HomeMy WebLinkAbout94-3849
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit N ~
_ 38498
~-//-'f#
Date
~ILD~
E~
P~'
ME~ Sewer Conn
Water Conn:
Property Owner:
Job Address:
Parcell.D. #
C~ll:;;~ J!!;l",#!~
~ - :2 la - :; /- IS - - 0 ~ 0
Water Meter:
T.I.F.'s:
Zoning:
Description of Work
En~ ]: ~as:
<1'<~ &.;-R \.. ;G/)~t'J-
NO OCCUPANCY BEFORE C.O.
FINAL 2 -
C.O.
DATE
Complete Plans, Specifications and Fee Must Accompany Application.
All work shall be performed in accordance with City Codes and Ordinances.
DATE
Inspector
oS~:o>
Permit Fee ~.~
Signature ~ tJ..;:;{&:=e.
Company
Address
Telephone#
Valuation or
Contract Price
5::<s
City License Registration # /9.:::l
State Certified License#
QjeO U:;"'JI._
BUILDING
E LE c.:r.RJeAl
~
Tp. Servo
Rough In
Meter Can
Const. Pole
Pool
Pre-Meter
Final
~
MECHANICAL
Breakers
Ducts Insl.
Compressor
Final
SLB
Tub Set
Water
Sewer
Final
Ftr.
Pre SLB
Lintel
FRM.
Insul. CL
WL
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.001 shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
c. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
FENCING CONTRACT
PASCO FENCE COMPANY
4254 PLUM STREET
ZEPHYRHILLS~ FL. 33541
788-5642
For Value Receivee- G~ C;::~77~O~~
ZEPHYRHILS, FL. promise to pay to the or.~r~f PAq~.. ~O.
Licensed and insured to do bussiness in the county of Pasco, and
City of Zephyrhills, Fl. the sum of FIVE HUNDRED TWENTY
,/
~ .)Z~'. () 0
for fence work described below.
123' OF 48" CHAIN LINK FENCING
10 EA. 2 1/2" TERMINAL POSTS WITH FITTINGS
2 EA. 4' X 4' WALK GATES
1 PERMIT
TERMS OF PAYMENT:
$262.50 DOWN PAYMENT IN ADVANCE.
$262.50 BALANCE DUE WHEN COMPLETED.
Work to start on: 2/9 Completion on: 2/11 or sooner.
We the undersigned hearby agree to all conditions listed above.
Signed this 8 TH. day of FEB. 1994.
OWNERS SIGNATURE ~~~
CONTRACTORS SIGNATURE.-i . ~ ~
/}n~ ~~
I~
E.
X
I
S
T
I 0-0-)0
N
G
o
BACK YARD
o
o
0-)0
o
HOUSE
SHED
F
E
N
cl
E1
I