HomeMy WebLinkAbout07-6687
I I
CITY OF ZEPHYRHILLS
5335 - 8TH STREET
(813)780-0020
BUILDING PERMIT
6687
Permit Numb
Permit Ty : ADDITION/ALTERATION
Class of Work: 434-ADD/AL T RESIDENTIAL
Proposed Use: MOBILE HOME PARK
Square Fe~:
Est. Val e:
ImP. rov. Co t: 10,540.00
Date Issue :
Total Feel;: 162.50
Amount Pa d: 162.50
Date Pai : 5/07/2007
Work De c: LANAI 10x31 & SCRN RM
Address: 3447 TOURMALINE DR LO
ZEPHYRHILLS, FL.
Township: Range: Boak:
Lot(s): Block: Section:
Subdivision: EMERALD POINTE RV RESORT
Parcel Number: 24-26-21-0070-00000-2530
Name: HAMEL, RAYMOND
Address: 3447 TOURMALINE DR LOT 253
ZEPHYRHILLS, FL. 33542
Phone: 978815-4610
310' ON EXISTING CONCRETE
~?~~
o ~~'V
'01\
N{)~V
LINTEL
SHEATHING
FRAME I
INSULATION WALLI
ELECTRICAL FINM
BUILDING FINAL '
REINSPEcn N FEES: Reinspection fees will comply with Florida Statute 553.80 (2)( c) when extra inspection
trips are nece ry due to anyone of the following reasons: a) wrong address b) condemned work resulting
from faulty c nstruction c) repairs or corrections not made when inspections called d) work not ready for
inspection w , n called e) permit not posted on job site f) plans not at job site g) work not accessible.
NOTICE: In ad~ition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found i the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
The payment 0 inspection fees shall be made before any further permits will be issued to the person owning same
"Warning to ner: Your failure to record a notice of commencement may result in your paying twice for
improvemen to your property. If you intend to obtain financing, consult with your lender or an attorney
before record ng your notice of commencement."
I NO OCCUPANCY BEFORE C.O.
~ j/~<Iw; r~- ~
CTOR SIGNA RE PERMIT OFFI
CALL FOR INSPECTION - 8 HOUR NOnCE REQUIRED
PROTECT CARD FROM WEATHER
813-780~oobo I
City of Zephyrhills Permit AppliCatiOn
Building Department
I ....n. .......... ....._ ____
,. u, . .
Date Received
Owner's Name
Owner's Address
Fee Simple TitleholC:Jer Name
Owner Phone Number q1
'/fJowner Phone Number I
Owner Phone Number I
Fee Simple Titleholrer Address
JOB ADDRESS I 3 I u..rrnCA..-1 ;n~ r.
IfmeraJd PO/nT((V Resort1
SUBDIVISION
t.f-
E3 NEWCONSTR E3 ADD/ALT 0
INSTALL REPAIR
o SFR 0 COMM 0
o BLOCK 0 FRAME 0
Lana, + Scre~ fOJvm on e'{.isfin
X 31 SQFOOTAGE I D
WORK PROPOSED I
PROPOSED USE .
TYPE OF CONSTR~CTION
DESCRIPTION OF
BUILDING SIZE
/0
1$ /0 I OliO, @..
,
1$
1$
1$
o ROOFING
FINISHED FLOOR aLEVATIONS I
I
I
I
I
o
I
SPECIALTY 0
FLOOD ZONE AREA
fA] BUILDIN~
I
00 ELECTRldAL
D PLUMBIN~
I
D MECHANlbAL
D GAS
SIGN
o
DEMOLISH
OTHER I
STEEL 0
~ncr~te.
HEIGHT I
OTHER I
VALUATION OF TOTAL CONSTRUCTION
(0. -J~
AMP SERViCe 0 PROGRESS ENERGY
VALUATION OF MECHANICAL INSTALLATION
Attach (2) Plot Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Pennlt for new construction,
Minimum ten (10) working days after submittal date. Required onsile, Construction Plans, Stonnwaler Plans wI Sill Fence installed,
Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisions/large projecls
Attach (3) sets of Building Plans; (1) set of Energy Fonns. R-O-W Pennit for new construction.
Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stonnwater Plans w/ Silt Fence Installed,
Sanitary Facilities & 1 dumpster. Site Work Pennit for all new projects. All commercial requirements must meet compliance
Attach (2) sets of Engineered Plans.
....PROPERTY SURVEY required for all NEW construction.
BUILDER
SIGNATURE'
ELECTRICIAN
SIGNATURE
AI" ;,
PLUMBER
SIGNATURE
COMPANY
REGISTERED
Address
MECHANICAL
SIGNATURE
Address
OTHER
SIGNATURE
Address
RESIDENTIAL
COMMERCIAL
SIGN PERMIT
o
W.R.E.C.
- ;-JOe n
,~~ Arr;:~~
OTHER
DYES
ONO
, l..c;(\'\ /2.,
\&
License #
FEE CURRENT
License #
Y / N FEE CURRENT
Y/N
License #
Y / N FEE CURRENT
Y/N
License #
Y / N FEE CURRENT
Y/N
License #
Directions:
Fill out applicati n completely.
Owner & Contr ctor sign back of application, notarized
If over $2500, Notice of Commencement Is required. (AlC upgrades over $5000)
Agent (for the c ntractor) or Power of Attorney (for the owner) would be someone with notarized letter from owner authorizing same
OVER THE COUNT R AERMITTING (Front of Application Only)
Reroofs Sewers Service Upgrades NC Fences (Plot/Survey/Footage)
Driveways-Not ver Counter if on public roadways..needs ROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to '"deed" restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited tor a misdemeanor violation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Sedion at 727-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the constrUction of neW buildings, change of
use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance humber 89-07 arid
90-07, as amended. The undersigned also understands, that such fees, as may be due, Will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a "certificate of occupancy" or final power release; If the project does not involve a certificate of occupancy or
final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco CoUnty Water/Sewer Impact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): if valuation of work is $2,500.00 or more, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien LaW-Homeowner's
Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the "owner" prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laWs regUlating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands, WaterlWastewater Treatment.
Southwest Florida Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering
Watercourses.
Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
US Environmental Protection Agency-Asbestos abatement.
Federal Aviation Authority-Runways.
I understand that the following restrictions apply to the use of fill:
Use offill is not allowed in Flood Zone "V" unless expressly permitted.
If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume" will be submitted at time of permitting which Is prepared by a professional engineer
licensed by the State of Florida.
If the fill material Is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction, I certify that fill will be used only to fill the area within the stem wall.
If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
the conditions of the building permit issued under the attached permit application, for lots less thah one (1)
acre which are elevated by fill, an engineered drainage plan is required. .
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other !nstallations hot specifically in?Juded. in the application. A
permit Issued shall be construed to be a license to proce~d With the work a~d not as. authon~y !o vlolat~, cancel, alter, or
set aside any provisions of the technical codes, n?r shall.lss~ance of a permit prevent the B~II.dl~g OffiCial from the~eaft~r
requiring a correction of errors in plans, construction or Violations of any codes.. Every permit Issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
the permit is suspended or abandoned for a period of six (6) mo~ths after the time th~ work is commenced: An extension
may be requested, in writing, from the Building Official for a penod not t~ exceed n1n~ty ~90) days and Will demonstrate
justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the Job IS conSidered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT M~Y RESULT IN Y~UR
PAYING TWICE FOR IMPROVE TS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCiNG, CONSULT
WITH YOUR LENDER OR AN 0 NE BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
FLORIDA JURAT F: 7.03)
/'
OWNER OR ii
Subscrtbed a
t?-OOI by
Who Is/are personally kno
-:Dn 'iJe., ~ L .1:...... t' , as Identification.
Cozi7::~o:::::~.
.~~ Suzanne Bahr
Name of Notary typed( . ~n#DD601110
"""" ",' ExpIres: NOY. 15,2010
BU\Di:.lJ THRLTATL\j'!C BONDING CO.,I:\C.
.:<
Notary Public
~\\II"I S B h
:/ "-.:. uzanne a r
Name of Notary typed, prlnte~ . . sian # DD6011l0
""""""" Expires: NOY. 15, 2010
BONDED nlRu ATL SHe BO:~Dl:-;G CO., I\C
I I
....._-~_._-..__... .~,..- ._----------_.~......... ...
City of Zephyrhills
BUILDING PLAN REVIEW COMMEN'ffi
ContrnctorlHojneowner: JeJ:.(JfllY ~t ~ 1I1um~ tt",
Date Receivedt 5- 2 -() 7
Site: '1 Y</7/ou. r/nA i~r' /J",
Permit Type: /tt.Wu' i.s-C;( Jim '/;V1 et/i~) {/K~k
Approved w/n~ comments:D Appro~ed withe below comments: ~enied withe below comments: El
JD\LI. . ~01W- ~~"-'~J6-k~liN~rz:~~)~I^-'\
~ ~L)) )?()\f'Tii:- {?0fVlG). rt1l~~ ~ t S~ \.:)ft{'i.<1I "OJ':: ,fJvl.y-tl-r'
This commen~ sheet shall be kept with the permit and/or plans.
rh /r7 "
Date Contractor andJorHomeowner
(Required when comments are present)
,,!:,...;\>'"
I I
,12 ay /X () l'oJ! ;J UHf! /
Name .
d 7''/') 7tJMAJ/)..e 12<
Address .
U,P~ r iJ/J F/ - dJryo
To Whom It May Concern,
I
Please be advised that:
Stacie Cross, & Debbie Dokendorfof Pasco
Permit Service have my permission until further written
notice to act as my agent to sign and pick up permits.
i
I
~OTARY
I
,TATE OF FLORIDA, COUNTY OF PASCO
I The foregoing instrument was sworn to and
slubscribed before me this d7'f''''day of vv1aY'ch..
I
p~rSOnallY known
NOTARY PUBLIC-STATE OF FLORIDA
:,'ij\ Suzanne Bahr
\' , )Co~missio~ #DD601l1O
'.~"",., E.xplres: NOV. 15 2010
O.\DED THRU ATL-HIe BOND " '~c.
missioned Stamp
Expiration Date
./7.... / Since~~. '
/ ,> /f ..... j~
~e~e.~ ~
~- -Z 7 '" () 7-
date
, d-007
or Produced identification
~
vL ~
N6ta~~
Page 1
I I
I, eet
agree .
DISCLOSURB ~ J'OJ1 OWIIBR
CITY OP ZDIIYV'IrTT.t.,R BUJ:LDDIG D:8PAllTJIBNT
~ hJt1M! 1lfU>! e / have rea.d. and fu1.ly UD.derstand and
the provisions of this instrument. .
The UDd,8rsigned. states and affizms that he or she is desirous of constructing,
renovatfing, adding to or reroofing his or her own domicile, that he or she
actua11jY' occupies, or wil.1 occupy by . sa:i.d d.om:i.ci1e, and. same is not for
rent, 1.rase or sal.e. That he or she shal.1. compl.y with the fo1.1.ow:ing CODd:i. tions:
1.. Tha the owner and. he or she alone sha11 act as the bui1.der for all. phases of
truction.
2. the owner wi1l. comp,1y with a1l. provisions of the City of Zephyrhil.1s
ces and. codes pert:i.Dent to the builc:ling.
3. in the event various phases of construction are subcontracted, he wi1l.
ge only properly licensed subcontractors. and will perscmally supervise
work..
4. in the event the Building Inspector sbal.l require corrections to be mac:le,
OWID.er wi1l. assume ful.1 reaponsibili ty to insure they are made, and. upon
letion wi1l cal1 for a rei.D.spection before proceeding with the building.
5 - the ow.a.er sbal.l. assume fu11 responsibi1i ty for the construction and wil.l.
expect supervision of his work from the City of Zephyrhil.l.S Builcti.ng
t.
6. prior to final. inspection any a.d.d.i tiOD.ill fees, iD.clu.ciin.g rei.D.spection
, must be paid in ful.l.. A written request from th:i..s office shall
titute an official notice to pay ac1ditional. fees.
7. the ow.a.er sbal.1 comply with &1.1 City, State and Pecleral laws in regard to
al security, workman's COJDpensation, 1ien l.aws. etc., where applicable.
8. the owner shal.l. comply with all. the s~ety codes issued by the Pl.orida
strial Commission.
9. e law requires construction to be done by 1icensed contractors. You have
app ied for a permit UDder an exeIQption to that law_The exemption allows
you, as the owner of your property, to act as your own contractor with certain
res' ictions E!'Ve:D. though you do DOt have a l.icense. You IIlU8t provic:le direct
ODS'te S13pervision of the construction yourse1f. You may bui1d or improve a
ODe family or two-family resiclence or a fcum. outbuilding. You may al.so bui1d
or' rove a COllllllercial. building, proviciec:l your costs do DOt exceed. $25.000.
The ui1ding or residence must be for your ow.u use or occupancy. :It Diay DOt
be '1 t or substantial.1y improved for sal.e or l.ease. :If you sal.l. or 1ease a
. bu.i.1' you have ))uil.t or substantial1y improved yourse1f within 1. year after
the OD.Struction is camp1ete, the 1aw wil.l. pre&1JlDe that you bui1t or
sub t:i.al.l.yimprOVed :if for sal.e or 1ea.se, whi.ch is a viol.ation of th:i..s
tion. You may DOt hire an tmlicensed persOn to act as your ccmtractor or
ervise peopl.e working on your building. :It is your responsibil.ity to
sure that peop1e empl.oyed by you have 1icenses required by state 1aw and
:ty or municipal. licensing ordinances. You may DOt de1agate the
ibility for supervising work to a l.:icensed ccmtractor who is Dot
lic ed to perfO%Dl the work being done. Any person working OD your building
who . s not licensed must work under your direct supervision and. must be
emp1 ed. by you, which means t:hat you must deduct P.:I.C.A. and. withholding tax
and rovic:le workers' compensation for that emp1oyee, al.1 as prescribed by l.aw.
Your construction must comp1y with all appliCable 1aws, orrU 'fto;ll"1CeS, buil.ding
code , and zoning.. aticm.s .-..
DATE 3 ~ 2 ~ - v7
~~lUi4
-.J
PBRKIT #
I I
NOTICE OF COMMENCEMENT
CL'~ Or 2 -}.IJ 1J
State of
PI6rL&'4.-
County of
/J ((..reo
THE UN~ERSIGNED hereby gives notice that improvement will be made to certain real property,
and in ac ordance with Chapter 713, Florida Statutes, the following information is provided in
this Notic of Commencement:
1. Description of Property: Parcel No. J-'I-c)...~ -cJ-I- () cJ7cJ - GOOde) - c,lS30
- I J t'l7 / tJltA/H. uL~ .(h. rk/Ir .PI. 3Jj?jO
i (Legal description of the property an str et address if available)
2. Gene*l Description ofImprovement / (L/J LJ. ,t- if Uu/) room
I
~~~ij~~~~lW'IIIII 1111I11111111111111I1111111111111
It
~wnet Information: Name I2JymoAd
Addre~s .3 '1'17 TJ'tuz.hl d.l/Aa Ot.
, I
Intere~t in Property:
I
Name Jof Fee Simple Titleholder:
(~f other than owner)
Addrefs
4. contrjctor: Name ()tu;..er
Addre s
I!tLhJ~/
ZepiyrM/r
~StateR. JJJW
City
'It \..
Rcpt: 1094136 Rec: 10.00
DS: 0.00 IT: 0.00
04/2!5/07 __ Dpty Clerk
City
State
_ City
State
5. Surety Name
Addre s City State
Amou t of Bond: $ JED PITTnAN0 PASCO COUNTY CLERK
04/2!5/07 1 : 4Sam 1 of 1
6. Lende : Name OR BK 7473 PG 1152
Address City State
7. Person~ within the State of Florida designated by Owner upon whom notices or other
documfnts may be served as provided by Section 713.13 (1) (a) (7), Florida Statutes:
I
I
Name ~
Addres City State
8. In addi ion to himself, Owner designates
of to receive a copy of the Lienor's Notice as
provid d in Section 713.13 (1) (b), Florida Statutes.
9. Expirat on date of Notice of Commencement (the expiration date is 1 year from the date
of reco ding unless a different date is specified.)
Sworn to an sub cribed before me this
~lu-~
cJ..yrM day of
jJltttl-tv; 7
-
~/
,20{2L.
NOTARY PUBUC . STATE OF FLORIDA
My Commis ion Expires: ~.. St~d. H~rtwig
i iCommission #DD652189
PC 930530481A ~~.........,~ Expires: OCT. 16.2009
BONDED nmu MI.AHTIc BONDING co..lHC,
I I
)~
i x'~'
'~ ~ ~
1.......... t)
.: ' - "'t)
;~ r-- ~
!. __~ V\..
. ~ ~\
~ t)
. \i
/0.0)' I
I, ?>h I
t<:::' ~~ ~ I'
!B ~ ~:~
/~~
I
I~-
I
. I
I .
i ywrrH -1
' LL CipM.PL r
BUILflTI'\G sHA LE if" OF. I ,____
ALL APPLiCAt\ ORfllNr\NC13,
v:rYRHIL1's
ZEPn 3l.j11 TO!/,;(fi/?1LIN~
\~
~1':
~.:J
~7.
~ ,<)
--€~
1r~
-7 'C'
--
r 8
[. moo' r
' t f'. n-,
,: .....- ~ ~
. ......~
If) la. ~ ~. I
[lJ ~
, /0.00/
t; 1'1-1
'/(><:
""-
'Ci'.
~:j
I~ ~\~
I~ illr-....
Ie:::, th 'I"
- -Ie:> ~1
, - t
N
~
1
~
~
"1
~
fI1
~
1:::1
~
d
I
3~ .(1)
I
tJl
. I
: I
I
i
~\i
<J~
~~ o~v~
c;
~
""v
8:
W'
I
,
/-!A//i L LtJ T a2S3
cME~A{.{) /'CU/V'r"E" ,(V /!ESO.Rr /w-s
C;'1-e2b -,,2/- 0070 - OOCO()- J.SJ()
I I
. . (0. 7- O.~--o
LOT IMPROVEMENT.R:EQtTEST b7
. .,. · ~ ~@'1fI
To~PPOA Property EvaluatIon CommIttee & Bom:d ofDIrec~ors:
F~/~Il-P1&7~ ~cm.I/~) .
I ~ f.' --r- __
Lot#I/ A.ddress 6"'ir)'I-~]"3 . .3 C!:::Cf: 7 I CJ f/.~ MO /p
.'
. ' r
qtl~stPf).A approval for the.foll&Wing(mustinclude drawing for any
ction I additions / remodeling / landscaping, etc.).
r
"
Denied
.. :..
.~
..-.....-
.Date: b 3,o7-oe-
~,~/ ~,
Date~j" ~,0..5--6) :::>
I I
"
, '"
-,,/
c
'(
f
......')
"
')--
'"
,
"
~~
~!
.J~ ,
'/1 "': '-\l
.
-
"j..,
'VI
,.
> .
,~
,
5~
1tf~
. . S'
Se"&t~ ,"
J. .
~ '(l-l'r}~Y
- u 0 ~ ~q
~i l~ l__~; ( 1> ~~
~ll \ \ .
( ~X fS.-f.;/J ff.
\:t5A-fA R-1JoH
( f-l A-u vtff'J
P'c.~ L' . gla' t' ~" Lo,
w,,~ '., .',
CONa~(. c2~t,,~~:
-
U)
I ~
... ~
..... 'I
"HI
~ '.l!
~
. ~ ~ cV f!-Lf
. ,'"
~, \
"
'~ ~
.....,,,- ,.
......
\>:~ \.)
'~:';\.f'\ .-
X
..' :
..~
;;'0' Se+~K
frOM., ...~ b
,,: .
. . ,
. . ....1iL.-.....~.' -. ....:Jr. .........
. ~ .~:.-:. -..- .: ~
: ' I'trlltd(
I I
0'.
... ."
Procedure for Lot Improvement Requests
(Please refer to "Rules and Regulations '?
1. . All requests are to go to Chairman of the Property Evaluation Committee, for the committee
to view. There is a holder labeled "ProIJertv Evaluation & l11UJI"ovements" in the librarv
Ii r Lo owners to lace their com leted forms in and these forms will be icked from
e L' ra the P Evaluationcommi
3. ommittee will review requests and visit the site of the request as necessary.
4. r the Committee has approved or denied the request, it will be presented to the Board of
Dire tors for their approval or denial.
5. ere will be NO more one day approvals or last minute approvals. Request will take 7 _ 14
days for appropriate review and consideration, thus giving the Committee and Board members
time to review and consider the request in a thorough manner.
e original request will be stamped approved or denied, and after being copied the original
o into to the members file and the copy returned to the Lot owner by the Board of Director
to the committee.
e committee will follow up on requests to detennine that the request as presented and
ed is being adhered to.
As th owner of Lot # . I understand the Property Evaluation Committee and/or the
BOat of Directors will enter the property to follow the external progress of the construction or
impro ement, as submitted on the Lot Impro ement Request.
Date
I' I I
EME ....D
POINTE
~tPr ZS3
LOT IMPROVEMENT
PERMIT # -0
't.,~
EME D POINTE BOARD OF DIRECTORS
APPR VED: ~/;A'&"rs--
DA TE:..J . !2 -cJ ;/
PROP RTY EV ALUATIONCOMMITTEE
"
APPR VED: /~ /J - W.~ DATE:03.h.s76 7
~ /~ / /
EXPI.. TION DATE: '