HomeMy WebLinkAbout94-3918
BUILDING PERMIT
CITY OF ZEPHYRHILLS
(813) 788-6611
Permit N ~
_ 391813
Date J-/r- 75/
~~
ELECTRICAL
PLUMBING
MECHANICAL
Sewer Conn
Water Conn:
Pmpeny owne'~~
Job Address: .'- ~ -4 ;(O.A ~
Parcell.D, #
Water Meter:
T.I.F.'s:
Zoning:
Description of Work
Ener~de:
C L ~ \ L4tAI f2
Radon Gas:
NO OCCUPANCY BEFORE C.O.
FINAL
C.O.
DATE
Complete Plans, Specifications and Fee Must Accompany Application.
All work shall be performed in accordance with City Codes and Ordinances.
DATE
Inspector
P~rm.it Fee ;2~~
Signature ..1t..
Company
Address
Telephone#
Valuation or
Contract Price J..:s (,~ c/.....O
City License Registration # /.f~;t
State Certified License#
ELECTRICAL
PLUMBING
MECHANICAL
Breakers
Ducts Insl.
Compressor
Final
SLB
Tub Set
Water
Sewer
Final
Tp. Servo
Rough In
Meter Can
Canst. Pole
Pool
Pre-Meter
Final
Ftr.
Pre SLB
Lintel
FRM.
Insul. CL
WL
Driveway
REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a
charge of Fifteen and 00/100 Dollars ($15.00) shall be made for each trip for each trade:
a. Wrong Address
b. Condemned work resulting from faulty construction.
C. Repairs or corrections not made when inspection called.
d. Work not ready for inspection when called.
e. Permit not posted on job site.
f. Plans not at job site.
g. Work not accessible.
The payment of inspection fees shall be made before any further permits will be issued to the person owning
same.
,---
I
i
.
i
!
I
I
\
i
;
!
I
!
j
I
I
!
i
!
I
;
;
L
FENCING CONTRACT
For Value Received, I MRS. RAMSEY
of 4651 LARCH DR.
Zephyrhills. Fl. Promise to pay to the order of PASCO FENCE COMPANY of
4254 Plum Street Zephyrhills. Fl. 33541 the total sum of $ 335.00
THREE HUNDRED THIRTY FIVE DOLLARS...........................OO/1.00
for materials and labor described below.
56 FT. OF 48" CHAIN LINK FENCING
1 EA. 4' X 3' WALK GATE
1 EA. 4' X 4' WALK GATE
PRICE INCLUDES LABOR AND PERMIT
TO BE PAID AS FOLLOWS:
----------------------
----------------------
PAYMENT IN FULL ON DAY OF COMPLETION
Work to be started on:
3/18/94 Completion on 3/19/94 or sooner.
We the undersigned hereby agree to all terms listed above.
Property owne~s. Signatur~~
Contractors S2qnature '
Signed this 15 TH. Day of MAR. 1994.
I .~--------------------~;~~~~~~-~~~~~------------------------------.~I
! ! ; I
I i ~ I
j II : !
I : I
I I : I
Ii' ;
I I : I
I I ' I
1 0---0--)0---01 HOUSE 10---0(---0 01
I I I I
I I I i
j
j
,
1
I
<--.
I
------1