= sq. ft. R= L, , (J~ \'~,'-iA~tJM/uncond.) R= , (cond./uncond.) Type: C~""+~I SEERlEERlCOP: J O. 60 Capacity: .:; 01) Type: -..j HSPF/COP/AFUE: -, Capacity: .3 ~ ODD Type: r I f.....k EF: q I :~ , . "2..- C;:-I C L/ S- "I 1 I Z '510 ! 'I 7!5 Review of plana and Bpeciftcations covered by this caJculat;on indicates compliance with the Florida Energy Code. Bafore construction IS completed, this building will be inspected for compliance in accordance with Section 553.908. F.S. -1- BUILDING OFACIAL: DATE: , . . SUMME_R CALCULATIONS . GLASS I BASE 1 BASE AREA x SUMMER SUMMER PT. MUL T. ""'p01N1S . N 7 L. ~Jr 82.2 '" 'f"t. 10 NE 82.2 E It" JII 82.2 J:l,~O,V SE 82.2 S 9Xb 82.2 x/D ~ SW 82.2 W J)^_dC- 82.2 In/... t')j ~ NW 82.2 H' 82.2 en en ~ CJ , L~ ~ L._~___ CLIMATE ZONES 4 5 6. GLASS I SINGLE-PANE DOUBLE-PANE I SUMMER I AS.BUILT AREA x SUMMER POINT.Mt1t:{. OR SUMMER POINT MUL T. x OVERHANG = GLASS CLEAR I1Nf2 \ CLEAR TINf2 FACTOR (6A-1) SUM. PTS N 723ft 51.0 51.5 47.8 43.5 .-'11[ LC:F\Lf.o NE 77.2 76.6 71.7 63.4 E Ii., I q 109.2 107.1 102.0 87.3 ,YS rrr::-.:TI_ 'Z.. SE 112.9 110.3 104.1 89.4 S Q.1f !" 100.2 98.3 90.9 78.8 .11 ~2.6 SW 112.9 110.3 104.1 89.4 W ..I"f V...-x 109.2 -- --- ~ 107.1 ~-102.0 -. 87.3 ,'Ie., 12/l1 If. f) NW 77.2 76.6 71.7 63.4 H' 367.7 303.3/ 324.6 238.1 '\. / . " BASE CEILING AREA EQUALS FLOOR AREA DIRECTLY UNDER CEILING, AS,BUIL T CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. ~ -31.8 L -3.43 .15 x .15 COMPONENT DESCRIPTION EXTERIOR ::l ADJACENT ~ == rn EXTERIOR 8 ADJACENT Q T"~8'" 4.8 1.6 CJ z ::::i iii u UNDER ATTIC OR SINGLE ASSEMBLY .6 .6 a: o 9" LL COMPONENT DESCRIPTION ~ Ili,J II ~ t~(6 1-.1~~ I ~- ~ . .Y 10.9 FOR SLAB ON GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR. FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. ~ INFILTRATION TOTAL COMPONENT BASE SUMMER POINTS ~ TOTAL BASE x SUMMER POINTS 14, COOLING SYSTEM BASE COOLING SYSTEM MULTIPLIER .37 HOT WATER SYSTEM NUMBER OF BEDROOMS "7, = TOTAL COMPONENT AS-BUILT SUMMER POINTS .. TOTAL AS-BUILT x x x SUM. PTS. .. ..___L~'~,:?, y AS-BUILT HOT WATER SYSTEM DESC. 'H = HORIZONTAL GLASS (SKYLIGHTS) 2FOR GLASS WITH KNOWN SHADING COEFFICIENT, SEE SECTION 1.1 OF APPENDIX C. TINT MULTIPLIERS MAY BE USED FOR GLASS WITH SOLAR SCREENS, FILM, OR TINT. -2- . SUMMER POINT' MULTIPLIERS (SPM) CLIMATE ZONES 4 S. 6 6A.1 'SUMMER OVERHANG FACTORS (SOFII ~ GLE AND DOUBLE PANE GLASS. ~r OH RATIO .00-.11 "2-.m .18-.26 .27-.35 .36-.46 .47-.57 .58- .70 .71-.83 .84-1.18 1.19-1.72 1.73-2.73 2.74+ N 1.00 .94 .91 .87 .83 .79 .75 .72 .69 .62 .56 .50 NEJNW 1.00 .94 .91 .85 .79 .72 .68 .63 .58 .50 .40 .36 1-0: E!W 1.00 .95 .92 .85 .78 .70 .64 .58 .52 .42 .33 .26 frlo 91l SEJSW 1.00 .93 .90 .81 .72 .62 .55 .49 .42 .33 .27 .22 S 1.00 .91 .87 .77 .67 .57 .50 .45 .39 .32 .28 .25 . Olt 1 It fuft 2ft 3ft ~'/, ft 4'/, ft <;'/, ft fiV, ft Ot/,ft 1Aft ?Oft+ '\ 'To Jl'..1ect bv Overhano Lenoth no oar! of nlass shall be more than 8 ft. below the overhano 6A.2 WALL SUMMER POINT MULTIPLIERS /SPMl FRAME CONCRETE BLOCKl FACE BRICK LOG INT. INSULATION FXT. INSUL R-VALUE WOOD FA WOOD STEEL NORMAL WT. NOR. WT. 0-6.9 2.9 6 INCH R-VALUE EXT ADJ EXT ADJ R-VALUE EXT ADJ EXT 7-10.9 .6 ~..'.. /fR-VALUE EXT 0-6.9 6.4 2.2 8.9 2.9 0-2.9 2.5 .9 2.5 11-18.9 .4 0-2.9 1.7 7-10.9 2.3 .8 4.1 1.3 3-4.9 1.4 .7 .7 19-25.9 .2 3-6.9 1.1 11-12.9 (1.~ C1 ) 3.0 1.0 5-6.9 1.0 .6 .3 26 & Uo .1 I, 7&Uo .8 13-18.9 'r.T" .6 2,8 0.9 7-10.9 .8 .4 .1 R-VALUE BLOCK /e:; ...... 8 INCH 19-25.9 1.0 .3 2.4 0.8 11-18.9 .4 .3 0 0-2.9 1.0 Iii R-VALUE EXT 26& Uo .6 .2 1.3 0.4 19.25.9 .2 .2 3-6.9 .6 0-2.9 1.0 26 & Uo .1 .1 7-9.9 .4 3-6.9 .8 10& Uo .2 7 R.lln 7 6A.3 DOOR SUMMER POINT MULTIPLIERS SPM) DOOR TYPE EXTERIOR ADJACENT 6A-4 CEILING SUMMER POINT MULTIPLIERS (SPMI WOOD UNDER A mc R-VALUE SPY- 19-21.9 f 1 ' 22-25.9 (-:!I J 26.29.9 ..,., 30-37.9 .6 38 & Uo .4 SINGLE ASSEMBLY R-VALUE SPM 10-10.9 3.0 11-12.9 2.7 13-18.9 2.4 19-25.9 1.8 26-29.9 1.1 30 & Uo 09 R-VALUE 10.13.9 14-20.9 21 &Up CONCRETE DECK ROOF CEILING TYPE DROPPED EXPOSED 3.0 3.3 2.0 2.1 1.4 1.3 INSULATED 6A-S FLOOR SUMMER POINT MUL TI?L1ERS /SPMl SLAB-oN-GRADE . RAISED RAISED WOO02 EDGE INSULATION CONCRETE POST OR PIER STEM WALL wI UNDER ADJ~CENT CONSTRUCTION FLOOR INSULATION R-VALUE SPM R.VALUE SPM R.VALUE SPM SPM SPM 0-2.9 ( -31.9;) 0-2.9 -1.0 0-6.9 0.9 -5.8 5.3 3-4.9 ~ 3-4.9 -1.7 7-10.9 -1.1 -2.8 2.1 5-6.9 -31.7 5-6.9 -1.7 11-18.9 -1.0 -2.2 1.8 7R.lln -~1fi 7 & LJn -17 10 R.lln -09 -lA 10 6A-6 INFILTRATION SUMMER POINT MULTIPLIERS (SPM) INFILTRATION PRACTICE SPM SEETABLE 6A-21 . PRACTICE #1 PRACTICE #2 6A.7 DUCT MULTIPLIERS COMl RETURN DUCTS RETURN DUCTS R-VALUE IN UNCONDITIONED SPACE IN CONDITIONED SPACE SUPPLY DUCTS IN 4.2-5.9 1.1.4. 1.10 6.0-6.6 <'1.10 ) 1.07 UNCONDITIONED SPACE 6.7 & Uo 1.09 1.06 SUPPLY DUCTS IN 4.2-5.9 1.10 1.00 CONDITIONED SPACE' 6.0-6.6 1.07 1.00 1':7 R.lln 106 1M 6A-8 COOLING SYSTEM MULTIPLIERS CSM . SYSTEM TYPE C()OLlNG S1STEM MULTIPLIERS (CSMl ~"'"lL_ Z..,79 _ 9.0~ _~,'~~ '.~9"4 ~H~_ J - 4 10.,-10,9 11.011.4 11.s'!I':r~Ol~.4 . CSM '_'~ .43 .40 .38 .36 .34 .32 .31 .30 .28 PTAC & Room Uoits (EER) Ratio 12.5:12.9 13.0-13.4 13.5.13.9 14.0-14.4 14.5-14.9 15.0-15.4 15. -___9 16.0-16.4 16.5-16.9 17.0-17.4 17..ii~J,iQ __...___ CSM .27 .26 .25 .24 .24 .23 .22 .21 .21 .20 .19 MINIMUMS: CENTRAL UNITS-AIR COOLEO SPLIT SYSTEM 10.0 SEER, SINGLE PKG. 9.7 SEER, GROUND WATER HEAT PUMP 11.0 EER. PTAG-SEE TABLE 6-2 -. Central Units (SEER) 6A-9 HOT WATER MULTIPLIERS HWM SYSTEM TYPE HOT WATER MULTIPLlER~HWM Electric Resistance EF ----~--~.- .80:,81 .82-.83 .84-.85 .86-.87 .88-.90 .94-.96 .97 &IJIL HWM 3879 3785 3695. 3609 3527 3302 3200 Natural Gas EF .43-.47 .48-.49 .50-.51 .52-.53_ ~4-"5~ .56-~57 .5~-.59 ,60-.61 .64-.65 .66 & ~p -----_._~---- HWM 2974 2664 2558 2459 2368 2284 2205 2132 2063 1998 1938 LP Gas HWM 3638 3259 3129 3009 2897 2794 2697 2607 2523 2444 2370 1 FOR MULTIPLIERS FOR OTHER TYPES OF CONCRETE BLOCK CONSTRUCTION SEE SECTION 2.1 OF APPENDIX C. 2 MULTIPLIERS FOR OTHER TYPES OF RAISED WOOD ASSEMBLIES SEE SECTION 3. f OF APPENDIX C. 3 DUCTS IN CONDITIONED SPACE NEED TO BE INSULATED ONLY TO THE R-VALUE NECESSARY TO PREVENT CONDENSATION. ,3- .WINTER CALCULATIONS I BASE I BASE GLASS x WINTER = WINTER AREA PI. MUL I. POINTS N 71.?X -3.4 I- ~4Io. I NE -3.4 E fro, 1'1 -3.4 t- 'S~ [) SE -3.4 S 1"$('(,, -3.4 Z,,~ F; SW -3.4 W ~or -3.4 -))..'}4.n NW -3.4 H' -3.4 en en ::3 CJ r ------- L-______ CUMATE ZONES 4 5. 6 GLASS ~ SINGLE-P~N~ I DOUBLE-PANE J WINTER I AS-BUILT 'WINTER POINT T. OR WINTER POINT MULT. x OVERHANG = GLASS AREA CLEAR nNf2 , CLEAR TlNf2 FACTOR (6A.l0) WIN. PTS N 72.:?V 9.6 9'.6 5.6 6.1 J.B' 7/~. '1 NE . 7.4 7.3 3.5 4.2 E I 1..1 Cf - 2.2 - 2.0 - 5.6 - 3.6 . ~I ;.. ~ :':;.f[ SE -10.3 - 9.7 -13.4 -10.4 S <'/XCo -10.9 -10.2 -14.0 -11.0 . '{Ii -Q,<). ~ SW -10.3 - 9.7 -13.4 -10.4 W -"'" ,-t;. - 2.2 - 2.Q - 5.6 - 3.6 . ,I 1-1\ L\ L\ NW 7.4 7.3 3.5 4.2 H' -32.1 -28.07 -27.0 -21.5 \ / \7 ... - .15 COMPONENT DESCRIPTION EXTERIOR ::l ADJACENT <C 3: AREA or 1.1 1.8 1- ;() Off' [[j EXTERIOR 8 ADJACENT c 5.1 4.0 CJ z :::::i iii o UNDER ATTIC OR SINGLE ASSEMBLY .6 o .6 .6 BASE CEILING AREA EQUALS FLOOR AREA DIRECTLY UNDER CEILING. AS-BUILT CEILING AREA EQUALS ACTUAL CEILING SQUARE FOOTAGE. ~ a: o g)' u... 4.1 FOR SLAB ON GRADE USE PERIMETER LENGTH AROUND CONDITIONED FLOOR. FOR RAISED FLOORS USE AREA OVER UNCONDITIONED SPACE. ~ -1.9 - .2 INFILTRATION COMPONENT DESCRIPTION AREA 1'91:'211 ~ ~g(~ U . (! 70 ",~ I}~ TOTAL COMPONENT BASE WINTER POINTS ~ BASE HEATING TOTAL BASE HEATING SYSTEM x WINTER = SYSTEM MULTIPLIER POINTS 1.1 2FOR GLASS WITH KNOWN SHADING COEFFICIENT, SEE SECTION 1.1 OF APPENDIX C. TINT MULTIPLIERS MAY BE USED FOR GLASS WITH SOLAR SCREENS. FILM. OR TINT. -4. .~ . WINTER POINT MULTI~LIERS (WPM) CLIMATE ZONES 4 5 ~ 6A-10 WINTER OVERHANG FACTORS (WOF)! ~\ r OH RATIO I .00-.11 I 1}l2-.1?\ I .16-.26 I .27-.35 I .36-.46 I .47-.57 .56-.70 I .71-.63 .64-1.16 1.19-1.72 1.73-2.73 I 2.74+ \ SINGLE PANE GLASS N 1.00 1.03 1.05 1.06 1.10 1.13 1.15 1.16 1.20 1.24 1.29 1.34 NE/NW 1.00 1.07 1.10 1.15 1.20 1.25 1.30 1.35 1.39 1.50 1.59 1.67 >-1 EfIN 1.00 .71 .57 .19 -.20 -.65 -1.05 -1.48 -2.03 -3.01 -4.06 -5.04 SE/SW 1.00 .93 .90 .60 .68 .54 .39 .22 .05 -.33 -.71 -1.01 ~I S 1.00 \ .95 I .92 .63 .70 .54 .36 .13 -.13 -.70 -.96 -1.09 ua: '-../ DOUBLE PANE GLASS wO ~I N 1.00 1.05 1.07 1.11 1.14 1.16 1.21 1.24 1.26 1.34 1.40 1.47 I NE/NW 1.00 1.11 1.16 1.24 1.32 1.41 1.46 1.56 1.63 1.60 1.94 2.06 EfIN 1.00 .66 .62 .66 .50 .31 .15 -.03 -.26 -.66 -1.10 -1.50 l SE/SW 1.00 .95 .92 .65 .76 .65 .54 .41 .26 -.01 -.30 -.52 S 1.00 .96 .94 .67 .76 .65 .51 .33 .13 -.30 -.51 -.60 OH LENGTH' Oft. 1 ft. 1'12 ft. 2 ft. 3ft. 3'12 ft. 4'12 ft. 5'12 ft. 6'12 ft. 9'12 ft. 14ft. 20ft.+ :TO SELEGJ BY OYERHANG LENGTH. NO PART OF GLASS SHALL BE MORE THAiN 8 FT BELOW THE OVERHANG. 6A-11 WALL WINTER POINT MULTIPLIERS (WPM I FRAME CONCRETE BLOCK' FACE BRICK LOG INT. INSULATION ~XT. INSUL R-VALUE WOOD FR WOOD STEEL NORMAL WT. NOR. WT. 0-6.9 7.0 6 INCH ~-VALUE EXT ADJ EXT ADJ R.V ALUE EXT ADJ EXT 7-10.9 2.1 R-V ALUE EXT . 0-69 6.8 5.3 9.4 6.7 0-2.9 6.0 3.1 6.0 11-18.9 1.7 0-2.9 22 7-10.9 ?'l 2.t 4.4 3.3 3-4.9 3.6 2.3 2.6 19-25.9 1.0 3-6.9 1.2 11-12.9 (2.D ') ( (8'1 3.3 2.6 5-6.9 2.9 1.9 2.0 26 & Uo .6 7 & Uo .9 13-18.9 1.6 1.6 3.0 2.4 7-10.9 2.3 1.5 1.5 R-VALUE BLOCK 8 INCH 19-25.9 1.1 1.0 2.6 2.2 11-16.9 1.5 1.1 .8 0-2.9 3.7 R-V ALUE EXT 26& Un .7 .7 1.4 1.2 19-25.9 .6 .7 3-6.9 2.6 0-2.9 1.2 26 & Uo .5 .5 7-9.9 1.6 3-6.9 .9 1n R. Iln 1<1 7 & Un 7 6A-12 DOOR WINTER POINT MULTIPLIERS WPM) DOOR TYPE EXTERIOR ADJACENT INSULATED 6A-13 CEILING WINTER POINT MULTIPLIERS (WPM) UNDER ATTIC SINGLE ASSEMBLY CONCRETE DECK ROOF R-VALUE WPM R.VALUE WPM CEILING TYPE 19-21.9 1.0 10-10.9 1.8 R-VALUE DROPPED EXPOSED 22-25.9 1'.9 ') 11-12.9 1.6 10-13.9 1.2 1.3 26-29.9 '7 "13-18.9 1.5 14-20.9 .7 .7 30-37.9 .6 19-25.9 1.1 21 & Uo .4 .3 36 & Uo .4 26-29.9 .6 ~R.lln '" WOOD 6A-14 FLOOR WINTER POINT MULTIPLIERS (WPM\ SLAB-ON-GRADE RAISED RAISED WOO[)2 POST OR P!~R STEM WALL wi UNDER EDGE INSULATION CONCRETE CONSTRUCTION FLOOR INSULATION ADJACENT R-V ALUE WPM R-VALUE WPM R.VALUE WPM WPM WPM 0-2.9 1'?"2.5 ') 0-2.9 4.0 0-6.9 7.9 1.8 5.3 3-4.9 --r,:r 3-4.9 1.6 7-10.9 2.1 .7 2.1 5-6.9 -2.4 5-6.9 1.1 11-18.9 1.5 .5 1.8 71/.1In -? 7 7 P'lln R HIP.lln a ~ 1 n 6A-15 INFILTRATION WINTER POINT MULTIPLIERS (WPM) INFILTRATION PRACTICE WPM SEE TABLE 6A-21 PRACTICE #1 PRACTICE #2 6A-16 DUCT MULTIPLIERS OM SUPPLY DUCTS IN UNCONDITIONED SPACE RETURN DUCTS IN UNCONDITIONED SPACE 1.1 RETURN DUCTS IN CONDITIONED SPACE 1.10 1.07 1.06 1.00 1.00 SUPPLY DUCTS IN CONDmONED SPACE' 6A-17 HEATING SYSTEM MULTIPLIERS HSM SYSTEM TYPE HEATING SYSTEM MULTIPLIERS (HSM) -- Central Heat HSPF _ 6.40-6.79 6.60-6.89 6.90-7.39 7.90-8.39 6.40-8.89 8.9-9.39 9.4:9.flli Pump Units HSM .53 .50 .49 .43 .41 .38 .36 HSPF 9.90-10.39 10.40-10.89 10.90-11.39 11.90-12.39 12.40 & u :'":' ___..~ _._.__.,_,______n___ HSM .34 .33 .31 .29 .26 PTHP CQP__ 2.50-~.69 2.70-2.89 2.9()-3.09 3.30-3.49 3.50-3.69 3.70-3.89 3.90-4J31 -_._._---~_._. HSM .40 .37 .34 .30 .29 .27 .26 ~~c;tric_$tri!L__ ______~______n~U_. 1.0 ___________ GJI,S& LP G(iS _ _ ~_ __ _____________ _________...LQJSee Table 6A-18 for Credit MultiDI~L --- MINIMUMS: CENTRAL UNITS-AIR SOURCE SPLIT SYSTEM 6.8 HSPF. SINGLE PKG. 6.6 HSPF. WATER SOURCE 3.8 COP. GROUND WATER SOURCE 3.4 COP, PTHP SEE TABLES 6,6 TO 6-8. 1 FOR MULTIPLIERS FOR OTHER TYPES OF CONCRETE BLOCK CONSTRUCTION SEE SECTION 2.1 OF APPENDIX C. 2 MULTIPLIERS FOR OTHER TYPES OF RAISED WOOD ASSEMBLIES SEE SECTION 3.1 OF APPENDIX C. 3 DUCTS IN CONDITIONED SPACE NEED TO BE INSULATED ONLY TO THE R-VALUE NECESSARY TO PREVENT CONDENSATION. ,5, - ADDITIONAL TABLES CLIMATE ZONES' 4 .5 .6 ^. . 6A-18 HEATING CREDIT MULTIPLIERS HCM ~___.~YS'IIM_TY~~__ ____O Attic Radiant Barrier Multizone LP Gas HCM .-------_. HCM .- '.---------- ~ AFUL HCM HCM HEATING CREDIT MULTIPLIERS (HCM) .98 .95 Natural Gas ---.pa--.~. .61 .77 _ ~ ---.--.--- --~_._._- .73-.77 -_._~---- .5S .72 ~.8L .53 .S7 .83-.87 .50 .S3 .88-.92 .47 .0 .93 & lJp .44 ---_.~---------- .57 SA-19 COOLING CREDIT MULTIPLIERS CCM\ ---- ,.-. SYSTEM TYPE COOLING CREDIT MULTIPLIERS /CCM) -~ - c;~iIir19.ECin~__~~_ ----.-- ~- .8S' .~ Cross Ventilation .95' 'Credit may be taken for only _~.,_____.~M_ Whole House Fan .95' one of these system types concurrently. ~.- Multizone .95 _.___~ __.,.__..____ 0- -- ~- ---- Attic Radiant Barrier .95 TWA SYSTEM TIPf Heat Recovery Unit Dedicated Heat Pump w,i ... j I~o - A<rC",d'.on~~~nPlIERSIHw<:.IHe~puIDQ. u ~~ .. . .~ 7U ..:=;1;'-~t ..j 5~99U~0- ~.~~4g-1 3~u-_ EL__~~___ ~~ 19.--r-~ . 3.03.9 _ 4.049 __ 5.0 :&~~ .- HWCM __ .84 . _.42 28 .2L-....... _ _ ~ .J 7 A HWM MUST BE USED IN CONJUNCTION WITH ALL HWCM. SEE TABLE 6A,9. EF MEANS ENERGY FACTOR. Solar .,:'" 6A-21 INFILTRATION REDUCTION PRACTICE COMPLIANCE CHECKLIST /SEE SECTION 606) COMPONENTS SECTION REQUIREMENTS FOR EACH PRACTICE CHECK PRACTICE #1 SOS.l COMPLY WITH All INFll TRA TION PRESCRIPTIVES. Windows Maximum of 0.34 CFM per linear foot of operable sash crack (includes slidina alass doors\. Exterior & Adiacent Doors Maximum of 0.5 CFM per Sq. ft. of door area' solid core wood panel, insulated or alass doors onlv. Exterior Joints & Cracks To be caulked aasketed weatherstripped or otherwise sealed. u..___,______u COMPLY WITH #1 AND THE FOllOWING: PRACTICE #2 606.1 Exterior Walls and Floors Ton nlate nenetrations sealed. Infiltration barrier installed. Sole plate/floor ioint caulked or sealed. Exterior Walls & Ceilinas Penetrations ioints and cracks on interior surface caulked sealed or nasketed. Ductwork Ductwork in unconditioned space must be sealed. Fireolaces Eauipped with outside combustion air doors and flue dampers. Exhaust Fans Eauipped with dampers. Combustion devices see 606.1.A.2 PRACTICE #3 S06.1 COMPLY WITH PRACTICES #1 AND #2 AND THE FOllOWING: Ceilinas Infiltration barrier installed. Interior Walls Ton nenetrations sealed or ioints & cracks on interior walls caulked sealed or nasketed. Recessed Liahts Sealed from conditioned & insulated from ventilated attic spaces. Ductwork All ductwork located in conditioned space. Combustion Appliances Be in unconditioned space (except direct vent), draw air from unconditioned space, exhaust by-products to outside. Combustion cooking appliances see section 606.1 A3 , .:! 6A-22 OTHER PRESCRIPTIVE MEASURES (must be met or exceeded bv all residences.) COMPONENTS SECTION REQUIREMENTS CHECK Water Heaters 612.1 Comply with efficiency requirements in Table 6-11. Switch or clearly marked circuit breaker (electric) or cutoff (nas) must be provided. External or built-in heat tran reauired. Swimming Pools & Spas 612.1 Spas & heated pools must have covers (except solar heated). Non-commercial pools must have a pump timer. Gas spa & pool heaters must have a minimum thermal efficiencv of 78%. Shower Heads 612.1 Water flow must be restricted to no more than 3 aallons per minute at 80 PSIG. -'"---_.~----- Air Distribution System 610.1 All ducts, fittings, mechanical equipment and plenum chambers shall be mechanically attached, sealed, insulated, and installed in accordance with the criteria of Section 610. Ducts in unconditioned attics must be insulated to a minimum of R-6. Air handlers shall not be installed in attics unless in mechanical closet. HV AC Controls 607.1 Separate readilv accessible manual or automatic thermostat for each svstem. Insulation 604.1,602.1 Ceilinas-Min. R-19. Common walls-Frame R-11 or CBS R-3 both sides. Common ceilina & floors R-11. .. , - :,.1: ,6-