HomeMy WebLinkAbout11-12625 CITY OF ZEPHYRHILLS �/
' S335 - 8TH STREET
(si3)�so-oo20 12625
. BUILDING PERMIT
Permit Number: 12625 Address: 39050 MANOR DR
Permit Type: RE-ROOF ZEPHYRHILLS, FL.
Class of Work: ROOF REPLACEMENT Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: ZEPHYR HEIGHTS
Est. Value: Parcel Number: 12-26-21-0050-00000-0100
Improv. Cost: 7,039.00
Date Issued: 12/16/2011 Name: CHENKIN FAMILY TRUST
Total Fees: 112.50 Address: 39050 MANOR DR
Amount Paid: 112.50 ZEPHYRHILLS, FL. 33542
Date Paid: 12/16/2011 Phone: (813)782-1984
Work Desc: REROOF RUBBER TPO
�) �rf�C�r�
C,�
�o�-�
T INT �FIN P ` �
FINAL �/li �
�
` � �/
` ___,___•-----'� �
EC�@rt : Reinspection fees will comply with Florida Statute 553.80 (2)(c) when extra inspection
trips are necessary due to any one of the following reasons: a) wrong address b) condemned work resulting
from faulty aonstruction c) repairs or corrections not made when inspections called d) work not ready for
inspection when called e) permit not posted on job site t) plans not at job site g) work not accessible.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing, consult with your lender or an attorney
before recording your notice of commencement."
Com lete Plans, Specifications Must Accompany Application. All work shall be performed in acxordance with
Ci Codes and Ordinances. NO OCCUPANCY BEFO C.O.
C, � /
� ' ,r-� ,
CONTRACT IGNATURE PERMIT OFFI R
PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
-
. ' f
..:�u ""''� �
�.,. '
� `.>>.,,,� xa .... '
City of Zephyrhills
BUILDING PLAN REVIEW COM1v�NT5
Contrac /Homeowner: '� y •
Date Received: ``� � � � j J
Site: ���� �. v C i�� /�'� �/�
Permit Type: � � �L� -�
/
Approved w/no comments: Approved w/the below comments: ❑ Denied w/the below comments: ❑
This comment sh t shall be kept with the permit andlor plans.
2-�6- �
Kal ' S er ans Examiner Dat Contractor and/or Homeowner
(Required when comments aze present)
MULE-HIDE PRODUCTS CO., INC.
, Summary Listing of Florida Approvals
TPO Roofing Systems
10771.5 Mule Hide Single Ply TPO Roof Single Ply Thermoplastic Roof Membrane
Systems over Steel Decks
- ; ..-
' Um1ts of Use CertHication Agenry Certlftcate
Approved for use In HVHZ: Yes FL30771 Rn. C CAG 030708os �taoi �
` Approved for use outside HVHZ: Yes Quality Assurance Cor�tract Expiration Date
� Design Pressure: +N/q/-g�, � Installatlon Instructions
° Other: 1.) Refer to current Miami-Dade NOAs. 2.) Impact FL10771 RO it 0'�mnanS a+ooi �
resistance referenced in this application relates to hail impact Verified ey: Miami-Dade BCCO - CER
; in accordance with FBC Sections 1504.7 (non-HYHZ) and Created 6y Independent Third Party:
� 1515,2.4 (HYHZ), not to missile impact resistance. Evaivation Repor[s
- Created bp tndeeendent Third Party:
Mute Wide �ir�gle=Pl,y TPO Roa� �ir�gle'Ply Thei'�id�tastie Rt�qf Meii��t,sr�e
� Sysfetris Q�r H1ood Deeks �
, . .. .... � _,_
' `: »a[�5 of U5e - - - - - - - - - -
l�.ti�ed f�c asB i� NVHZ: Yes �` '.��' �g'�'�����`
�T�-i'� ��l ,f�l�.,,C A� E+�f]3�I-81 i�f3Eld.r��'df
��►e�l ft�r qse•�ut�side H1dH�Z: 1�es �'
�e�ii�t:l�e5#s��llitc i°�s t�1!!�;�!�l�R,�'�o�r:ar:t Esc�aft�pn f�ata
'E1�� R�esst�re; �NF/-�F/�%kS.0 �=�'
yF �t 3�l.
�.�,:....���r�s
'�t: 1.) R6�er t+o edc�ant h�li�mf-�ade t�(3A�, 2.) ImRaRt �,- - ". ' gr�,Q: ., .�.
�,
��es _refe�n�d: i�► t�h'rs appfi,�a#ion c�eFa�es ta fiail impa�# ;: �`Ef'�y; ;��
� :a���iar�ce �nr��A.FB� �e�tron515�34.7 �no�-Fi:1tH atatl r :..•;
����,:P,4 <FwM�3 rao# to missils-ihap�ct i�esis�a��e ' •����`�r��a�d� �ir.�i-��y:
� ; -
, ;. :.�
�c
: . �'��� �,
:
,:. . _... . ,�,,�
... _
>: `:.:,�
..
;_
- .... ._ . . _ . - s
_ :.�_. _ _# �►�t ��.
ALL WORK SHALL COMPLY WITH ALL
pREVA1LING CODES, FLORIDA BUILDING
CODE, NATIONAL ELECTRIC CODE AND
CITY OF ZEPHYRHILLS ORDIIVAI�rCES
�t v��'!�" p�q���
` �-�p` �Ei� �����I�----
MYRHfLL
.;�_ f�ht;; L:: x�clfi,�tth�F� —_��
Revised Mar 2009
MULE-HIDE PRODUCTS CO., lNC:
. Summary Listing of Florida Approvals
TPO Roofing Systems
- ---_-. ... __...._.
-- -- -------- -- ----------- �-
: �.:. - - - -- - - - --- --
�. ----� __ _
,
....._.. --
. --- - - - --- --
,�,.... ..._.. . � _ .... . ___ __ -----
_. ..... � .._ -.. --- -
t ... ...... _.._�__ - -
.,.,,� �_ . , � .v ; .. . � - - _ . ._ _. -- -- - -
- -� _ .. .
_ . . • . _�, ._ ..,,y...x,...,_.��_. ._._. � .._ ,,, , _
_. ; ,.. _ . .. ,-:
:. -,
: io�7i,1 � _ ..� �..._.�:;. .... � � ,
' Mule Hide Sin le PI TPO Roof � - '• - ` °" "" • �--'
9 Y . Single Ply Therrnoplastic Roof Membrane
S stems over Ceme i'
{ - - c 5
:
, - _ . ,. � ----- ----- - : �
_ ..._ _ .
i Umits of Use --- .. .-..___.. -_- - --- _ --- - - . - . . _ _ _._ . - - --
� ... ___ -- -
' p ' certiflcation Agency certNicate
pproved for use In HVHZ: Yes i FL10771 RO C CAC 03070807 CWF �df
° APpraved for use outside HYHZ: Yes � Quality Assurance Corrtrad Expiration Date
Impact Resistant: Yes ; 08/12/2009
Design Pressure: +N/q/-120.D ; Installatian Instructions
Other: 1.) Refer tp currant Miami-Dade NOAs. 2.) Impact FL10771 RO II 0307080� rwG �
resistance referenced in this applicatian relates to hail impact Venfied By: Miami-Dade BCCO - CER
� in accordance with FBC Sections 15U4.7 (non-HVHZ) and ; Created by Independent Third Party:
; 1515.2.4 (HVHZ), not to missile impact resistance. E�aluatlon Reports
[:,,r. ,. a
, . ,..
` Cre ted by Independent Third Part�r:
' �����.,� • ' ` � . . - - --- ----- - - — - - --- --
. .( ---- -
.. _ . _
•-,
: �: _ P.1 _ T�?t3 , , �
; � __ .:.. .... _ ..... . ... ��.. _ . _ . . _ .. . .. . _ .
�..�
,
,
�
,.....sz ._... _ �a - . �4�6�8'�8..�'F2$ . _
�:?�i�.�� ;�D� � . °�"' �,
, „..
. , ,.: . , . . . . --- - � -
g ��
��
,.,.
... .
.� ::::.:� `
.
. , ., .
_
. r._.:.__. ��ks
.;
.. :
,_..
:,
'
�
�.
r
,:
. . _.
. _: ., � - -
, . ,� �� Y . M . :. - _ --- � - -
; s. �..�1Y.1��'r' ;,_��. >} ` :.r° . ,
:, 'a_.
. .'�,C�;'��5 � ,
t . : , +;.,� y;j: - �-� „ , . . • - „ . . . ,
1 , � .��'' '.¢t .- " � ,t, y � � 4 �; � z. �'. "1 ' _ -.
�_,`_ '. i..���F„� �i �' �:<'�. -.1.
.`.. _. -''' � , r:.
���: : y � , �� f � „�,, ` v i���� ., � Nr. � ✓: .,� �" � � •
. , � �>, ` .�'��,;; �+
t - , .. ?X4Y�1',, _. . � ,. . •. .
, ���?��?k=�a�i��a, •<;�- , •
� , ,. ; ;
� ��� ���':....
;
, 10771.3 � Mule Hide Single Ply TPO Roof ' Single Ply Roof Meafbrane
___ _._ ___ S stenls o�er G sum Decks � :
-- - - -� ------ - .. _.. __�.P._.. _ _ __ . „__ _ � -----" --- --- ------ - - -- - -
� Limits of use - --.. _ - --------.----,--. ,- -
� Certification A en Certlflcate
- -'
; Appror►ed fior use in HVHZ: Yes , FL10771 RU C 9 A 03070808 G su t
! Approved for use ouLSide HVHZ: Yes Yp�pdf
� Impect R�aslstant• Yes � Q�a�nY Assura�ce Contrad Expiratlon Date
i Deslgn Pressure: +W/A/-45.0 ' ��/19/'2009
' � Installetlon fistructlons
; O�her: 1.) Refer to currsnt Miami NOAs. 2.) Impact : FL10771 RO Ii 03070808 y RSLm �
; resistance referenced in this appiication relates to hail impact ; Venfied By: Miami-Dade BCCO - CER
� in �ac�ordance with FBC Sections 1504 (non-HYHZ) and j Created by Independent Thind Party: �
� 1515.2.4 (HVHZ), not to missile impact resistance, ;
; _._ .._
: Evaluation Repqrts �
• .,. : _.- -- - -
, , ,,.,,. ,.: _ . .... . :. ., - -- - - -
: Created b�r Inde�endent Third Part�r: '
. � . . � - -- ----
_. ;
..
.
.
. , . . . . , x. > _ .
, � ,,..- .. .. .
� � - . . - - :.� ' ' �4�!��'s - _ , , z. . .a- , . • ,, . . .. ,
; , .... _ .. - _ >"�,:�`�-� � ' i ,<
_... .._.. .: . .,.
_ , ,;,<.
. .: ,
r .. � . : :-
, ... _ . _. _. .4: .,.. . .� �..., . ... ;..,,,
, - .;:��>
; .... - - _
� . ,. :_ . • _ � - .. . . , .. : -- . -:.. --- ,
; - .
. , :
.
�
, �.; ..::.,,.
.• ..,:,.
r.. . . _ ._. _ n -
.,,,;,
,
.... ;
; w
.'
�
'; ' w. . . .. ��5, •:e+�.ia �
���� '' ,.;� � �'� � ., . . . . . . .. . .. . . . � . .
i; ' �'�A'��� ���1�� , . . . w.'�. . . . _ .
�_� - ���.�e� °to ���-��a�i�����...ru��� �::} �mpa� ...�^���+�"��:
• r�t�te§ �i;hafl �i �� ' �,: �-� � � ��
�' �c'�R � �+�i�F� - � [. � ti�lr 5v��d� . . v `�
t�tfal�rc �el�'t�i�� :�Et!4.� ('r?�t�=�lfd�i�) , � ?�I.n ;b ��4�A: ".�.
'�� (�V�; ��.,�Q.-�s��i �� �k ����irlie'�t �`Fa�F�:R;'�k'�;
_ r[►p�e:t "r°eslst���, ` •.±' ._ • � -- : "�
�'�.. , .. z �`..� :.` �. �t 7�.��i��
Revised Mar 2009
ai3-�eo-oozo City of Zephyrhills Permit Application I
' Building Department Fax-813•780-0 21
Date Recelved ,�
T Phone ContactforPermittin
Owners Name � � ; '
Owner Phone Number
Owner's Address �-�('� Q D Y
Owner Phone Number
Fee Slmple TlUeholder Name
Owner Phone Number
Fee Stmple TlGeholder Address
JOB ADDRESS � R ��
� LOT #
SUBDIVISION PARCELID# i Z,�p l ��y�„-,,,�G O �
vvW
WORK PROPOSED e (OBTAINED FROM pROPERTV TAX NOTICE)
NEW cONS7R ADDlALT � SIGN � O DEMOLtSH
INSTALL REPAIR
PROPOSED USE � SFR Q COMM � OTHER
TYPE OF CONSTRUCTION � BLOCK Q FRAME C� STEEL Q
DESCRIPTION OF WORK �, � J + `�
t V
BUILDING SIZE SO FOOTAGE Z�
HEIGHT ��
OBUILDING $
VALUATION OF TOTAL CONSTRUCTION
QELECTRICAI a AMP SERVICE � PROGRESS ENERGY
Q W.R.E.
QPLUMBING $ �
MECHANICAI $ {�' � �`� �
� VALUATION OF MECHANICAL INSTALLATION ��
� o3Q _OU
QGAS Q ROOFING � SPECIALTY � OTHER
FINISHED FLOOR ELEVATIONS � FLOOD ZONE AREA �YES NO
BUIL r � COMPANY p�t,`I � �p��
SIGNATU REGISTERED Y/ N FEE CURR �
1_ Y/N
Address �-� 1\ � c� � C 1� � 1} r�� License # C� Q � 3
ELECTRICIAN � COMPANY
SIGNATURE REGISTERED Y/ N FEE CURRE� Y/ N
Address
License #
PLUMBER COMPANY
SIGNATURE REGISTERED Y/ N FEE CURRE� Y/ N
Address
License #
MECHANICAL � COMPANY
SIGNATURE � REGISTERED Y/ N FEE CURRE� Y! N
Address
License #
OTHER � COMPANY
SIGNATURE REGISTERED Y/ N FEE CURRE� Y/ N
Address
�icense #
11111111111111111111111111111111111111111
RESIDENTIAL Attach (2) Plot Plans; (2) sets of Bullding Plans; (1) set of Energy Forms; R-O-W Permit for new construction,
Minimum ten (10) working days after submittal date. Required onsite, ConsWctlon Plans, Stormwater Plans w/ Silt Fence install d,
Sanitary Fadlities & 1 dumpsler; Site Work Permlt for subdivisions/larpe projects
COMMERCIAL Attach (3) complete sets of Buildinp Plans plus a Life Safety Paye; (1) set of Eneryy Forms. R-O-W Permil for new construclion.
Minimum ten (10) workinp days after submittal date. Requlred onsite, Construction Plans, Slormwater Plans wl Sllt Fence install d,
Sanitary FaGlilies 8� 1 dumpster Site Work Permit for all new projects. All commercial requirements must meet compliance
SIGN PERMIT Attach (2) sels ot Engineered Plans.
""PROPERTY SURVEY required for all NEW construction.
Directlons:
fill out applfcation completely
Owner & Contractor sign back of appliptlon, notadzed
Ii over 52500, a NoUce of Commencement Is requlred. (A/C upprades over 57500)
" Agent (for lhe contractor) or Power of Attomey (for lhe owner) would be someone with nolanzed letter from owner authorizing same
OYER THE COUNTER PERMIT'fING (Front of Application Only)
Reroofs if shingles Sewers Service Upgrades A/C Fences {PIoUSurvey/Footage)
Oriveways-Nol over Counter if on publlc roadways..needs ROW
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" rest ctions
which may be more resVictive than County regulafions. The undersigned assumes responsibility for compliance ith any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contr tor or
contractors to undertake work, they may be required to be licensed in accordance with state and local regulations If the
conVactor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor v olation
under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Sedion at 7 7-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor( ) si n
portions of the "contractor Block" of this appliqtion for which they will be responsible. If you, as the owner sign as the
contrador, that may be an indication that he is not properly Iicensed and is not entitled to permitting privileges in Pasco
Counry.
TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned unde stands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, ch nge of
use in existing buildings, or expansion of existing buildings, as specified in Pasco Counry Ordinance number 89- 7 and
90-07, as amended The undersigned also understands, that such fees, as may be due, will be identified at the ime of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid rior to
receiving a"certificate of occupancY' or final power release. If the project dces not involve a certificate of occup ncy or
final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer mpact
fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or ore, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Home ner's
Protection Guide" prepared by the Florida Department of �c riculture and Consumer Affairs. If the applicant is so eone
other than the "owner', I certify that I have obtained a copy of the above described document and promise in good aith to
deliver it to the "owner" prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT I certify that all the information in this application is accurate and that II work
will be done in compliance with all applicable laws regulating aonstruction, zoning and land development. Appli tion is
hereby made to obtain a permit to do work and installation as Indicated. I certify that no work or installati n has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws re lating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other government agencies may apply to the intended work, and t at it is
my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally S nsiGve
Lands, WateNWastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Itering
Watercourses.
- Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
- Department of Health & Rehabilitative Services/Environmental Health Unit-Welis, Wastewater Tre tment,
Septic Tanks.
- US Environmental Protection f�qency-Asbestos abatement. `
Federal Aviation Authority-Runways.
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addre ing a
"compensating volume" will be submitted at time of permitting which is prepared by a professional e gineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building usfng ste wall
construction, I certlfy that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect a jacent
properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for vi lating
the conditions of the building permit issued under the attached permit application, for lots less than ne (1)
acre which are elevated by fill, an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set orth in
this affidavit prior to oommencing construction. I understand that a separate permit may be required for electrica work,
plumbing, signs, welis, pools, air conditioning, gas, or other instailations not speafically induded in the applicat n. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, ter, or
set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from th eafter
requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become nvalid
unless the work authorized by such perrnit is commenced within six months of permit issuance, or if work authori ed by
the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An ex nsion
may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demo strate
justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandone .
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN OUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CO SULT
W TH Y UR LEND OR AN A RNEY BEFORE RECORDING YO R ICE OF CO ENCEMENT.
FLORIDA JURAT (F.S. 11 . �
� OWNER OR AGEN � � "�— CONTRACTOR �—�
Subscribed and swom lo (or affirmed) e re me this Subscnbed and s o o.{dr aff(rmed fore me lhis
1.'� �J+h ,Z►' "�Jo \ G.5 �b �r�) s�tc S by .� �o r�ov ��S
Who �s/are persona no lo me or has/have produced Who is/ar personally kno n lo me or haslhave produced
as identification. as identifiqtion.
�`_ �,
����/ Notary Pubhc � � Notary Pu lic
Commission No. Commission No,
Name of Notary typed, printed cr stampad Name ot Nolary lyped, nt d SUZ
�' = NoUry PuDlic - State of fio�M
,,�;,�-"=':y-., SUZANNE ALLEN s,� � My COmm. Expires Oct 5, 20/S
� r `' "; Notary Public - State of Florid� ' �.� Commiuion N EE 1 770
. ..,����
"' = IiAy Comm. Ezpires Oct 25, 2015
�� ` � r .r COmmiESion +1E EE 131770
...Y►�:ar_. ,..K._..a►�..�ak..,�tk.r�r.�,,..,...aa,�
•� a
�?., . . .. . . � . . -Lh. -�t. .r
..,� . � , ^ , �, , '. °�"' _ � .
.�";� "�,,' P . Ji�` �
e "`'`', `�
� �` - `�.� � ��"..�� ��c��'
,� t.��� �� � r�,�, � r� �_
��`��'= -•��; �.��+si.�;:�� ;�:�F�, �� ��:a�l
�::� �� �:� •- ;�=,�� r L _- .
��.Jt' ,�w j' yr+� cs-� :.t�.?� `'�°' .Ci {=.. � t 1'�tL? 'c
=�'�?`: .�rt`TiF' i,r �t r�if" i;: _'P � _ ' :
��' 3� t(�! ,_. �.hi s�� , �t'•i� "wF•�I ,, ���
` ' • '• - (-..�,' "'•_ #'�Pr+_S�J�aC i ; �>a-.,,� �f�t.�..t�C1=d.�' �E3d
4�L'�T_r3'u�I�:t.�:����':= F'��a �1;��`.�, � 1_`�T.a'����; �g��_:� ��7i� ��t�.�r� �:r.}�;tt�:�°t°�xt��,tt cc5r:�
• - -- -r -- _ _ _. -- - --- -.�. - ----
?� �at� P�t�e
��.�..sc�.. `:�..._._.__ �`.t.�"� _"�'����. _ �� � `=–.r� p�
_�� �.�._._ �'
�.�a��s. _' r'
�� r . � �
._�_ ... �_ ��'!�� -c;,;�.;.�.t.i.�:'? t�..___—_�. , r� , � l r;� _ __ _.. -_.. _ �.,,r -
�t�` ���. ? .i,��{ � �. ..��._..._.......__.�.....�.._. �1�1�iF � � � _7�� �'^� � _
.te:..1.-•-- �-�„ -..�..=�.�'.s.._.____--
�''��'�.� �
�4�, k�
� � 4��r8l;,� ���s���e t� £�is� maters�ls �nd l�r�c+� �e�essaxv £c� #�ae co�l�hoa� €�f " `�
� ,. �„ � _.,��<� � :` r��w,�, - - 'r ,. „ .:' ` ` ��',
. ; i�a�iii��� �°���� �;t � , '�: � � ,� -,. ` . .
1, �'a,a� ��� =.=:��x�l�c� ��.�ti��r��: c�f �� h�.°+�a�, ��:�����►� �-��� ������ in��±�Is t� €�-�t�, t���� �t���._�� �r�
pr th� tiuildi�n� �ir1 t�� lan�:��.pa��_ �ir�c�rri th� d��:k �c� res�� the ��i�ting �er�Cin� �a�13_
.�_ ��1�z.� k�ac# �T�. �.�i3x�th� �i��i� a�r t� � _��.�� ��1l�r� ��r �l�a�
�nat�.r��1� �.n�rk�d �p at a 2�°�� ��������e�t �:or�trac#c.�+r'il ���_
�� :����� .._.__._1d..,�s.a '�'";�, - � ������ ;.�i� �v�'r� �� �d��� ��al�t# �� pl�i� �er��
=� ���i ____._._.t�.��=- �--- L.��+e��� � f� �.�'�1i� :��!-1�b �.�.xia�S# :�ai�n�� t�ns��rl��m�t.
= I�� :��j � i� '�IS��� �r��i�� �5��� SCtr �� lC�i���Sf �.�� t1l2 Yt'�3l�� ;,? 'r��l�� � �� �� �:I���e�_
�. I���a13 ��x�r ����3 t��,a�#� rr�� v�t �i��� �� ��rla�;� �,et� 3��nt� ��ifih r��e��--
� ��i��� ��x��� �h�� �� :#i�tAC�s ta� �=_ �r����r ����s�s
�. ��a�.��t3 �-=-�� �..�?_._.__ z �� y ..�° � �. ° �ila.�, � :��f-���Ii��, �ia��s � fib��l�� �hi.��le.
I4�a�t�f�c�sr�r_ �____�' �T _ / � ' �r�..—____._.______._ �-`'���r�-
�-x�-' �-f.�""? L,�_� , ..�._._�_�_.____.__
�. ��:� �-�.r�'" ���rr r��i��t ��3 ��'S�t �� gtI��I��?� �9��' ��I�Ld���G'�lI#'�L'•Y �����1���,� �.,�;'/`�..e..,.,�.. �
���c���
Hurs����r�e-n�t� th� ��� ��� th�e �a1t�e� �c� m.�� �u��.t ��t'�.�I c��l�. �`
��.;����� ______�� � ._ ���� �� � r-��'.��. c`` ,�,.�� :�.luc�i�n.�� r��#�v �r���. �
---- -_._._____._.____. ________.___.._____.__._.�_._�.____.._____.__,._ __ __.__._____.___.._..___ ..N.- ._._______
z:�� �i�i.�� �i����
___ �,_ � F ''i3u'�s::<c� . �P �r�` $r,�
(S3a � . . a
�.� � �� ,������,� _ � � +C���t � � � �:�
� ��
��►��!��� ��-r°c�c�� �.au�t���i� . . .
.
�a�b,�M 7�.�,a�5��, ��►�rai�inent t���`�t -
�.�il� �trr�. �fxst�3 �� c� �p�� at�� v�����ted bv zu�:sn�t� u�.:1���i �d �ot��etiges��i1� s�s s�et�°t�ds t�eer�!!d tn
�:�e�cc� �Sig� qu�li�.- �•ot��
gThe jt�#� s:te �►� �� ke�i i:��s�:: da��=t ft�r th� d�s�itm �►f the jo1� �t�s� �� �x �Ta.�1� �e le� sl��r� af �11 s r�Iated
�e�i� a�r r.oa�apl�camm�xa.
•'�fe ��� si�s� b� �ept vQS�t� � Fzrua���:t.
���9.� t�dt3�YeC$tTa ��n�1P �,rt�ti�i�3� p�t w€��saa�� c-atxi�,��t��a, stx�# g�:er�I li�bslit3�= i�ura�tac�.
��; �t �r�tfasr�rY�ed c�a;ati�e nr�lera �z€� �vv€st�, �akxi� �-e ra+�t cst u�ar�e the s��►� of vv�,a��;�tt�itfat��ec? �ter±e�;xxx., �� �e
pe��£i?ra�s�c� ��a � time ar►.s� msteri�ai ���iz u��te:s a!$�rwi�e � reet# k '• - R. ,
� ��� ....
���.�TT.'1�_�.�`�''�..��.ER � ��1'��'�..�.�:`�'��. �'�t�.�.'��'�T�' ���}
Upca� c�l.et�� oft�a� �a+�7�. a�€� �a�,rrne�.t o� �l1 �ie� ��r�c�, �cs�ac�or �Ya�i 9ssa�e:
i- � �,°" ue�r a��at3t4 iFor wor�r.��ansf�ig 1�cszt�t� tr �e��s �su��r� �,�' �trr c�ts�oiai►�tt iassta�led b�- ttri� co��actt>t�
�..:_.____.. �
�?, 5�iixtr�e �s�naf�ctv�re� �.all pr��.�e#� � ,�.�}, __.._ Y�� l�tx�tes! �aa��r�y-
,_._.____._.�_________.. . --
; ��.. �►�ITRA,�`T �I�"Il �`'
� � i�:��1� T �: I�� .��l�r�.��ra�.�- -__�_�____------ .- -----------_____---------�— _____________ �fi 1 .,..,.» �
� �..�..��.�_�
k ::�#t€c��l� �?�-r�� �s �:�r�sb�� he��r�----�--._._______________---____._.__._____.____----.------- � ` � �
� ��di�i��i�s�� � r� .�'� '.1 �", t a r� [ � c� 6� � �� � v�. r *,`_� ._..___ � � ` — -
� � _.--� — "� }--__ - —
� "`°°.?.�,_"t�,�:_ t�_..___.___.f �Y].1 r �� 1 ah: �" �•;. tr ,�,f,�.,_.._j� a d �� F...��'' � i ,� � �,.... ^ ���
_�'t?'T� �C�?�� GP�33�T �'.O1V'�!.'F,1t� PRI�E, I�.f��3Q&AI� I��k�tAL —..-- �
�'��-.���� � � �� ���� ,
' �.c,n.t.vaa �f „` r"j � ,,.�^ . 1 �
i .��......._.�,.�':"�L.�t � ti.� l�, K (;' { �i,..s�.'� ( �^r�: a.�e�s .� _i l '�'✓., . r�. �'2„CL � �
� ..�_.__M.__..,....____-{---��-.�:,��.._W.;.��"_°-°-._�f�'��, - f"� iR .c4.a�+ ", C' '�.?� °'� .� ,l' �
� � � t �'�
� _.______.___._.__�_..._.__�.______.�_�.__.._______� - � �
i _�._.._._..._.e.—._�__�a �i ,iiit��C$' T�"ifa r � 13"�': � _�l���'r...,�.... ��_.._�
f.�.. ` j .�.��......�..��........� . �
s:�,�]�:`.�i�, c.u�s i�`a��;. t;. i�a���� �l�:�l b� �de�e�ta� t�,� ti�.�tr,�t �r��� if;����a�.sat d��u� ����ux�-.
�i��.�ii���� �. ��a#r�c� �.�� s�i� �2-#��t�r� �r�ce p�it�� �:�►�i ��ut� a r��iir►�.� �'��.
c•
�" �`,.
- � i � y � ryjy /
-�.a.�w+��/�u..L'1 '4 +'.4v���'F-...Lr�.w,+^"F � I� /I _r�� . � �43.0 ._�_r_. i �f � V�
'�c��ap�i- �iao�i�� }'aiEC. Re�►s t �
� ��e;�� �.� ��«���� p�.r� ��� �:���: ����a ��°� ���th��� t� b� �ra��,
r•'Y P
/' /
�aP #l�t� � � /� y
� ,� ..1. ` 3lLit£'
,, --s:.--'�y�^'E..•.ix..-.rc"a.�_ 1 (' '..�t. �P r..�.. ,.
_._.__. ._._ _._._...a�._..,.._... ._..�
3:�lB��
P�E r+'_�i0f S�IIA�f? a:G2I.'S3aL +:c0.^_: }.�3�E i 4�,�
� i iiiiii iiiii iiiii iiiii iiiii iiiii �iiii iiiii iiiii ii�ii iiii iiii
201118806
Permit No. Parcel ID No � 2� z�p '(. �- �� 50 -� � U D � � Q j � d
NOTICE OF COMMENCEMEI�T
State of �1 UY � 1 O� County of � Q
THE UNDERSIGNED hereby gives notice that improvement will he made to certain real property, and in aocordance with Chapter 713, Florida Statutes
the following information is provided in this Notice of Commencement:
1 Description of PropeAy Parcel Ident�ration No. SBe Plat fOC tF1LS SUI�[IIVlS1Ofl �
SVeetAddress: 3G��JO YYlt�Ylo2 �Q� �t- ZEPHYR HEIGHTS MANOR PB 6 PG
46 LOT 10
2. General Description of Improvement RE - KGO F OR 4240 PG 736
3. Owner Infortnation or Lessee information 'rf the Lessee contracted for the improvement:
C'_ hE. n K � r� � �� y TRU i
Name - � 33� �kZ
�JGb�b C�1 \HrY �G� � Y L�t1�' 1l/(��I1 �
Address Ciry State
Interest in Property
Name of Fee Simple Titleholder
(If different from Owner listed above)
Address (� (`
4. Contractor c� i�� c�c"_�/"1 c-s__��!' nV[J'} ��RC,, Tf1� State
8�1 �� me C' .\� 4 1 1 u cl 2 h �j �
R ' �.n1-� u r- � 1 l S � �-�. (
Address City State
Contractors Telephone No. ��� � PJ �� Z�
5. Surery 1 1�'.utQ 1 'j � S C';r' \ C�`�.S
1��L 10 �.1..�� � x, �O1 �G� �E C��1 1F 1
Address �- City t State
Amount of Bond: $�� �MJ • �� Telephone No. �S � `' �o� 3��Z
6. Lender•
Name
Address City State
Lender's Telephone No.
7 Persons within the State of Flo�da designated by the owner upon whom notices or other documents may be served as provided by
Section 713.13(t)(a)(7), Flarida Statutes:
Name Rept.:1402499 Ree: 10.00
D5: 0.00 IT: 0.00
12/06/11 D. Bonilla Dply Clerk
Address City State
Telephone Number of Designated Person:
B. In addition to himself, the owner designates of
to receive a copy of the Lienor's Notice as provided in Section 713.13(1)(b), Florida Statutes.
Telephone Number of Person or Entily Designated by Ownar
9. E�cpiraGon date of Notice of Commencement (the e�iretion date may not be before the completion of construction and final payment to the
contractor, but will be one year from the date of recording unless a different date is specified):
WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT
ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 773, PART 1, SECTION 713.13, FLORIDA STATUTES, AND CAN
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY A NOTICE OF COMMENCEMENT MUST BE
RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU tNTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT
Under penalty of perjury, I deGare that 1 have read the foregoing notice of commencement and that the facls stated therein are true to the best
of my knowledge and belief.
STATE OF FLORIDA �j��� � /��
t � ^ j
COUNTY OF PASCO �� �•-� � l �-i�� -��'�-��
�gnature af Ovmer or Lessee, or Own or Lessee's Aufhorized
Officer/Director/PartnedManager
Signatory's TiUe/Office
The foregoing instrumenl was acknowledged before me lhis �day of �_, 20 �1 , by �� V'�G f R J• C� n� �n
as O W`�l, Gv (type of authoriry, e.g., officer, trustee, attomey in fact) for
(name of paRypp behalf of whom instrument was executed).
�
Personally Known ❑� Produced Identlfication�� Notary Signatu� ���---
Type of Identification ProducedG�� �� 3 0�� '��J`' ��f.lame (Print) ��� �
.au�
,t •;►R" ° �'''o SUUNNE ALLEN
�� �� Notuy Public - StMe of Plorida
wpdata/bcs/noticecommencement�rA53048 ,� � C�m• �ifli � ZS, ��s
COwa�N�iOl1 N EE 1S17r0
PRULR 5 0'NEIL,Ph D PASCO CLERK & COMPTROLLER
12 o R6 BKl �629 i PG � 256�
�.:..---- -
_
.. . ,�, .� : �' ��.
e.t�;z�i;i't :'r'! ; � � : r�Y(imi � i r r ,� �
G" if l� .i�S S:r' la!:,7x ttim�:. y� �y�
'��t "�� ��_� Yi '�il?8i�41NM;} A �'� •
.�.^v
MULE-HIDE PRODUCTS C4., INC:
Summary Listing of Florida Approvals
TPO Roofing Systems
..-- -
.._ .._ - - -
_..
- -- -, ---- --
,..,_. - -
_ _ . - - - - ---
.�� �- - _ _
,..
, � - ; �;�- _ --- -
.
..
_:,�,.,.: , . - --�-- - - -
..... :..:. ..: . . . . .
t���:r. �;, .,.. . . . __. _ ..._
, __... �. _..
:>� . . ..... _
_ . . . ... _ _ ..:.. .....-... . .._ : ..�.. ;..,_� ._ .. . ...
; 107�1,1 ' -• -. _-. . ._.. . w..:, 9 y P -. _�. �
_ _ _. ......._.
,. ;-. .
�: .,._. .,: ... :.:.. : ,
Mule Hide Sin le PI TPO Roof -'---;° :-�..--.___
9 Y Sin le PI 7hermo lastic Roof Memb�ane
, S stems over Cem n i'
s
: . --- - ----.. . .
: Limtts of Use
--- g cil
-
-- -
Approved for use in HYHZ: Yes Ce����tion A en Certii'icate
Approvedfor use outside HYHZ• Yes FL10771 RO C CAC 03070807 CWF �df
I►►�Pect Resistarrt• Yes Quality Assurance CoMrad Expiration Date
, Deslgn Pressure: +M a8/12/2009
/A/-120.0 Installetion Instructions
Other: 1,) Refer tp cument Miami-Dade NOAs. 2.} Impact FL1�771 RO II o�mnan
resistance referenced in this application relates to hail impact ` Yenfied ey: Miami-Dade BC O CER
� in accordance with FBC Sections 1504.7 (non-HVHZ) and Created by Independent Third Party:
1515.2.4 (HVH2), not to missile impact resistance.
Evaluatlon Reports
Created by Independent Third Part
:.�����:-� . . . . -- - - - -- - - -- --- y:
,� " � E�f��"t�� ��igfe; Pd�Z �T�!��-R�i�'f ''_� -.._.. � . _ i _ : _ . .
� ` ' -�;,, �'' ��;���s�� "
. .....
�i ��' ',�� .�Q�1 _ z _ �'. � . � _ ;@r
�..,... . . _ "- - '`'`' - -
> + -. �:.. . - -- --- - - � -
, :. ..;,
. � , - _
� � :::�.;� .�. .� °�, : _ - -
:� ,-
. ,. _�.
;,
� B' �G � {,...
� ,8��'' `. . x�r�
.,. . ..;�_
u .
;_ � ,.
,,
; . . ;€= _
�`
. .`. x �..: ...: v� LL t`��'
.�..� ...... �.....�s '
� I � 'd'
; �� � t ���'��lS ' ���
.� - ���;�� ° _ , �•.• _ '
;6£ � . . ,. _.�:4.i'ic�y�. :. .
' ; _ s'�t,� ti����-` ' _ _
� . - � ��
a.; ���' '..�. , ('' � _ � i!� � � � -
:�
;, . .. _
�
y. ��.
r <'� . �� � �::
{ 7n � �b'�! . �..,n�... � �' ` � '
' ':�� .�....: ,��z:';:;.`�;�� :��__:_�
i .,;;;. .,����' : �,:�'.. - .� '`�';;.;
� �' _ s';: �-,-
> Ly7. � .'y .. F ,,,C�t�:, . �`;ry ,.. �z ^_
F � � l� {e,.�rT�!•�,,�?g'::` ,. r . ;?3�. . . - .� �� ..
'e ''C��1�,Yr�t�.�, r�,' ,�,,,� � �'1: +�.''
, a�r� _ .., t . _ , ... fp. ° :�y._ � , ., i�.�i..,
�,.>_:... :..., . .. _ s . .. -�^ i:i..•
u :a:. ti'n..rv' '� ` �"`!'>J.� a :,., I =.F 1.Y:"
� 10771.3 :' Mule Hide Single Ply TPO Roof �, Single Ply Thermoplastic Roof Merrfbrane
�.,.... . _ _ _ _ _ ; Systems over Gypsum Decks
; Umits of Use _- _.. _..__------- , -- - -
Certification Agency Certiflcate - --
� Approved fior use in HYHZ: Yes FL10771 RO C CAC 030708 8 G
' Approved for use outside HVHZ: Yes ypsum odf
Impact Resistarrt• Yss ' Q�a�ny �ssurance Contract Expiration Date
Deslgn P�BSSUre: +N/A/-45.0 0�/19/2009
: 4ther: 1.) Refer to current Miami-Dade NOAs, 2. Im act 'IRStallation instr�ctions
) P FL10771 RO tt namnana r...._. --,
� resistance r�eferenced in this appiication relates to hail impact : Venfied By: Miami-Dade BCCO - CER
� in ac�ordance with FBC Sections 1504J non-HYHZ and
� ) � Created by Independent Third Party:
1515.2.4 (HVHZ), not to missile impact resistance. ;
Eveluation Repqrts ;
_ Created by Inde�endent Third Party:
=:� . �,:>:::�;:.. -- - —
. _ - - -- - --
, ... .. .... . - _
-- ,,..,: . :
..,
�i.r:.x., � ''' `_i - _ ,
. •
}a•
• � ��:.. . . . , . _
� ............_ . ............ .� . _ ...
�,��.
, . ..._-_ ..<........� .`a ' .�.v:P. :�, ,.-. . . , . .
`5:%,. '.... ., ti .. — _ __ . _ x,.r: ., ,...._ .. _ "
�� .
�..
� ,...,,. . ::� .�^. ._ ....�....
j - ...:. . . . -�-` _ _ �
.
, . .. ,. �.
,
.
.»..,�
�
� . . , ' '- ' ' _ - �i�lt.t� � ...;...
: , ,r�.:., , ; , - '_ _ _
. .�. .. . .. . .' ' - :: ... . _ . — .. . - __
;n�
, . i . .,. �J,.t.. � . . .. _ �
�
�'.. . �� ` ��..�( W� . . .. . _ __. � . .
•(�
;� s� �� , _. :. . ,,. ,
;: .. •< ��.f.,,:;.�: = 3w.:;. .
, , . . . R � � : .�r..,:,..LL ...
...
� .. .:. .. ....... ..
_:W.:: °
�._, w
.,, � _,. �; V,.� :�,F
. �. {{� p
:, x:. . .. . . ,:
r . �7��
:..: . , d;.�� .�. � � , .. . ,....i1��1�'�i "
�:, , �
... � i i {
.
a
� w�
_ 5�
. >.. •
•e �
�.��Y� {. ��.. `A ��
4- z,�` .- ''�� � � .: � �:�,. , .. ��_r�,�4���
.+���?�` � - .`�'` �
,,. � �: � y ✓:S �;'s�`�`:�' v:: � ��, ' .
Y"�
ei� '�'r'�, ..�.�� tCk��". �"'d x�p� s, 2.,. F r�_• �,� �.
:'�.,, ..�''_" d� N�A- �, . � �� - �� � �N .
; T ,%�i�e�..r� ,�.; •f�. x �a; �i: F _ _ �
- - ���'.>;� :���� � Qi�i.r F,:° ;; ReeQ _ .
° _ ;�.� 1�_ �kat'e"s Fo hail i�? ��t -o- L�-.�;.:,.�. ":,' : �' 1�s
I�?a��r�P s ,�.�...�. l�lt � '�;B4rle '�k � "
� .�: `Ci�Eis. 3 � , �;��;%::,.,.,�l, �. ;
�= �4�� `�c� (r.tvta=Nl�+i� a �� ' �
1�;�:�2:4 (k�1��k�, �io�t;�ir_�iz�,H..er.:i �'et re � . s:� ��. ���' ��id�'iit �'F�r
�?A si."st ce, �'�. �, r�d.F?�t
;,��'."i' qfit�
`� �. t. _,. .-:� .�" _ ;�'����� 7�i7� ���
i�;
Revised Mar 2009
MULE-HIDE PRODUCTS CO., INC.
MECHANICALLY ATTACHED PVC SYSTEM SPECIFICATION
07520/MUL
PART 1— GENERAL �
1.01 Description
A. Scope: ,
1. Furnish and instaU a Mechanically Attached Mule-Hide Reinforced PVC RoaFing
Membrane with flashings and acc�ssories necessary to comprise a roofing
system.
B. Related Work:
The work indudes, but is not necessarily limited to the installation of:
1. Vapor Retarder (where spec�edj
2. Wood Blocking (Nailers)
3. Insulation
4. Slip Sheet (where required)
5. Fasteners
6. Roof Membrane
7. Roof Membrane Flashings
8. Metal Flashings
S. Adhesives
10. Sealants
11. Walk�►rays
1.02 Quality Assurance
A. The Mule-Hide Reir�forced PVC Membrane Roofing System shall be installed by an
independer�t roafing oontrador eligible to apply for Mul�Hide warranties when Standafd
System and Premium System Wamanties are requested.
B. There shall be no deviations from this specification or the Mu1�Hide Products Co. ("Mule-
Hide") standard details without prior written approval from Mul�Hide's Customer Service
Department.
C. Upon completion of the instaliation acc;ording to the tertns and conditions stated in this
specification and in accordance with the ir�formation provided in the Warranty Application
and Pr�Job sunrey form and any additional approvals which might have been given by
Mule-Hide, an authorized representative aF Mule-Hide may pertorm an on-site inspection
of the roo�f to verify that all installation and material requirements have been met.
i.03 Submittals
A. Prior to the time of bidding, the roaflng contradw shall submit to the Owner or Owner's
representative the following items: �
1. Copies of Mule-Hide's specific�tion and published product data.
2. Samples of each material to be used in the roof system.
3. Specimen copy of Mule-Hide Products Co. warranty
1
4. Dimensioned shop drawings to include an ouUine af the ro� and appropriate
details for flashings and terminations.
5. Certification from insulation, roafing and accessory cornpcments manufacturers
that all materials supplied compfy with identified ASTM and industry standards.
6. Verification that system specifications meet atl identified code and insurance
requirements induding but not limited to the following:
a. Faetory Mutual Researoch Laboratories
Non+vood, MA
b. Underwriters Laboratories
Northbrook, IL
7.04 Product Delivery, Storage and Handling
A. All produds delivered to thejob site shall be in their original unapened containars or
wrappings and clearly labeled with the manufadurer's name, product identification and
date af' manufacture.
B. Protect all materials from damage during transit, storage and delivery to the job site.
Place all materials on pallets and protect from masture.
C. Store all materials in a dry, dean area proteded from the elemerrts. All ydls of inembrane
shall be stored flat on p�lets.
D. All adhesive and caulking shall be stored at temperatunes between 60 `F and 80`F.
E. All flammable materials shall be stored in a cool, dry area away from open flames and
sparks. Follow precautions outlined on containers or supplied by the material
manufadurer/supplier.
F. All materials determined to have been damaged (confirmed by Mule-Hide) are to be
replaced with new materials at no cost to the owner.
1.05 Job Conditions
A. Mule-Hide PVC roofing materials may be ir�stalled under certain adverse wieather
c�nditions such as high humidity or extreme temperatures, but only after consultation
with the Mule-Hide Customer Service Department as special precautions or procedures
may be necessary. The performanoe of the materials, installation costs and production
rates may be affeded.
B. Only as much new roofing as can be made watertight each day shall be installed each
day. This includes all flashing work
C. All substrates to receive new insulation, membrane orflashing shall be thoroughly dry
and free of �ntaminants. Should surfacg masture occur, the contractor should pravide
adequate equipment to dry the substrate prior to the application af new materials.
�
D. Prior to and during application, all dirt, debris and dust shall be removed from surfaces to
be roofed for both new and reroofing substrates.
E. On all reroof jobs and for all lightweight dedc systems, pullout tests shall be performed by
the independent r�ng contractor, fastener manufacturer or owner's representative to
verify the condition of the deck or substrate and to confi►m system design pullout values.
2
A minimum o� 10 pullout tests for areas up to 500 squares, thereafter 2 tests per 100
squares is considered suffiaent. Tests should be taken aPproximately 60% in perimeters
and 40% from field areas. Additional tests shall be performed in areas where the integrity
of the deck is questionable. A written report af pullout test results shaH be submitted to
Mule-Hide's Customer Service Departrnent for review.
F. Precautions shall be taken to p�event wind blaw-off or wind damage during the course of
the rooFing application. This may necessitate additional securement of temporary
construction, materiats and equipment.
G. The contractor shall verify and ensure that all roof drain lines are unblocked before •
starting v�ork. Any blockages found shall be reported to the owner's representative and
Mule-Hide's Customer Service Department in writing.
H. Temporary waterstops shall be installed at the end af each day's work. Temporary
waterstops shall be removed at the start of the next day's work and disposed of properly.
Waterstops shall be compatible with al1 materials.
I. Do not install the Mule-Hide PVC Roofing Membrane in dired contad with any product
containing asphalt, coal tar pitch, creosote or penta-based materisls. Consult the Mul�
Hide Customer Service Department for special installation requirements.
J. Do not allow contaminarrts such as petraleum, grease, acid, solvents, vegetable or
rnineral oil, animal al, animal fat, etc. or dired steam venting to come into direct contact
with the Mule-Hide PVC Roofing Membrane. Contact the Mule-Hide Customer Senrice
Department for recommendations if such conditions exist.
K. The contractor shall follow all safery regulations as recommended by OSHA.
L. All work shall be scheduled and executed without exposing interior building areas to the
effects of indement weather. The existing building and its contents shall be protected
against all risks.
M. Arrange work sequence to avoid use of newly constructed roofing for storage, walking
surfaces and equipment movement. Contractor shall provide all necessary protection and
barriers to segregate the wurk areas and prevent damage to adjaoent areas. ff excessive
traffic over newly installed memlxane is necessary, contractor shaf{ provide plywood or
polysster felt protedion to prevent damage.
N• AI� existing �ng materiats to be remwed for construction shall be immediately
remaved from the construction site to a dumping area authorized to receive such debris.
My hazardous materials such as asbestos or materials containing asbestos �bers sha��
be removed and disposed of in accordance with applicable City, St�e and Federal
requir�nents.
O. Any unusual or concealed conditions discovered during the course of the v►rork are to be
reported to the owner and Mul�Hide immediately in wriUng. Work is to be halted un61 the
owner has responded with a solution to the problems.
P. All loql building codes and requirements must be follawed where applicable. It is the
r�ng contrac�or's sole responsibility to determine and ensure that the r�ng system
seleded cpmplies with all local codes and requirements.
Q. Both interior and exterior building areas affected by construdion shall be deaned up and
any damaged areas shatl be repaired to the owner's satisfaction.
3
1.06 Warranties
All Mule-Hide warranties are available for commercial projects. A Roofing Membrane Limited Wamanty
for a maximum aF 10 years is available for residential projects.
A. Mule-Hide's Roofing Membrane LimitedWarranty
Mule-Hide affers a 10, 15 or 20-year Roofing Membrane Limited Warranty ("Warranty')
for a charge. The Warranty covers only the Mule-Hide PVC membrane (or portion
thereof) determined by Mul�Hide to be defective and resulting in roof leaks. This
Warranty does not cover vwrkmanship or other components not supplied by Mule-Hide.
Mule-Hide does not perform inspections of the installation before issuing the Roofing
Membrane Limited Warranty. A Mule-Hide Warranty Application and the appropriate fee
must be submitted to Mul�Hide to obtain this warranty. Proaf of purchase may be
required.
Note: Projeds requesting a 2a-year Roofing Membrane Limited Warranty require the
use of the 80-mil thidc PVC membrane and shall incorporate additional design
enhancements as outlined in the 20-year Design Enhanoemerrts for PVC Mechanically
Attached Roo�iing System Specification. Mul�Hide reoommends that Warranty
Applica6ons be submitted for re�riew prior to bidding the project.
B. Mule-Hide's Standard System Warrar�ty
Mule-Hide o�fers a 10, 15 or 20-year Standard System Warranty ("Standard") for
commercial projects for a charge. The 5tandard warranty is a"No Dollar Limit", labor and
material warranty that covers the Mul�Hide labeled membrane and other components
supplied by Mule-Wide installed by a Mule-Hide Warranty Efigible App4icator. The
Standard warranty dces not cover insulation or its attachment system. Metal flashing
components are not covered under this warranty. A Mule-Hide Warranty Eligible
Applicator must submit a WarraMy Application and the appropriate fee to Mu1�Hide.
Standard warranties require inspections by a Mule-Hide represerrtative.
Note: Projec�s requesting a 2Qyear Standard System Wamanty require the use of the
80-mil thick PVC membrane and shall incorporate additional design enhancements as
outlined in the 20-year Design Enhancements for PVC Mechanically Attached Roafing
System Specification. Mule-Hide recommends that Warranty Applications be submitted
for review prior to bidding the project.
C. Mule-Hide Premium System Warranty
Mul�Hide offers a 10, 15 or 20-year Premium System Warranty ("Premium") for
commercial projects for a charge. The Premium warranty is a"No Dollar Limit", labor and
material warranty that oovers the Mul�Hide labeled membrane, insulation, other
components supplied by Mule-Hide and approved products (such as metal flashing,
insufation adhesive or dher pre-approved accessories) installed by a Mule-Hide
Warranty Eligible Applicator. A Mul�Hide Wamanty Eligible Applicator must submit a
Warranty Applicatlon and the appropriate fee to Mule-Hide. Premium warranties require
inspections by a Mule-Hide representative.
Note: Projects requesting a 20-year Premium Warranty require the use of the 80-mil
thick PVC membrane and shall incorporate additional design enhancements as outlined
in the 20-year Design Enhancements for PVC Mechanically Attached Roa�ing System
Specification. Mule-Hide recommends that Warranty Ap�lications be submitted for
review prior to bidding the project.
D. Standard and Premium System warrarrties are not available for residential projects.
E_ PVC tie-ins to built-up (BUR} or any other type of roof system are not cavered by Mule-
Hide warranties.
4
F. Contact Mule-Hide for other extended warranties that may be available.
G. Terms and Conditions af Warranties
Mule-Hide's obligations under the Roofing Membrane Limited Wamanty, the Standard
System Warranty, and the Premium System Warranty are limited to the specific terms
and conditions af the respedive Warranties. Sample c�opies of the Mule-Hide Wamanties
are available from Mule-Hide upon request.
PART 2 - PRODUCTS ,
2.01 General
A. The components of the Mechanically Attached Mule-Hide PVC Membrane Roof System
are to be products manufactured or supplied by Mule-Hide Products Co. as spec�ed in
the contract documents.
B. Components other than those supplied or manufactured by Mule-Hide may be submitted
for review and acceptance by Mul�Hide's Customer Service Departmerrt. Mule-Hide's
acceptance vf any other product is based on chemiql canpatibility and published
performance data. Mule-Hide does not guarantee such products or their performance.
Other components may be considered on a jot}by�ob basis and must be apprwed in
writing by Mule-Hide's Customer Service Department. The speafications, installation
instructions, limitations, and/or restrictions af the respective manufacturers must be
review�d by the designerfor acceptability for use with Mule-Hide PVC roofing products.
2.02 Roofing Membrane
The Mule-Hide Reirforced P1/C Membrane is available 50 mils (.050-inch) thidc, 60 mils (.060-inch) thick
or 80 mils (.080-inch) thick. The Mule-Hide PVC membrane is a polyester scrim rei�onced thermoplastic
roaFing membrane that meets and exceeds the requirements of ASTM D4434 (Type Itl) Standard
Speafiqtion for Po{y (Vinyl Chloride) Sheet Roo�fing. Refer to the Produd Data Sheets for physical
properties and additional information.
2.03 A�ccessory Materials
A. PVC Cut-Edge Sealant - a liquid PVC sealirx,� compound, shall have a consistancy equal
to that of "honey" at room temperature and shall be fumished in 16 oz. bottles.
B. PVC Bonding Adhesive - a solvent based adhesive for bonding the Mule-Hide PVC
Membrane to various vertical substrates and insulation boards.
C. Termination Caulk - a single component, non-sag elastomeric polyurethane caulk.
Contact Mule-Hide for accepfiable brands.
D. Aluminum Foil Tape - a 3-mil tape with acrylic adhesive used over Mule-Hide PVC
roofing system metal joints prior to a PVC flashing strip being welded over the joints.
E. Slip sheets - Mule-Hide affers a variety of slip sheets dependent upon the particulars of
an application. Some of these are the following:
1. A laminated kraft paper with fiber�ass scrim reinforcement.
2. Polyester Mat Protection Material 9 oz. - needle�punched polyester fabric.
F. PVC Membrane Cleaner - a clear liquid available in 5 gallon cans used for deaning
asphalt and dirt from membrane surface.
5
G. PVC Non-Reinforced Flashing — an 80-mil PVC Flashing �unreiriforced) membrane can
be used to complete flashing details.
H. PVC Coated Metal - 24-gauge galvanized steel to which is iaminated 35 mils of Mule-
Hide PVC Non-Reir�forced Flashing (white) used for flashing and edge metal detailing.
f
1. Mute-Hide AN-Purpose Bar - an extruded aluminum bar 50-mils tF�ck used to termirrate
adhered, reirtiforced membrane base flashings in certain constructions.
J. Membrane Fasteners and Plates - Mule-Hide affers a variety ofi membrane fasteners and
plates to meet specific job conditions and substrates: '
1. Muis-Hide Steel/Wood Deck Fasteners
a. Drill Point-Coeted
b. Thread Point-Coated
c. Stainless Steel Drill Point
2. Mule-Hide Concrete Fasteners - For Strudural Concrete Decks
3. TL (2 Piece) -(High Density Nylon Auger & Metal Plate) - For Cementitious Fiber
Substrates (Tectum, etc.) and Lightw�eight Concrete or Gypsum Decks
4. Mule-Hide Metal plates — Mule-Hide affers a variety of ine�al plates for
membrane and insulation attac�meM.
K. PVC Walkway Roll - a 90-mil (.090 inch) thick, textured, polyester reirforced PVC
membrane for tr�c areas.
L. Prefabricated Details - PVC Universal (insideloutside) Comers, PVC Molded Pipe Seals
in sizes to fit pipes from 1" — 6" and PVC Mdded Sealant Podcets.
M. Thermoplastic One-Part Pourable Sealer - a one-part thermoplastic seatant for use in
PVC Molded Sealant Pockets.
2.04 Related Materials By Others
A. Wood Nailers
1. Nailers shall be #2 or better lumber and shall be pressure treated for rot
resistance. Creosote and asphaltic preservatives are not acceptable.
2. Wood nailers shall conform to Fadory Mutual's Loss Prevention Data Sheet 1-
49.
3. Wood nailers shall be installed as spepfied on the project drawings and shall be
of a height sufficient to match the thickness of the insulation being used.
B. Vapor Retarders �
1. Vapor retarders shall meet specified oode andJor insuranoe requirements.
2. Vapor retarders shall be compatible with insulation and other accessories.
6
3. It is the responsibility of the architect or engineer to determine if a vapor r�arder
is required. However, Mule-Hide fotlows the NRCA guidelines that recommend a
vapor retarcier be considered when both of two oonditions are anticipated:
a. The outside average January temperature is below 40°F, and
b. The expected interior winter relative humidity is 45 percent or greater.
C. lnsulation
1. Insulation shall be installed as a protedion layer aver the existing substrate or to
obtain a desired therm� value.
2. Insulation shall be compatible with the Muls-Hide PVC Membranes or have an
acceptable slipsheet or cover board placed between the insutation and the PVC
roof inembrane.
3. The #ollowing insulation boards are acceptable for use in a Mule-Hide
Mechanically Attached Roafiing System when a standard warranty is requested:
a. Polyisocyanurate insulations having nonasphaltic meeting or exceeding
the physical property requirements af Fed. Spec HH-1-1972 and having a
minimum compressive resistance af 18 psi. Thickness miromum is 1" or
greater as required by insulation manufacturer to span flutes on metal
decks.
b. High density wood fiberboard with nonasphal6c binders. Boards with
asphalt binders or have been coated with asphalt cannot be used in
direct corrtact with the PVC membrane. Contact the iRSUlation
manufacturer for minimum thidcness requirements when instatling this
board directiy aver a steel deck.
c• Expanded polystyrene with kra�tt taminated facers on both sides or with
an acceptabte slip sheet or cover board placed over no�t-faced boards.
Minimum density of nonfaced boards must be 1.25 PCF and meeting
ASTM C578, Type II physical properties. Contact the EPS (expanded)
manufadurer for minimum thidcness requiremerrts when spanning flutes
on steel decks.
d. Extruded polystyrene meeting ASTM C578, Types N, VI or VH physical
Properties. An acceptable slipsheet or compatible caver board shall be
required over the extruded polystyrene. Check with the EPS (extruded)
manufacturer for minimum thickness requirements when spanning flutes
on steel decks.
4. Insulation manufadurer shall provide its recommendations for use and
attacfinent to the owner with a co�y to Mule-Hide Products Co. In addition, the
insulation manufacturer shall provide a copy of their specific warranty conditions
if required by the building owner.
2.05 Precautions
A. Consult Material Safety Data Sheets and container labels for specific safety instructions
prior to use.
B. Avad breathing vapors of solvent, sealant and adhesives. Use with adequate ventilation.
Avoid prdonged contad ofi solverrts, sealants and adhesives with skin.
C. Do not use Mule-Hide PVC roo�fiing pr•oducts near fire orflame.
7
D. Do not use c�en flames for drying of surfaces, sealants, or adhesives.
E. Do not use oil-based paint on PVC Coated Metal or membrane. Contact Mule-Hide's
Customer Service Departrnent for recommendations.
F. Do not allow muriatic aad (masonry cleaner) to come in direct contact with the Mule-Hide
PVC Membrane or accessory products.
PART 3 - EXECUTION '
3,01 General
When instaliing a MechanicallyAttached Mule-Hide Reinforced PVC Membrane Roofing System in cooler
weather, it is recommended that liquids such as solvents, sealants, etc. be stored at temperatures
betw�een 60°F and 80°F until just prior to use in order to f�ilitate the installation. Liquid products, if
stored outdoors, should be brought up to room temperature prior to use.
3.02 Substrate Conditions
The following general c�nditions apply to the substrate that will receive a Mechanically Attached Mufe-
Hide PVC Membrane Roofing System for both reroof and new construction:
A. The roof deck must be structuratly sound to provide proper securement for mechanicat
fasteners. Areas showing a loss of integrity due to corrosion, rotting, warping, concrete
spalling, etc., must be repaired or replaced prior to installing the r�ng system.
B. It is imperative that the rooFing contractor performs test cuts at each roaf area prior to
reroofing. The condition aF the substrate must be suitable to receive a Mechanically
Attached Mule-Hide PVC Roafing System. Wet insulation must be remaved and
replaced. See SPRI's guidelines for deterrriir�ng wet insulation.
C. A determination must be made regarding the presence or absence of coal tar pitch within
the existing roof assembly. The presence af coal tar pitch requires a separation layer of
insulation a minimum aF 1-1/2" thick having a minimum "R" value of 5.0 if the coal tar
pitch is 10 years or older. All joints must be butted tightly together or have joints
completely taped to prevent vola6les from damaging roof inembrane. lf the existing
assembly is less than 10 years old, specific procedures must be fallowed. Contact Mule-
Hide Customer Service Department for specific requirements.
D. Contact Mule-Hide Customer Service Department when the substrate is exposed to
excessively high humidity and/or a corrosive environment. Speaal fasteners (i.e.,
staintess steel) or details may be required.
E. ft is acceptable to install a Mechanically Attached Mule-Hide PVC Membrane Roofing
System over the following dedc substrates provided that an acceptable insulation,
barrier/cover board or an appropriate slip sheet is installsd over the substrate as needed:
1. Structural Metal Deck (24gauge minimum) shall conform to recommendations
outlined in Factory Mutual's Loss Prevention Data Sheet 1-28. Pullout tests are
required on all decks less than 22 gauge. An inrulation or barrier bosrd is
required to provide a smooth surface and shall be of suffiaent thidcness to span
the steel flutes without damage from traffic.
2• Plywood should conform to Fadory Mutual's requirements should tested (for
uplift) assemblies be required. For non-FM as.semblies, plywood minimum
thickness shall be determined by local code requiremer�ts but shall not be less
8
,
than 15/32" thick. Contad Mule-Hide for maximum membrane sheet widths,
fastener sizes and spaang when using plywood, as requirements will change
with thickness used. Insulation, barrier board or sli�heet may be required under
the membrane.
3. Structural concrete and pre-casf, pre-stressed concrete (3,000 psi minimum)
shall be cured and dry to industry standards. Surfaces shall be smooth and free
of moisture or frost. All sharp ridges or other projedions above the surtace shall
be removed before roafing. An insulation, barrier board or slip sheet is required
under the membrane.
4. Lightweight Insulating Concrete Fill and Metal Formwork (minimum 24-gauge
rnetal fomiv�rork) — the roaf deck shall be cured and dry to the deck
manufacturer's and/or industry star�ards and shall be smooth and free o� ridges
and depressions. All necessary venting as recomrnended boy the roa�f dedc
manufacturer shall be accomplished. These decks may be acceptable to receive
a Meehanically Attached Mul��lide PVC Membrane RoaFing System after pullout
tests have beer� completed and appropriate fasteners have been seleded.
5. Wood plank (1" minimum) shall conform to Factory Mutual's requirements for
Class 1 impregnated decks. M insulation, barrier board or slip sheet is required
under the membrane.
6. Cementitious Wood Fiber Decks - Certan cementitious wood fiber decks may be
acceptable to receive a Mechanically Attached Mule-Hide PVC M�nbrane
Roofing System after pullout tests have been completed and appropriate
festeners have been seleded.
7. Gypsum Deck - shaN be cured and dry to manufacture►'s and/or industry
standards. The surface aF the dedc shall be smooth and free from ridges and
depressions. Certain gypsum decks may be acceptable to recaive a
Mechanically Attached Mul�Hide P'VC Membrane Roafing System after pullout
tests have been completed and appropriate fasteners have been selected.
Insulation, slop sheet or barrier board may be required over rough surfaces or
plank dedcs.
8. Oriented Strand Soard (OSB) shall be a minimum 7/16" thick. Contact Mule-Hide
for acceptable sheet sizes, fastener types and spaang when using OSB as
requirements will change with thidcness used. Minimum thicknesses or usage
restridions may change depending on local code requirements. Pullout tests
must be performed and submitted to Mule-Hide prior to bidding the project.
Minimum pullout valuss of 250 Ibs are required. An insulation, berrier board or
slip sheet is required under the membrane. Fasteners and sheet sizes shall be
determined by pullout values.
3.03 Preparation of Existing Substrate
A. General
1. To prevent delays or interruptions, coordinate work with other tredes or suppliers
to ensure that components to be incorporated into the Mechanically Attached
Mule-Hide PVC Membrane R�ng System are �vailable as the w�ork
progresses. Examine substrates to which the roofiing materials are to be applied
to ensure that their condition is satisfactory for the Mule-Hide PVC Membrane
Roofing Sysfem application. Do not peRnit vads greater than 1/4" width in the
substrate. Concrete substrates shall be cured and free of laitance and curing
compounds. Substrates for roo�ng materials shall be dry and free of oil, dirt,
grease, sharp edges and debris. Inspect substrates and corred defects before
application af �ng membrane.
9
�
2. Large blisters on existing roo� systems shall be cut and patched to provide a
reasonably level substrate surface. �
3. Gravel aver existing nailers must be totally removed prior to installing new nailers
and flashings. Verify that the existing nailers are securely anchored to the roaf
decks. '
4. When an additional thickness of insulation is being added, new nailers must be
added to match the height aF the new insulation. Nailers must be securely
anchored to the roaf dedc per Sedion 3.05 � this specification.
5. All roof surtaces shall be free of ponded water, ice, or snow and drain prope�ly.
Drainage is the responsibility of the ro�ing contrador and designedspecifier.
6. Specifier and roofiing cor�trador shall detem�ine the condition of the existing roof
deck and roofing. Areas with deteriorated decking or wet insulation or dher
materials shall have those affected materials remaved and replaced.
7_ When removing an existing roof during reroofing, remove only that amount of
roofing and flashing that can be made watertight with new Mule-Hide PVC
materials in a one-day period or prior to the onset of indement weather.
3.04 Vapor Retarder Installation (where specified)
General
Speafic climatic and job conditions may require the use aF a vapor retarder. It is the sole responsibility af
the design professional to determine the need for a vapor retarder, its type and location in the roofing
system. A vapor retarder may aften ad as an "air barrier" which rnay have a positive effect in reduang
intemal air �.xessure. Air barriers should be strongly considered for buildings subject to high intemal air
pressures such as airplane hangars and buildings with many loading bays such as warehouse faalities.
The National Roofing Contrador's Association recommends the installation af vapor retarders when
intericx relative humidity is 45% or greater and the outside mean average January temperature is below
40°F.
Contact Mule-Hide Customer Service Departmentfor qusstions regarding compatibility with Mule-Hide
products.
3.05 Wood Nailers
A. Install nailers at the perimeter of the roof and around all roo�F penetrations and projections
{unless othervuise shown on Mule-Hide standard d�ails).
8. Nailers shall be firmly anchored to the decks at a ma�cimum 2'-0" o.c. and shall resist a
pulloutferce of 200 IbsJlinearfoot in any direction. A 1/2" vent space shall be provided
between adjacent lengths ofi nailers. Fasteners shall be installed within 6 inches of each
end. Spacing and fastener embedmerrt shall cor�form to Factory Mutual Loss Prevention
Data She� 1-49 or local building code requirements.
C. Height af nailers shall match the surface level of the insulation and roof inembrane.
D. All w�oodwork to be reused shall resist a minimum force pf 200-Ibs./linear foot in any
direction and shall be free of rot.
3.061nsulation Installation
A. Mule-Hide accepted roaF insulations shall be installed in accordance with Mule-Hide
spec�cations or the insula6on manufacturer's requirements whichever is more stringent.
10
�
B. Mule-Hide accepted roof insulations shall be secured to the roof dedc in accordance with
Mule-Hide's requirements utilizing Mule-Hide fasteners or approved compatible fasteners.
When more than one layer af insulation is to be used, succeeding layers are to be laid
staggered in relation to the previous layer of insulation and all jants shall be staggered.
All layers may be fastened as a single 19yer with one fastener. It is not required that each
layer be individually attached.
C. All roof insulation shall be neatly cut to fit around aH penetrations and projections with a
maximum allowable gap of 1/4".
D. Open jants greater than 1/4" wide shall be repaired with like insulation material.
E. Insulation shalt be tapered to provide a sump area a minimum af 36" x 36" where
possible at all drains.
F. tnstall no more roaf insulation in one day than can be c�vered with the Mule-Hide PVC
Membrane or when the onset of inclement weather is anticipated.
G. Insulation installed over steel decks shall be checked so that no edges are left
unsupported along the flutes. All insulations shall be of suffiaent thickness and density to
prevent breakage under normal roof construction or maintenance tra�c.
H. 7apered insulation shall be installed in aocordance with tapered fabricators shop
drawings.
3.07 Membrane Instaltation
A. General - Unroll the Mule-Hide PVC Membrane and position without stretching. Allow the
membrane to relax at least 15 minutes when the temperature is above 60°F, or 30
minutes when the temperature is below 60°F, prior to installation. Inspect and remove
any damaged membrane. Lap shests a minimum af 5", for In-Lap fastening, leaving
space for mechanical fasteners and plates and space for a 1-1/2" minimum w�eld.
Membrane overiaps shall be shingled with the flow af water.
B. Ir}Lap Fastening
1. Perimefer and comer areas - When installing Mule-Hide PVC R�ng, install a
minimum of one (1) Perimeter Sheet (1/2 width sheet) parallel with the perimeter
and fastened with Mule-Hide approved fastening system at the pnedetermined
spacing in the lap area in a line centered approximately 1-1/2" from the edge o�
the sheet le-aving 2" a� membrane outside the disc. Weld lap area continuously
with a minimum weld width of 1-1/2 inches.
Perimeter areas shall be determined by one af the following methods:
a, 1/10th the lesser plan dimension
or
b. 4/10th the eave height
Whichever is the lesser may be used.
Corner areas are defined as the irrtersection af two perimeter areas.
Perimeter sheets are required to be installed in all perimeter and comer areas.
Spacing of the rows of fasteners in the perimeter areas shall be reduced to 60%
of the spacing of the rows of fasteners in the field sheets. Spacing � the
fasteners in the seam shall remain the same distance apart as the spacing ofi the
11
fasteners in the seams in the field sheets. Spacing of the rows of fasteners in the
corners shall be reduced to 40% of the spacing of the rows of fasteners in the
field sheets. Spacing af the fasteners in the seams shall remain the same
distance a�rt as the spacing of the fasteners in the seams in the field sheets.
Fastener shall be supplied by Mtde-Hide and shall be installed according to
fastener manufacturers instructions and using the fastener manufacture�'s
recommended fastening tools.
When installing Mule-Hide PVC Membranes using either Mule-Hide's PVC
Coated Metal Flashing or PVC Membrane Flashing, the first perimeter sheet �
shall be a half width sheet. Subsequent sheets may be either Perimeter sheets
(haff width sheets) or full width sheets as required. If the project requires FM
compliance, contad Mule-Hide (prior to bidding the project) to review sheet
layouts, sizes and enhancements to address the perimeter and comer areas.
Note: For FM 1-90 or greater compliance, where the perimeter sheets are wider
than 3', Perimeter sheets cannot run parallel with the direction aF the flutes on
steel decks. Full width field sheets are run perpendicular to the edge vf the roaF
(ar base of parapet watl) and additional row of fasteners installed running paratlal
and centered betvu�een the field seams.
2. Field Areas
a. Membrane should run perpendicular to the direction ofi steel deck flutes
and orientation of wood decks.
b. All membrane overlaps shall be installed to facilitate the flow of water.
c. All membrane sheets are #o be overlapped a minimum of 5" to provide
space for fastener and disc placement and for a cnntinuous 1-1/2" wide
weld.
C. The roafing contractor shall check afl welded seamsfor continuity and integrity using a
rounded screwdriver or other suitabfe blunt object. The contrador should perform
several sample test seams each day. Prior to welding field seams, the contractor shall,
using scrap material, run at least tvw test seams, each a minimum of 2' long. Each test
seam shall be used to determine adequate seam strength and to ensure the equipment
has warmed up and is operating properly. This should be done each time the equipmerrt
is tumed on after a cool down period.
3.08 Welding of Lap Areas
A. General
1. Roofing membrane fleld seams are to be hot air w�elded.
2. All surfaces to be welded shall be dean and dry.
B. Hot-Air Welding
1. Machines for hot air welding are available from �everal different sources. Each
manufactur�r's instructions for use shall be followecl, as w�ell as all local oodes
regarding electric grounding, supply and dher related fundions. Since most
automatic welding machines require 218 to 230 vdts, fhe use af a portable
generator on the roaf is recommended for greater flexibility. Muie-Hide requires
the use of automatic welding machines ior all field sheet se�ning. On1y
those areas that cannot be completed with an automatic welder may be
12
welded with a hand welder. The seam width must be as wide as one
created with an automatic welder (approximatety 1-1/2" wide).
2. Hand-held woelding equipment is also available. Hand welders (guns) are typically
only used to w+eld flashings and areas where an automatic welder cannot be
used. After the prehe�ated nozzfe tip is applied in the overlap area and the
materiat starts to flow, immediately follow with a hand roller to psess the heated
membrane surfaces togethe� with slow, even mavements. Keep the roller within
one inch of the noale tip. Angle the hot air tool so that the flawing air faces the
roHer. The temperature of the hot-air tool shall be adjusted so that a minimum of
smoke is developed and material from the bottom af the sheet begins to soften
and flowfrom the seam. Seam strength may be tested when cool. For best
results, testing seams 8 hours after hot air w�elding is recommended.
C. Quality Control af Seams
1. After seaming, the seams are checked for integrity with a blunt-ended probe. Any
openings or "�ishmouths" are to be reRaired with a hand-held hot-air tool fitted with a
narrow nozzle tip and with a roller.
2. Each day the contractor shall attempt to pull ap0rt several sections af welded seams
to test the qu�ity af the welds. Should the vwelds be defiaent, a more thorough
examination of the work performed must be carried out and necessary repairs made.
Mule-Hide's PVC Cut Edge Sealant is used to seal the membrane edges where
reir�forcing fabric is cut and expased.
3.09 Flashing Installation
A. PVC Coated Metal Flashing
1. PVC Coated Metal Flashing shall be installed in acoordance with Mule-Hide
Roofing Systems' standard details.
2. Complete all metalvwrk concurrertitly with roofing and flashings so that a
watertight condition exists daily.
3. PVC Coated Metal may be used at all peaks, valleys and slope intersections
where the net change in slope e�cceeds 1-V2" in 12". In some cases reinforced
membrane may be suffiaent for ridges but should be fastened securely at �I
transition areas. Contact the Mule-Hide Custorrrer Service Department for
specific recommendations.
4. PVC Coated Metal shall be installed to provide adequate resistance to bending
and to allow for noRnal thermal expansion and contradion.
5. All metal jants are to be watertight and staggered over nailer jants to prevent
joints in nailers and jarrts in metal from lining up.
6. Base flashings shall extend a minimum af 8" up vertical surface.s where possible.
7. All metal flashings and t+erminations shall be securely fastened in the plane af the
roof deck with fasteners recommended by Mule�Hide.
8. Fasteners used to secure flashings to w�ood nailers shall be stainless steel,
galvanized metal or other coROSior�resistant material, with a head diameter af
not less than 3J8", and with fastener penetration into the �nrood nailer ofi at least
3/4".
13
9. Mule-Hide recommends the use of PVC Coated Metal for scuppers and metal
overflows. '
10. AIi Mule-Hide PVC Coated Metal shall be fabricated to form hemmed edges to
prevent sharp metal edges from cutting the membrane, except when used in
conjunction with wood nailers. '
B. PVC M�nbrane Flashings
1. All membrane flashings are to be installed concuRently with the roaf inembrane
as the job progresses. Temporary flashings are not allaw�ed without prior writt�n
approval from the Mule-Hide Warranty Department. Should any water peneUate
the new roofing because of incomplete flashings, the affected areas shall be
removed and replaced at the contradtor's expense.
2. All PVC Membrane flashings shall be fully adhered using Mule-Hide's PVC
Bonding Adhesive. The following conditions must be met:
a. All surtaces to be fully adhered should be compatible, dry and smooth
with no excessive surface roughness. tf an existing asphalt surtace is
present, a 1/2" minimum plyvwod, 9 oz. polyester felt, acceptable
insulation board or 26-gauge minimum galvgnized metal barrier must be
plaoed over the asphaltic surface.
b. After the proper surface has been prepared, Mule-Hide's PVC Bonding
Adhesive shall be applied using a minimum 1/2" nap paint roller at a rate
of approximately 60 square feet per gallon a# "fir�shed surface area"
depending on the type of substrate. App1y adhesive in smooth even
coats, avading globs, puddles or other types aF irregularities.
c. Muie-Hide PVC Membrane used as a flashing shall be cut to a woekable
length. Adhesive should be applied to the area of substrate to be
flashed and to the back � the PVC membrane at a rate of approximately
120 square feet per g�lon. Coverage rates will vary depending on
substrate and environmental conditions. Let adhesive dry sufficierrtly
to be tacky but not produce strings when touched with a dry, dean finger.
Note: When the PVC membrane is mated to the substrate this will
provide an approximate "finished coverage rate of 60 square feet per
gallon".
d. Carefully rdl the membrane onto the coated substrate. Avad wrinkling
membrane when applying to substrate. The amount of adhesive that can
be successfiully applied to the membrane will vary depending on ambient
temperatures, humidity and manpower. After mating membrane to the
substrate, cargfully roll the membrane with a 2" wide rubber hand roller
to prom�e maximum positive corrtad between the membrane and the
substrate. Overiap all adjacent flashing sheets a minimum af 2". The
PVC Membrane flashings shall extend a minimum of 6" onto the field
sheet. There shall be a minimum 1-1/2" hot-air weld in front ofi the
fastener plates. Alt side laps are to ove�lap a minimurn of 2" and welded.
e. Do not apply PVC Bonding Adhesive�to seun areas that will be hot
air welded together.
3. All flashings shaU extend a minimum of 8" abave roo�f inembrane ievel where
possible unless previously accepted by the owner or his representative and the
Mule-Hide Warranty Department.
14
4. All flashings shall be hot air welded at their connections with the roofing
mernbrane and other PVC flashings. �
5. Apply PVC Cut-Edge Sealant at all w�elded edges where the membrane has been
cut and sctim is exposed.
�
8. All flashings stratl be properly terminated in compliance with MuVe-Hide's
published Standard Details.
3.10 Walkway Installation
,
Walkways must be provided in areas where routine rooftop maintenance occurs and in areas where
regular roaftop traffic is expeded.
A. PVC Walkway Roll Installation
1. Install Mule-Hide PVC Walkway Roll material over dean, dry surtaces. Layout
areas where the PVC Walkway Roll is to be installed with most of the material
being oriented so that it is placed betvireen field seams with each adjacent and
abutting section gapped a minimum o�f 6".
2. Heat weld the perimeter of the properly positioned PVC Walkway Roll. Check
seams for any vads or inoonsistencies that might prevent watertightness.
3. Apply PVC Cut-Edge Sealant at all w�elded edges.
B. Precast Pavers
1. Install precast paver systems acceptable to Mul�Hide over one layer af
Polyester Mat Protection Material or an acceptable slip sheet.
2. A sheet of PVC membrane may be used as a protection layer under the precast
pavers.
3. Set precast pavers so that they do not cover field seams.
3.11 Temporary Tie-ins
A. Install temporary cutoffs around incomplete edges of roofing assembly at the end c�f each
days work and when work must be postponed due to indement weather. Straighten the
insulation line using pieces of insulation loosely laid, and seal the Mule-Hide sheet
membrane to the deck or existing membrane. Use a heavy application of roof cement or
hot asphalt at least sbc inches in width overlayed with an embecided reir�orcement
Remave the temporary seals completely when vwrk resumes, cutting out the
contaminated membrane. Remove �I sealarrt, coMaminated membrane, insulation fillers,
etc. from the vwrk area and properly dispose off-site.
B. Other methods of temporary tie-ins may be used. Mule-Hide does not recommend a
specific mettiod. This is the responsibility of the roafing contractor.
End of Section
This specfication represents the applicable informatipn available � the time af its publication. Mule-Hide
reserves the right to cha�qe this infarmation at any time. Contact Mule-Hide or check the Mule-Hide
w�ebsite (www.mulehide.com) for the latest updates regarding changes or modifications to this
specification.
15