Loading...
HomeMy WebLinkAbout09-8767 CITY OF ZEPHYRHILLS 5335-8TH STREET (813)780-0020 8767 BUILDING PERMIT Permit Number: 8767 Address: 7243 APPLEGATE DR Permit Type: ADDITION/ALTERATION ZEPHYRHILLS, FL. Class of Work: 434-ADD/ALT RESIDENTIAL Township: Range: Book: Proposed Use: NOT APPLICABLE Lot(s): Block: Section: Square Feet: Subdivision: ALPHA VILLAGE Est. Value: Parcel Number: 35-25-21-0050-00000-0090 Improv. Cost: 1,600.00 .,, Hi Date Issued: 2/04/2009 Name: WILLIS, WADE & KIMBERLY Total Fees: 60.00 Address: 7243 APPLEGATE DR Amount Paid: 60.00 ZEPHYRHILLS, FL. 33542 Date Paid: 2/04/2009 Phone: (813)997-3347 Work Desc: REPLACE PATIO DOOR SIZE/SIZE 6tURCSW1I1 = c "> nd J&G CARPENTRY INC BUILDING FEE 60.00 FOOTER 2ND ROUGH PLUMB MISC INSULATION CEILING FOOTER BOND DUCTS INSULATED SEWER MISC. ROUGH ELECTRIC LINTEL MISC MISC. 1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC. DUCTS INSTALLED WATER MISC DRIVEWAY PRE-SLAB SHEATHING MISC. MISC. CONSTRUCTION POLE FRAME MISC. MISC. REINSPECTION FEES: Reinspection fees will comply with Florida Statute 553.80 (2)(c) when extra inspection trips are necessary due to any one of the following reasons: a)wrong address b) condemned work resulting from faulty construction c) repairs or corrections not made when inspections called d)work not ready for inspection when called e) permit not posted on job site f) plans not at job site g) work not accessible. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management, state agencies or federal agencies. The payment of inspection fees shall be made before any further permits will be issued to the person owning same "Warning to owner: Your failure to record a notice of commencement may result in your paying twice for improvements to your property. If you intend to obtain financing, consult with your lender or an attorney before recording your notice of commencement." � 1 CONT CTOR SIGNATURE PERMIT OFF! R PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED PROTECT CARD FROM WEATHER STATE OF FLORIDA, COUNTY OF PASCO THIS IS TO CERTIFY THAT THE FOREGOING IS A TRUE AND CORRECT COPY OF THE DOCUMENT ON FILE OR OF PUBLIC RECORD IN THIS OFFICE WIT ES MY HAND,AN 1CIAL SEAL THIS DAY 2 O PAULA S. O' RK&COMPTROLLE BY DEPUTY CLERK City of Zephyrhills BUILDING PLAN REVIEW COMMENTS Contractor/Homeowner: V 4 Date Received: `- .2 Z--Q g Site: 7 2 '(3 ,4q/ (e L)r Permit Type: 4/ c ,%)( Approved w/no comm Approved w/the below comments: ❑ Denied w/the.below comments: O • This comment sheet shall be kept with the permit and/or-plans. Kalvin Switzer—flans Examiner Date . Contractor.and/or Homeowner (Required when comments are present) 813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 Building Department 1(Q 1 Date Received I Phone Contact for PermittinJ I IAI- I J Owner's Name Owner Phone Number I W Owner's Address 143' Owner Phone Number( c *_r' Q.. I Fee Simple Titleholder Name Owner Phone Number I '.3 -Vt. Fee Simple Titleholder Address JOB ADDRESS I n7r43LOT# I SUBDIVISION ' PARCEL ID# cJ (OBTAINED FROM PROPERTY TAX NOTICE) WORK PROPOSED e NEW CONSTR e ADD/ALT SIGN Q MOVE Q DEMOLISH INSTALL REPAIR PROPOSED USE Q SFR Q COMM Q OTHER TYPE OF CONSTRUCTION Q BLOCK 0 FRAME Q STEEL Q OTHER DESCRIPTION OF WORK I - S 7�- Y' BUILDING SIZE I SQ FOOTAGE I HEIGHT C liii BUILDING $ � VALUATION OF TOTAL CONSTRUCTION Q ELECTRICAL $ AMP SERVICE Q PROGRESS ENERGY 0 W.R.E.C. Q PLUMBING $ I 0 MECHANICAL $ VALUATION OF MECHANICAL INSTALLATION 0 GAS Q ROOFING Q SPECIALTY Q OTHER FINISHED FLOOR ELEVATIONS FLOOD ZONE AREA YES =NO BUILDER /`i COMPANY SIGNATURE r f'�l b REGISTERED Y/ N FEE CURRENT Y/N Address License# 9, I ELECTRICIAN COMPANY SIGNATURE REGISTERED I Y/ N I FEE CURRENT I Y/N Address f I License# I PLUMBER COMPANY SIGNATURE REGISTERED I Y/ N I FEE CURRENT I Y/N Address I License# MECHANICAL COMPANY SIGNATURE REGISTERED I Y/ N I FEE CURRENT I Y/N Address I License# I I OTHER COMPANY SIGNATURE REGISTERED I Y/ N I FEE CURRENT I Y/N Address I License# RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction, Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans wl Silt Fence installed, Sanitary Facilities&1 dumpster;Site Work Permit for subdivisions/large projects COMMERCIAL Attach(3)sets of Building Plans;(1)set of Energy Forms.R-O-W Permit for new construction. Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence Installed, Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requirements must meet compliance SIGN PERMIT Attach(2)sets of Engineered Plans. ****PROPERTY SURVEY required for all NEW construction. Directions: Fill out application completely. Owner&Contractor sign back of application,notarized If over$2500,a Notice of Commencement is required. (A/C upgrades over$5000) ** Agent(for the contractor)or Power of Attorney(for the owner)would be someone with notarized letter from owner authorizing same OVER THE COUNTER PERMITTING (Front of Application Only) Reroofs Sewers Service Upgrades A/C Fences(Plot/Survey/Footage) Driveways-Not over Counter if on public roadways..needs ROW NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed" restrictions" which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any applicable deed restrictions. UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation under state law. If the owner or Intended contractor are uncertain as to what licensing requirements may apply for the intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco County. TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to deliver it to the"owner"prior to commencement. CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive Lands,Water/Wastewater Treatment. - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering Watercourses. - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, Septic Tanks. - US Environmental Protection Agency-Asbestos abatement. - Federal Aviation Authority-Runways. I understand that the following restrictions apply to the use of fill: Use of fill is not allowed in Flood Zone"V"unless expressly permitted. - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer licensed by the State of Florida. If the fill material is to be used in Flood Zone "A in connection with a permitted building using stem wall construction, I certify that fill will be used only to fill the area within the stem wall. If fill material is to be used in any area, I certify that use of such fill will not ,adversely affect adjacent properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating the conditions of the building permit issued under the attached permit application, for lots less than one (1) acre which are elevated by fill, an engineered drainage plan is required. If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A permit issued shall be construed to be a license to proceed with the work and not as authority to.violate, cancel, alter, or set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate justifiable cause for the extension. If work ceases for ninety(90)consecutive days, thq�iob is considered abandoned. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY EFORE RECORDING YOUR NOTICE OF COMMENCEMENT. FLORIDA JURAT(F.S.117.03) OWNER O AGENT CONTRACTOR S b bed an o(or a rrne be Sub d and sworn or affl )b by by o i are ersonally Hewn to meor ha eve produ ed, VVho /are personally kr to me or has/have prod ced p _as identification. as identification. Notary Public L. 4�()tary Public Commissio o. Commission No. Name of Nota typed,printed or stamped Name of Notary typed,pri ed or stamp .�pv°>p �otay f'u4fir,State o�Ffr�rida `�: r,s lotary Pt bile State of Florida :° sheuy Be wick r°� ;i1e ry B S'NiCk ;L� p nmiysiGn Dr7745038 iF CJ � z I—z3-cq ,�s Florida Building Code Online Page 1 of 7 BCIS Home Log In Hot Topics Submit Surcharge Stats & Facts Public Product Approval USER: Public User Product Approval Menu > Product or Application Search > Application List > A 4ptlrP ,Y FL # FL1097-R1 Application Type Revision Code Version 2004 Application Status Approved Comments Archived ■ Product Manufacturer Andersen Corporation Address/Phone/Email 100 Fourth Avenue Nc Bayport, MN 55003 (651) 264-5308 abarstad@andersenco Authorized Signature Alan Barstad abarstad@andersenco Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Exterior Doors Subcategory Swinging Exterior Doo Compliance Method Certification Mark or L Florida Building Code Online Page 2 of 7 Certification Agency Window and Door Man Referenced Standard and Year (of Standard Standard) 101/I.S.2 101/I.S.2/NAFS ASTM E 1996 Equivalence of Product Standards Certified By Product Approval Method Method 1 Option A Date Submitted 11/02/2005 Date Validated 11/14/2005 Date Pending FBC Approval 11/14/2005 Date Approved 12/06/2005 Summary of Products FL # [Model, Number or Name Descripl 1097.1 400 Series Frenchwood Hinged Wood In! Patio Door - Double - Impact Resistant Limits of Use (See Other) Certifica Approved for use in HVHZ: Installai Approved for use outside HVHZ: PTID 1C Impact Resistant: PTID 1C Design Pressure: +/- PTID 1C Other: Hallmark Certificate: 129-H-665.02 Rating is Impact.p HGD-R45 72" x 83" Unit tested was a FWH60611AP Verified with HPIR Glass Hallmark Certificate: 129-H-665.04 Rating is Missle Level D, Cycle Pressure +50/-65 Unit tested was a FWH60611AP with HPIR Glass Hallmark Certificate: 129-H-673.01 Rating is HGD-R40 1810mm x 2426mm Unit tested was a FWH6080SA with HPIR Glass Hallmark Certificate: 129-H-673.00 Rating is HGD-R40 72" x 96" Unit tested was a Florida Building Code Online Page 4 of 6 Impact Resistant: Design Pressure: +/- Other: Hallmark Certificate: 129-H-617.00 Rating is HGD-R55 108" x 83" Unit tested was a FWH90611SAS with HP Glass Hallmark Certificate: 129-H-617.01 Rating is HGD-R40 108" x 96" Unit tested was a FWH9080SAS with HP Glass 1097.6 400 Series Frenchwood Wood Outswing Patio Door Outswing Patio Door - I Double - Impact Resistant Limits of Use (See Other) Certification Agency Certificate Approved for use in HVHZ: Installation Instructions Approved for use outside HVHZ: Verified By: Impact Resistant: Design Pressure: +/- Other: Hallmark Certificate: 129-H-647.00 Rating is HGD-050 72" x 96" Unit tested was a FWO6080AP with HPIR Glass Hallmark Certificate: 129-H-643.00 Rating is Missle Level ( D, Cycle Pressure +50/-65 Unit tested was a j FWO6080AP with HPIR Glass 1097.7 400 Series Frenchwood Wood Outswing Patio Door Outswing Patio Door - ( Double - Non Impact Limits of Use (See Other) Certification Agency Certificate Approved for use in HVHZ: Installation Instructions Approved for use outside HVHZ: Verified By: Impact Resistant: Design Pressure: +/- Other: Hallmark Certificate: 129-H-678.02 Rating is HGD-R50 72" x 83" Unit tested was a FWO60611AP with HP Glass Hallmark Certificate: 129-H-682.00 Rating is HGD-LC40 72" x 96" Unit tested was a FWO6080AP with HP Glass Hallmark Certificate: 129-H-681.00 Rating is HGD-LC55 72" x 96" Unit tested was a FWO6080AP with DP Upgrade and HP Glass f 1097.8 400 Series Frenchwood Wood Outswing Patio Door Outswing Patio Door - Single - Impact Resistant Limits of Use (See Other) Certification Agency Certificate Approved for use in HVHZ: Installation Instructions Approved for use outside HVHZ: Verified By: Impact Resistant: Design Pressure: +/- Other: Hallmark Certificate: 129-H-645.00 Rating is HGD-050 37" x 96" Unit tested was a FWO3180A with HPIR Glass Hallmark Certificate: 129-H-644.00 Rating is Missle Level D, Cycle Installation Guide Installation Guide Andersen for Andersen® Frenchwood® Outswin Patio Door or WI N DOW S'DO OR S Congratulations! You have just purchased one of the many fine Andersen®products. Proper assembly, installation and maintenance are essential if the benefits of your Andersen product are to be fully attained. Therefore, please read and follow this instruction guide completely. If your abilities do not match this procedure's requirements, contact an experienced contractor. You may direct any questions about this or other products to your local Andersen dealer, found in the Yellow Pages under"Windows" or call Andersen WindowCare®service center at 1-888-888-7020 Monday through Friday, 7 a.m.to 7 p.m. Central Time and Saturday, 8 a.m.to 4 p.m. Central Time. Thank you for choosing Andersen. . . • Every assembly and installation is different (windloads, structural support, etc.). Andersen strongly recommends consultation with an Andersen supplier or an experienced contractor, architect, or structural engineer prior to the assembly and installation of any Andersen product. For installation methods not covered in this guide, (i.e.through jamb) please visit the Architect Detail File on the web (www.andersenwindows.com). Andersen has no responsibility in regard to the post-manufactured assembly and installation of Andersen products. - t ► - ! ► - Using ladders and/or scaffolding and Improper use of hand/power Weight of window/door unit(s) working at elevated levels may be hazardous. tools could result in personal and accessories will vary. Use a Follow equipment manufacturer's injury and/or product damage. reasonable number of people with instructions for safe operation. Use extreme Follow manufacturer's sufficient strength to lift, carry, caution when working around window and instructions for safe operation and install window and door door openings. Falling from opening may of equipment. Always wear unit(s) and accessories. Always result in personal injury or death. safety glasses. use appropriate lifting techniques. r ► - Unless specifically ordered, Andersen windows and doors are not equipped with safety glass, and if broken, could fragment causing injury. Many laws and building codes require safety glass in locations adjacent to or near doors. Andersen windows are available with safety glass that may reduce the likelihood of injury when broken. Information on safety glass is available from your local Andersen dealer. • Andersen®Head Flashing and Installation Flanges DO NOT take the place of standard window and door flashing. Unit must be properly flashed and sealed with silicone for protection against water and air infiltration. Use non-reflective flashings. Highly reflective flashing tapes can raise the surface temperature of the vinyl to the point where vinyl deformation and product damage may occur. • Do not apply any type of film to glass. Thermal stress conditions resulting in glass damage could occur. • Use of movable insulating materials such as window coverings, shutters, and other shading devices may damage glass and/or vinyl. In addition, excessive condensation may result causing deterioration of windows and doors. "Andersen" and "Andersen WindowCare° are registered trademarks of Andersen Corporation. All other marks where denoted are marks of Andersen Corporation. ©1997,2003-2004 Andersen Corporation. All rights reserved. Instruction Guide 0005221 Revised 03/11/04 1 Installation Guide Parts Included Optional Accessories (1) Instruction Guide •Sill Support DO NOT carry door unit horizontally, exterior down. (1) Door Unit •#10 x 2-1/2" Screw Door panels may swing oper causing product damage and/or severe personal injury. (3) Installation Flange (1) Temporary Locking Handle (1) Screw Pack Unsecured door may swing = Tools & Supplies open or closed causing injury. •Safety Glasses •Hand Level •Clamp Secure door when open. _ / L • Phillips Screwdriver •Small Pry Bar •Shims • Flat Blade Screwdriver •Silicone Sealant •Hammer •Finish Nails • Steel fasteners will corrode when used with ACQ •Tape Measure •Caulk Gun Pressure Treated Lumber. • Obtain and use the appropriate size stainless steel Component Identification screws, as called out in this installation guide, to fasten unit to any rough opening made from ACQ Pressure Treated Lumber. Head • Failure to use stainless steel fastners may result in Installation Flanges fastner corrosion causing product damage. Side Installation NOTICE Flanges If your Andersen®Frenchwcod®Outswing Patio Door will be equipped with Exterior Sill Extension Active these accessories must be applied to door unit Panel before installation. NOTICE Single Panel Optional Panel Removal Panels may be removed for easier installation. Passive Panel Refer to Panel Removal and Reinstallation Guide #0005225, included in installation packet. Head Installation Panel Operation Flanges Active Panel will open first. Passive Panel will Side operate only after Active Panel has been opened. Installation a Flanges Lock Operation TO LOCK ' L'F' Active • To lock, lift handle to engage upper HANDLE Panel and lower hook bolts. Turn lock turnpiece to horizontal position. __ RN • To unlock, turn lock turnpiece to 2.o K vertical position. Open door by or turning handle downward. i Double Panel Exterior Views 2 Installation Guide 1. Prepare Rough Opening • Frame rough opening to dimensions from table below according to unit size. SINGLE PANEL UNITS Unit No. 2168 2768 2968 3168 21611 27611 29611 31611 2180 2780 2980 3180 Rough Opening Width 2'1" 2'7" 2'9" 3'1" 2'1" 2'7" 2'9" 3'1" 2'1" 2'7" 2'9" 3'1" Height 6'8" 6'8" 6'8" 6'8" 611" 611" 611° 611" 8'0" 8'0" 8'0" 8'0" Approximate Weight(lbs.) Standard Units 100 105 115 125 110 115 125 135 125 135 150 160 Impact Resistant Units 115 126 138 152 126 137 149 163 144 161 179 194 DOUBLE PANEL UNITS Unit No. 4168 5068 5468 6068 41611 50611 54611 60611 4180 5080 5480 6080 Rough Opening Width 4'1" 5'0" 5'4" 6'0" 4'1" 5'0" 5'4" 6'0" 4'1" 5'0" 54" 6'0" Height 6'8" 6'8" 6'8" 6'8" 611" 611° 611" 611° 8'0" 8'0" 8'0" 8'0" Approximate Weight(Ibs.) Standard Units 150 185 197 215 165 195 205 225 185 230 248 275 Impact Resistant Units 180 227 243 305 197 239 253 281 223 282 306 343 DO NOT install unit directly on masonry/concrete surface. Place a full length barrier (i.e.treated wood, tar paper, ice/water membrane) between unit sill and Rough masonry/concrete surface. Failure to use barrier and Opening sealing it to masonry/concrete surface and unit sill Width may result in product and/or property damage. Entire Rough Opening barrier must be sealed to masonry/concrete surface Height to help prevent water infiltration. Barrier thickness must not exceed 1/4". • Check sill plate for level. Sill must be level. Shim sill Standard Construction plate if necessary. • Check rough opening for plumb and level. If rough opening is not plumb or level, correct as necessary. • Check opening for square by measuring diagonally, Rough upper left to lower right and upper right to lower left Opening Width corner. If measurements are the same, opening is square. If rough opening is not square, correct Rough Opening aS necessary. Height Masonry/Concrete Construction 3 Installation Guide 2. Prepare Unit - Support Boards Door Panels must be in locked position before beginning. Failure to do so may result in Door Panels inadvertently opening causing personal injury and/or product damage. Interior Side Up Weight of Patio Doors will vary. Use a reasonable Door Panel number of people with sufficient strength to lift, carry, and install door unit(s) and accessories. Flat Blade Always use appropriate lifting techniques. Screwdriver • Carefully remove unit from carton. • Insert the Temporary Lock Handle into lock on Door 0 Panel and lift upwards. Use a flat blade screwdriver to lock dead bolt. Doors must be in locked position before beginning. • Place unit interior side up on support boards over a clean flat work surface to protect hinges. Temporary Lock Handle • Remove packaging blocks. 3. Apply Installation Flanges Rotate Jamb AInstallation Flange • Side Installation Flanges must overlap Head Installation Flanges to the interior to help prevent water infiltration. • Install Installation Flanges by hand only. Use of hammer or other tools may damage unit or flanges. Snap NOTICE DO NOT apply Installation Flanges to unit if installing unit into masonry/concrete walls or Head Installation Flange remodeling/replacement applications where flanges Overlap cannot be used. • Position Head Installation Flange on center of Head Side Jamb, snap into groove and rotate flange down until ns Itallation perpendicular to jamb. Flange • Repeat for Side Installation Flanges positioning flush with bottom of door unit. Side Installation Flush at Flanges must overlap Head Installation Flange Bottom when viewed from the interior. Interior Side Up 4 Installation Guide 4. Install Sill Support or Wood Blocking Sill must be supported its entire length and width or Sill deformation may occur. Sill © ° • Install wood blocking or Andersen®Sill Support under Sill on the exterior to support the door, if necessary. Exterior Sill must be supported its entire length and width. Wood Blocking A �aMVaoa Wood Blocking DO NOT install unit directly on masonry/concrete surface. Place a full length barrier(i.e.treated wood, tar paper, ice/water membrane) between unit sill and masonry/concrete surface. Failure to use barrier and sealing it to masonry/concrete surface and unit sill may result in product and/or property damage. Entire barrier must be sealed to masonry/concrete surface Sill © to help prevent water infiltration. Barrier thickness must not exceed 1/4". Exterior Andersen® Sill Support Andersen®Sill Support 5. Seal Frame and Rough Opening • Clean and prepare surfaces receiving Silicone Sealant following manufacturer's instructions. 1/2" 2-1/2" Failure to do so may result in water infiltration. Caulk Gun • Complete installation of all fasteners before Silicone Sealant cures. If silicone sealant sets Silicone Sealant before Sill Receiver is secure (Step 12), sill bow and improper unit operation may result. Exterior View Silicone Sealant • Apply two 3/8" beads of Silicone Sealant to bottom of Caulk Gun rough opening, 1/2" and 2-1/2"from exterior edge. • Apply a 1/4" bead of Silicone Sealant to interior surface of Head and Side Installation Flanges and at corners where flanges intersect at Head Jamb. Installation Flange Interior Side Up 5 Installation Guide 6. Lift Door into Rough Opening ! - Weight of Patio Doors will vary. Use a reasonable number of people with sufficient strength to lift, carry, and install door unit(s) and accessories. Always use appropriate lifting techniques. r ! - Installation Support unit in rough opening at all times until Flange secured. Failure to support unit could result in unit falling out causing product damage and/or personal injury. • DO NOT use Installation Flanges for fastening unit. Installation Flanges are for sealing only, Installation Flanges must be flush with exterior of rough opening. • Lift unit into rough opening to avoid displacing silicone. DO NOT slide. • Lift door unit into rough opening from the exterior, setting Sill of unit onto Silicone Sealant. DO NOT slide into rough opening. Exterior View • Center unit and press firmly into Silicone Sealant. Installation Flanges must be positioned flush with exterior of rough opening. 7. Plumb Unit • Adjust door in opening from the interior, entire unit must be plumb, level, and square. • Check unit for plumb and level. If unit is not plumb or level, correct as necessary. • Check unit for square by measuring diagonally, upper left to lower right and upper right to lower left corner. Level If measurements are the same, opening is square. If unit is not square, correct as necessary. Interior View 6 Installation Guide 8. Shim Unit • Shim between rough opening and door unit Shims directly above and below hinges and near Shims each fastener hole at head of unit. Shims help prevent bowing when unit is fastened to rough opening. Installation Flange Interior View 9. Secure Unit A@Laa4DQ } • Steel fasteners will corrode when Head Jamb Side b 1 1 1 1 used with ACO Pressure Treated Lumber. • Obtain and use the appropriate size stainless steel screws, as called out ii in this installation guide, to fasten unit to any rough opening made from ACQ Pressure Treated ._. Lumber. • Failure to use stainless steel fastners may result in fastner Installation corrosion causing product damage. Screw Interior View • Fasten #10 x 3"Installation Screws through all predrilled holes in Side Jambs and Head Jamb from the interior. Check unit for plumb and level while fastening screws. • Reinstall Door Panels if panels were removed for installation. Refer to Panel Removal Instruction Guide #0005225, included in installation packet for panel reinstallation. Installation Guide 10. Check Door Clearance and Swing Door Panel • Unlock doors using a flat blade screwdriver to turn dead bolt clockwise, then insert Flat Blade Screwdriver Temporary Lock Handle into lock on Door Panel and turn downwards. 0 • Check if clearance and/or swing are correct. Door should remain motionless when positioned at any point in the entire swing range. Temporary If clearance and/or swing are not correct: Lock Handle • First, check and adjust unit plumb and Interior View square. Second, check and adjust sill for _ _ ] level. Third, refer to Patio Door Hinge and Hardware Adjustment Installation Guide #0005105. • For Single Panel units proceed to Step 11. For Double Panel units proceed to Step 12. Door should remain motionless Exterior when positioned at any point in View the entire swing range. 11. Secure Through Lock Receivers (Single Panel Units Only) A@ 1t1© t1©a • Steel fasteners will corrode when used with ACQ Pressure Treated Lumber. Side Jamb • Obtain and use the appropriate size stainless steel screws, as called out in this installation guide, to Installation fasten unit to any rough opening made from ACQ Screw Pressure Treated Lumber. • Failure to use stainless steel fastners may result init fastner corrosion causing product damage. • For Single Panel units fasten through Lock Receivers Lock Receiver on Side Jamb using #10 x 3"Installation Screws. Proceed to Step 13. __ t Exterior Interior Singe Panel Lock Jamb 8 Installation Guide 12. Secure Through Hardware (Double Panel Units Only) 1/2"x 4"x 10"Shim Block • Steel fasteners will corrode when used with ACQ (Units withStormwatch'°ProtectionOnly) Pressure Treated Lumber. Receiver• Obtain and use the appropriate size stainless steel Basket ReinforcementBracket screws, as called out in this installation guide, to fasten unit to any rough opening made from ACQ Pressure Treated Lumber. Head Jamb • Failure to use stainless steel fastners may result in Lock Receiver fastner corrosion causing product damage. Head Jamb A a aoa Stainless Steel Installation Screws • DO NOT bow Head Jamb when blocking and (replacement for 1"screws) shimming. Interference with Door Panels will result affecting product performance and/or proper Double Panel Head Jamb* operation of unit. • DO NOT fasten#10 x 3" Installation Screw through Interior View receiver basket on Head Jamb Lock Receivers until all other receiver screws are fastened. Doing so may cause rocking of Head receiver plate and may affect product performance and/or operation of unit. • For Double Panel Units with Stormwatch- Protection, place a 1/2"x 4"x 10"shim block directly above Head Jamb Lock Receiver, between header and Head Jamb. • Remove screws and cardboard spacer from Head Jamb Lock Receiver. Refasten Lock Receiver using two #10x 3"installation Screws. • Fasten #10 x 3"Installation Screws through Reinforcement Bracket and each receiver basket at a 15° angle toward the interior. Outer screws must be secured first. (For Double Panel Units with Stormwatch" Protection, all screws must pass through shim block) 9 Installation Guide 12. Secure Through Hardware, continued (Double Panel Units Only) • Steel fasteners will corrode when used with ACQ Pressure Treated Lumber. Stainless Steel • Obtain and use the appropriate size stainless steel Installation screws, as called out in this installation guide, to Screws fasten unit to any rough opening made from ACQ Receiver Basket Pressure Treated Lumber. • Failure to use stainless steel fastners may result in fastner corrosion causing product damage. Sill Lock Receiver #10 x 2-1/2"Screw A@QUUD@M Rout Pocket DO NOT fasten #10 x 3" Installation Screw through / Sill receiver basket on Sill Lock Receiver until all other receiver screws are fastened. Doing so may cause rocking of Sill receiver plate and may affect product performance and/or operation of unit. Interior View Double Panel Sill* • Remove plastic fasteners and cardboard spacer from Sill Lock Receiver. *For STANDARD UNITS only. • Apply Silicone Sealant to all holes located in Sill rout pocket. Remove Sill Lock Receiver and fasten a #10 x 2-1/2" screw (not included) into predrilled hole in rout pocket to keep Sill level and prevent upward draw. For masonry/concrete subfloor, predrill hole into concrete prior to installation. • Replace Sill Lock Receiver and fasten using two#10x3" Installation Screws. Fasten an additional#10x3" Installation Screwthrough each receiver basket at a 15° angle toward the interior. • Check for equal panel/frame reveal along Side Jambs, Head Jamb, and Sill. If door adjustment is necessary, refer to the Frenchwood® Outswing Hinge and Hardware Adjustment Instruction Guide. 10 Installation Guide 13. Apply Interior Stops • Close and lock Door Panels. • Fasten Interior Stops to Head and Side Jambs using finish nails. Leave 1/32" space between Door Panel and Interior Stops. Interior Stop Finish Interior Stop Nail Interior Stop Interior View 1/32" Door Panel 14. Seal Unit 1/4" 1/4" • Apply exterior finish over Installation Flanges leaving 1/4" between door frame and exterior finish. 1/4" • Apply a continuous bead of Silicone Sealant around exterior perimeter of door between frame and exterior finish. Silicone Sealant Exterior View 15. Insulate Around Unit When insulating between the unit frame and rough opening,or between units when joining, DO NOT overpack batt insulation or overfill with foam. Bowed jambs will result, adversely affecting product performance and/or proper unit operation. • Insert insulation between frame and rough opening from the interior side of door. DO NOT overpack batt insulation or overfill with foam. Batt Insulation Interior View 11 Installation Guide Finishing, Cleaning, and Maintenance Instructions �����,�O� INTERIOR FINISHING Read and follow finishing manufacturer's instructions • DO NOT expose unfinished wood to high and warnings on each container of finish material for moisture conditions, excessive heat or humidity. priming, painting, staining, and varnishing. Finish interior wood surfaces immediately after CLEANING installation. Unfinished wood surfaces will Clean exterior frame, sash members, and insect discolor, deteriorate, and/or may bow and split. screens using a mild detergent-and-water solution and • DO NOT stain or paint weatherstrip, silicone a soft cloth or brush. DO NOT use abrasive cleaners or beads, vinyl, glass, or hardware, solutions containing corrosive solvents. For persistent • Acid solutions used to wash masonry/concrete dirt or grime, use a nonabrasive cleanser or a mixture will damage glass, fasteners, hardware, and of water and alcohol or ammonia. metal flashing. Follow the acid solution MAINTENANCE manufacturer's instructions carefully. Protect and/or cover Andersen products during the Immediately sand and refinish any interior wood that cleaning process to prevent acid contact. If acid becomes stained or mildewed to prevent further does come in contact with unit, immediately discoloration and/or damage. For further information, wash all surfaces with clean water. contact your local Andersen dealer. Dealers can be found in the Yellow Pages under Windows. 12