HomeMy WebLinkAbout94-3803
BUILDING PERMIT
Permit N ~
CITY OF ZEPHYRHILLS
(813) 788.6611
_3803,8
/-.;)6- 9~
I
Date
~~.~/
pmpertYownJ~A. ~,
Job Address: ~ "5"'" 1_ - ~ tr'>i/!.;;
Parcell.D. #
Zoning: Energy Code: Radon Gas:
~/ / f "/7
Description of Work I CJ:> r:-'I 0 F' (C> lIt:if<. _ JH/7 /~L lAY K
fl;< Of) J.Jp illtJl'J1 P~YF/(..
ME~sewer Conn
Water Conn:
Water Meter:
T,I.F.'s:
F" E'AJeC ~1.3/..A73
FINAL 02/09/94
DATE
NO OCCUPANCY BEFORE C.O.
Complete Plans. Specifications and Fee Must Accompany Application,
All work shall be performed in accordance with City Codes and Ordinances,
c.o.
DATE
Inspector W.A. RJRGESS
'"
Permit Fee
Signature......--f<,. uJ
Company
Address
Telephone#
Valuation or J ....., / 7-' ?i?..
Contract Price . 0<
City License Registration #
Certified License#
19:2~elr-
EL
AL
PLU
MECH
Tp. Servo
Rough In
Meter Can
Canst. Pole
Pool
Pre-Meter
Final
FRM.
Insul. CL
WL
SLB
Tub Set
Water
Sewer
Final
Breakers
Ducts Insl.
Compressor
Final
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.001 shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
c. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
FENCING CONTRACT
For Value Received. DR. BEDI
of
6151 301 N. ZEPHYRHILLS. FL.
Promise to pay to the order of PASCO FENCE CO.
with offices at 4254 Plum Street Zephyrhills. Florida 33541
the sum of TWO HUNDRED NINETEEN DOLLARS........................$219.00
for fence work described below.
16' OF 72" CHAIN LINK FENCING WITH ALUM. SLATS. ( GRAY & REDWOOD )
PAYMENT;
$133.00 DOWN PAYMENT DUE AFTER FENCE IS INSTALLED.
I
I
permi tting. I
I
I
$ 86.00 BALANCE DUE UPON COMPETION OF SLATS BEING INSTALLED.
Work to start on: 1/26 Completion on: 2/10 or sooner. weather
We the undersigned hearby agree to all terms listed above.
Signed this 25 TH. Day of JAN. 1994.
OWNERS SIGNATURE 11~ ~
CONTRACTORS $J.O:?;:,
~
-..,..
.J ([:) ~
'." ,..,-._'--..~,~.._~.~ ~
............ T--____________
\ ~~~.-
....
........".-.------.....
"",,-
fA ...
n "
.. fJ::'//.J C
~~...,....
, . _.,~~.,-_..~~