Loading...
HomeMy WebLinkAbout08-7739 CITY OF ZEPHYRHILLS 5335 - 8TH STREET (813)780-0020 BUILDING PERMIT 7739 Permit Number: Permit Type: Class of Work: Proposed Use: Square Feet: Est. Value: Improv. Cost: Date Issued: Total Fees: Amount Paid: Date Paid: Work Desc: 7739 RE-ROOF ROOF REPLACEMENT Township: Lot(s): Subdivision: Parcel Number: Range: Block: Book: Section: 16,500.00 4/11/2008 172.50 172.50 4/11/2008 REROOF METAL Name: ROCKHILL, CRAIG& KAREN Address: 38819 9TH AVE ZEPHYRHILLS, FL. 33542 Phone: 813695-6468 0~~o~ TAPE JOINTS ROOF INSP FINAL REINSPECTION FEES: Reinspection fees will comply with Florida Statute 553.80 (2)( c) when extra inspection trips are necessary due to anyone of the following reasons: a) wrong address b) condemned work resulting from faulty construction c) repairs or corrections not made when inspections called d) work not ready for inspection when called e) permit not posted on job site f) plans not at job site g) work not accessible. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. The payment of inspection fees shall be made before any further permits will be issued to the person owning same "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your perty. If you intend to obtain financing, consult with your lender or an attorney before recording your ice of commencement." NTRAC R SIG ATURE PERMIT OFFI PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER 813-780-0020 City of Zephyrhills Permit Application Building Department Ownerls Name Date Received Owner Phone Number Owner Phone Numbe, I WORK PROPOSED NEW CONSTR INSTALL SFR BLOCK ve. Zc I PARCEL ID# B ADD/ALT REPAIR D COMM D FRAME I I LOU 1'.=t-17 I i I-afc, -~/--oo 10 -OS"CCO-o /.;;:() (OBTAINED FROM PROPERTY TAX NOTICE) SIGN D MOVE D DEMOLISH Fee Simple Titleholder Address JOB ADDRESS SUBDIVISION B PROPOSED USE D TYPE OF CONSTRUCTION D DESCRIPTION OF WORK I re roo{.... I : 1$ '~(5a:> ~ o ELECTRICAL 1$ o PLUMBING 1$ o MECHANICAL 1$ o GAS D FINISHED FLOOR ELEVATIONS I D D D OTHER STEEL I D OTHER I SQ FOOTAGE I ~O HEIGHT I BUILDING SIZE o BUILDING ROOFING I I I I D I AMP SERVICE D PROGRESS ENERGY D W.R.E.C VALUATION OF TOTAL CONSTRUCTION VALUATION OF MECHANICAL INSTALLATION BUILDER SIGNATURE SPECIALTY D FLOOD ZONE AREA \) OTHER DYES DNO Id(~1~fFl:~.cI~/~S ~ License # ~CC ~t9?.3 I I I I I I I I I Address ELECTRICIAN I SIGNATURE . Address I PLUMBER I SIGNATURE I COMPANY REGISTERED YI N FEE CURRENT L!:.L!U License # COMPANY REGISTERED YIN FEE CURRENT L!:.L!U Address MECHANICAL I SIGNATURE . Address I OTHER I SIGNATURE Address I License # COMPANY REGISTERED YIN FEE CURRENT L!:.L!U License # COMPANY REGISTERED YI N FEE CURRENT L!:.L!U License # RESIDENTIAL Attach (2) Pi at Plans; (2) sets of Building Plans; (1) set of Energy Forms; R-O-W Permit for new construction, Minimum ten (1 0) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans wi Silt Fence installed, Sanitary Facilities & 1 dumpster; Site Work Permit for subdivisionsnarge projects Attach (3) complete sets of Building Plans plus a Life Safety Page; (1) set of Energy Forms. R-O-W Permit for new construction. Minimum ten (10) working days after submittal date. Required onsite, Construction Plans, Stormwater Plans wi Silt Fence installed, Sanitary Facilities & 1 dumpster. Site Work Permit for all new projects. All commercial requirements must meet compliance Attach (2) sets of Engineered Plans. ....PROPERTY SURVEY required for all NEW construction. COMMERCIAL SIGN PERMIT Directions: Fill out application completely. Owner & Contractor sign back of application, notarized If over $2500, a Nollce of Commencement Is required. (AlC upgrades over $5000) Agent (for the contractor) or Power of Attomey (for the owner) would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (Front of Application Only) Reroofs Sewers Service Upgrades AlC Fences (PloVSurvey/Footage) Driveways-Not over Counter if on public roadways. .needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law-Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the "owner", I certify that I have obtained a copy of the above desO"ibed document and promise in good faith to deliver it to the "owner" prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands, WaterlWastewater Treatment. Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. Department of Health & Rehabilitative ServiceslEnvironmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. US Environmental Protection Agency-Asbestos abatement. Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone 'Y" unless expressly permitted. If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not spedfically induded in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. RESULT IN YOUR F ANCING, CONSULT CEMENT. ublic Notary Public Commission No. Name of Notary typed. printed or s ~~'~".;. . CINDY M FETTIG ~ : .*1 MY COMMISSION # DD733401 '. EXPIRES November 08, 2011 F/orldeNOlarySeMce.com City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: !vte L ~+ ~--O~ 3~SU1 q%~ ----Me laP fl~ ~ Date Received: Site: Permit Type: Approved wino connnents:~ Approved withe below comments: 0 Denied withe below comments: 0 the pennit and/or plans. ~ ( ".-0'1 Contractor and/or Homeowner (Required when comments are present) PROPOSAL 17026 US Hwy 41 North Spring Hill, Florida 34610 352-797-3773 Fax 352-796-3717 License No. CGC057353 Roofing License No. CCC058093 Certified In Dade County "Fabricators for the Future"'" Engineered For Today" Date: 03-31-08 I Bid# I 03-31-08HRW Proposal Submitted To: Craig Rockhill 38819 9In Ave. Zephyrhills, FL 33542 Phone & Fax #'s 813-695-6468 I Fax I Attention: Craig Job Name: Rockhill Job Location: 38819 9In Ave. Zephyrhills, FL 33542 Proiect Engineer: Architect: Plans & Specifications: Bid Set Issued: Job# Revision Date: SCOPE OF WORK: $16,500.00 50% due when material dropped and 50ot'o on Schedule com letions of 'ob WE PROPOSE hereby to furnish LABOR AND MATERIALS in accordance with the above defined SCOPE OF WORK for the sum of: A)There is ene Mobilization included in the above price. Additional mobilizations will be charged as provided for below. B) Payment to MEGALlFT is not contingent upon acceptance of MEGALlFT work by any third party, and is not contingent upon payment being received by buyer. C) Materials delivered to the job to be included in invoicing. D) There are no bonds or liquidated damages included. This proposal does not include fees, or other charges as may be required by state or local agencies. Megalift accepts no responsibility for design of the project and does not warrant any products delivered to be merchantable for any particular purpose. This proposal is offered as a service, and it is Buyer's responsibility to provide Megalift with correct and comprehensive plans and specifications, and with adjacent and/or adjoining work which conform to those plans and specifications. Any defect in project design or installation of adjacent and/or adjoining work voids any and all warranties, either express or implied, and shall discharge Megalift from all liability. E) All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tomado, builder's risk and other necessary insurance. Our workers are fully covered by Worker's Compensation Insurance. F) All payments will be conditioned solely on acceptability of completed work. Unless Megalift receives notice, in writing, of any claimed defect or non-confonnity within thirty (30) days of its last date of fumishing labor, services or materials ('Work"), all Work fumished by Megalift shall be needed to have been accepted. In the event that any payment is not made, the amount shall be deemed delinquent and shall bear interest at 1.5% per month. Buyer also agrees to pay all collection costs and expenses, including reasonable attomey's fees, incurred by Seller in collecting or attempting to collect any invoice that has not been paid within sixty (60) days of invoice date. G) Megalift will not indemnify any other parties' negligence. Buyer shall indemnify, defect, or hold hannless Megalift from any against all liability that does not result solely from any act or omission of Megalift. This obligation to indemnify shall be limited, in amount, to the contract price for constructing the Project. Megalift will not be responsible for, and will not indemnify any party for any act or omission of that party. H) Any reduction and/or change in the Scope of work may result in additional charges. Price quoted is based upon typical installation, adequate access to the site and work area, and timely completion of related work by other parties. In the event that Megalift work is impaired by an act or omission, not solely due to Megallft own forces, additional charges may result. I) This Proposal is valid for 60 days from the date of submission. Proposal for: Megalift Technologies LLC. ~ . .WILLIA 5 fl:f ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. In the event it becomes necessary to tum this amount over to an attorney for collection or in the event legal proceedings are instituted for the collection of any amount unpaid on this agreement, I agree to pay all costs of collection, including but not limited to, pre and post judgement costs, plus a reasonable attorney's fee. I further agree that this agreement is subject to a finance charge of 1 Y:z% per month on the unpaid balance as allowed by law. ACCEPTED BY: G--I L ~A/P;p7 DATE: r-J...I-(J~ COMPANY: PRINT NAME: (;ra ~ ~2D Co K 'r.. '\ \ \ TITLE: 6wne{' Pasco County Parcel: 11-26-21-0010-08000-0120001 Page 1 of2 Search Again Show Map Generalized Building Schematic Estimate Taxes Frequently Asked Questions other Agency Data: Tax Collector School Board Supervisor of Elections Data Current as Of: Weekly Archive - Saturday, April 05, 2008 ParcellD 11-26-21-0010-08000-0120 (Card: 001 of 001) Classification 01 - Single Family Mailing Address Assessment (totals) ROCKHILL CRAIG & KAREN Ag Land $0 38819 9TH AVE Land $55,770 ZEPHYRHILLS, FL 335424401 Building $94,591 Physical Address Extra Features $16,645 38819 9TH AVE ZEPHYRHILLS, FL 33542-4402 Total Assessment $167,006 Save Our Homes $125,024 Legal Description (First 4 Lines) Homestead Exemption - $25,000 cm OF ZEPHYRHILLS PB 1 PG 54 Taxable Value $100,024 LOTS 12-17 BLOCK 80 Warning: A significant taxable value increase OR 3438 PG 1734 may occur when sold. Click here for details and info. regarding the posting of exemptions. Land Detail (Card: 001 of 001) I Line II Use I Description Zo~ Unb Type Price II Condition I Valu I 1 I 0100 SFR o 8,400.00 SF $5.26 II 1.00 $44,18 I 2 I 0100 SFR 00 7,824.00 I Sf: II $0.65 II 1.00 I $11,58 Additional Land Information I Acres " 0.60 II Tax Area II ,1Qztl II FEMA Code II X IIResidential Codell ZHLHLP2 Building Information - Use 01 - Single Family Residential (Card: 001 of 001) Year Built 1960 Stories 1.0 Exterior Wall 1 Concrete or Cinder Block Exterior Wall 2 None Roof Structure Gable or Hip Roof Cover Asphalt or Composition Shingle Interior Wall 1 Drywall Interior Wall 2 None Flooring 1 Hardwood Flooring 2 Parquet Fuel Electric Heat Forced Air - Ducted A/e Central Baths 1.0 Line Description I Sq. Feet I Repl. Cost New 1 BAS 1,556 $107,364 2 FOP 205 $3,519 3 FGR 580 $16,008 4 UDU 216 $4,485 Extra Features (Card: 001 of 001) Line Descripti Year Units Value 1 DWSWC 1973 222 $208 2 CLFENCE 2000 320 $399 3 POOL-6 2002 392 $11,446 4 BRK PTO 2002 661 $1,877 5 SCRN-AF 2002 1,293 $2,715 Sales History Previous Owner II OGLESBY TED L & SONJA MARIE Year ,I Month II Book/Page II Type II Amount I http://appraiser.pascogov .com/search/parce1.aspx?sec= 11 &twn=26&mg=21 &sbb=OO 1 O&bl... 4/8/2008 GUIDE SPECIFICA TION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 ************************************************************************************************************************ STONE COATED METAL ROOF TILE This guide specification has been prepared by DECRA Roofing Systems, in printed and electronic media, as an aid to specifiers in preparing written construction documents for stone coated metal Tile. Edit entire master to suit project requirements. Modify or add items as necessary. Delete items which are not applicable. Words and sentences within brackets r 1 reflect a choice to be made regarding inclusion or exclusion of a particular item or statement. This section may include performance, proprietary and descriptive type specifications. Edit to avoid conflicting requirements. Editor notes to guide the specifier are included between lines of asterisks to assist in choices to be made. Remove these notes before final printing of specification. This guide specification is written around the Construction Specifications Institute (CSI), Section Format standards references to section names and numbers are based on MasterFormat 95. For specification assistance on specific product applications, please contact our local product representa- tives throughout North America at 800-795-0776. ..4~(9 .-,~~'k . \I (.._ "'~'-'~"r . (,j) v ~,1 t '~\i u\'" " '-'~L\lt,\UNll . .' \\. i... ,1" - _~\ .\ . 'r ~,', ,\T\C.hr\\ " ('OD\:j.",I. "'1\.; i.. - "c ,",\1'\1 It k'iLl..''''; - -. O.'C'I'CI' ,!'...,. ( ; -/ i .. DECRA Roofing Systems reserves the right to modify these guide specifications at any time. Updates to this guide specification will be posted to the manufacturer's web site and/or in printed matter as they oc- cur. DECRA Roofing Systems makes no expressed or implied warranties regarding content, errors, or omissions in the information presented. DECRA Roofing Systems Master Guide Specifications 07314 - 1 Stone Coated Metal Roof Tile (Villa Tile) 12-07-07 PART 1 - GENERAL 1.1 A. SUMMARY Related Documents: Provisions established within General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and the Drawings are collectively applicable to this Section. B. Section Includes: Formed metal roofing panels with colored stone chip finish. C. Associated metal flashings. ************************************************************************************************************************ Edit the Related Sections paragraph below to suit project requirements; delete sections that will not be used, or add sections as required. ************************************************************************************************************************ D. Related Sections: 1. Division 6 Section "Rough Carpentry" for framing and sheathing. 2. Division 7 Section "Sheet Metal Flashing and Trim" for metal flashing, gutters, and downspouts. 3. Division 7 Section "Roof Accessories" for roof ventilators. 4. Division 7 Section "Joint Sealants" for field-applied sealants. 5. Division 9 Section "Painting" for painting of roof accessories. E. Alternates. ************************************************************************************************************************ If work of this section will affect alternate bids, retain the following subparagraph. ************************************************************************************************************************ 1. Refer to Section 01230 for alternatives involving work of this Section. 1.2 SUBMITTALS ************************************************************************************************************************ Include submittal requirements below, which are consistent with the scope of the project and extent of work of this section - only request submittals, which are necessary for review of design intent. Do not request submittals if drawings sufficiently describe the products of this section or if proprietary specifying techniques are used. The review of submittals increases the possibility of unintended varia- tions to drawings. Insert the appropriate reference to the Division 1 section. ************************************************************************************************************************ 1.3 A. A. B. Submit under provisions of Section 01300 L-J. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, finishes, fasteners, accessories, and manufacturers written installation instructions. Shop Drawings: Include roof plans and elevations; sections at hips, ridges, gables, valleys, and eaves; and details of components, accessories, and attachments to other work. Samples for Initial Selection: Manufacturer's color charts and samples consisting of units or sections of units showing the full range of colors, textures, and patterns available for each type DECRA Villa Tile indicated. C. D. QUALITY ASSURANCE Regulatory Requirements: 1. Conform to applicable building code for roof assembly fire hazard requirements. 2. Conform to building code for minimum wind uplift resistance. DECRA Roofing Systems Master Guide Specifications 07314 - 2 Stone Coated Metal Roof Tile (Villa Tile) 12-07 -07 1.4 REFERENCES A. Fire-Test-Response Characteristics: Provide DECRA Villa Tile with fire-test-response characteristics indicated, as determined per test method ASTM E 108 - Test For Fire Resistance of Roof Covering Materials, for application and slopes indicated. 1. Fire-Test Exposure: Class A. B. ASTM A792/A792M: Sheet Steel, Aluminum-Zinc Alloy Coated by the Hot Dip Process, Structural (physical) Quality. C. UL 1897 and UL 580: Wind Uplift Resistance of Roof Assemblies. D. ASTM C920: Specification for Elastomeric Joint Sealants. E. Impact Resistance: UL 2218, Class 4. F. Appraisal Certificates: 1. International Code Council, Whittier California, Report Nos. ICC ESR-1754. 2. Underwriters Laboratories, Inc., Northbrook, Illinois, USA File No. R14710. 3. Canadian Construction Materials Center, Ottawa, Ontario, CCMC#10241-R, Issued 1983 re-evaluated 2002-06-21. ************************************************************************************************************************ Retain the following paragraph if the specific project requires this rating. Otherwise, delete the following paragraph. ************************************************************************************************************************ G. [Dade County, Florida Acceptance No. 07-1129.04.] H. [Florida Approval No. 9759.5] 1.5 DELIVERY, STORAGE, AND HANDLING A. Store and handle roofing materials to ensure dryness. Store in a dry, well-ventilated, weather tight place. Protect from corrosion, staining and traffic and wind damage. 1.6 WARRANTY A. Manufacturing Warranty: Written, transferable, limited warranty provided by DECRA Roofing Systems, covering manufacturing defects. 1. Warranty Period: 50 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 MANUFACTURER A. DECRA Roofing Systems, 1230 Railroad Street, Corona, CA 92882 (951-272-8180), (951-272- 4476 FAX). 2.2 MATERIALS A. Metal Tile: DECRA Villa Tile interlocking panels, with an interlocking nose, resembling barrel roofing tile. 1. Material: Pressure formed, Aluminum-Zinc Alloy Coated Steel with 5, 3-1/4", raised barrels. 2. Finish: Ceramic coated, colored stone chip finish. 3. Thickness: 26 Gauge, .0179 inches (.455 mm). 4. Size: 17" wide by 44-1/4" long (432 by 1124 mm). 5. Exposure: 14-112" wide by 39-1/2" long (368 by 1003 mm). 6. Weight: 160 pounds per square. DECRA Roofing Systems Master Guide Specifications 07314 - 3 Stone Coated Metal Roof Tile (Villa Tile) 12-07-07 Make color selection from the choices below and delete the colors not required for the project. ************************************************************************************************************************ ************************************************************************************************************************ 7. Color: [Amalfi Sand] [Capri Clay] [Pompeii Ash] [Rustico Clay] [Venetian Gold]. 8. [Meets requirements of Dade County, Florida Acceptance No. 07-1129.04.] 9. [Florida Approval No. 0759.5.] B. Flashing: 1. Valley: DECRA Villa Valley - 26 Gauge, .0179 inches (.455 mm), Aluminum-Zinc Alloy Coated Steel sheet, ASTM A792/A792M, 17" wide, 3-114" center upstand. ************************************************************************************************************************ Select the appropriate flashing for the project type. ************************************************************************************************************************ 2. [Side Flashing: DECRA Villa Channel - Aluminum-Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed to flash vertical roof surface transitions. Finish: Paint to match roofing material.] 2. [Roof to Wall Flashing: DECRA Villa Channel - Aluminum-Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed to flash vertical roof surface transitions. Finish: Pain to match color to exterior finish.] 3. Pipe Jack Flashing: 26 Gauge, .0179 inches (.455 mm) galvanized or Aluminum-Zinc Alloy Coated Steel, clean, prime and paint to match roof material. 4. Underpans - DECRA Villa Tile: Aluminum-Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed to counterflash roof penetrations matching tile material profile. C. Hip & Ridge: Ridge and hip covers, bird stop, rakes and other trim required, matching tile material, color, and finish. 1. Hips 1 Ridges and Rakes - DECRA Tile: Barrel Hip & Ridge. 2. Fascia Metal: DECRA Bird Stop Eave - Aluminum-Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed eave closure. Finish: Ceramic coated, colored stone chip finish to match roofing material. 3. Ridge Bird Stop: DECRA Bird Stop Ridge - Aluminum-Zinc Alloy Coated Steel sheet, 26 Gauge, .0179 inches (.455 mm), pressure formed angle installed at ridge. Finish: Ceramic coated, colored stone chip finish to match roofing material. 2.3 A. ACCESSORIES Sheet Metal Materials: Aluminum-Zinc Alloy Coated Steel sheet: ASTM A 792/A 792M, Class AlSO (Al150) coating designation; minimum Grade 37 (Grade 255). ************************************************************************************************************************ Do NOT use LEAD or COPPER with this aluminum-zinc alloy coated steel roofing system. ************************************************************************************************************************ B. Felt Underlayment: ASTM D 226, Type I, No. 15 or ASTM D 226, Type II, No. 30, unperforated, asphalt-saturated organic felt. As required by local building code. C. Perimeter Underlayment: ASTM D 1970; self-adhering, polymer-modified, bituminous sheet underlayment; 40 mils (1 mm) thick. Provide primer when recommended by underlayment manufacturer. As required by local building code. D. Sealant: One-part elastomeric polyurethane, sealant as recommended in writing by panel manufacturer. Where sealant will be exposed, provide in color to match panels. 1. Standard: ASTM C920-86. E. Fasteners: Screws - Minimum No.8, 1 inch (25 mm) long, or of sufficient length to penetrate substrate 1/2 inch (12.7 mm) minimum with either a black or color finish matching the panels. DECRA Roofing Systems Master Guide Specifications 07314 - 4 Stone Coated Metal Roof Tile (Villa Tile) 12-07 -07 PART 3 - EXECUTION ************************************************************************************************************************ Include the following [noted] requirements for re-roofing applications when required by project require- ments. ************************************************************************************************************************ 3.1 A. 3.2 A. 3.3 A. EXAMINATION Examine substrate and conditions for compliance with requirements for maximum moisture content, soundness of framing, and other conditions affecting performance of DECRA metal roofing. [Damaged, rotted or loose roofing materials shall be removed and the substrate corrected for re-roofing applications]. Proceed with installation only after unsatisfactory conditions have been corrected. B. PREPARATION Inspect and verify roof framing spacing and installation is straight, true and ready for installation of battens and DECRA roof panels. Coordinate installation of metal panels with flashing and other adjoining work to ensure proper sequencing. Do not install roofing until vent stacks and other penetrations through roofing have been installed, are securely fastened and flashing is in place. Inspect and verify exterior stucco and EIFS wall enclosures are completed. C. B. INSTALLATION General: Comply with manufacturers written instructions for products and applications indicated, unless more stringent requirements apply. Valleys: Install in accordance with manufacturers instructions with a minimum 6 inch overlap in direction of flow. Flashing: Install as indicated on approved submittals and in accordance with manufacturers written instructions. Tile Panels: Install DECRA Villa Tile, accessories, flashing, and hip & ridge level and plumb. Use fasteners per above specifications. 1. Install each DECRA Villa Tile Panel with alternating courses staggered in accordance with manufacturer's instructions. C. D. ************************************************************************************************************************ Specify the appropriate number of fasteners per code requirements. Metro-Dade may require additional fasteners. ************************************************************************************************************************ 2. Fasten each panel with minimum 4 fasteners horizontally along the back flange of each panel at pre-punched tabs. 3. First course of panels positioned at eave will require 4 fasteners in the nose of the panel. E. Cut DECRA panels into each side of valleys in accordance with the manufacturer's instructions straight and true to the line of the valley. F. Hip & Ridge: Install Barrel Hip & Ridge along hips, ridges and rakes as indicated on approved submittals and in accordance with manufacturers written instructions. Bend and fold exposed ends of hips ridges and neatly, cap with an end cap or a piece of similar material. DECRA Roofing Systems Master Guide Specifications 07314 - 5 Stone Coated Metal Roof Tile (Villa Tile) 12-07-07 3.4 CLEANING AND PROTECTION G. Damaged Units: Replace panels and other components of the work that have been dented, damaged or have deteriorated beyond successful repair by finish touchup with acrylic coating and stone chip granules. H. Cleaning: After completing installation, remove any debris from the roof. I. Foot Traffic: Avoid walking on side laps. Foot traffic should be kept to the tile pans or low points, not on the high points, to prevent denting of panels. END OF SECTION 07314 DECRA Roofing Systems Master Guide Specifications 07314 - 6 Stone Coated Metal Roof Tile (Villa Tile) 12-07-07