6319
Permit Number: 6319
Permit Type: MISC
Class of Work: RIGHT-OF-WAY
Proposed Use: COMMERCIAL
Square Feet:
Est. Value:
Improv. Cost:
Date Issued:
Total Fees:
Amount Paid:
Date Paid:
Work Desc:
Address: 6TH A M 6TH S -C
ZEPHYRHILLS, FL.
Township: Range: Book:
Lot(s): Block: Section:
Subdivision: CITY OF ZEPHYRHILLS
Parcel Number:
12/18/2006
Name: CITY OF ZEPHYRHILLS
Address: 5335 8TH ST
ZEPHYRHILLS, FL. 33542
Phone:
R-O-W VERIZON CABLE - "NO TRENCHING ACROSS PAVED SECTIONS"
~./'
\ \) r,,'\:i
(~,,~ .)\\
yl ~ \'V
REINSPECTlON FEES: Reinspection fees will comply with Florida Statute 553.80 (2){ c) when extra inspection
trips are necessary due to anyone of the following reasons: a) wrong address b) condemned work resulting
from faulty construction c) repairs or colTeCtions not made when inspections called d) work not ready for
inspection when called e) permit not posted on job site f) plans not at job site g) work not accessible.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
The payment of inspection fees shall be made before any further permits will be issued to the person owning same
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing, consult with your lender or an attorney
before recording your notice of commencement."
NO OCCUPANCY BEFORE C.O.
~C~ ~.
CONTRACTOR SIGNATURE PERMIT OFFI
CAlL FOR INSPECTION - 8 HOUR N011CE REQUIRED
PROTECT CARD FROM WEATHER
/
DATE:
'plJ:5j;ep
-!II '/oe.
I I
'1'-\ I - ~4." 9'75~.
~
~23r 7FFAoAH
CITY OF ZEPHYRHILLS - BUILDING DEPARTMENT
RIGHT-OF-WAY USE PERMIT PERMIT#
No eonstruetlon under ground or above ground of any facility .hall be accompll.hed on any City Rights of Wtry without written approval from the
Cltv BuDding Department. A:ty application for approval of construction opcratlon. on any City owned Rights of Way shall famish a detailed drawing
.hu:mng the complete .cope of the proposed ',,'or:( In triplicate to the office of the BuJlding Offidal for approval prior to the commencement of any work. A
copy of this permit Is to be kept readily avanable at the site of the work at all times.
PARCELLD.# CITY ROAD CAVE
DATE /0/1/'"
, ,
LOCATION (Legal Dacrlptlon):
(ourt- .rr
~ Ave, "ON. (., H. $'- 10
UJ I/.p [,~- (J{ 2eDLrA:1k
_ t _ w
Permbslon Is hereby granted to VEH.lZON
for the eonJtmetlon and maintenance of -
of SO
/.SO' HOPE W/.FOC
DJ'I//H. BOllE OK YRENco. v
_subject to the following conditions: 1-! t~
1. The construetlon and maJnt~Qfsul:h utility sbaD'bot4n
2. AD work .hall be done In keepIng with the .tandards of the CIty Streets cpartment and under the su
wID be notlf1ed at least one day prior to commencement of construetlon.
5. AD private and aD CIty properly sllaD be restored to Its original condition a. far as praetlcalln the opinion of the City B
6. AD underground crossing Installadon.shaD be laid at such depth as may be spedOed by the City Building omclal.
7. The .ketch covering the details of thl.lnstallatlon shall be made a part of this permit. ThIs permIt Is granted with the undentanding at the
applicant lias nodDed all other utility usen In the area covered by the permit and takes flIlJ responslblnty for any dlllllaRe Inc:urred by prior In. atlonsasa
result of hIs operations In order that they may safe guard their Interests.
8. It" expressly stipulated that thI. permIt I. a license for permls.lve use lIIIly and thet the pladng offadlltles upon public property punaant to
this permit shall not operate to create or to vest any property right In .ald holder.
9. Whenever the CIty decides to further exploit the City Rights of Way, any or aD said poles, wires, pipes, cables, or other faeDltles and
appurtenances authorized hereunder, Ihall be Immediately removed from said Rlghtll of Way, or reset or relocated thereon a. required by the City Balldlng
omdal at the expense of the holder of this permit.
10. The holder shan lave and keep the CIty harmless from any and all damages, claims, or Injuries that may occar by reason of the construction,
malnteuance, and operation of said fadllty.
11. Theholdershall complete the requested work within days or this permltshall become null and void. In the event the work
requested Is not eompleted upon the expiration date of this permIt, the City Ihall hav" the right to complete such work and to charge the holder ofibe perml~
for aD eosts incurred in completing said work.
Public Works:
Date:
City Manager:
Date:
orlurety bond with the CIty Manager In the sum ofS dollan to guarantee performance orthe
oUhe right-of-way deserlbed herein for a period ofone (1) year fOllOwing completion of the requested
he .urety bond .hall be made payable to the CIty and .hall obligate the surety to hold the City harmlcs.ln
Iftt any oflts obligations hereunder. The bond .hall also IndemnIfY tile CIty for all court com and
Is required to collect on .ald bond.
SUBMITTED BY:
BKY~ foe
6 ~~.A NEtfPSOU711EA.STIlEG/ON F7TP
fJ AIl "OOK. (FL7PtJ6S2) TAAO:; FL. .1.16/9
q / z, / f;
DATE: _, I 6
I I
~~!:::i;:n: ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the
Cltv Bundlng Department. A;IY application for approval of construction operations on any City owned Rights of Way shan furnish a detailed drawing
sho';vlng the complete .cope of the proposed ."or:t 1\1 triplicate to the office of the Building Official for approval prior to the commencement of any work. A
copy of this permit Is to be kept readily avaUable at the site of the work at all times.
~41- Soy - <11S~
~~
~23r 7fT"AOAH
CITY OF ZEPHYRHILLS - BUILDING DEPARTMENT
RIGHT-OF-WAY USE PERMIT
PERMIT#
PARCEL I.D. #
CITY ROAD
DATE /0/1/'"
I ,
CAVE
LOCATION (Legal Description):
~ AveJ "ON. (., H.. S,- 10
(ourt- .rr
n) I/.p (, ~_ (J{ 2~DLr'J.;/1s
Permission Is hereby granted to VEH.lZON
for the connrllctlon and maIntenance of -
of SOU77lEAsr IlEG/ON FTIP
I.SO' HOPE W/.FOC
OJ'vIK. BOllE OK YRENCHFNG
_subJect to the following conditions:
1. The construction and maintenance of such utility shall not Interfere wl'.h the property and rights of a prior occupant.
2. AD work shall be done In keepIng with the standards of the CIty Streets Department and under the .upervlslon of the City BuildIng Official, whc
will be notlfled at least one day prior to commencement of construction.
3. All materials and equIpment shall be subJect to Inspection by the City Building Official.
. 4. During construction an safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all
responslblllty from damage of any nature arIsing from this permIt. Subject to the same terms and conditions, the permit holder may take such safety
measures, Including placing and dl.play of caution sIgns, as It may deem necessary In conduct of construction and maintenance work hereunder. It Is the
responslblDty of the permittee to 1111
5. All private and all CIty properly sllall be restored to Its orlllfnal condition as far as practical In the opinIon of the CIty Building OfficIal.
6. All underground crossIng Installadons shall be laid at such depth as may be .peclOed by the City Building omclal.
7. The sketch covering the details of thl.lnstallatlon .hall be made a part of this permit. ThIs permit Is granted with the undentandlng that the
applicant lias notified all other utility usen In the area covered by the permit and take. full responsibility for any dlllllage Incurred by prior Installations as a
result of his operations In order that they may safe guard their Interests.
8. It Is expre!lly stipulated that this permit Is a IIcen.e for permIssive u.e Dnly and that the pladng of facilities upon public property punuant to
this permit shall not operate to create or to vest any property right In said holder.
9. Whenever the City decides to further exploit the City Rights of Way, any or all saId poles, wires, pipes, cables, or other facJlltles and
appurtenances authorized hereunder, shall be IllUDedlately removed from said Right! of Way, or reset or relocated thereon as required by the City Building
Official at the expense of the holder ofthls permit.
10. The holder shall save and keep the CIty harmless from any and all damages, claims, or InJuries that may occur by reason of the construction,
maintenance, and operation of .ald fadllty.
11. The holder .hall complete the requested work within days or this permIt shall become null and void. In the event the work
requested Is not completed upon the expiration date of this permit, the City shall hsvp. the right to complete such work and to charge the holder of the permIt
for all costs Incurred In completing saId work.
Bu~lding Off~c~al
Date:
or .urety bond with the City Manager In the sum of $ dollars to guarantee pcrf"rmance of the
nee of the right-of-way descrIbed herein for a period of one (1) year following completion of the requested
!~, the .urety bond shall be made payable to the City and shall obligate the surety to hold the City harmless In
to meet any of Its obligations hereunder. The bond shall also Indemnify the City for all court cosll and
:Ion Is required to collect on saId bond.
APPROVED BY:
CITY OF ZEPHYRHILLS
Utilities Supervisor
Date:
Public Works:
Date:
SUBMITTED BY:
~~L<=m;07NEASTKEGIOHFJ7?
BIJ(J(J ADAMO OK. (FLTP 06S2) TAMPA FL 33619
C~ty Manager:
Date:
..
CITY OF ZEPHYRHILLS PERMIT REVISIONS
DATE-3-21-2007
WORK ORDER-3623-7F
APPROVED PERM] 6319
1. PRINT 10 OF 10 CHANGED RUNNING LINE TO GO NORTH ON COURT ST. AT
AVE C. FOR 27' THEN CROSS COURT ST. TO A PROPOSED 3'X5' HH
BYPASSING MANHOLE 207.
RIGHT OF WAY PERMIT - REVISION
Please review/approve if appropriate.
Pass on to the next person and return to
The Building Dept. Thank you.
Route:
Approved
Denied
Utilities
Public Works
City Manager
.1/' ~o-o1
CITY OF ZEPHYRHILLS
5335 - 8TH STREET
(813)780-0020 ...
BUILDING PERMIT
"%.3 i FFA a A-H
6319
Permit Number:
Permit Type:
Class of Work:
Proposed Use:
Square Feet:
Est. Value:
. Improv. Cost:
Date Issued:
Total Fees:
Amount Paid:
Date Paid:
Work Desc:
6319
MISC
RIGHT-OF
COMMER
Name: CITY OF ZEPHYRHILLS
ddress: 5335 8TH ST
ZEPHYRHILLS, FL. 33542
Phone:
R-O-W VERIZON CABLE - "NO TRENCHING ACROSS PAVED SECTIONS"
REINSPECTION FEES: Reinspection fees will comply with Florida Statute 553.80 (2)( c) when extra inspection
trips are necessary due to anyone of the following reasons: a) wrong address b) condemned work resulting
from faulty construction c) repairs or corrections not made when inspections called d) work not ready for
inspection when called e) permit not posted on job site f) plans not at job site g) work not accessible.
NOTICE: In addition to the requirements of this permitl there may be additional restrictions applicable to this property that
may be found in the public records of this countyl and there may be additional permits required from other governmental
entities such as water managementl state agencies or federal agencies.
The payment of inspection fees shall be made before any further permits will be issued to the person owning same
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing, consult with your lender or an attorney
before recording your notice of commencement. "
NO OCCUPANCY BEFORE C.O.
,.. ~-~
~
CONTRACTOR SIGNATURE PERMIT OFFI
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
~
t:.l~ 1- 504 - cn5~
~
Jf~~'jt~
~23' 7FFAoAH
CITY OF ZEPHYRHILLS - BUILDING DEPARTMENT
RIGHT-OF-WAY USE PERMIT PERMIT#
DATE:
No construction under around or above ground of any facility shall be accomplished on any City RIghts of Way without written approval from the
City Buildhlg Department. A;IY application for approval of construction operation. on any City owned Rights of Way shall fllmlJh a detailed drawing
showing the complete scope of the proposed '"or:( hI triplicate to the office of the Building Officfal for approval prIor to the commencement of any work. A
copy of this permit Is to be kept readily available at the site of the 'Work at all times.
PARCEL I.D. #
CITY ROAD
DATE /O/J/t7'
. ,
CAVE
LOCATION (Legal Description):
/ A r / H.. ('- h,
V lJeJ rfOIA !1 ~L _
(ourt- .rr
/1) I/.p Dft (J{ 2eDL'(,CI/C
_ f_ .
Permission Is hereby granted to VEIl.lZON
for the conJtmctlon and maIntenance of -
I.SO. HOPE W/.FOC
BYE/IX. BOllE OK YRENco. v
_subJect to the following conditions: J; ! fl'--' b
1. The construction and malnte~eQfsucb U~D'bot4nf tJere wI.h e ~
2. An work shall be done In keepIng with the standards of the City Streets epartment and under the su f the B In
will be notified at least one day prior to commencement of construction.
3. AD materials and equipment .hall be subJect to Inspection by the City BuildIng Official. I j1
4. During construction all safety regqlatIons or the Department or Tran.portatlon shall be ob.erved and the City Shalll~Te~} all /
responslbmty from damage of any nature arl!ln6 from thIs permit. SubJect to the same terms and condItions, the permIt holder may k such sd
measures, Including pladng and dIsplay of caution sIgns, as It may deem necessary In conduct of construction and maintenance work cund. It Is th
responsibility of the permittee to 1111 ~
5. An private and an CIty properly sllall be restored to Its original condition as far as practical In the opinion of the CIty B ding 0 al.
6. All underground crossing Installadons shall be laid at such depth a. may be spedfJed by the CIty BuildIng OMclal.
7. The .ketch covering the details of thl.lnstallatlon shall be made a part ofthls permIt. This permit Is granted with the under.tandlng at the
applicant lias notified all other utility nsen In the area covered by the permit and takes fun responslblnty for any dlllllaRe Incurred by prior Inst atlons as a
result of his operations In order that they may safe guard theIr Interests.
8. It Is expre!.ly stfpulated that thIs permit Is a license for permIssive use only and that the placing offacllltles upon public property pursuant to
this permIt shall not operate to create or to vest any property right In .ald holder.
~. Whenever the City decides to further exploit the City RIghts of Way, Iny or aD saId poles, wires, pipes, cables, or other facUlties and
appurtenances authorized hereunder, .han be Immediately removed from said Rlghtll of Way, or reset or relocated thereon as required by the City Building
Official at the expense of the holder ofthls permit.
10. The holder .hall save and keep the City harmless from any and an damages, claims, or InJuries that may occur by reason of the constructIon,
maintenance, and operation of .ald fadllty.
11. The holder .hall complete the requested work within days or this permIt shall become null and void. In the event the work
requested Is not completed upon the expIration date of this permIt, the CIty shall havOl the right to complete such work and to charge the holder of the permit
for an costs Incurred In completing said work.
APPROVED BY: :6 . ()
CITY OF ZEPHYRlIILLS Y '1
=~ ,'''oW ~ ;j)j}f<-
Utilities Supervisor,
Date:' A / $1- .
or .urety bond with the City Manager In the sum of $ dollars to guarantee perfJrmance of the
of the right-of-way descrIbed herein for a period of one (1) year following completion or the requested
he surety bond shall be made payable to the City and .hall obligate the surety to hold the City harmless In
eet any of Its obligations hel't!under. The bond shall also Indemnify the CIty for all court costs and
I. required to collect on saId bond.
City Manager:
Date:
SUBMITTED BY:
&~~foe
6-) .. 1Jrf~-1.... Nli&PSOll7HFAST _fON F77P
t7 AD. "() Ox. (FL7?06S2) TAMPA FL. 33619
Public Works:
Date:
.~___ ..~j~b.s'"'-/r-l-'AOJ'O{IL
.~ ,. .
VERIZON FLORIDA, INC.
. -
GENERAL RIGHT OF WAY PERMIT
EXHIBIT "A n
Verizon F'orida 'nc. daily activities that do not require a specific right of way utilization pannit
when working within the boundaries of Pasco County right of way
New CUstomer Service
1.
2~
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Installation of service drops from seMng location. .
. (
InstaUation of new aetfal distribution- cal?le fi"9m existing poles.
Jns~lation of a second aerial distnbutfon cable from existing poles.
Extension of existing aerial distribution cable fi"orit existing poles.
Installation of a new buried distribution CAble that does not aoss or begin In the pavement.
Extension of an exisUng buried distnbution cable that does not Cl"QSS or begin in the pavement.
Installation of two way fot!r Inch conduit system that does not aoss or begin in the pavement.
Extension of.a two way four Inch conduit system that does not Cross or begin In the pavement.
Installation of a new pole line. .
extension of existing pole line providing it does not enaoach into an underground utility area.
Adding of a new terminal to exlsUng cable.
Pulling in new underground feeder cables in an existing permitted manhole and conduit system.
Digging of a splice hole to splice a new cable or adding a terminal.
Digging of a splice hole for cable acceptance tesUng for quality;
Digging of a splice hOle to change the count of a cable leg for new service.
Maintenance of Existlna Telecon'1munlcations Facilities
1. Replacement of existing serVice drops.
2. ReplacemenVrepalr of an existing aerial ~ble providing other aerial utility service still exist.
3~ Replacement of existing poles providing other aerial uUlity service stili exist.
4. ReplacemenVrepalr of eXisUng teonlnals.
5. ReplacemenVrepalr of an existing undergrpund feeder cable in an existing permitted manhole and Conduit
system.
6. Pumping water out of.a manhole to maintain underground cables in conduit system.
7. Digging of splice holes to-locate and repair air leaks In cables.
~. Digging of a splice hole to change the count of the cable.
9. Digging of a splice hole to 'add a side leg off feeder cable.
10. Digging of a bole to repafr broken conduits.
11. Digging of a splice hole for cable a~ptance testing for quality.
12. Digging _ of a splice hole to repair wet or damaged cable.
13. Digging of a hole to verify the location of buried facilities.
14. Removal of-facilities no longer needed for service.
15. . Tree trimming to clear aerial facilities.
16. Adjust aerial facilities to accommodate other users of pole line and/or to meet National Electric Safety Code.
Page 1 of 1
, .._......, .s"~"-1C-~.
VERlZON FLQRIDA, INC.
GENERAL RIGHT Of' WAY PERMIT
EXHIBIT "S" .
A GENERAl.. RIGHT OF WAY PERMIT (G~) -Is given for certain routine repetitive work not
requiring a speqtic pennlt defined on Exhibit "A" that Is 5 feet or greater from back of curb
(BOC) or edge of pavement (EP).
No roadway will ba open cut or directional dnlled with this pennlt.
Upon completion of work the. Pasco County Inspector shall be noUfied for a final Inspection of
the project "
Best Management Practices (BMP) will be ~servOO at all times.
,../
Notify Sunshine State One Call of ROOda at 1-800-432-4nO not less than 48 hours or more
than 5 days prior to construction, and all other I~qlilrements of Rorida Statute 556 will ~
obselVed at all times.
MAINTENANCE OF TRAFFIC
- All activities in accordance with this agreement will require conformance to the "Manual of
Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and
Utility Operations." (Chapter 316, Rorida Statutes)
- Pedestrian, blcyc/e and hanoscap traffic must be safely maintained and must not be
redirected Into the roadway or Into ditches. Use of sidewalks may not be Impaired or
closed for greater than 60 minutes. When a sidewalk Is to be removed means of
rerouting pedestrians, bicyclists and handicapped people must be constructed prior to
sidewalk removal per Rorida Department of Transpottatian (FOOT), Manual on
Uniform Traffic ContrOl Revises MUTCD and American Disabilities Act (ADA).
?
- No street shall be closed without the prior written permission of Pasco County Inspector. At
least 2 normal woiidng days (Monday. thru Friday) advance notice is fequlred. All
. maintenance of traffic plans are to be submitted to the 'Pasco County Inspector for
approval prior to commencement of cOnstruction. Appropriate work zone safety Is to
be followed at all times.
- All construction activities shatllnclude traffic control through the work zone in accordanCe
with FOOT "Roadway and Traffic 1?~lgn Standards" Indexes 600 Series titled "Traffic
Control Through Work Zones."
Where it is discovered that a site specific permit will be required, i.e., during excavation existing facili.ties
become less than 5 feet froni BOClEP: .
1) The Construction Supervisor will notify the Verizon Engineer that a project cannot be
completed under the GRP.
Page 1 of 1
"IUI.~; II
"~I.~~t,~ .}:,t:i::i ' . . ~" ... .
., . .. ... . ;:i'~{f";~.ff"'f:;!
~~;'nfr .Blif~;': , : I .
::' 2}'The veilZo~,tIR~~i~t'~1 nofitY':'the;Pl:isco CountY ;nspeetci#of the ~lluauorl;~d~~cti8dule
, a fiel~ meetfrl9~{~e~ort Will ~ made to)lrrange .the ffeid meeting Yiftf,(il:~::tJine '1~?'. :>
~~ that~I~:1~~e~Co~;~~ dr~ to leave thr~~H~~a~d 4f1ul~ ~Ei~ooc)
. 3) The V~ 1:iiQf~~r wm be responsible for notificatfon all appropriate personnel of the .
~time and loeatfo4t:of the' field meetirig.;: i: ,i- ,( "
..,..,~'.~.:";;f: ,. . ."..
~.1...:;:.'t .. .
4) ~ mutual Und~~lng of the scope of.~~ l'99ufred to ~Iete the pro~ will be
. ; aChieved an;;~1!eJd meeting. , ,~: .. :\/;l:~<": : Y :';7.. . ~"
: f.):;~:'!:./: ' . . "!, ,. '". . ,..,' '; "
5) At the pascoC6iiniY Inspector's dfscretlon,:a verbal approval of the work may J>e ISsued
allowing work to resume.
6) The Verfzon 'Englneer shall apply for a site specfflc Pennft inclusive of all detaOs as
agreed upon at the field meeting. (If a Verbal Approval was granted, the site specfflc
. shaff be submitted as an aAfter-the- Fact" applicatiOn.)
7) upon completion of the work, the Pasco County Inspector shall be notified f~ a final
Inspection of the project.
RIGHT-OF-WAY RESTORATION
- All disturbed areas in the right-of-way will be sodded unless otherwise directed by Pasco
County Inspector. Sod must be maintaIned until its roots, a minimum water of two weeks.
- Vegetation, other than sod, wm be restored to Its pre-constructfon condition.
- Prior to disturbing sprinkler systems, plants and mailboxes that may be disturbed during
coristructfon, notify property owners. Replace those Items that are damaged by
pennfttee. '
- The permittee shall be responsible (or handling all complaints regarding the cOnstruction
projeCt.. ,
Page 1 of 1
~.. v fr (r r fWllttt....
.~
Jt-l '
i:~
~o
i.
,
II
B-
ID
a.
GO
!
.',
,
I
'~
I
"
r
. .
.j
'i
:i
ii.
~.
..
,I .
.'.1' .
J
"U
.ID
lD
CD
-4
~
a
N
~
.\0
P'.
i
,
j'
i ii Iii
" J~ill
t ,"1;:1 I
t:! 'jy .
II r. i..
f f' ~
!
..
Ilt
. 5-'
I
,
cc}
~
.:';!'ii'
f~
3:1
'i~
fs
s:~
g
i..
, ,I.
I
V\
~
N
'-"1
I
'-.i
"")-
i'
'~
a
~
a~
~'@
i~
:i'8
GO....
jf
3:;:J
~~
00
i
I
III
a
...
. v . Om
, i! ,n
, r ts': I
.' 'r f.
, ....
j -i~
J r,
~ I i
i ;.
it 1..,,1. ..t.~. !jl....ri ..e ....
~ JeIt,:t9
1,~~. ;1. ~. It
t ',.:-.'il!ll
J - II ...,1
I; < '. PIUi .
;II t
if.. ...
~.
I '
",1
'haJ.1
fi
J :
': , 'it- Il
lilil II
!Ii' I
!ll' .
lJ-f
,I i
I
.....
Co)
a.
N
Q)
~
~cr
. i{z
, ~p
3:1
~g
&~
g.....
jf.o
:J
'1& .
2
fll
..c
CS!,
SiN
ji!O
...~
~
~
,
~
~
~
~
J(21- 7FF;1(),fH
'\ ~'
~
8800 Adamo Dr (FL TP0652).
Tampa, FL 33619
Date 10130/2006
To: Owners ofall Utility
Installation and Structures
One Call: 262605543
Reference: 3623-7FF AOAB
To Whom It May Concern:
This is to advise that Verizon will submit an application for a right of way use permit in the near
future. We are enclosing a map of the area in which we will be placing new infrastructure for
your review and comment.
If no response is received within 20 days from the date you receive this letter we will consider
this a no conflict on your part.
If you have any questions please contact Joe Hendrix @ 813-635-0673.
Very truly yours,
.l5ryanLmtL
Bryan Lantz
NE&P Southeast Region FTTP
Cc: AD dJity companies ladadlag;
[] Florida Gas Trans
[Xl TECD-Peoples Gas
[] Tampa Electric
[Xl Bright House Networks
[] Tampa Sewer
[] Florida Power Corp
[] Pasco County Utilities
[] TECD-Propane
[] Tampa Electric
[Xl WithJacoochie River Electric
[J Hillsborough County
Hwy/Eng
[Xl Pasco County Utilities
[] MCI:
[J PeopJes Gas
[Xl Progress Energy
[J Other:_City ofSt
Petersb~
[JOther:
[] Other:
[Xl Aqua Utilities
[] FPL Fibemet
[Xl Pasco County Traffic
[J Clearwater Gas Systems
[] Knology Broadband ofFL. Inc. '
[Xl City of Zephyrhills
@o
00
.g~
.",CO
.c.;:!:
;t@
N~
0<0
8lp
<TN
~~
.8~
~g
:r.8
"""
00
~~
-l'
"!j
9-e:
gg
,gijf
~l!'
~~
~!'
~~
~.i5'
..:r
:-
<ii
....
a."
, <
0..
N"'"
O:r
~-&'
z'
~r
m.
02,
, Q
~o
-..
::LO
"'''''
i!s
iil~
"l!l-
~CD
..!!!.
f1.1e.
~
ii'
a.
..
iP
5'
I!.
c
"-
CD
..
f
~
e-
o
:>
f
:>
'€
5'
..,
~
ii'
..
g
[
r-
(I)
III
~
(I)
E"
"0
:r
(I)
-0
....
[ane'Rd:-:.....
Huron'.:st
,. ,~. Shaw Dr
.<,
(I)
i"i
o
S;:,
0'
(I),
,<,
9
j II
~). i -St--.-n-"..-.---
uuurtl , ----I I
Ii
- ---~ '.
(")
::::;~
(')
"', CD'
; !
_..1 !._
rt.SL .. - _
i
I
'I ,
,I, I
I LarCh=Or:=:,
:! !
~.
'(s-~tena::::
1 i
"
I
~
'1 r--'''''~1
"-::
III
<'
(I)
~
~
(I).
::0
III
'<
..~
~
(I)
~'
,<:
Betmar 'Or
I
i
, "r=i1l;fillOr
~I
,[;P- I Wood~Sf
iii'8.1 I
,_m 'I I
i I'St
, Lantana .
.: I
. I
i !
o
..,
}:.:
<-
CD
I
Studio~Dr ~
I
I
I
I
I
L
r
I
I
!
nw
-, en
~N
OW
-"
~=JI
"O~
~)>
~:I:
iii'
o
..
~
iii'
:>
II
~
o
;a,
ii'
..
@
::J:
!II
~
II
'ii'
~
5'
..
o
Ii
:>
5'
;:0
a
;t
!l.
o
II
~
'"
?
o
N
? ---, I
W i i
; I
Ii
I I
I I
o
::71
o llli
:,.. ~ II
,.-_mL__. - u-x.
)>:"------lll;
li! -g!! (
.1 ~::
~
~I
...e>'
=lS::Yl+
~I
a; "
(Dt
?
(11
I 8th St
CD
)>
. '--- ---<-
, -, c-t.- 9thSt ~ I
csth-v --~ ! , I
, '
\, "
~
1-.
oc'
-,=~/
\~,
.>
~.
1l
CSl
~va Ct
"
(I)
-,;
::I.
(fJ
)>
'-<c--
(I)
, CoUrt:~Sf'::::::::~.',-
en
~n
~-
CD,
: ;
1st-, St=~,
,~\l't ~
."S "
- " ~
~
,s~q,\
~
0-/
~
t9
<iu.''O,
0- ,S.' '.
/ :'.1i
CSl
nu,
i
I
i
i
I
I I ,
! OaUer:Ct
\ \'., '
\ . .-~--~
, "'-.,.----Corall$t~~t,
z \ \
i __.z:r '
- JO WIBd-JB ~~, n'~ i\
.--.---.------.-----~-.-.--~'l :J>i ; \
"... -- -:=,'JS-uopJ()f)':~:::~-----'-- '\ \
:r. _. :\
H.... Ub-"S.t::::~~.::. :'..:'~..:;;IP ,\
S:; "1- t:t:.' , \
, ! ,-- j-'E~ :=~ ~I i i ~/ "
: ~~-l---'. ill" ']: i. ' , .:~./
='tDCottage'Sr' '...-,
'CSl'
AUtUmn::Palni::Or
II
i i
9ran~~.::sIosSom:.Dr,-----= :11
j f!
i ~ i
:--='-==3 :=OIiVe:::Or::::::::::"':::: ;
~i ,
I i Ii
=--=-~'=-la=F-{)rce=Sf== ; \
<,1'1 , \
i! 1
: !. . . . .... u . J 1
o Ch'al1er:::St-=,:,::.::.~.::_=---:.::::::= '0
~. \ Ii. ... . ~
,; : I CF-URk-~t -<:!
'.' -Q.----- ..~ I
(', &1. , I
' !
il ~ Ii
i 1__ __,1' L___" , l.
PllJrn~ ~f:':::-,-):l,-------- I r
II ~I i I ~ ii
i I I I ! ! ~)> .' %.., ~,
~t i__---=,~~ ;::.::=::::== ~ L :::::::=:~ ,~~=~-:-:,'::'~}~:::=-=--='::::=~ i 1r, . .~\
I f'----' II Iii ! ~: ~, CSl 1C '
i Iii j i i i ! i I ,Q- .eK;.': ~\\v/ /'
Il.____.J 1____ j L_______J__ . I I ....__.1 >~ G> \ g-/> ,./'
6~1't!-----1 i---- 1 r-----" ;---------- \~th~-'--tri" ~' ~ \\'/gy----\
J ::dJ L J i I ! i_____w \ L.. ~ ~' _,~-;:>/ ~
~-__Cl _ -co ~ L---- /---- u.\l?:' .
, .... _..~" ,S'
?L. (I),:
? /7.'
U}.::::;
\
\
t-D'" \ \
~ \\
~ \\9.)c;,.
* '\~ \,
\\
~-'S~\(
,.?i . ~,
~ ~\.
'.. .~~/:.~\
,s-- ~\
., \>~
\
0)''-
~,.
)i~
<---
::Cb:
~
.~
J>
<
(I)
"
o
...,
c.:
Q)
C
::J
;::;:
CD
a.
en
.....
Q)
.....
CD
(J)
"'0'0
~i~
CD'(/1
role.:
-< ICD
z
o
::+
::r
)>
3
CD
:::!.
o
Q)
.<,,\
~
'C
(
~
v-J
---
I I
,
I I
,
, I L----
I ,
, I
I 4930 ,
, I
I ,
, I
, ,
, I
4933 I ,
, I N
1 , M
, I ()
I , ..q-
, I
I ,
4928 , I
I ,
, I
I ,
, I
I ,
I-- ' 01
(/)1 >, -
, ~I
II (D'
1--' I
ill! ~'
4924 I -.J!
, <II
4921 I 0,
, I
I , N
, 4918 I N
I ()
, I ..q-
I ,
, I
I I .. I I I , , I I
, P(OfO~d VU;ZAu FDL ~ I
,
, ~1[lilJ iN ~is hoJ'), CONJLJ It. I
I ,
, I
I e--
,
38345 , 4917 I
I ,
, I
38411 I ,
, I CD
I , ..---<
, I ()
I , ..q-
, I
~)c'I~t\N~ fl~~ Hde.. I ,
, I
I , -
~ , I
I ,
, I
I
_~ i A AV I
,
-------,------------------------------------ ----------~---------------,--------- -----------------,-----,-----,---------------------1-,---,--
,
, I
I
P(Opme.J ~e..c;tQAJ C}) t.C;" ~DPf.+- (2.) U.5 "f{J)pt: .W/F'o~ ~r.-I '\ ; (' , '\ ; /'
(?l.\ \\~(ecJ'IU."'\CA..\ '6D(v-t-~A~D TR!~C\{ 8{5 ~:Jr I I i r
~
SEE SHEET 2
REV...
RtV.,,\\ >
REv."!21
REV,#13 )
REV."( ~ I
REv,"ISI
REV,"! 5 >
REVISIONS
DA TE
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HDPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
MAINT!\IN 12' MINIMUM HORIZONTAL
SEPAR,UION AND 12' M[N[MUM VERTlCAL
SEPARATION BETWEEN UTILITIES,
LOCATlON OF EXISTING UTILlTES ARE
APPROxIMATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
DRIVEWAYS, TREES & CULVERTS MAY BE
MISSILE BORES, ROADS W[LL BE
DIRECTIONAL BORES.
~
verlZSlD
FLORIDA. INC.
1010': lFFAelAH TITLE: FTTP FEEDER PERMIT
WIRE CENTER If: 3623 DIVISION: TAMPA
FIBER HUB [0: H CITY: ZEPHYRH1LL5
MAP SCf'll E: 1'=4~' COUNTY: PASCO
DRAWN BY:JA 5TATE:FLORIDA
DATE: 10/20/06 APPROVED BY:
FEEDER 1010": TWP, RNG: SEC: SHEET:
285 21E 14,151 OF 10
ALL BORES WILL BEGIN AND END
AT A MrN OF 4' FT. FROM EO?
ROW WILL BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION AND COMPACTED PER
CITY OF ZEPHRYHILL5 UAG.
VERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SHES FDR PUBLIC AWARENESS.
J
~.~
...,
nTER
SEwER
ELECTRIC AERIAL
CABLE TV
TELEPHONE AtR I A
STOOM DRAI~
SEE SHEET
I ~.
I
I I
,
, I
I ,
I I
,
, I
I ,
, I
I I
4900 4851 5~ I
,
, ~ I
.\ lS-
- ~s -~ ,
I I I I
,
15 2p~ ~lS- I
,
, I
I ,
, I
I ,
, I
'{~ ,
, I
I ,
, I
I, I~ I ,
I' I
Pro postel \b i Zi)~ (1\ L ~" J+OP~ I ,
, I
I ,
(c.1l.2.5" ~hPt. W(FoC , I
,/ f-I 38430 0,
B~ J)\I(. Bc>~C:.H\~rJt> TR..!~Cl{ (j) I. ..1 >1
8\5 ' , , ....J'
I 1'-2'1 m!
4837 f-' (c) ....J!
wi
, ....JI
, , ~ <I,
-.:!: , lJl
v ~ I ,
4844 ., I
"Z I ,
UJ , I
. ~ I I
0 t- , I
r-J I ,
T a , I
"2 I ,
<J: , I
z I ,
, I
I , t:::::=:
, I
I
, I
I ,
, I
I ,
, I
I ,
, I
I ,
, I
4829 I ,
, I
I ,
, I
38345 I
; i
SEE SHEET 3
REV."
REv.'" 1)
REV,tJ'12 )
REV.#I)>
REv."\~1
REV,'" S)
REv."161
REV J S I ONS
OA TE
UT I LI TIES O~ PLANt
CAS
I/o. T[R
SE IER
ELECTRIC
CABlE TV
~-.<
...s
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
MA!NTAiN 12' MINIMUM HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPARATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. ALL UTlLlTlES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
ORIvE'o'AYS, TREES & CUlvERTS MAY BE
MISSILE BORES. ROADS WILL BE
DIRECTIONAL BORES.
ALL BORES WILL BEGIN AND END
AT A MIN OF 4' FT. FROi'-1 EOP.
ROW WILL BE RESTORED AS
GaDa OR BETTER THAN ORIGINAL
CONomON AND COMPACTED PER
CITY OF ZEPHRYHILLS UAG.
vERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
~
verllSlD
FLOR IDA. INC.
IVO': 7FFA0AH TITLE: FTTP FEEDER PERMIT
WIRE CENTER -:3623
-'--
FIBER HUB [0: H
MAP SCALEl }'=40'
DRAWN BY:JA
DATE: 1012~/06
FEEDER WOo: TWP:
265
STOflIl DRAI~ N
SEE SHEET 2-
,
I I
, ,
4829 I I
,
I I
, ,
I , 38430 I
~D ,
38345 , I
2S 5 l--> ,
4821 I I
, t- z9' -) ,
I~~ l"- /5 -l I
, ,
I I
, , -
~ T l- I I
, ,
I I
J'v., \. ,
, I
I
T I; I:> ' B AV '
N -J:: ~ ~__.J____ - ----------------------------------------------------------------,------~---------
~--------------------------------------~ -0,---; ~ , I ,
, I
I / ,
, I
Vi C1 I ,
l' .l " I I ~
,
f-i 0 I
,
(f), > I
I ---1 ,
I, m I
~ f-I ,
U)' , ---1 I
~: '-
---1 ,
.,~~ .,. - ~ I
<I
C) ,
;... / 4802 I
38352 4803 !g
, , . I I I I I
I ( ,
p(OpoS({~ ~elILM D'J IS"~ , I
I ,
, I
1:- (2\ I. 2.5 v H b ~~ WI foe B. '{ I ,
I I
j)(R. BDRE t- HA/-lb iRE/J C. H vy ,
, I
~(S' I ,
, I
I ,
, I
I ,
'% , I
-t.n ca <J I ,
4753 , I
r--;l'2 I ,
_q:UJ , I
~Ol I ,
~ , 4749 I
4754 I 4748 ,
, I
~b I ,
, I
I ,
, I
4747 I ,
, I
I
; i
-
SEE SHEET Y
REV."
REV.1t11 )
REY.ttf2)
REV."(l>
REV,"(~ }
REV.#IS)
REV."! 6}
REVISICJ-IS
DAlE UTILITIES O~ PLA~I J
CAS
HTLR ~-.<
SEILR
ELECTRIC ALR I AL
CAlle E TV AE.R I A
TELLPHC>IE ALR 1 A ..,s
STQP,II DRAIN tJ
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
MAINTAIN 12' MiNIMUM HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPARA1iON BETWEEN U1iLITIES.
LOCATION OF EXISTING UTILITES ARE
APPROXIMATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
DRIYEWA~S. TREES & CULVERTS MAY BE
MISSILE BORES. ROADS WILL BE
DIRECT rONAL BORES.
All BORES WIll BEGIN AND END
AT A HIN OF 4' FT. FROM EOP.
ROW WILL BE RESTORED AS
GOOD OR BETTER THAN OR!GINAL
CONDITION AND COMPACTED PER
CITY OF ZEPHRYHILLS UAG.
YERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
~
verIzRD
FLORIDA. INC.
\..r)
I-
W
W
I
(j)
REV.1t
REV.ltI1 )
REV."12 )
REV.,,1])
REV,"I~)
REV.#"\ S)
REV,"16 )
4754
4747
I-
_ l1.t
o CJ!
IT) JJ~
4741
,
I
,
I
,
I
,
S!o'
" .I~ ..'~
,~., > -,.
1 I, I,
IS f--2>o~HS-
I
,
I
~
z:
J D V
<:l '2 '2
OJ~ UJ
~
~~
t--
,
38349
"
1)(ojXJs~d Vaito;) [I) L ~ lId--,
(a) 1.1..S"kbPf: W/fc,C. BY D(R.'
-
BoRE.,J. HAND TRE'NC.:~ ;;. ~
8\5' ~
3.0 l C
HA~D
TR.E~C~
2309'
~
a v
-0 '2 '2
r'4~"':
~~
ti'
c~
[\
SEE SHEET 3
4748
I
I~
,.
4742
38427
4749
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
.
I
,
I
,
I
,
o!
>1
~,
ml
,
~I
~i
([,
01
,
I
,
'-----
, ,,'
I- l.U'
t"'
,
I
,
I
I- '
U)I
,
:rl
1-:
I \OofzJ 1 W:
1~' ~S' 2 ~ ' ~ !
~ ~_________~_____ _~'_>o~_~____________________~______l:____
(j) 1\ *-+-, I;
'L~l E;<.;shN3 M~~ Hole :
,
1
,
I
.
I
,
I
,
I
.
I
,
I
,
I
,
I
,
I
,
I
,
I
;
C AV
_____________________________,_,_______________________,_______________,J_________
I
/
1'7
38408
38348
4713
4710
REV IS I DNS
DATE
J
~.<
..s
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HOPE WITH F1BER OPTIC
CABLE BY TRENCHING DR BOR1NG
UTER
SEILR
ELECTRIC ~ERI~
CAflt.E TV ~ER 1 ~
TELEPHONE ~ER I~
STOfUi DRAIN N
MAINTAIN 12' MINIMUM HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPARATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
DRIVEWAYS. TREES ~ CULVERTS MAY BE
MISSILE BORES. ROADS WILL BE
D1RECTIoNAL BORES.
4711
AI.L BORES WILL BEGIN AND END
AT A MIN OF 4' FT. FROM ED?
ROW WILL BE RESTORED AS \ ~
GOOD DR BETTER THAN ORIGINAL ~
CONDITION AND COMPACTED PER rl
CITY OF ZEPHRYHILLS UAG. ve 'ZSlIJ
VERIZoN FTTP PROJECT SIGNS TO FLORIDA. INC.
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
,
I
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
I
,
I
,
REV."
REV...t 1)
REV.#t2)
REV...13I
REv...t ~ I
RE'i...\~ )
REV. ..16)
I !
! 474g!
! !
! !
I I
,
! !
! !
! 4802 !
I !
, I
I ,
, I
I ,
4p' I
'I I r{orn~ej ~e{il.U~ [I) I.Sfl .r tiol
r2.r> "',' l~ r- ,
~IO/-li'-~o'-H-IO'-i (1.)I,?s"HDPE WIF6C. BY !E-~' ~. ~~
f-I, .DIR. BoR({ ~Af\m tRe.~tH ~JO~~~O~'-I/)"-i
2. 300. t r-
(j) I ~I 341' K~rJb if?e~C H (j)!
" I .
2 , I~~.
:J ; l-{o I~
~ ::,' I I I I _:
r--; - I 1[\ , $ , 2. 5 I T
, ~ iSo~e
! SeR.E. C A V Z . 'I' I , ,
~--------------------------------'------~l-'---'-----'-'-'-i~'-'-'---'-'-'--------~Jr---~-----------------------------~'!---'------------------
I , I
, rll ~" "\ '
I 15 2~ I
I -1- ~ i
i I
i /7 I i
i !
i 38324 !
i 38330!
i !
i !
i I
, i
I ,
i !
i 4720 !
i 4713 I
i i
\..Q
I---
W
W
I
(j)
W
W
(j)
DATE UTILITIES ON PLAN. ~.<
CAS N
.. TER
SEwER
ELECTR I C
CABLE TV
TELEPHONE A!:R I A ..s
STORloIORAIN
474g
~18.' HAr\JD
38250
38232
4713
REVISIONS
3834g
r~ENc.fi
.::I-
I---
W
W
I
(f)
W
W
(f)
-.!Y
I
&
38348
4710
APPLlCATlON TO CITY OF ZEPHYRH1LLS
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
MAINTAIN 12' MINIMUH HORIZONTAL
SEPARATION AND 12' MINIMUM VERllCAL
SEPARATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. All UTlllTlES TO BE
LOCATED IN FIELD PRIOR TO CGNSTRUCTION.
DRIVEWAYS. TREES &. CULVERTS MAY BE
MISSILE BORES. ROADS WILL BE
DIRECTJQNAL BORES.
ALL BORES WILL BEGIN AND END
AT A M[N OF 4'FT.FROM EOP.
ROW WIll BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION AND COMPACTED PER
CITY OF ZEPHRYHILLS UAG.
VERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
~
verlZSJD
FLORIDA. INC.
REV."
REV."11 I
REV...t2 )
REV.#1,) ]
REV ,"1 ~ I
RE'I,"~ 5>)
REV.",6 )
L'
I-
W
W
I
())
W
W
())
I
I ~S HAtJD T RE~CK
LAKE
ZEPHYR
f(OPD5eJ VUIWN CI) I. 5 II +-
(2. \ I. 205 '('{.DPf: W{(o<'.. B I{ ..D ll<. i:lo R E ~
HANb TR. ih~C. H
2J04 '
I I
- - - - - - - - - - - - - -, - - -j-r - - - - - - ,l,J). -, ~- - -
C AV
----_.j---------------------------
I
,
I
J1o'
4720
4717
471'2
4711
REVISIONS
DATE
UTILITIES ON PLAN.
CAS
UTt~
S(wt~
ElECn lC ~E~ I ~L
C~BlE TV ~.~I~
TEL EP~ONE ~.R 'A
STORl/ DRAIN
H' 35'
J
~.<
..s
w
I
,
I
,
I
,
I
f-I
(f)i
,
a::j
w'
f-I
CC'
<II
I'
u!
I
,
I
,
I
,
4722
4716
4712
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HOPE WITH FIBER OPTlC
CABLE BY TRENCHING OR BORING
fli
LL..\Ul!..rt
11B' ({AN~ TRtNCi{
c:.
I ry I
4614
4614
MAINTAiN 12' MINIMUM HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPA.'~ATJON BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
DRIVEIo'AYS. TREES 8. CULVERTS MAY BE
MISSILE BORES. ROADS WILL BE
DIRECT rONAL BORES.
ALL BORES WILL BEGIN AND END
AT A MIN OF 4' FT. FROM EOP.
ROW' WILL BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION AND COMPACTED PER
CITY OF ZEPHRYHILLS UAG.
VERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC A',o/ARENESS.
~
verlZSlD
FLORIDA. INC.
38240
PI ewe., J)(jt~:
Se2- {~c!55 >ee-t;"'~ Fc;r
PI C\ C. e...Me ",J .
~l&' HAND 1R.t:/IJ~ ~
l-0
I-
W
W
:::c
())
w
w
())
Vl
38232
3623-7FFI'CAH
R/IJ
.
CAVE
R/IJ
Road R/IJ
50'
15'
17'
25'
10'
CAVE
C/l
10'
25'
IS'
,,' RC P
301
3D'
PLAN VIEW'
CULVERT CROSSING
PROFILE
CUL VERT
Graole
I.' COVER
~' R.Cf
~o'
Ml\E.
25'
CUL VERT
r N
Edge of P~veMent
CAVE
E ge of Po.veMent
Proposed Verlzonr.I1/2'J- (2)(,2.5"
HDPE ulF6C. B'1 D\~. BoR.f!
~e.e., She.e.t (; of 10
Proposed Verlson 1 112'
HDPE w/FOC
<:;)
-
u..
0
""
'-.0
e> ~ ~
WZ
0- ::c ~
:5~ II)
-l o..Z
lL. W \1J
~ 00::: w
~ 1-1- l'.) z
0 :::E
!l. i'2 ~>- z -;
- 2 9 _!D W ~
~ u.. ::z:: (.)
~W z t:i
~ 5:..J ~ II) (5
I-~ Cl..!D
w<:
U Ii) NO
W
J l..L.0 ~
0 0- ~
I-
~ ~~ N ::i
!l. -;
00::: ~ 0.: ~
!l. I ~ z
E OW ~,
It z ~
~ I-~ " :: (;j
l.L. I 12 ~ 0
I z I')
z OIe> C'j
~ <0
0 -f-Z I') ~
N n. ~~O::: V)
~ w o 0
N &: ~
W ..Jwro w ::r- N
> Z 0..0... 0 '-- W
0..00::: Cl: a-
0 <:IO 0 z ~
Vi 0
~ ~ [d ~
~ ~
0 ~
II) ~ r;:
....
,
: \
I '
, \
I \
I '
, \
I '
, \
I '
\
I 'r
\D
f-I '1'
~' \~
! \ tf>
wI ,~
~ i PrQPo~J Veil20N (,] I. ~ II -l- \~
f- ! (2\ t1bPE. WfFe:.c. BY .DIR. ne:.gE~ \g
8 ! t~ArJ\) T RE NC. H \
4:-1~ ~ 2.30'1 I \'{
I ~~ \/
(-r-jC,' '0.-,
12.5' HANb TRe(\)c.~
1\,
~ '"l{" ~~
,I r I I ~ I T I ,
~-1 I I I l I)' '_' 1\ ')OO~,r: \ I
'le~R ~ I BoU ~o~e "-- J 'tS "-
; I 'I 2.~' C A V '.
, ' , I ~
--- --- -- -- -r..J- - -- - - - -- - - -, - --- - -- - - --- - - - - - - - _lr-_1\-'-O- .10_ - c-- --, --- - - - - -- -T - - ---- - - ---- --- - ,\- - --- - -, - - - - - -- -- - - - - - - - -, -' - - - - - -- - - - - -- :-- -- - - ----
i ~, i !
i ~ f 3'1' Z S' 3. S i I
....,
ro
REV,#
REv.#l1 >
REv.#12 )
REV.lIt13 )
REv."(~ )
REV,"l S)
REV."! 6)
5"0 I
H-ANCl
TRc~C.t-\
f-
W
W
I
(f)
W
W
(f)
~
~...-
4723
REVISICNS
:
I
,
(LI
0'
I
2:'
o!
~I
(j)'
01
..-J'
CD!
w!
l'J1
z'
<Ii
(L'
O!
I
,
I
;
l.o I
L{" I
~\)
r~ENc ct
2.01
IDa'
~f\i\J~ 1"Re.~t~
4722
4715
OATE
WATER
SEwER
ELECTRIC ~ERI~L
CI<BLE TV
TEl EPHCNE ~ER I ~
STORII DR~I~ I\l
~.<
oS
rc'
:
17 '
4723
i
,
I
,
I
,
I
,
0:1
0,
j
l1.' 0
>'
I--< 0
-..-JI
0'
J
I
,
I
o
I
o
4716
4722
4717
APPLICATION TO CITY OF ZEPHYRHILLS
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
MAHHAIN 12' MINIMUH HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEP4RATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRIOR TO CONSTRUCTION.
DR[VEWAYS. TREES & CULVERTS MAY BE
MISSILE BORES, ROADS WILL BE
DIRECTIONAL BORES.
(Uw
IB1't~"tJO TRENCH
ALL BORES WILL BEGIN AND END
AT A MIN OF 4' FT. FROM EOP.
ROW WILL BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION AND COMPACTED PER
CITY OF ZEPHRYH!LLS UAG.
VERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
4721
4713
~
verlZSlD
FLORIDA. INC.
'-..9
L10'
f-
W
W
I
(f)
W
W
(f)
, BoRt:
I
!
I
,
I
o
~!
(j)1
o
wi
U'
0:1
DO
LL!
([!
..-JI
,
I
,
I
o
,
o
I
,
4720
4712
WO": 7FFA0AH TITLE: FTTP FEEDER PERMIT
WIRE CENTER ": 3623 DiVISION: TAMPA
FIBER HUB 10: H CITY: lEPHYRHILLS
MAP SCALE: 1'=40' COUNTY: PASCO
DRAWN BY:JA STATE: FLORIDA
DATE: 10/20/06 APPROVED BY:
FEEDER WO"1 HIP: RNG: SEe: 7SHEET:
265 21E 14,15 OF 10
! ! l~
, 4745 I ~
i ! l:
~I ! ~
0; I I f'J
, , .;1-- ~
2:1 I ~-U
---1' , j r
<J: / 4739 f-- / q h2.,-_.
~i ~i ~ I~
, , <:)
---1/ ZI u~. ~
<J:, 0' <.-t r z
>-1 01 .j f-<
o ' 0:: ' Q- ---1
0:: I 0 I ---1
, LJi ) ~ 0
! ' IIcopCSed' ~t'/12.0\\ (I)l.~'ti- a:
/ 4733 ! C;?) l.?S"HbPC: W(r-oc.. B'( Q/\v ! t!1,J
J,', ~I.... J tJ~'1 JJ R B Ii ' )lp/_4 'io'
'l , Peu.AiHe bu. fC\.SlO ~uJ~ ' ;-1 I. ~Rf. '" A~D iR~~~1< 15'<1' l{A~D I' >
~~ J C~ '-Z-O-l 230q' TRf~~\\ t-Ir~ 1-lArJ~
-r , - 161' H(hJ~ rR..E~c. \-t r I ' f 1'MNc..li 2.0 \
I- I ylO ~i()1 \ tG\.. I ~p I
~ ___________.~_nr ". I T-.-.-:~._-.-._.-.-.-.-.~t-'-'I~OI~f~J~T.-C-AV-.-.:._._._._._._. ' ._.~r._,:_._.__.~G.R~.~._._._._._.
W I t',f- ,.,' I
W ; I IT' 2'st )~'l i
(J) '1'(;' _.:& I I '
! '--.--- I-- !-'-
! !
I /7 f I
, ,
I I
~' 4721~,
o! o!
L! 2:!
<i! 4714 <i!
~I ~I
, ,
---11 z!
<Ii LI
>-, 4715:J'
DI f--I
~, :J'
! <J: !
! !
I I
; 4708 4709 ;
RH.If
REV. If" ,
REV."'2'
R'EV._t;) )
REV.If(~ ,
REV."1S}
REv.If(61
4745
f--
~
4739
~
lJ'"
2.MI HRrJD TRENCH
4720
4721
4722
4714
4715
4716
4708
4709
REV I S I ONS
DA TE
MAINTAIN 12' MINIMUM HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPARATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTILlTES ARE
APPROXIMATE. ALL UTfLlTlES TO BE
LOCATED IN FlELO PRlOR TO CONSTRUCTION.
OR[VE~AYS. TREES & CULvERTS MAY BE
MISSILE BORES. ROADS WILL BE
DIRECTIONAL BORES.
~
verllS2D
FLORIOA..INC.
ALL BORES WILL BEGIN AND END
AT A MIN OF 4' FT. FROM EOP.
ROW WILL BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION AND COMPACTED PER
CIT'( OF ZEPHRYHILLS UAG.
VERIZON FTTP PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PU8UC AWARENESS.
U11LIT1ES ON PLAN'
CAS
rATER
$r.ER
ELEC1R1C
CABLE TV
TELEPHONE AER I A
STORlofDRAIN ,J
J
~.<
..,
APPLICATION TO CITY OF ZEPHYRHILL5
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
So \
1.{A~b
'T Re- ~C.l.j
l:-
f-
W
W
::r
(f)
w
w
(f)
~
4723
1.'0': 7FFA0AH TITLE: FTTP FEEDER PERMIT
WIRE CENTER ": 3623 DIVISION: TAMPA
FIBER HUB 10: H CITY: ZEPHYRHILLs
MAP SCALE: 1'=41'.1' COUNTY: PASCO
DRAWN BY:JA STATE: FLORIDA
DATE: 10/20/1'.16 APPROVED BY:
FEEDER 1.'0', TWPI RNG: SEer SHEET:
265 2IE 14.15 ~ OF 10
REV...
REV...I1>
REV.#f2l
REV...I) )
REV ...1 ~ I
REV.'-l 5 ~
REV. "16)
o
~I
-t."i?
~~
c..O
<:;.I
NI6'
<-J....F
E) "(:
~y
~
I
REVISIONS
4720
4714
473g
4731
2.1.{~' HANb TRe/IJCH
4721
4715
CA TE
.. TE~
>E-rt~
ELECTR IC
CABLE TV AER I'
TElEPHQt,f; AER I'
STQRW CRAIN
,
J
~.~
...,
I
,
I
I
,
I
,
I
,
>-'
<Ii
3,
j
0::'
wi
(D'
L:!
~I
1--,
I
qo~
{;-~()~
I
Ld:/
I
P(0Po~J \\e.ClLOl\J ll/ \. <; I/~,
(1.)\'Z.S"UbPE. w/foc.. B'1'..D\({..Bc~E+
HAlUD TRft-.lC.'K
pr R M l1t E D B,( P A SC 6 c.. 0 IJ r-.rr Y
7'
I ry f
4720
4714
APPLICATION TO CITY OF lEPHYRHILLS
TO PLACE HOPE WITH FIBER OPTIC
CABLE BY TRENCHING OR BORING
I
4743
4737
4731
Yl
300' l{A~~ TRE~C.l{
MAINTAIN 12' H[N[MUH HORIZONTAL
SEPARATION AND 12' MINIMUM VERTICAL
SEPARATION BETWEEN UTILITIES.
LOCATION OF EXISTING UTlLlTES ARE
APPROX1MATE. ALL UTILITIES TO BE
LOCATED IN FIELD PRlDR TO CONSTRUCTION.
DRIVE\,IAYS. TREES g. CULVERTS MAY BE
MISSILE BORES, ROADS WILL BE
DIRECTIONAL BORES.
4721
4715
470g
ALL BORES WILL BEGIN AND END
AT A MIN OF 4'FT.FROH EOP.
RO~ WILL BE RESTORED AS
GOOD OR BETTER THAN ORIGINAL
CONDITION ANO COMPACTED PER
CITY OF ZEPHYRH1LLS UAG.
VERIZON FTTP PROJECT SlONS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
,
....
I
,
I
,
/
,
I
,
1--1
(f)'
,
,
----.JI
<I,
0:1
D'
U!
,
,
I
,
I
,
I
~JI
~~-7
uhf
^ ,
--- T
~
I
,
I
,
I
,
I
,
0:1
0,
J
<I'
~I
0:'
wi
1--'
(f)!
~I
3,
I
,
I
,
,
,
I
;
~
tlenZRD
FLORIDA.INC.
4744
4738
4732
-....
DO
-.
l-
W
W
::r::
(j)
w
w
(j)
/
,
I
,
I
,
I
,
I--!
(f)I
,
----.JI
<I'
crl
01
u'
I
,
I
,
I
,
I
,
I
I
4720
4714
4708
Flbcr 01)~;c.. Lu.o\e.. ~l"'c.eJ
itJ El'(>1{~ CaNJl.A.lt
7
I<- -< 0
PROf. ~ Z
3/)(6 'm\
..1''''
'l W
; ~
lr1
MC\~ UtJ!t/ ~.
,
I: ~ I ~ t i '.) ~ tclZ,O.lJ
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
{O'~IO'~
,
\
37737
, ZM--7
tbl'-H-l ~ -W~DJlf:
, , ~-Z7'
4p
, I~'
Pco9osJ VUIl.O,r\J [() /. ~ (/ ~
(?) l. 2.5"1-\ i) Pc wi FoC. .a Y b \foe B 0 R ~ ~
HANtJ l'RErJc' \-\
aqo'
.lJt~1: '
-+- '
Vii
~ i__ __, f-----------
::)'
01
U'
I
,
I
,
I
,
I
,
,
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
,
,
I
,
I
i
,
;-
~ ~~ \I
2.3S' ~AND TRr.:~~\{
401
I Bt.R.!; r
-
t
()
I---
W
W
::r:
(f)
w
w
(f)
-
v
hi
I- ' 2~';o. C AV
-.->~-2Q--f--~~,~-------------------.-----,---.-;---------.-
~~' ~'~' !
~t'" ...... "'\ I
It ~
'1\
t
t
/
"G
I
17 I
I
,
I
,
,
,
I
,
I
0::'
o!
=r!
UI
0:'
<II
-1'
I
,
I
,
I
,
I
,
I
i
(
4721
4720
4644
4715
4714
REV... REV I S I ONS OPE ~.< MAINTAIN 12' MINIMUM HORIZONTAL ALL BORES WILL BEGIN AND END
REv.'" 1) SEPARA1l0N AND 12' MiNiMUM VERTICAL AT A MIN OF 4' FT. FROM EOP.
SEPARATION BETW'EEN UTILlTlES. ~
REV,,,,: ) WATER ROW WILL BE RESTORED AS
APPLlCATlON TO CITY OF ZEPHYRHILLS
REV.#t 3) SEWER TO PLACE HOPE WITH FIBER OPTIC LOCATION OF EXISTING UTILlTES ARE GOOD OR BETTER THAN ORIGINAL
APPROX[MA TE. ALL UTlLl TIES TO BE CONOIT ION AND COMPACTED PER
REv...t. ) nECTR Ie CABLE BY TRENCHING OR BORING LOCATED IN FIELD PRIOR TO 2CNSTRUCTlON. CITY OF lEPHYRHILlS UAG. verlZlilD
REv...tS) CABLE rv
REV...16 ) TEL EPHONE AER I ~ DRIYEW'A'iS. TREES S. CULVERTS MAY BE VER/ZON FTTP PROJECT SIGNS TO FLORIDA. INC.
"" MISSILE BORES. ROADS WILL BE BE POSTED AT CONSTRUCTION
sroo.. ORAIN DIRECTIONAL BORES. SITES FOR PUBLIC AWARENESS.
6TH ST
R/W
50'
R/W
25'
Q
25'
IS'
EOP
EOP
201
15'
10'
10'
E'l(,sfi~3 MCA.N Hole.
o
ROPOSED VERIZON ( 1 ) 1.5".J. (z.) \. as I' l-\.b P €
W/FOC BY DIRECTIONAL BORE'" Hl\tJD rA€,..)c ~
..
141
13'
-@
G)
14'
8'
7'
18'
Q
TYPICAL PROFILE
~-th..-Si lookIng North froM CAVE to_.lL....
.A~____ _n_ .__.._._, . .-_.- ----. - .,
SEE PLAN VIEW 1-4 of 10
MAINTAIN 24" MIN. HORIZONTAL ALL BORES WILL BEGIN AND END UTIUTIES
SEPARATION AND 18" MIN. VERTICAL AT A MIN OF 6 FT. FROM E/P.
SEPARATION BElWEEN UTIUTIES. CAS N
WATER N
LOCATION OF EXISTING UTILITIES R/W WILL BE RESTORED AS GOOD SEWER N
APPROXIMATE. ALL UTILITIES TO OR BETTER THAN ORIGINAL
BE LOCATED IN FlELD PRIOR TO CONDmON & COMPACTED ELEe krl,,/
CONSTRUCTION. PER City of Zephyrhills UAG.
CATV '(
DRNE'NAYS, TREES & CULVERTS MAY VERtZON mp PROJECT SIGNS TO TELE '(
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION OTriER N
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS.
r- .--.,.- .-- .. ---" ----I
I"_u ~~. ~"-~~. :
L-__ _.~_. _'_~ .~ __ ._.-..:
VERIZON mp PROJECT, TAMPA FL
APPLICATION TO CllY OF ZEPHYRHILLS TO
PLACE HDPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
8800 ADAMO DR.
(FLTP) 0652 WORK ORDER: 3623-7FfAOAH
TAMPA. FL 33619
(813) 740-1231 SECTION: 14. 15 TOWNSHiP:
ENGINEERED BY: J. Morris
ISSUE DATE: 9/26/06
J. Morris
RANGE: 21 E SCALE: NONE
SHEET 1 OF II
B AVE
R/W R/W
40'
25' ct 15'
-14
EOP EOP
151 20'
5'
101 10'
t
1 "'::~:m"'1)'"tV{"\9';X'~/."!"'~.l~~lloj:),,,,~-"~_I'~..c..."~.a:"' ~
p.z;S1~~~~l:~~~:J:' .;'~'~.Tlt4i:~i~~1~.~~~.~~~:~;~j~!f;!!;J;1;~~~~~J~~~~~<~~ k\~)
36' ~ __.. _ .' .. .z ". _" ..."" . J" .
I
MIN -ROPOSED VERIZON ( 1 ) 1.5" HDPE
W /FOC BY DIRECTIONAL BORE
\1 I
Q
I
I
TYPICAL PROFILE 1 Bore 40'
B AVE looklng__\.IesiJror'L_~,th S_L to~_
th St.
--_..._-~,_....-~-- - ._~._--
-----------~. . ----~.~-"--------
-------- - --~ - ----.----------- --------------------.
.-.----'..-- ------ .~. ...---..---. ---- ~ ---- -,-
SEE PLAN VIEW 3 of 10
MAJNTAIN 24" MIN. HORIZONTAL ALL BORES WILL BEGIN AND END ,-'-----------, VERIZON mp PROJECT, TAMPA FL
SEPARA110N AND , B" MIN. VERTICAL AT A MIN OF 6 FT. FROM E/P. UTlUTIES
SEPARATION BElWEEN UTl UTI ES. !u;.".....""'l':"4...;,~..~.-....,.:E~~1
G.4S N : I
WATER N i I APPLICATION TO CllY OF ZEPHYRHILLS TO
LOCATION OF EXISTING UTI LITI ES R/W WILL BE RESTORED AS GOOD '-----------------.-- -----'
APPROXIMATE. ALL UTIUTIES TO OR BETTER lliAN ORIGINAL SEWER N PLACE HOPE WITH FIBER OPTIC CABLE BY
BE LOCATED IN FIELD PRIOR TO CONDmON &: COMPACTED me A..-lnol TRENCHING OR BORING
CONSTRUCTION. PER City of Zephyrhills UAG. 8800 ADAMO DR.
CAW Mool (FlT?) 0652 WORK ORDER: 3623-7FfAOAH
DRIVEWAYS, TREES &: CULVERTS MAY I YERIZON mp PROJECT SIGNS TO I TAMPA, FL 336'9
mE Mriol (813) 740-'231 SECTION: '4, 15 /TOWNSHIP: lRANGE: I SCALE: NONE
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION 26 S 2' E
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS. Oll-iER N I DRAWN BY:
ENGINEERED BY: J. Morris J. Morris
ISSUE DATE: 9/26/06 SHEET 2 OF II
CAVE
R/W
50'
R/W
15'
EOP
Q
~~
25'
25'
EOP
20'
15'
10'
10'
13'
,
PROPOSED VERIZON ( 1 ) 1.5" HDP
W/FOC BY DIRECTIONAL BORE
36'
MIN
fj)
T
7'
Q
I
I
17'
8'
TYPICAL PROFILE
~_AYL-1QQJslog__Y! e s..:t.fr Ot"l_.Q.t ~,~L t o_-.E UNK
_$T,_'___'_______ ______
SEE PLAN VIEW 4-6 of 10
MAlNTAJN 24" MIN. HORIZONTAL ALL BORES WILL BEGIN AND END UTIUTlES
SEPARATION AND 18" MIN. VERTICAL AT A MIN OF 6 FT. FROM E/p.
SEPARATION BElWEEN UllUTIES. G.!S N
WATER N
LOCATION OF EXISTING UTILlTlES R/W WILL BE RESTORED AS GOOD SE'NER N
APPROXIMATE. ALL UTl UTI ES TO OR BETTER lliAN ORIGINAL
BE LOCATED IN FJELD PRIOR TO CCNDIT10~~ &. COMPACTED [LEe Mnnl
CONSTRUCTION. PER City of Zephyrhills UAG.
CATV Aenal
DRIVEWAYS, TREES &. CULVERTS MAY VERIZON mp PROJECT SIGNS TO TUE y
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION OTHER N
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS.
! -- - --.-- ----~l
I.~.~--*~~'-I
L___---1
VERIZON mp PROJECT, TAMPA FL
APPLICATION TO CllY OF ZEPHYRHILLS TO
PLACE HOPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
8800 ADAMO DR.
(FLTP) 0652 WORK ORDER: 3623-7FFAOAH
TAMPA, FL 33619
(813) 740-1231 SECTION: 14. 15 TOWNSHIP:
ENGINEERED BY: J. Morris
ISSUE DATE: 9/26/06
RANGE: 21 E SCALE: NONE
J. Morris
SHEET 3 OF II
5 TH ST
R/W R/W
40'
201 Q 20'
14
EOP EOP
la' 20'
10'
10' 10'
d~
I ).rc-~ ",,,,,:W"'~~'"9.i~-i'/'..f;".rl!;'2y.'.~''l'-I'''''''''''.''''''' ~
'Z~i~,~=";~;tl!i~:' .;..;,?!:~:t(4f:;:~~f:.~?;?-~~~;ii ;)~.;i~!-f~~~'~~~~L~~'~~~~.f~r~~', "J
36' .. .... _ 4' ,- . .,_". .... '!lo .,........
I
MIN 'FROPOSED VERIZON ( 1 ) 1.5" HOPE
W/FOC BY DIRECTIONAL BORE
ct
I
I
TYPICAL PROFILE 1 Bore 401
5TH St lookln,g North frOM C_ AVE to B
AVE.
-- --
- ----_.__.__._~---_.-
----..-.- - ---- ----_. --- ----------------'-----_.- -,.--..----.--.----.--------
_._._---,~--~- ----
SEE PLAN VIEW 5 of 10
MAINTAIN 24- MIN. HORIZONTAL ALL BORES WilL BEGIN AND END I r---'~--~ VERIZON mp PROJECT, TAM PA FL
SEPARATION AND 18- MIN. VERTICAL UT1UTlES
AT A MIN OF 6 FT. FROM E/P. I--'-'-~'----I
SEPARATlON BE1WEEN UTIUTlES. C,AS N
LOCATION OF EXISTING UTILITIES R/W WILL BE RESTORED AS GOOD WATER N L....._____ ______.____________ APPLICATION TO CITY OF ZEPHYRHILLS TO
APPROXIMATE. ALL UTlUTIES TO OR BETTER THAN ORIGINAL SEWER N PLACE HDPE WITH FIBER OPTIC CABLE BY
BE LOCATED IN FIELD PRIOR TO CONDI110N de COMPACTED ELEe Allnn' TRENCHING OR BORING
CONSTRUCTION. PER City of Zephyrhills UAG. 8800 ADAMO DR.
CAW Acrid (FLTP) 0652 WORK ORDER: 3623-7FFAO,t..H
DRIVEWAYS, TREES &: CULVERTS MAY VERIZON mP PROJECT SIGNS TO TAMPA. FL 33619
n:u: Aerial (813) 740-1231 SECTlON: 14, 15 /TOWNSHIP: I RANGE: I SCALE: NONE
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION 26 S 21 E
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS. OTHER N I DRAWN BY:
ENGINEERED BY: J. Morris J. Morris
ISSUE DATE: 9/26/06 SHEET 4 OF II
PlUM Si;
R/W R/W
401
Q. I
201 20'
-1-
EOP EOP
10'
20' 10'
10' 10'
(~
. ~ ~""1'l::;r~~~1"9';\i<I"'f;'-f,r~;.t)''''-~':''''''''''4';.R '" ~
'~0ir~=;'~"J"~~;.7J" .;.,...~~t4f;i~~:.~.!;!'?~~:.i..~ ~""..J~.~{~~~~t~~~~~J~~i~J~t~.}~~I.},...~~""
36' _ ....~.. ...... ". _." .1.... '. J . iI
,
MIN -f'ROPOSED VERIZON ( 1 ) 1.5" HDPE
W/FOC BY DIRECTIONAL BORE
Q.
I
I
TYPICAL PROFILE 1 Bore 40'
PlUM st looking North froM C AVE to B
.A~_ -
,- - ----- - ------~-- -- ---~- - - - - ~---
-----
-_._~----_._- ---- --------.------- --. ._-- --..- -- ~------"--_._----
- .---.
SEE PLAN VIEW 5 of 10
MAINTAIN 24 It MIN. HORIZONTAL ALL BORES WILL BEGIN AND END r-----, VERIZON mp PROJECT, TAMPA FL
SEPARATlON AND 1 Bit MIN. VERTlCAL AT A MIN OF 6 FT. FROM E/P. UTIUTlES 1---.----1
SEPARATlON BETWEEN UTIUTlES. G.4.S N
, I APPLICATION TO CITY OF
LOCATION OF EXISTING UTIUTIES R/W WILL BE RESTORED AS GOOD WAn:R N L_________, _____,_J ZEPHYRHILLS TO
APPROXIMATE. ALL UTlUTIES TO OR BETTER l1-W-I ORIGINAL SEWER N PLACE HDPE WITH FIBER OPTIC CABLE BY
BE LOCATED IN FIELD PRIOR TO CONDfTlON &: COMPACTED [lie ~\lII!';(11 TRENCHING OR BORING
CONSTRUCTION. PER City of Zephyrhilfs UAG. 8800 ADAMO DR.
CAN Aerial (F1.TP) 0552 WORK ORDER: 3623-7ffAOAH
TAMPA, F1. 33619
DRNEWAYS. TREES & CULVERTS MAY YERlZON FTTP PROJECT SIGNS TO TIlE .....riol (813) 740-1231 SECTlON: 14, 15 lTOWNSHIP: I RANGE: I SCALE: NONE
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTlON 26 S 21 E
DIRECTlONAL BORES SITES fOR PUBLIC AWARENESS. OTIlER N T DRAWN BY:
ENGINEERED BY: J. Morris J. Morris
ISSUE DATE: 9/26/06 SHEET 5 OF If
R/W
0-
@-.
MAINTAIN 24" MIN. HORIZONTAL
SEPARATION ~D 18" MIN. VERTICAL
SEPARATION BE1WEEN ununES.
LOCATION OF EXISTING UTILITIES
APPROXIMATE. ALL UTIUTIES TO
BE LOCATED IN FIELD PRIOR TO
CONSTRUCTION.
DRNEWAYS. TREES &: CULVERTS MAY
BE MISSILE BORES, ROADS WILL BE
DIRECTIONAL BORES
35'
25'
EOP
10'
CAVE
60'
Q
~-
20'
25'
EOP
10'
7
24'
I
PROPOSED VERIZON ( 1 ) 1.5" HDP
W/FOC BY DIRECTIONAL BORE
36'
1 Y , MIN
'\
231
Q
I
I
17'
TYPICAL PROFILE
J; j'j'y E._.lQ.Ql:51!Jg_.YL~!:?.i._sr..9_t)_EJlt-J.K.._SL_.iQ. ,CJ:t y
j..IMlt~__________.___________
ALL BORES WILL BEGIN ~D END
AT A MIN OF 6 FT. FROM E/P.
R/W WILL BE RESTORED I>S GOOD
OR BETTER THAN ORIGINAL
CONDmON &: COMPACTED
PER City of Zephyrhills UAG.
VERIZON mp PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBUC AWARENESS.
SEE PLAN VIEW 4-6 of 10
G,iS N
WATER y
SEWER N
E1..EC Mrlol
CAN '(
1U.E Aerial
OniER N
UTlUTI ES
15'
R/W
xj~h'~ \Jelfl.lW !)wHJ
(Y)
8'
VERIZON mp PROJECT, TAMPA FL
!----~----------l
! ,
I ~....~~....-~~ i
I i
I
i
APPLICATION TO CllY OF ZEPHYRHILLS TO
PLACE HOPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
8800 ADAMO DR.
(FLTP) 0652
TAMPA. FL 33619
(813) 740-1231
WORK ORDER: 3623-7FFAOAH
SECTION: 14, 15 TOWNSHIP:
ENGINEERED BY: J. Morris
ISSUE DATE: 9/26/06
RANGE: 21 E
SCALE: NONE
J. Morris
SHEET 6 OF II
Lukes Ide Dr
R/W R/W
3D'
15' Q 151
_14
EOP EOP
71 16'
7'
8' 8'
t
~ ',c"i: ....*~~....;~~"'..f9.;:(<I...<';'.r.1!;.'1.: ',,'.A::S':'<i;T..~ ' (
.;:. ii~:~;.r-:'~i~: 'i:'~~!l.ll~i~~~.~);~~:~~ti:;(:~..::!t:~f~;~~~_~.~~~~'~~~~:}~~~:":~
36' ... _,"~' ",. _,... .r"~...",.. ..,J" ",'
,
MIN ;:'ROPOSED VERIZON ( 1 ) 1.5" HOPE
W/FOC BY DIRECTIONAl BORE
Q
I
I
TYPICAL PROFILE 1 Bore 3D'
_Lo.keslcle Dr lookIng North froM C AVE to
50 ft North on Lo.keslcle Dr,
-'---'---
---- -~_.- -, ~-- -- -..---.- ------
,- _________________ ___ __ u ____________'_ _.___ -.-----.-
--~_._-_. -~_..-----_.. --_..--
SEE PLAN VIEW 7 of 10
MAlNTAJN 24" MIN. HORIZONTAL ALL BORES WILL BEGIN AND END 1-----' VERIZON mp PROJECT, TAM P A FL
SEPARATION AND 18. MIN. VERTICAL ununES
SEPARATION BElWEEN UTlUTIES. AT A MIN OF 6 FT. FROM E/p. ! r'....._IO;,.....,..._:w-.._~.. I
G.lS f.j L_________ _ J
LOCATION OF EXISTING UTIUTIES R/W WILL BE RESTORED AS GOOD WATER N APPLICATION TO CITY OF ZEPHYRHILLS TO
APPROXIMATE. ALL UTlUTIES TO OR BETTER THAN ORIGINAL SEWER N PLACE HDPE WITH FIBER OPTIC CABLE BY
BE LOCATED IN FIELD PRIOR TO CONDmON & COMPACTED El.EC AAnl"ll TRENCHING OR BORING
CONSTRUCTION. PER City of Zephyrhills UAG. 8800 ADAMO DR.
CAN Aerial (FLTP) 0652 WORK ORDER: 3623-7FfAOAH
TAMPA, FL 33619
DRIVEWAYS, TREES & CULVERTS MAY VERIZON mp PROJECT SIGNS TO TELE kriol (813) 740-1231 SECTION: 14, 15 h-OWNSHiP: [RANGE: I SCALE: NONE
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION 26 S 21 E
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS. OTHER f.j I DRAWN BY:
ENGiNEERED BY: J. Morris J. Morris
ISSUE DATE: 9/26/06 SHEET 7 OF /I
Cof+c>-~e. Si;
R!W 301 R!W
15' Q 15'
I
EOP I EOP
r; , I (, I 71
8' .8'
(
. ~ ~'. .' .....,..,..;.oi~J.!;''J.: .......""~-'4i.... ........r.i.":-~.. .~ .', . (
~i~:;ii':J.{~:k~i~~'1';~t~!.~.!;~~~~~~:;,!j~~~f~;t-;.~~~t~~&1~~~~~~~,~;~;,}~~";j
36' I
MIN ~ROPOSED VERIZON ( 1 ) 1.5" HOPE
W!fOC BY DIRECTIONAL BORE
Q
TYPICAL PROFILE 1 Bore 301
_~e St Looking North froM C A VE:_to_,
.5_0_I. North on (ol+(X~~~.!-______________
-- ,-- -------.
-..--.----..-.-- .._-----_.~------_.. _.__._._.~ .- ......-. .-.---------- -. -.--- . ----_.._---
---' ------.------.---- ",-,.- ----. --".~._- ---- --.-- ._--
SEE PLAN VIEW 7 of 10
,..--------- '1 VERIZON mp PROJECT, TAM P A FL
MAINTNN 24" MIN. HORIZONTAL ALL BORES WILL BEGIN AND END UTIUTIES I .
I I
SEPARATION AND 18" MIN. VERTICAL AT A MIN OF 6 FT. FROM E/P. I ~'--'''''''---.'''''''''~-I
SEPARATION BETYv'EEN UTIUTIES. GAS N
WATER N l_________ __,J APPLICATION TO CllY OF ZEPHYRHILLS TO
LOCATION OF EXISTING UTIUTIES R/W Will BE RESTORED AS GOOD SEWER H PLACE HOPE WITH FIBER OPTIC CABLE BY
APPROXIMATE. ALL UTIUTIES TO OR BETTER THAN ORIGINAL TRENCHING OR BORING
BE lOCATED IN FIELD PRIOR TO CONDITION &: COMPACTED ELEC .'.Annl 8800 ADAMO DR.
CONSTRUCTION. PER City of Zephyrhills UAG. (FLTP) 0652 WORK ORDER: 3623-7FfAOAH
CAW Aerial
TAMPA. FL 33819 /TOWNSHIP: I RANGE: I SCALE: NONE
DRIVEWAYS, TREES &: CULVERTS MAY VERIZON FTIP PROJECT SIGNS TO TEtE Aerial (813) 74-0-1231 SECTION: 14, 15 26 S 21 E
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION OTHER N I DRAWN BY:
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS. ENGINEERED BY: J. Morris J. Morris
ISSUE DATE: 9/26/06 SHEET 8 OF II
Rollins St
R/W R/W
30'
151 ct 15'
"I-
EOP EOP
7'
16' 71
81 8'
(~
MAlNTAJN 24- MIN. HORIZONTAL
SEPARATION AND 18- MIN. VERTICAL
SEPARATION BElWEEN UTIUT1ES.
LOCATION OF EXISTING UTILITIES
APPROXIMATE. ALL UTIUTIES TO
BE LOCATED IN FIELD PRIOR TO
CONSTRUCTION.
DRIVEWAYS, TREES & CULVERTS MAY
BE MISSILE BORES, ROADS WILL BE
DIRECTlONAL BORES
36'
MIN
'\ ,,- "R;J~~''',Jt~v,',,~,;~,'' '-.i';'""J~;It: ',,"~iX -, ". ..... .. (
~~~;:t~~~:-'.t:i:'r.;~.rJ;t~f~:i~~!~.!;~:~~{~<.;jj~'~f~r~~~~*i~~:t"ijt.~>=...e-~~t~ ~
,.. .. 4_'" ,.. _ ~ '4 _ . ~.JI:"".....\'i"'J.- '''.l."r. .~-3
1'1
I ,ROPOSED VERIZON ( 1 ) 1.5" HDPE
I W/FOC BY DIRECTIONAL BORE
Q
1 Bore 301
TYPICAL PROFILE
_RolUns St lookIng North froM C AVE to
50 ft North on Rollins St,
ALL BORES WILL BEGIN AND END
AT A MIN OF 6 fT. FROM E/P.
R/W WILL BE RESTORED AS GOOD
OR BETTER THAN ORIGINAl
CONDmON & COMPACTED
PER City of Zephyrhills UAG.
VERIZON mp PROJECT SIGNS TO
BE POSTED AT CONSTRUCTION
SITES FOR PUBLIC AWARENESS.
SEE PLAN VIEW 8 of 10
I
U1lUTIES
1------,
, ,
J i
!"f-i....-........-......:..__.,.!
I_________,____....___J
G.'S N
WATER N
SEWER N
ElEC AMIni
CAN Aeri<J1
8800 ADAMO DR.
(FLTP) 0652
TAMPA, FL 33619
(813) 740-1231
TEl..! Aerial
OTIjER N
VERIZON mp PROJECT, TAMPA FL
APPLICATION TO CI1Y OF ZEPHYRHILLS TO
PLACE HDPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
WORK ORDER: 3623-7FTAOAH
SEC1l0N: 14, 15 lTOWNSHIP:
ENGINEERED BY: J. Morris
ISSUE DATE: 9/26/06
26 S 'fRANGE: 21 E I SCAlE: NONE
I DRAWN BY: J. Morris
SHEET 9 OF II
CAVE
R/W
501
Q
25'
15'
EOP
20'
101
101
25'
EOP
141
.
PROPOSED VERIZON ( 1 ) 1.5- HDP
w/roc BY DIRECTIONAL BORE
I
Q
C
@.
13'
171
TYPICAL PROFILE
_k._~ VE...J.ookln9__W'e!'?...i...frQl~L .Clty__L1l"'llts tQ___
,fJ~J~:t.!Qg_ .t1(tI'lJ:iQ!~~rL c Q~r:':t~_L-_ ___'. ,__._.n
SEE PLAN VIEW 10 of 10
WJNTAlN 24- kilN. HORIZONTAL ALL BORES WILL BEGIN AND END ununES
SEPARATION AND 18- MIN. VERTICAL AT A MIN OF 6 FT. FROM E/P.
SEPARATION BElWEEN ununES. G.4S N
WA~ y
LOCATION OF EXISTING UTIUTIES R/W WILL BE RESTORED AS GOOD SEWER N
APPROXIMATE. ALL UTIUTIES TO OR BETTER 1lWI ORIGINAL
BE LOCATED IN FIELD PRIOR TO CONOrnON & COMPACTED EllC J.A.nnt
CONSTRUCTION. PER City of Zephyrhills UAG.
CAN Y
DRIVEWAYS, TREES & CULVERTS MAY VER1ZON F1TP PROJECT SIGNS TO lU.E y
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION 01HER N
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS.
[---1
} c;-.-........~_......._~__ J
I i
!___ ,__ - ._m_'_... .I
7'
151
36'
MIN
R!W
f)(,J;~~ fbu IJc
@
gt
VERIZON mp PROJECT, TAMPA FL
APPLICATION TO Cll'( OF ZEPHYRHILLS TO
PLACE HDPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
8800 ADAMO DR.
(FLTP) 0652 WORK ORDER: 3623-7FTAOAH
TAMPA, FL 33619
(813) 740-1231 SECTION: 14, 15 TOWNSHIP:
ENGiNEERED BY: J. Morris
ISSUE DATE: 9/26/06
RANGE: 21 E SCALE: NONE
J. Morris
SHEET /0 OF /1
Court ST
10'
EOP
40'
Q
1-
R!W
R!W
20'
20'
EOP
20'
10'
10'
101
PROT'o ~t .3'6' ~\~ -
.
ROPOSED VERIZON ( 1 ) 1.5- HOPE
w!roc BY OIRECTIONAL_
36' '-2 I
-M1N-- tI
l~
2.1
Existing
Verizon
Hun Hole
l1'
>
Q
I
-I
7'
VI
0)-
7'
TYPICAL PROFILE
1 Bore 35'
_Col;lrt St lookIng North froM,LAVE_to-.-S-R
54, ___ __._____'____
MAINTAIN H" Mlt~. HORIZONTAL ALL BORES WILL BEGIN AND END UTIUTIES '-----l
SEPARATION AND 1 B" MIN. VERTICAL AT A MIN OF 6 FT. FROM E/P. I
SEPARATlON BElWEEN ununES. G."S !oj I_.__o"-.~'_~_.
WATIR y L-_._.______-.<_~__
LOCATION OF EXISTING UTILITIES R/W WilL BE RESTORED AS GOOD SEWER y
APPROXIMATE. ALL UTILITIES TO OR BETTER l1-WI ORIGINAL
BE LOCATED IN FIELD PRIOR TO CONDmON & COMPACTED me Mrinl 8800 ADAMO DR.
CONSTRUCTION. PER City of Zephyrhills UAG. (FLTP) 0652
CI--.TV ....oeti'" TAMPA. fL 33619
DRIVEWAYS, TREES & CULVERTS MAY VERIZON mp PROJECT SIGNS TO TIlE Aenot (813) 740-1231
BE MISSILE BORES, ROADS WILL BE BE POSTED AT CONSTRUCTION OTI-lER H
DIRECTIONAL BORES SITES FOR PUBUC AWARENESS.
VERIZON mp
SEE PLAN VIEW 10 of 10
APPLICATION TO CITY OF ZEPHYRHILLS TO
PLACE HDPE WITH FIBER OPTIC CABLE BY
TRENCHING OR BORING
WORK ORDER: 3623-7FFAOAH
SECTION: 14, 15 TOWNSHIP:
ENGINEERED BY: J. Morris
ISSUE DATE: 9/26/06
RANGE: 21 E SCALE: NONE
J. Morris
SHEET II OF II