Loading...
HomeMy WebLinkAbout02-1516 BUILDING PERMIT CITY OF ZEPHYRHILLS Permit N2 1516 (813) 780-0020 Date 9':10~02 PLUMBING MECHANICAL Sewer Conn BUILDING ELECTRICAL P'operty Own.' M~ Job Address: _La? ~ G ChIli Water Conn: L//. , Water Meter: T.I.F.'s: Parcell.D. , Zoning: DescriDtion of Work Energy Code: <) ewull"'<- Radon Gas: FINAL NO OCCUPANCY BEFORE C.O. DATE Complete Plans. Specifications and Fee Must Accompany Application. C.O. All work shall be performed in accordance with City Codes and Ordinances. Valuation or Contract Price DATE ~ Inspector /9;;J-V . ,pi:) Permit Fee ~. ~ignature 7;. '7:70, ~~~~L Company Address /'felephone# City License Registration # State Certified License# BUILDING Ftr. Pre SLB Lintel FRM. Insul. CL WL Drivewa V&nn; 5 ~/( //t44~ 5 ELECTRICAL PLUMBING SLB Tub Set Water Sewer Final Breakers Ducts Insl. Compre Final Tp. Servo Rough In Meter Can Const. Pole Pool Pre-Meter Final REINSPECTION FEES: When extra inspection trips are necessary due to anyone of the following reasons, a charge of twenty-five and 00/100 Dollars ($25.00) shall be made for each trip for each trade: a. Wrong Address b. Condemned work resulting from faulty construction. c. Repairs or corrections not made when inspection called, d. Work not ready for inspection when called. e. Permit not posted on job site. f. Plans not at job site. g. Work not accessible. The payment of inspection fees shall be made before any further permits will be issued to the person owning same.