HomeMy WebLinkAbout13-14005 CITY OF ZEPHYRHILLS
5335-8TH STREET
�sis)�so-oozo 1 05
BUILDING PERMIT
Permit Number: 14005 Address: 38522 A AVE
Permit Type: COMMERCIAL ZEPHYRHILLS, FL.
Class of Work: ADD/ALT COMMERCIAL Township: Range: Book:
Proposed Use: NOT APPLICABLE Lot(s): Block: Section:
Square Feet: Subdivision: CITY OF ZEPHYRHILLS
Est. Value: Parcel Number: 14-26-21-0010-01700-0060
Improv. Cost: 20,000.00
Date Issued: 5/28/2013 Name: CROWN CASTLE GT COMPANY LLC
Total Fees: 202.50 Address: 4017 WASHINGTON RD
Amount Paid: 202.50 MC MURRAY PA 15317-2520
Date Paid: 5/28/2013 Phone: (813)342-3853
Work Desc: INSTALL ANTENNA& LINES TO EXISTING TOWER T-MOBILE
� /�
,?
s
���� �
�,� �f � � �
`J� / ,�� i��
V , r,�
� -� �
� �
,�d �n
FOOTER BOND DUCTS INSULATED SEWER . MISC.
ROUGH ELECTRIC LINTEL MISC � MISC.
1ST ROUGH PLUMB PRE-METER INSULATION WALL MISC.
DUCTS INSTALLED WATER MISC DRIVEWAY
PRE-SLAB SHEATHING MISC. MISC.
CONSTRUCTION POLE FRAME MISC. MISC.
REINSPECTION FEES: Reinspection fees will comply with Florida Statute 553.80(2)(c)when extra inspection
trips are necessary due to any one of the following reasons: a)wrong address b)condemned work resulting
from faulty construction c) repairs or corrections not made when inspections called d)work not ready for
inspection when called e) permit not posted on job site� plans not at job site g)work not accessible.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that
may be found in the public records of this county, and there may be additional permits required from other governmental
entities such as water management, state agencies or federal agencies.
"Warning to owner: Your failure to record a notice of commencement may result in your paying twice for
improvements to your property. If you intend to obtain financing,consult with your lender or an attorney
before recording your notice of commencement."
Complete Plans, Specifications Must Accompany Application. All work shall be performed in accordance with
Ci Codes and Ordinances. NO OCCUPANCY BEFO C.O.
� -,r'- -.
NTRACTOR SIGNATU PERMIT OFFI R
--- PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION
CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED
PROTECT CARD FROM WEATHER
a�s-�eo-oozo City of Zephyrhills Permit Application Fax-813-780-0021
Building Departme�t
Date Racelved 3 '� Phon�CoMaet for Permlttin
TT-TTTT
owners Name Verizon Wireless owner Phona Number
Owno�"s Addross 14055 Riveredge Drive,Suite 600,Tampa,FL 332637 pN,nsr phonQ Numbsr
Fee Slmple Titlehdder Name C�OWh Ca5tl2 p��p�e Number �—�
Fes Simpb Titleholdsr Addross 017 Washington Rd.,McMurray,PA 15317-2520
,we n�ortESS 38522 A Avenue,Zephyrhills,FL 33542 �
LOT�
sueonns�or, � PARCEL ID� 1a-26-Zi-ooio-oi�oo-o060
(OBTAINED FROM PROPEItTY TAl(NOTICE)
WORK PROPOSED B NEW CoNSTA 8 ADO/ALT Q SIGN � Q DEMOLISH
INSTALL REPAIR
PROPOSED USE Q SFR Q COMM Q OTHER
TYPE OF CONBTRUCTION Q BLOCK Q FRAME Q STEEL Q
DESCRIPTION OF WORK �nstall antennas&lines to existing telcom tower �/ — /i1 —��
BUILDING SI2E � "�A SQ FOOTAGE N�A HEIGHT N/A
STRUCTION
QELECTRICAL S AMP SERVICE Q PROGRESS ENERGY Q W.R.E.C.
QPLUMBING $ �// �
� -���
QMECHANICAL $ VALUATION OF MECHANICAL INSTALLATION
QGAS Q ROOFING Q SPECIALTY Q OTHER
FINISHED FLOOR ELEVATIONS FLO00 20NE AREA QYES NO
BUILDER �`�COMPANY �CROMPTON ELECTRIC,INC �
SIGNATURE REGISTERED Y I N FEE CURRE� Y!N
address 1799 7TH AV ,LAKE WORTH FL 33461 �icense# CGC62911 �
ELECTRICIAN COMPANY
SIGNATURE REGISTERED Y/ N FEE cURREn Y/N
Address License# ��
PLUMBER COMPANY �
SIGNATURE REGISTERED Y! N �E cuwtE� Y 1 N
Addresc License# �—
AIECHANIGLL COMPANY �
SI(iNATURE REGISTERED Y! N �e cuwtEn Y!N
Addreas License# ��
ER �. /� COMPANY �i �At d'
SI(iNATURE �i��'� r�asr�D Y N r�E cur�n Y!N
Address License# �
IIIIIIIIIIIIt1111111111 / 111111111111111111111111111111111111i111111
RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy Forms;R-O-W Permit for new construction,
Minimum ten(10)waking days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed,
Sanitary FaciliNes 8 1 dumpster;Site Work Pertnit for subdivisions/large projects
COMMERCIAL Attach(3)complete sets of Building Plans plus a Lite Safery Page;(1)set of Energy Fortns.R-O-W Permit for new construction.
Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stortnwater Plans w/Silt Fence installed,
Sanitary Facilities 8 1 dumpster Site Work Pertnit for all new projects.All commercial requirements must meet compliance
SIGN PERMIT Attach(2)sets of Engineered Plans.
""PROPERTY SURVEY required for all NEW construction.
'J ' i.l � i i�i Y i ' �i 1 1 i 1 1 1 i • 1 � • ' 1 f i •J • 1 i • 1 i • • 1 • • 1 •
Direetlons:•
Fill out application completely.
Owner 8 ConVactor sign back of application,notarized
If over 52500,a Hotice of Commencsment Is required. (AIC upgndes over i75�)
'" Agent(tw the contractor)or Power ot Attomey(for the owner)would be someone witti noTarized letter from owner authorizing same
OVER THE COUNTER PERMITTING (Front of Application ONy)
Reroofs If shingies Sewers Service Upgrades NC Fences(Wot/Surveylfootage)
Driveways-Not over Counter i(on puWic roadways..needs ROW
05/2812013 13:16 Northwest Insurance Agency �A�214 352 7744 P.0011001
�►�a� CERTfFICA7� OF L,IA�IL�ITY INSURANCE si2si oi3'
THI$ CER7IFICATE 19 ISSUED AS A MATTER OF INFORMATION pNLY AND CONFER9 NO RI0FfT8 UrON TH� CFRTIFICATE NOLDER. THIS
CERTIFICATE OOE9 NOT AFFIRAIATIVEI.Y OR N�OATNEI.Y AMEND, EXTEND OR ALTER TFIE COVERAOE AFFOROED BY TME POLICIES
BELOW. 7HIS CERYIFICATE OF q�URANCE DOES NOT CONSTITUT� A CONYRAC7 BESWEEN THE 188UING IN8tlREli(8►, AuTHORIZED
REPRESENYAYIVE OR PRODUCER,AND 7NE CER7IFICA7E HO�OER.
MAPORTANT: 1F q1e�OrtMC�t6 h01d9�16 Pn ADDi'1'IONAL IN9URPD,ihe p011CyQsY)muot be OndOroNJ. I�9tJaRdOATIOPt 19 WAIVED,wbJeet to
tlr twms�nd�ondl�ons oi q►e poNc�1,certaln potldes m�y�quks�n�ndon�meot A�tertMnt on 1Ms�doa not�onl�r r1�s to!ho
o�rtllk�o hold�r In INu o!wch�ndo��m s.
PrtOOVC�t H�t�:
NORTSWEST IN3LIRANCE AGrENCY ; (214)352-5656 �:I214)352-7744
11722 �sh I�xx Ste 3�S ,�� .i�o@na ncias.com
Dallas, T7C 75224 .,�,p��,covau,oE ,we�
iNSUr��:L�T3WTILLTB IN3LiRANCE COMPANY
INSURED �Z(�,'gpQy�T IZIDV9TRIES L�t,G IN6URER B s� =�Z�N�'
u�suaea c:'x'EXA$ MUTW,L
9884 M�TROE RD INSURERD:
pALLA,S, xX 75220 n+suaea e;
INSURER P:
f,'OyEFtAGES CERTIFICA'T'E NUMBER: REVISION NUNiBER:
THIS IS TO CERTIFY T}WT TME POUCIES OF INSURANCE LIS7ED BELDW MAVE BEEN ISSUED T4 THE INSURED NAMED A90VE FOR THE POLICY PERI00
INDICATED. NOTWITMSTANOINO ANY REQUIREMENT,TERM OR CONCRtON OF ANY CONTRACT OR OTMER DOCUNIENT N11TN RESPECT TO NMICH THIS
CERYIFICATE MAY BE IS3tJED OR MAY PERTAMI, TNE INSURIWCE AFFORDED BY TNE POLICIES DFSCR��D H�REIN 1S SuB.IECT To AI.L THE TERMS,
D(CLUSIONS ANO CONDITIONS OF SUCH POLIGIES.UMITS SHOWN MAY HAVE BEEN REDUCED 8Y PAIO CWMS.
L� TYPE OF INSUNANCE pOLICY NUMBER ��''�TS
c,�Er+,� w�eiulr ErYcH occu�t� e �. 000 000
X ������,��i� �e�, s 100 000
cu�s�+oE �oc�Ua Meo��,�ny a»r»non) i S O O O
A gC�W 02/23/13 02/23/l4 p�gp�µd,�,pVMWINtY 4 1,000 000
�,,,� ,,�,,,� , z,o00,ooa
�,L�,,������qppVEg p�: PRODUC7S-COIYPlOP/�(;G : 2,000,000
POL�Cr PRO- � !
�uTOMOei��N,siuTy ,�,d,,,, I 000 000
zxc7862068 ix/zo/�z i�/zol�� BOO,�ruuu�►c�«v.� s
ALL OWNEO $ ��ULED 80DILY INJURY(P�r aoddmt) �
8 AUTOB
HIRED AuT08 ��� Par aedda�t $
s
u�nBr�u►uAe o� fJ1CH OCCURRENCE a 5,000,000
A S ��� X cw�a�uc� �C� 02/23/i3 02/23/i4 ���� = 5,000,000
DED f1EYENTION `
WORKERB COIrWEN8AT10N T
����A��� 02/23/l3 02/23/14
,�,�, ���� Y� N�� Q003079554 �.�.�►cn�cGOarr a 1,000,000
C orr�xaMween e�uoeoo
�..,,,,y,�� �.�.ws�.��or s 1 000 000
MoEBCRPTI��OW�OPERATIONg baloW E.L.DIBEABE-POLICY LIMR f � ��0 ���
bEBCfiIPTION OF OPEFtAT�NB/LOCATION81 VEHICLEB (Att�ch ACORD 101,Addltbnai Rartwrk�8dwduN,M moro�paro M raQulrod}
CERTIFICATE HdLDER CANCELLATION
SHOULG ANY OF'1'ME A60VE D�SCRIBED POLICIES BE CANCELLEO BEFORE
CI�'Y OL' f4�PH]LRHTLLS rHe �iw►noN oaTE rH�OF, NO'nCe wll�. BE OELNERED IN
5335 BTH STREET AC,CDRDANOE WITH THE PO PRrnns�oHS,
ZEPHYRBILLS, b'L 33342
AUTM D $ A
1 8-2010 ACORD CORPORATION. All righta reaenrod.
ACOR025(201W05) �e ACORD name and logo aro regiota m a o AGORD
�����
I Illill If III IIIII IIIII IIIII IIIII IIIII IIIII lIIII Iilll I�II IIII
Key No Permit No. ` 2013092522
NOTICE OF COMlU1ENCEMENT Rept:1523608 Rec: 10.00
DS: 0.00 IT: 0.00
THE tlNDERSIGNED hersby gives notice thai improvement wii!be 05/24/13 L. Korb, Dpty C 1 erk
�v4acie to certain and in accordance with Chap#sr 713, Florida State pRULR S 0'NEIL,Ph D PASCO CLERK & COMPTROLLER
Statues:the fotiowin5 irsformatior is prov;ded in Lhis Notice of 05/24/13 04:10 m 1 of 1�+
Commencement: OR BK ���� PG 2V�2
1. Description of Property: Parcei No.� �� �z4�•-2 i—r�t��t��-.��t7 r�n —cart2�
(Legai descr�ptia� of the property and street address if ava�able)
2. General Descriptio� of lmpravement:
t��G���L� �i ���' 1'����r �r.`r t.., �rv u..�rs..1'
3 Owner In#armation: Nam`e: iT�v�,z� .5�,,�rt L G 2�4,7�'"7s9-
A�ddress:3�n� w.1�,i?�nF�:.-L�.,�,l�.� �1J City T���,ri State�Zip33[U�
Interestin Properry: tccl�s.
Name and Adcfress of Fee Simple Titleholder(If other than ownerj :
. � & .��� f' �-
4. Contractor: Name: .4=-c � '
Address: � � � City � Staf Zip "
Fhone No. Fax No. � --
5. Surety: Name f�mount af 8ond. �
Address: City State_Zip
Phone No. Fax No.
6. Lender: Name:
Address: _ Cit�,� State_Zip
Phone No. ��x No.
7. Persons within the State of Fiorida designated by Ownar upon whorr natices or othet documen#s may be
served as provided by Sectian 713.13(1)(a)(7j Florida Statutes.
Name:
Address: City State_Zip
Phone Na. Fax No. '
8. 1n addition ta himself or herseff, Owner desi�nates ot
To receive a copy of the Leinor's No#ice as provided in Section 713.13(1}(b), Florida Statutes.
9. Expiration date of Notice of Commencernent{ihe expiration date is 9 year ot recarding unless a different
date is specified.)
WARNING TO OWNER:ANY PAYMENTS MADE BY THE�WNER AFiER THE IXPIRATIOM QF 7NE NOT}CE OF COMEAENGEMENT ARE
CONSIDERE€1 IMPROPER PAYMENTS UN�ER CHAPTER 743,PART 1,SEC 7'f3:13,FLORIDA STATU7ES,AND CRN RESULT IN YOUR
PAY[NG 1WICE FOR tMPROYEMENTS TO YOUR PROP�2TY.A NOTICE�F COMMEFICEtAElVTMUST BE RECORDED APiD POSTED ON THE
JOB SITE BEFORE THE FlRST tP1SPEC710N.IF YOU!N�D TO OBTAIN FIhIANCING,C01+iStlLT1MTH YOUR tEMDER OR AN ATTORNEY
BEFORE C MENCING 1NORK RECOR Y k7R NQTICE OF COMMENCEMENT.
x Carole Bradley
Sic,�atu►e wn,.r cx O:mer' A;.�th�rized Of�ice • ector:�artnerA9anaper Manage�, . ��e
Si nature Required by same bdow by`X"mark"`
State of���, Ceuntv ai '
The forgoing instrumeni was a�kr�avdl�dged befors me this�day a# ,20�by
/ ' { n ed rame per on kno edging)
as R for
(Type o auth�r e ofi€ u.,[ee,a:=ome4 in fact� (�a . ^ras ex,eclited}
;�• JENNIFER R FUILL
Si nature o 16�Ir�1lHg$g�8B3
P s y no Praducsd Edenrflcation � EXPIREB irta�h 13,2017
Type of Id ntific oduced: HOn � �
Verification pursuani t Sedion 32.528,Florida Siatutes:urttier PenaRies of perjury,1 declare that i have read Che foregoing and that the facts
stated in it are true to e f my knov�tedge and belie#.
K
Sica�ature o Ja;uea!Persan Sigr.�ng.4ba�e
raE.�riarosdoc �el-2aos
STATE OF FLORIDA, COUNTY OF PASC�
�0����,R���r TRUE AND CORR�EC7 CQPY OF 7�HE�DOCUMENT
� • . * ON FILE OR OF PUBLIC RECORD IN THlS OFFIC�
�.� � WITNESS MY i�AND AND UFFICIAL SEAL THIS
� . ,�Y�=t..-• * �_�AY OF � �, .._...4 c. � 2 �
y w��S�''' ' ,�` , * PAULA S O'NEI�, CLERK& PTROLLER
* � �_" BY ..1' a �. , , ���
�i8a� q ___. JEPUTv CLERK
� � . 0����
STATE,�
NOTICE OF DEED RESTRICTIONS. The undersigned understands that this permit may be subject to"deed"restrictions"
which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
applicable deed restrictions.
UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the
contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
under state law If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
intended work,they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
portions of the "contractor Block"of this application for which they will be responsible. If you,as the owner sign as the
contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
County
TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES. The undersigned understands
that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of
use in existing buildings, or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
90-07, as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or
final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more, I
certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
other than the"ownet",I certify that I have obtained a copy of the above described document and promise in good faith to
deliver it to the"owner"prior to commencement.
CONTRACTOR'S/OWNER'S AFFIDAVIT I certify that ail the information in this application is accurate and that all work
witl be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
hereby made to obtain a permit to do work and installation as indicated I certify that no work or installation has
commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
certify that I understand that the regulations of other govemment agencies may apply to the intended work,and that it is
my responsibility to identify what actions 1 must take to be in compliance. Such agencies include but are not limited to:
- Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
Lands,Water/Wastewater Treatment.
- Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
Watercourses.
- Army Cc+•��of Engineers-Seawalls,Docks,Navigable Waterways.
- �Prartment of Health & Rehabilitative ServiceslEnvironmental Health Unit-Wells, Wastewater Treatment,
Septic Tanks.
- US Environmental Protection Agency-Asbestos abatement.
- Federal Aviation Authority-Runways.
I understand that the following restrictions apply to the use of fill:
- Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
- If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
"compensating volume"will be submitted at time of permitting which is prepared by a professional engineer
licensed by the State of Florida.
- If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
construction,I certify that fill will be used only to fill the area within the stem wall.
- If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
properties. If use of fill is found to adversely affect adjacent properties,the owner may be cited for violating
the conditions of the building permit issued under the attached permit application,for lots less than one(1)
acre which are elevated by fill,an engineered drainage plan is required.
If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
permit issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Official from thereafter
requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by
the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate
justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT
WITH YOUR LE R OR AN ATTO N BEFO E RECORDING YOUR NOTICE F C MMEN EMENT.
FLORIDA JURAT(F.. .'j117.03) -
OWNER OR AGEI�FY" � ��-�,{� CONTRACTOR r
sG'bed and s 'or affirmed)before this Subscribed and swom to(or a�rtnec�befor me this t
r � K.quaftire by 1�p���S J�,SfO�
o /a personally known o me or has/have produced Who is/are persp nally known to me or has/have produced
as identification. �J //� as identifcation.
` .� Notary Public IC7'�CJ�/ �`�--�' Notary Public
Commission No. �� �t��� 1 Commission No.�E� � I lv gRq M DRURY
N 'S.YP�g�NR:7�P�(RUGHTEN Name of Notary type,rd printed or stamp d , MMtSSION!�EE194178
� ' EXPIRES May 28.2016
;'�'�� MY COMMISSION#EE8b25�{ • AoAmN .00m
�� �.�`'
EXPIRES J�nuary p3,201� ��
i�otf ste.o�ss
_ Crown Castle Tel: 813.342.3900
C O�/�/n' 451 I N.Himes Ave.
V V � V Suite 210 F��$�3.342.3901
�a�T�� Tampa,FL 33614 www.crowncastle.com
March 11, 2013
City of Zephyrhills —Building Department
5335 8�' Street
Zephyrhills, FL 33542
Re: Antenna Swap on a communication tower located at 38522 A Avenue
Dear Building Official,
Attached please find a building permit application for the communication tower with access
located at 38522 A Avenue. This application is to replace T-Mobile's existing antennas, add
boosters, and run hybrid cable up tower. T-Mobile will not be making any other adjustments to
the tower site, other than swapping out these components. The following items are included in
this application packet:
- Building Permit Application
-2 sets of Site Plans (bound with the construction drawings)
-2 sets of Construction Drawings
-Structural report
-Printout from the Assessor's website
Thank you in advance for your assistance.
Regards,
Veronica Kruchten
Property Specialist
4511 N. Himes Avenue, Suite 210
Tampa, FL 33614
813.342.3874 Desk
813.342.3901 Fax
o � �
�
�Y��l
�' ��
i
City of Zephyrhills
BUILDING PLAN REVIEW COMMENTS
1 (J
Contractor/Homeowner: �j�/�1� �,�+5�" '�
Date Received: �� (2 —� 3
Site: 3 � 5Z Z �" ��
Permit Type: � � (aC� � /S�`l GZ rl��►Gt.S' �,�'C�GC �Q'��5,
��-� hY��� ��
Approved w/no comments: Approved w/the below comments: ❑ Denied w/the below comments: ❑
This comment she t sha be kept with the permit and/or plans.
, ,, ��- 1 >
K in Swit lans Examiner Date Contractor and/or Homeowner
(Required when comments are present)
Pasco County Parcel: 14-26-21-0010-01700-0060 001 Page 1 of 1
Data Current as Of: Weekly Archive - Saturday, December 15, 2012
Parcel ID 14-26-21-0010-01700-0060 (Card: 001 of 001)
Classification 91 - Utilities
Mailing Address Property Value
CROWN CASTLE GT COMPANY LLC Ag Land $0
4017 WASHINGTON RD Land $55,482
MC MURRAY PA 15317-2520 Building $32,669
Physical Address Extra Features $677
38522 A AVE
ZEPHYRHILLS FL 33542 Just Value $88,828
Le9al DeSCription (First 4 Lines) Assessed (Non-School Amendment 1) $88,828
MOORES FIRST ADDITION TO CITY Taxable Value ;88,828
OF ZEPHYRHILLS PB 1 PG 57 LOTS
6 7 &8 INCLUSIVE BLOCK 17
OR 4639 PG 280
Land Detail (Card: 001 of 001)
Line Use Description 2oning Units Type Price Condition Value
1 9100 UTILITY OOC3 12,000.00 SF $3.46 1.00 $41,520
2 9100 UTILITY OOC3 7,800.00 SF $1.79 1.00 $13,962
Additional Land Information
Acres 0.45 Tax Area 30ZH FEMA Code �Commercial Code M3013AT
Building Information - Use 94 - Telephone Exchange Buildings (Card: 001 of 001)
Year Built 1971 Stories 1.0
Exterior Wall i Common Brick Exterior Wall 2 None
Roof Structure Rigid Frame w/Bar]oist Roof Cover Built-Up Tar and Gravel
Interior Wall i Masonry or Minimum Interior Wall 2 None
Flooring 1 Cork or Vinyl Tile Flooring 2 None
Fuel Electric Heat Forced Air- Ducted
A/C Central Baths 1 0
Line Description Sq. Feet Repl. Cost New
1 BAS 1,353 $81,816
Extra Features (Card: 001 of 001)
Line Description Year Units Value
1 CLFENCE 1966 1,920 $677
Sales History
Previous Owner GTE MOBILNET OF TAMPA INC
Month/Year Book/Page Type C de Condition Amount
01/2001 ��_y, Uz8u Warranty � Improved $149,400
Deed
08/1996 �bi !L U�)15 Warranty � Improved $277,600
Deed
http://appraiser.pascogov.com/search/parcel.aspx?sec=14&twn=26&rng=21&sbb=0010&... 12/18/2012
:�� •
^�U�:
���`� �II I I II, III I II Iliil III I I II
'I'IIIS INS'fRll{1tENT PREPARF:D l3Y Y�::1::�9a_d
AI�iU UPON Rb:CORUINC ItE'1'URV
I �'p; Rcpl: 505278 ec: 15.00
DS: 1045.80 ' IT; 0.00
Rotxn I). ��'�ird.Lu�. � 06/14/01 ���,�� OPIy Clrrk
'' '. • l�rn�ns R.�chlin&,��lartin I'l.l.0
` -� 90 f'ros�x�ct Strcc� JED PI1 TI1AN pp SCO COUNTY CLERK
�"'-•;• 06/14/0! 1i:27am 1 of 3
�� ���•�r� oa sK 4639 P� 2$0
SI.1olu�sbun. V'f OS819-fH)99
s���:c.i,��,�VARRAN•rv nF:t:i�
'TIIIS IIYDEti'CURE, madc as of January 31, 2000, bctH�een G'i'E �VIIt�:LF:SS
UF 'I'l1E SOtl7'll IN(:URPORA'1'EU, a a Virginia ccxporation(succc.�ssor in interest by
mcrgcr to G'fE iVlobilnet of't'ampa fncorporatcd), havine� its principal placc of busincss at
c/o C�fE Wirelcss lncorporate.�i, Onc GTE 1'lace, Alpharetta, CiA 30004 (herein callcd
"Grantor"), and CROWh' CAS'1'LE CT COM11PANY I.I.G, a Dclaware limitecl liability
comnany, a�hosc address is r/o Cro�vn C;astic lntcrnational Curp., SlU f3cring, Suite 500.
Houston, Tcxas 77507, and �vhosc Fcderal 'I'a:c ldcntification Numbcr is 76-0627250
(hcrein callcci "Grantcc").
(Whcrevcr uscd hcrcin thc tcrms "�rantor" and "�rantce" incl��dc all the partics tn tiiis
inst�timcnt�nd lhc succcssc�rs and assi5ns of corporati�ns, and othcr entitics).
�YI'1'NFSSF:1'f!: "fhal the Grantor, for and in cansidcration of thc sum of
and other valuable consideration to thc Grantor in hand paid
by Grantee, the rcc:cipt and su(liciency whereof is hereby acknoti�lcdgcd,by thcse prescnts
does �;rant, barc�ain, scll, alicn, remisc, release, cc>nvcy and confirm unto the Grantee, it
succ;essors and assi�ns,all that certain IanJ situate in Pasco County, Florida, ta wit:
SCE I�;Xlltl3i'I'"A" 11"1'TACHI:U HEIt�'1'O ANI) MADt� n PAR'l'}If:REON.
'I'ogcthcr with all the tenemcnts, hercditamcnts anci appurtenances thereto
belongin�or in�ny�visc appertaining.
'1'U t1AVE ��ND'1'O tIU1.0 the samc in fec simplc forcver
ANU the Grantor I�ereby covcnants with said C;rantcc that it is lawfuliy sc;i•r.cxi of
said land in fec: simple; that it has good ribht and lawful authority to sell and convey said
land;that it hcrcby fully warrants the titic to said land and witl defcnd the same against thc
lawful claims e�f alt persons claiming by, through or under Grdntor,but as�ainst none other.
lip{inilials)_ ��.V DSUC�'���p��ll� o
4kxiJa ti��cial WartaiNy l�wd(C�x�ation)
C.O[)updutc Lcasc I.iccnu�= %h:l'lll'RIIII.IS,FIAGSI
siic�uf[..e(rL� �h,c r.l� -
- � � ' OR BK 4639 PG 281 �
� 1 2 of 3
IN WiTNESS WIIEREOF,the Grantor has caused these presents to be executed
in manner and form suf�icient to bind it as of the day and ycar first abovc written.
Sibned, sealcd and dclivcrod in the GTE W1RE[.ESS OF TIIF SOUTH
presencc of INCORPORATED,a Virginia
corporation(successor in interest by merger
to GTE Mobilnet of Tampa incorporated)
Witness /�
Printed Namc: �� 1�Pil.tnqh By: ( /� �1..�
� Name: .forlv�e�th
\ Title: �Ce�id�r�t• F'i,:^^r�;,n:i Pl�nnin� .
J • �'C./� , 1
ess Attcst: .
Printed Name:k�..�rtc� 1.�=-(,Jl�.a.w.s Name� Dale S.Vo - ~
Title: � � ' �� '
(CORPORATE SEAL) • - � �
ACKNOWLEDGMEN'1' ' '� . '"���
STATE OE G E oR G i A
COUNTY OF v c. �)
-�.,t
Thc foregoin�instru�nent was acknowled�ed before me this Z r1 '-day of January,
�000, by l�r-Zi and-,��, 9�E S. L� , the
V and '�cretary, respectively, of G'TE WtItEL 'SS OF THE
SOUTH INC RPORATED, a Virf;inia corporation, on behalf of the corporation and
partnership. He/She is personally known to me
es�identifica�ti�r,.—
�1 1 � .�.
Notary Public
Printed Name: F. ��a
My Commission Expires:
(NOTARr,�� Y,�
NQ
tg
� �o+Q`P4'�'� � ,
:- �s�'��'� ti° �_
,,,, �y o�,,,
�
���''•• eAR RO�a•``,,�
�•..,,..u►�u��„'
-2 -
F1ariJs tip�tiiol Warramy tktid(Cor�uation)
ATI.1►1/111672359v1 %1?PI IYRIIII.I S,F7.(Ki31
.�—__ �
--�--•..
• � - ' ,
� OR BK 4fi39 P� 2�2
' 3 of 3
�:Xiill317'•'A•'
(fL0651 -Zcph�•riiills)
l.ots G, 7 and 8 in f3lock 17 of MUORE'S I'IRST AUI)1'I'101�'t'U'I'I[Cs TO�VN Ul�
7.F:PHYlt111I.LS,according to thc map Ar plat thcrcof recorded in Plat 13ook 1,1'x�c 57,
of thc public rcx:ords of Pasco(:ounty, rlorida.
Tax Polio No. 1�t-2G-21-UU10-017-UU-OOlO
' T
F ''
:�tY � .� �� l4_�3
v� 7 �•..J ' .�'_...1�_3 1 ` ,.
��,���� �:;,��j�;v��;..,_ _ - Cc j
k10G49�09t•I FI1NiS1 %ph}Tlriils
ticction I 1 1'a�eo Ciwnty,flwids
Date: October 24,2012 OO ��O�TM
Shelia Turnipseed SSOE Group
Crown Castle 1001 Madison Ave
197 Charmant Place, Suite 2 Toledo, OH 43604
Ridgeland, MS 39157 (419)255-3830
(601)607-3504 bniese@ssoe.com
Subject: Structural Analysis Report
j mob;l�
Carrier Designation: �e�-Wireless Co-Locate
Carrier Site Number: 89059
Carrier Site Name: CROWN ZEPHYRHILLS
Crown Castle Designation: Crown Castle BU Number: 816298
Crown Castle Site Name: ZEPHYRHILLS
Crown Castle JDE Job Number: 207227
Crown Castle Work Order Number: 541052
Crown Castle Application Number: 165308 Rev. 1
Engineering Firm Designation: SSOE Group Project Number: 012-01232-00
Site Data: 702 B Avenue,Zephyr Hills, FL 33542, Pasco Courrty
Latitude 28°13'40.63'; Longitude-82°10'45.6"
285 Foot—Modified Self Support Tower
Dear Ms. Shelia Turnipseed
SSOE Group is pleased to submit this"Structural Analysis Report"to determine the structural integrity of the above
mentioned tower This analysis has been performed in accordance with the Crown Castle Structural `Statement of
Work' and the terms of Crown Castle Purchase Order Number 497522, in accordance with application 165308,
revision 1
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have
determined the tower stress level for the structure and foundation, under the following load case,to be:
LC7• Existing+Reserved+Proposed Equipment Sufficient Capacity
Note:See Table I and Table II for the proposed and existing/reserved loading,respectively
The analysis has been performed in accordance with the 2010 Florida Building Code based upon and ultimate 3-
second gust wind speed of 140 mph converted to a nominal 3-second gust wind speed of 108 mph per section
1609.3 1 as required for the use in the TIA-222-G Standard per Exception#5 of Section 1609 1 1 Exposure Category
C and Risk Category II were used in this analysis.
We at SSOE Group appreciate the opportunity of providing our continuing professional services to you and Crown
Castle. If you have any questions or need further assistance on this or any other projects please give us a call.
Structural analysis prepared by: Benjamin Niese, EI
By signing below, the engineer certifies that they are in Responsible Charge of�}ijsaeei�ir�:•�e�ort as depicted in the
Table of Contents, including attachments and additional calculations. ,���� 3��fl�����F��.��.
Respectfully submitted by� `���Q`4,,'� ��� r'��p `�4�°`
� �
•Q.. � '° :'°'`°o�iG� .
• "��`.
��;� NO. �'��^ '.�-..�
Larry J.Griffdh, P E � "
.
Senior Structural Engineer m � � •�r
du��, ��
sd�.• BTATB QF :���
` ' ��soe
making tlients successful by saving them time, trouble, and money�o�0►�.A� � 1 �Q P:
,��, � ����4���,.��� o,,..
��is�������o�a��,
� �
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 2
TABLE OF CONTENTS
1) INTRODUCTION
2)ANALYSIS CRITERIA
Table 1 - Proposed Antenna and Cable Information
Table 2- Existing and Reserved Antenna and Cable Information
Table 3-Design Antenna and Cable Information
3)ANALYSIS PROCEDURE
Table 4- Documents Provided
3 1)Analysis Method
3.2)Assumptions
4)ANALYSIS RESULTS
Table 5-Section Capacity(Summary)
Table 6—Tower Component Stresses vs. Capacity
4 1) Recommendations
5) DISCLAIMER OF WARRANTIES
6)APPENDIX A
tnxTower Output
7)APPENDIX B
Base Level Drawing
8)APPENDIX C
Additional Calculations
�����m��ae���s
•`�,Qk°��,O� ���'���
���;� � � sa��
±' ; f�€�. 615 :'�
.
. .
9 ,�,��
w � (��d,9,°,
:a�. sT �� o :�_�p.
,,,,�, �f��;,^�
' �`.'•�� �� �.�e',.
•e���� ��•� �t r��,¢� ���;
+� ���,� �1.v �;y �'
���°� _.:enr'tEO�e'
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CC!BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 3
1) INTRODUCTION
The existing 285'tower is supported on four legs and has eighteen major sections. It has a square cross section
made of bolted connections, with "K"brace down, "K1"down, "K2" down, "K2A" down, and portal configurations.
The tower is fabricated with angle legs and angle diagonals.
The tower manufacturer is unknown and has been mapped by IETS
Modifications designed by IETS Group (Project #� 2005-70954, dated 10/25/05), which consisted of installing
concrete collars and grade beams to the existing foundations and by B&T Engineering (Project#� 79078, dated
5/6/08), which consisted of replacing select redundant horizontals, have been considered.
2)ANALYSIS CRITERIA
The analysis has been perFormed in accordance with the 2010 Florida Building Code based upon and ultimate
3-second gust wind speed of 140 mph converted to a nominal 3-second gust wind speed of 108 mph per section
1609 3.1 as required for the use in the TIA-222-G Standard per Exception#5 of Section 1609 1 1 Exposure
Category C and Risk Category II were used in this analysis.
Table 1 -Proposed Antenna and Cable Information
177 0 177 0 3 CSS X7C-FRO-860 w/ 9 1-5/8 1
Mount Pipe
Notes
1) See Appendix B for the proposed coax layout.
tnxTower Report-version 6.0.4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CC/8U No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 4
Table 2-Existin and Reserved Antenna and Cable Information
285 0 290.0 1 Decibel DB224 1 7/8
6 Andrew UMWD-03319-R2DM w/
227 0 227 0 Mount Pipe 12 1-5/8
� Sector Mount[SM 402-3]
11 Decibel �g878G90A-XY w/
215.0 215 0 Mount Pipe 11 1-5/8
� Sector Mount[SM 602-3] 2 ��2
3 Ericsson 800 MHz SMR Filter
� 1 Ericsson ANT2 0 6 11 HPX I I
� 6 Ericsson RRUS-111900MHz I �
� 3 Ericsson RRUS-11800MHz I �
� 2 Ericsson TN11/2X 248T/256X HP 2 � 3/8 ( 2
203 0 � 203 0 g RFS Celwave ACU-A20-N 3 � 1-1/32 (
( 2 RFS Celwave AP�9ERR18-C w/ I (
Mount Pipe
I 1 RFS Celwave AP�ERR18-C w/
Mount Pipe
� Sector Mount[SM 502-3]
200 0 3 Ericsson RRUS A2 Module 2
3 Andrew ETW200VS12U6
3 Andrew TMBX-6517-A1M w/ I I
194 0 I 194 0 Mount Pipe
6 EMS Wireless RR65-19-02DP 12 I �-5�8 I
� 6 LGP Telecom LGP13908 TMA I I
� Sector Mount[SM 402-3]
185 0 185 0 � Andrew PAR6-65
� Pipe Mount[PM 501-1] � EWP63
LPD-7905/8 w/
177 0 177.0 9 Antel 6 ��8
Mount Pipe �
� Sector Mount[SM 408-3] 3 1-5/8
Notes
1) The existing(3)LPD-7905/8 antennas and(6)7/8"coax at 177'level are to be removed upon installation of proposed
equipment and were not considered in this analysis.
2) Reserved equipment.
Table 3 -Design Antenna and Cable Information
N/A
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Projecf Number 012-01232-00,App/ication 165308, Revision 1 Page 5
3)ANALYSIS PROCEDURE
Table 4-Documents Provided
Mapped Tower Drawings IETS Project#: 2004-70893, Doc ID#• 1028647 Crown DMZ
dated 10/11/04
Foundation Drawings Golder Job#� 013-3163, Doc ID#� 2284739 Crown DMZ
dated 4/24/01
Geotechnical Re orts Golder Job#� 013-3163,
p dated 4/24/01 Doc ID#: 403319 Crown DMZ
Reinforcement Drawings IETS Project#: 2005-70954, Doc ID#� 1136789 Crown DMZ
dated 10/25/05
Reinforcement Drawings B&T Project#: 79078, Doc ID#� 1063786 Crown DMZ
dated 5/6/08
3.1) Analysis Method
tnxTower(version 6.0.4 0), a commercially available analysis software package, was used to create a
three-dimensional model of the tower and calculate member stresses for various loading cases.
Selected output from the analysis is included in Appendix A.
3.2) Assumptions
1) The tower was constructed in accordance with its original design and maintained per the
manufacturer's specifications.
2) The configuration of antennas, transmission cables, mounts and other appurtenances are as
specified in Tables 1 and 2 and the referenced drawings.
3) Mount sizes, weights, and manufacturers are best estimates based on photos provided and
determined without the benefit of a site visit by SSOE.
4) All member connections are assumed to have been designed to meet or exceed the load carrying
capacity aF the connected member unless otherwise specified in this report.
5) All foundation steel reinforcing is assumed to have been designed to meet or exceed the load
carrying capacity of the surrounding soils unless othenivise specified in this report.
6) All equipment model numbers, quantities, and centerline elevations are as provided in the CCI
CAD package, dated 10/12/12 with any adjustments as noted below
7) Caisson reinforcing information was not available, so minimum area of steel was assumed in this
analysis.
This analysis may be affected if any assumptions are not valid or have been made in error SSOE
Group should be notified to determine the effect on the structural integrity of the tower
4)ANALYSIS RESULTS
Table 5-Section Capaci (Summa )
T1 288-279 Leg L5x5x1/2 4 -0.39 87 75 0.4 Pass
T2 279-272 Leg L5x5x1/2 25 -1 45 124 74 1.2 Pass
T3 272-259 Leg L5x5x1/2 46 -3 48 134.35 2.6 Pass
T4 259-247 Leg L5x5x1/2 83 -8.64 143.90 6.0 Pass
T5 247-237 Leg L8x8x5/8 120 -15.46 282.60 10$�b� Pass
T6 237-232 Leg L8x8x5/8 141 -22.12 388.82 5.7 Pass
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structura/Analysis CCI BU No 816298
Project Number 012-01232-00, Application 165308, Revision 1 Page 6
T7 232-222 Leg L8x8x5/8 162 -26.34 388.82 6.8 Pass
T8 222-210 Leg L8x8x5/8 199 -35.54 371.04 ,69;6 b) Pass
T9 210-195 Leg L8x8x5/8 235 -50.04 340.41 14 7 Pass
T10 195-183 Leg L8x8x1 1!8 271 -73.67 642_24 25 0(b) Pass
T11 183-171 Leg L8x8x1 1!8 308 -94 95 642.24 14.8 Pass
T12 171 -146 Leg L8x8x1 1/8 347 -119 50 380.00 31 4 Pass
T13 146-122 Leg L8x8x3/4 2PL0 5x8 392 -169 39 788.33 �4�b� Pass
T14 122-96 Leg L8x8x3/4 2PL0.5x8 461 -221 56 774 14 zS'6 Pass
43.5(b)
T15 96-72 Leg L8x8x1 2PL0.75x8 530 -281.89 806.79 �3�b� Pass
T16 72-52 Leg LSx8x1 2PL0.625x8 599 -340.37 1046.93 53.5(b) Pass
T17 52-32 Leg L8x8x1 2PL0.75x8 680 -392.33 1132.32 6 5(b) Pass
T18 32-0 Leg L8x8x1 2PL0.875x8 761 -394.85 1181 17 61.8(b) Pass
T1 288-279 Diagonal 2L2 1/2X2x1/4x3/8 18 -0.61 24 08 2.5 Pass
T2 279-272 Diagonal 2L2 1/2X2x1/4x3/8 33 -1.54 29 13 5.3 Pass
T3 272-259 Diagonal 2L2 1/2x2 1/2x1/4x3l8 62 -3.50 23.40 14.9 Pass
T4 259-247 Diagonal 2L2X2 1/2x1l4x3/8 99 -4.69 23.29 20 1 Pass
T5 247-237 Diagonal 2L3�Q 1/2x1/4x3/8 128 -5.25 28 62 18.3 Pass
T6 237-232 Diagonal 2L3 1l2x2 1J2x5/16x3/8 149 -4 71 62.90 7.5 Pass
T7 232-222 Diagonal 2L2 1/2x3x5/16x3/8 178 -7 73 54.26 14.2 Pass
T8 222-210 Diagonal 2L2 1/2x3 1/2x1/4x3/8 215 -11 51 43.67 26 4 Pass
T9 210- 195 Diagonal 2L21/2x31/2x1/4x3J8 245 -16.75 32.93 50.9 Pass
T10 195-183 Oiagonal 2L3 1/2x4x1/4x3/8 285 -18.35 66.06 27 8 Pass
T11 183-171 Diagonal 2L3�1/2x1/4x3/8 322 -21 83 44.09 49.5 Pass
T12 171 - 146 Diagonal 2L3 1/2x5x3l8x3/8 359 -37 14 58 62 63 4 Pass
T13 146-122 Diagonal 2L31/2x5x3l8x3/8 410 -39.07 101.21 38.6 Pass
T14 122-96 Diagonal 2L3 1/2x5x5/16�13/8 479 �4 33 77.28 57 4 Pass
T15 96-72 Diagonal 2L3 1/2x5x5/16�3/8 548 -46.79 80.34 58.2 Pass
T16 72-52 Diagonal 2L3 1/2x4x5/16x3/8 620 -44 37 78 49 56.5 Pass
T17 52-32 Diagonal 2L3 1/2x4x5/16x3/8 701 -45.96 76.07 60 4 Pass
T18 32-0 Diagonal 2L5x5x3/8x3l8 790 -82.34 167.68 49 1 Pass
T2 279-272 Horizontal 2L2 1/2�Qx1/4x3/8 32 -0.85 40 42 2.1 Pass
T3 272-259 Horizontal 2L5x3x1l4x3/8 61 -1.39 73.48 2 3�b� Pass
T4 259-247 Horizontal 2L2 1/2X2x1/4x3/8 98 -2.34 36 11 6.5 Pass
T5 247-237 Horizontal 2L3�Q 1/2x1/4x3/8 127 -3.13 46.50 6.7 Pass
T6 237-232 Horizontal 2L2 1/2X2x1/4x3/8 148 -3.63 31.07 11 7 Pass
T7 232-222 Horizontal 2L5x3 1/2x3/Sx3/S 177 -4.60 126.83 6 9�b� Pass
T8 222-210 Horizontal 2L3x2x1/4x3/8 207 -6.56 29.80 22.0 Pass
T9 210-195 Horizontal 2L3x2x1/4x3/8 244 -9 47 25.89 36.6 Pass
T10 195-183 Horizontal 2L5x3x5/16x3l8 281 -12.70 79.26 16 0 Pass
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. Ocfober 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 7
T11 183-171 Horizontal 2L5x3 1/2x5/16x3/8 318 -15.32 93.31 16.4 Pass
T12 171 -146 Horizontal 2L3 1/2x2 1/2x1l4x3/8 355 -18.06 31 77 56.8 Pass
T13 146-122 Horizontal 2L5X�1/2x3/Sx3l8 404 -21.28 93.14 22.8 Pass
T14 122-96 Horizontal 2L4x3x1/4x3/8 473 -24.27 34.07 71.2 Pass
T15 96-72 Horizontal 2L4x3 1/2x3/8x3/8 542 -28.28 41.94 67 4 Pass
T16 72-52 Horizontal 2L3 1/2�12 1/2x1/4x3/8 613 -30 85 63.34 48.7 Pass
T17 52-32 Horizontal 2L2 1/2�Q 1/2x1/4x3/8 694 -32.74 45.49 72.0 Pass
T18 32-0 Horizontal 2L6x4x3lSx3/8 782 -62.35 106.79 58 4 Pass
T1 288-279 Top Girt 2L3�Q 1l2x1/4x3/8 7 -0.24 55.48 0 5(b) Pass
T3 272-25g Redund Horz 1 � ��2x2x1/4 66 -0.19 19.68 1.0 Pass
Bracing
T4 259-247 Redund Horz 1 � �12x2x1/4 107 -0 14 18.39 0.8 Pass
Bracing
T7 Z32_222 Redund Horz 1 � ��Zx2x1/4 182 -0.64 15.48 4 1 Pass
Bracing
T8 222-210 Redund Hoa 1 L2 1/2x2x1/4 219 -1.24 13.65 9 1 Pass
Bracing
T9 210-195 Redund Horz 1 L2 1l2x2x1/4 246 -1.00 11 62 8.6 Pass
Bracing
T10 195-183 Redund Horz 1 zL2 1/2x2x1/4�13/8 290 -1 43 39.65 3.6 Pass
Bracing
T11 183_17� Redund Horz 1 L2x2 1/2x1/4 337 -1 44 8.41 17 1 Pass
Bracing
T12 171 -146 Redund Horz 1 �x2 1l2x1/4 369 -1.97 7.39 26.6 Pass
Bracing
T13 146-122 Redund Horz 1 �x2 1/2x1/4 426 -2.60 13.03 19 9 Pass
Bracing
T14 �22_gg Redund Horz 1 L2x2 1/2x1/4 505 -3.58 10.57 33.9 Pass
Bracing
T15 gg-72 Redund Horz 1 �x2 1/2x1/4 564 -0.70 8.62 8.1 Pass
Bracing
T16 72-52 Redund Horz 1 2L2 1/2x2x1/4x3/8 638 -5.12 36.88 13.9 Pass
Bracing
T17 52-32 Redund Horz 1 2L2 1/2x2x1/4�13/8 719 -5.90 35.46 16.6 Pass
Bracing
T18 32-0 Redund Horz 1 2L2 1/2x2 1l2x114x3/8 816 -5.94 50.42 11 8 Pass
Bracing
T13 146-122 Redund Horz 2 L3x3x1/4 427 -2.60 8.63 30 1 Pass
Bracing
T14 122-96 Redund Horz 2 L3x3x1/4 506 -3.58 7.00 51.2 Pass
Bracing
T15 gg-72 Redund Horz 2 L3x3x1/4 575 -0 70 5.71 12.3 Pass
Bracing
T16 72_52 Redund Horz 2 2L2 1/2x2 1/2x1/4x3/8 639 -5.12 13.41 38.2 Pass
Bracing
T17 52-32 Redund Horz 2 2L2 1/2x2 1/2x1/4x3/8 720 -5.90 11 74 50.2 Pass
Bracing
T18 32-0 Redund Horz 2 2L2 1/2x2 1/2x1/4x3/8 817 -5.94 36.28 16.4 Pass
Bracing
T18 32-0 Redund Horz 3 2L3x3x1l4x3/8 837 -5.94 29 69 20 0 Pass
Bracing
T3 z72_25g Redund Diag 1 L2 1/2x2x1/4 74 -0.17 6.08 2.9 Pass
Bracing
{ T4 259-247 Redund Diag 1 �1/2x2x1/4 104 -0 13 6.57 1.9 Pass
Bracing
tnxTower Report-version 6 0 4 0
Crown Cast/e USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Projecf Number 012-01232-00, Application 165308, Revision 1 Page 8
T7 z32-22Z Redund Diag 1 � 1/2x2 1/2x1/4 173 -0.45 10.91 4 1 Pass
Bracing
TS 222-210 Redund Diag 1 ���2x2 1/2x1/4 220 -0.97 8.26 11 8 Pass
Bracing
T9 210-195 Redund Diag 1 � 112x2 1/2x1/4 257 -0.82 5.81 14 1 Pass
Bracing
T10 195-183 Redund Diag 1 2L21/2x2x1/4�C3/8 294 -1.08 31 77 3.4 Pass
Bracing
T11 183-171 Redund Diag 1 L2 1/2x2 1/2x5/16 338 -1 03 8.16 12.7 Pass
Bracing
T12 171 -146 Redund Diag 1 zL2 1/2x2x1/4�3/8 370 -2.12 10.95 19 4 Pass
Bracing
T13 146-122 Redund Diag 1 2L2 1/2x2x1/4x3/8 428 -2.46 24 91 9.9 Pass
Bracing
T14 122-96 Redund Diag 1 2L2 1/2x2x1/4�C3/8 507 -3.34 20.97 15.9 Pass
Bracing
T15 gg_72 Redund Diag 1 2L2 1/2x2x1/4�3/8 566 -5.78 22.08 26.2 Pass
Bracing
T16 72-52 Redund Diag 1 ZL2 1/2x2x1/4x3/8 640 -3.57 25.56 14 0 Pass
Bracing
T17 52-32 Redund Diag 1 2L2 1/2x2x1/4X3/8 721 -3.98 23.94 16.6 Pass
Bracing
T18 32-0 Redund Diag 1 2�2��2x2�f2x1/4x3/8 836 -6.73 29.38 22.9 Pass
Bracing
T13 146-122 Redund Diag 2 ZL2 1l2x2x1/4�C3/8 429 -1.64 14 05 11 7 Pass
Bracing
T14 �22_gg Redund Diag 2 ZL2 1/2x2x1/4x3/8 498 -2.24 11 62 19 3 Pass
Bracing
T15 gg_72 Redund Diag 2 2�2��Zx2��2x1/4x3/8 567 -4 14 11 57 35.8 Pass
Bracing
T16 72_9z Redund Diag 2 2L2 1/2x2x1/4x3/8 641 -3.21 14 07 22.8 Pass
Bracing
T17 52-32 Redund Diag 2 2L2 1/2x2x1/4�l3/8 733 -3.62 12.87 28.2 Pass
Bracing
T18 32-0 Redund Diag 2 2L3x3�13/16x3/8 820 -4 16 26.23 15.9 Pass
Bracing
T18 32-0 Redund Diag 3 2L5x3 1/2x5/16x3/8 796 �2.46 80 30 52.9 Pass
Bracing
T12 171 -146 Redund Hip 1 2L3 1/2x3 1/2x1/4x3/8 362 -0.17 58.25 0.3 Pass
Bracing
T13 146-122 Redund Hip 1 2L2 1/2x2 1/2x1/4x3/8 415 -0.42 39 44 1 1 Pass
Bracing
T14 �22_gg Redund Hip 1 2L3x2 1/2x1/4x3/8 484 -0.44 46.25 0.9 Pass
Bracing
T15 gg_72 Redund Hip 1 ZL3x2 1/2x1l4x318 553 -0.39 47.29 0.8 Pass
Bracing
T16 72_52 Redund Hip 1 2L3x2 1/2x1l4x3/8 626 -0.28 41 14 0.7 Pass
Bracing
T17 52-32 Redund Hip 1 2L3x2 1/2x1/4�3/8 707 -0.28 38.36 0.7 Pass
Bracing
T18 32-0 R�und Hip 1 2L3x2 1/2x1/4�3/8 798 -0.82 53.34 1.5 Pass
Bracing
T13 146-122 Redund Hip 2 2L2 1/2x2 1/2x1/4x3/8 416 -0.20 12.03 1 7 Pass
Bracing
T14 122-96 Redund Hip 2 2L3x2 1/2x1/4u3/8 485 -0.22 16.29 1.3 Pass
Bracing
T15 gg_72 Redund Hip 2 2L3x2 1/2x1/4u3/8 554 -0.20 13.28 1.5 Pass
Bracing
T16 7Z_52 Redund Hip 2 2L3x2 1/2x1/4x3/8 627 -0.14 11 19 1.2 Pass
Bracing
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page g
T17 52-32 Redund Hip 2 2L3x2 1/2x1/4�C3/8 708 -0.15 9.80 1.5 Pass
Bracing
T18 32-0 Redund Hip 2 2L2 1/2x2x1/4x3/8 854 -0.39 17.56 2.2 Pass
Bracing
T18 32-0 Redund Hip 3 2L3x2 1/2x1/4�C3/8 826 -0.23 14 00 1.6 Pass
Bracing
T12 171 -146 Redund Hip 2L31/2x3 1/2x1/4x3/8 372 -0.25 17 01 1.5 Pass
Diagonal&acing
T13 146-122 Redund Hip 2L3 1/2x3 1/2x1/4x3/8 417 -0.59 34 18 1 7 Pass
Diagonal Bracing
T14 122-96 Redund Hip zL2 1l2x2x1/4x3/8 486 -0.53 9.20 5.8 Pass
Diagonal Bracing
T15 gg_72 Redund Hip 2L2 1/2x2x1/4X3/8 555 -0.49 8.41 5.8 Pass
Diagonal Bracing
T16 72-52 Redund Hip 2L2 1/2x2x1/4x3/8 629 -0.14 3.51 3.9 Pass
Diagonal&acing
T17 52-32 Redund Hip 2L2 1/2x2x1/4�3/8 710 -0.14 3.10 4 4 Pass
Diagonal Bracing
T18 32-0 Redund Hip ZL2 1/2x2x1/4�13/8 800 -1 14 14 49 7.9 Pass
Diagonal&acing
T18 32-0 Redund Sub Hor2 ZL5x5�13/8x3/8 797 �3.15 108.54 39.8 Pass
Bracing
T18 32-0 Redund Sub 2L5x3 1/2x5l16x3/8 805 -59.36 100.13 59.3 Pass
Diagonal Bracing
T1 288-279 Inner Bracing L3�3x1/4 13 -0.00 7 92 0.2 Pass
T2 279-272 Inner Bracing L3�x1/4 42 -0.00 6.33 0.2 Pass
T3 272-259 Inner Bracing L3�x1/4 79 -0 00 5.40 0.3 Pass
T4 259-247 Inner Bracing L3x3x1/4 116 -0.00 4 14 0.3 Pass
T5 247-237 Inner Bracing L3x3x1/4 137 -0.00 3.33 0.3 Pass
T6 237-232 Inner Bracing L3X3x1/4 158 -0.00 2.83 0.4 Pass
T7 232-222 Inner Bracing L4x4x1/4 195 -0.01 6.36 0.4 Pass
T8 222-210 Inner Bracing L4x4x1/4 232 -0.01 5.50 0.4 Pass
T9 210-195 Inner Bracing L2�x1/4 267 -0.03 1 72 1.5 Pass
T10 195-183 Inner Bracing L7x4x3/8 306 -0.01 9.75 0.7 Pass
T11 183-171 Inner Bracing L3 1/2x2 1/2x1l4 339 -0.04 2.35 1 7 Pass
T12 171 -146 Inner Bracing �3u3x114 384 -0.08 2.45 3.4 Pass
T13 146-122 Inner Bracing L5x3x1/4 453 -0.13 3.24 3.9 Pass
T14 122-96 Inner Bracing L3 1/2x3 1/2x1l4 522 -0 13 2.51 5.2 Pass
T15 96-72 Inner Bracing 2L2x2 1/2x1/4x3/8 591 -0 15 1.88 7.8 Pass
T16 72-52 Inner Bracing 2L2 1/2x2 1/2x1l4x3l8 671 -0.13 2.98 4.3 Pass
T17 52-32 Inner Bracing 2L2 1/2�C3x1/4x3/8 749 -0.14 2.76 5.1 Pass
T18 32-0 Inner Bracing 2L4x3x5J16x3/8 866 -0.03 5.52 1 1 Pass
Summary
Leg(T18) 61 8 Pass
Diagonal 63 4 Pass
(T12)
Horizontal 72 0 Pass
(T17)
Top Girt 0.5 Pass
(T1)
Redund
Horz 1 33 9 Pass
Bracing
tnxTower Report-version 6.0 4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 10
(T14)
Redund
Horz 2 51.2 Pass
Bracing
(T14)
Redund
Horz 3 z0 0 Pass
Bracing
(T18)
Redund
Diag 1 26.2 Pass
Bracing
(T15)
Redund
Diag 2 35 S Pass
Bracing
(T15)
Redund
Diag 3 52.9 Pass
Bracing
(T18)
Redund Hip
1 Bracing 1.5 Pass
(T18)
Redund Hip
2 Bracing 2.2 Pass
(T18)
Redund Hip
3 Bracing 1.6 Pass
(T18)
Redund Hip
Diagonal �9 pass
Bracing
(T18)
Redund
Sub Horz 39 8 Pass
Bracing
(T18)
Redund
Sub
Diagonal 59.3 Pass
Bracing
(T18)
Inner
Bracing 7.8 Pass
(T15)
Bolt Checks 61.8 Pass
Rating= 72.0 Pass
Table 6 -Tower Component Stresses vs. Capacity—LC7
1 AnchorRods 64 3% Pass
1 Foundation 952% Pass
Notes
1) See additional documentation in"Appendix C—Add'Rional Calculations"for calculations supporting the%capacity
consumed.
tnxTower Report-version 6.0 4 0
Crown Castle USA, lnc. October 24, 2012
285 Ft Self Support Tower Structura/Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revisron 1 Page 11
4.1) Recommendations
The existing tower and its foundations are sufficient for the proposed loads and do not require
modifications
5)DISCLAIMER OF WARRANTIES
SSOE Group has not perFormed a site visit to the tower to verify member sizes or antenna/coax loading. SSOE
Group shall be contacted immediately if the existing conditions are not as represented on the tower elevation
contained in this report in order to evaluate the significance of the discrepancy SSOE Group has not performed
a condition assessment of the tower foundation This report does not replace a full tower inspection. The tower
and foundation are assumed to have been properly fabricated, erected and maintained and to be in good
condition, twist free, and plumb
The engineering services rendered by SSOE Group in connection with this structural analysis are limited to a
computer analysis of the tower structure and theoretical capacity of its main structural members. All tower
components have been assumed to resist dead loads only when no other loads are applied. No allowance has
been made for any damaged, bent, missing, loose, or rusted members(above and below ground) No allowance
has been made for any loose bolts or cracked welds
For the purposes of this report, SSOE Group has assumed that all connections in the tower are sufficient to
develop the allowable strength of the associated members. SSOE Group has not performed engineering
analysis to verify adequacy of these connections.
It is the owner's responsibility to determine the amount of ice accumulation, if any, that should be considered in
the structural analysis.
The attached sketches are a schematic representation of the analyzed tower If any material is fabricated from
these sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and
clearances in the field. Any mentions of structural modifications are reasonable estimates and should not be
used as a construction document. Construction documents depicting the required modification are obtainable
from SSOE Group, but are beyond the scope of this report.
Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as part of our work. We
recommend that material of suitable size and strength be purchased from a reputable tower manufacturer
SSOE Group makes no warranties, expressed and/or implied, in connection with this report and disclaims any
liability arising from material, fabrication, and erection of this tower SSOE Group will not be responsible
whatsoever for, or on account of, consequential or incidental damages sustained by any person, firm, or
organization as a result of any data or conclusions contained in this report. The maximum liability of SSOE
Group pursuant to this report will be limited to the total fee received for preparation of this report.
tnxTower Report-version 6.0.4 0
Crown Castle USA, Inc. October 24, 2012
285 Ft Self Suppo►t Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 12
APPENDIX A
TNXTOWER OUTPUT
tnxTower Report-version 6.0 4 0
288 0 ft
�m ql
d
� LL � �
' o Zdd z�son
a o Z Z �� < DESIGNED APPUR7ENANCE LOADING
� '� 2rz.o n i I TypE ELEVA710N ME ELEVA710N
� '
C o Y g g oi Flae�Bsaco^ 288 RRUS A2 Modb 203
� v V ° � � ^ I I LIylrYnp Rod 10'x 0.5' 288 R)RRUS-11 1900MFIZ 203
�� � 259 0 ft pB?24 285 RRUS71 BDOAAIix 203
� Sector Mout[SM 402-3J 727 (�ACLLA20.N 203
w U�� �� „ I I (�U M W p-0 3 3 1&R 2 D M w/M o u r t 2 2 7 8 0 0 Mltr SMR FilEx 2IXi
247.0 fl P�P° 8'mqrt pipp 2p3
o (Z�UM W60331&R7DM w!Mqnl 2T/ ANT2 0.811 HPX Z03
� Pe
� LL LL i Z �`� 237 0 ft (�UMWD-0331aRZDM�M MWM 227 �°P�^hM°PYMortn 195
K C7 U M „^ I Pipe R)LGP13908 TMA 196
232 0 ft Sactw Mout[SM H02-3] 215 ETW100JS72UB 194
F o = � J g n� � I I (4)D6878G9UA-XY�lout Pipe 215 RI RR6619-07DP 19l
222_0 it I I C3)����-�'�ourt Pipe 215 TMBX�577-A1M wd Mout Pipe 19t
�� � I a_ � � '' �� � �I �I I (4)DB878090A-XY wMOUt Plpe 215 R)LGP73908 TMA 194
e �� � m� �i � SecMr MwA[SM 502-3J 203 ETK100J"12UB /94
� e.�� 210 0 ft APXV9ERR18-C w/Mout Pipe ZIXi Q)RRBS19-02[7P 194
' I RRUSA2Modb p;{ TMBX8677-A1M�WMOUrIPipa 74l
� ��� � �1'^ I (2)RRUS-17 1900MHz 203 (�)LGP13908 TMA 191
� R� o � r �■ e,wzoovs�zue �s�
� � ° I RRUS11900A�iz 2«!
195 0 R (�ACLLA20.N p� S�ctor Moul�SM�0&3] 194
i ry I I � �I I I 800mM�SMR FNx 203
Q)RR8&79-04DP 190
� — � U U py� �y TMBX8517-A1Mw/MOUYRpe 194
' � �� � � APXVERRI&C w/AAOUrt Pipe 203 Pipe Mart(PM 501-1] 185
� 183 0 R RRUS A2 Modb 203 � ��
y"' ry I I (2)RRUS-11 1900MFtr 203 (Zl LPP7905/B W Mout Pipe 777
I�� z a o .�i �I I I RRUS11 BOOMHz p3 X7C-FROB60w/Mout Pfpe 177
171 0 R (���y�aN � (�LP67905�8 M✓Mout Ppe 177
� � � 800 Mhtr SMR Fllx p3 C-0�-�-��8'w Mout Pipe 177
i � �
� Y N I (Z�TN112X 20Hi258X HP p3 �or MouR M 108- 177
� �d� N I s'mouY ppe �{ x7GFR4B60 w/Mourt Rpe 177
� Z Z� � � APXV9ERR1&Cw/MOUrIPope p3 X7GFR6BBOwlMOVlFipe 177
� I I ZeplyAiis PIMfo�m 96
$,L $f � 146_0 fi SYMB�U�
i` n � ❑ ��( .4� �� .4�
i^ �� �Z � �N I I A L�7t1 7PLD.825� K 2LSXilA/47Q�8
�� � � B l�A7PID.75x8 L 2L5Xi7fb0l8X.il8
li F�� , f�� � I I C 2L27/Dfdcll4�fS�8 M 2L5�A�511�Gi�8
I �I , I� �� � I I D 2L2 1CLQ 12zIHXi�B N 2L5�Ct 1/b6/18Xi�8
1710 fl E 2LDQ 7ldAl4�GL8 O 2L312Q 12x1 HXiB
I � I F 2L31Q 1/LA/4�Gi18 P L21/DQ 1!D&78
Y
� x I n G 2L31/2Q 1/b6M�CS�B Q L3 1/DQ i/2A/4
i; � � � � �� I I H 2L21/'DG�6N87N8 R 9,2 7/LCix1l4Y5�8
'� , � � �I �j�l -- - '` -- -----
i I � Y I � I 2L3 1l2t4x1/4�GY8 _ _ _ _ S _1�5_ _
X J 2L3Xi 12A/41Gi�8
� � L �� I
� � ss o n I I MA7ERIAL STRENGTH
�S � � �N I I GRADE Fy Fu GRADE Fy Fu
� � nsn-so so�ai -- es�o� ---- - — -— - - -- --
�� i � � � � I I TOWER DESIGN NOTES
� ' � � � I 1 Tower is located in Paxo County,Florida.
,,,�_ 7z o�� 2. Tower designed for E�osure C to the TIM222-G Standard.
I �I I 3. Tower deaigned for a 108 mph besic wind in accordance with the TIA-222-G Standard.
4. Defiections are based upon a 60 mph wind.
��a m � o ° I '� I I 5. Tower Struclure Class II.
� � � q6_Topopraphic Category 1 with Crest HeigM of 0.00 ft
� II � � sz.o n I ARE FACTOlZED
w, � �
', „ ' I MAX.CORNER I�ACT/ONS AT BASE.
�I�m I �d � ❑� � rc il r �"' I DOWN: 522 K
� I � , I I SHEAR: 95 K
i 32 0 ft
UPL/FT �99 K
� SHEAR: 80 K
i ,� � � ���i ' I � I
j ? ' I I AXIAL
I�� ��� �� � � � 281K
_ �
I �� � �+�+���� I I I 2 8 K� 30658 kip-ft
OOflI I
roa�ue�soaP-n
I ' ��' � � „ ���� �acnoNS-�os�on►nnNo
�, � " �� �������5
o �
g�t
�ss ������� LL:#
I
O��0��, SSOE Inc. ° 816298 Ze h rhills
1001 Madison Ave. �"°�`o�2-arzsz-oo
Toledo, OH 43604 c���" cci �`�"'"�81352 '`�P'tl
Phone:(419)2553830 code TIA-222-G ��e 10/23/12 �� NTS
FAX. 419 25�6101 P�' �NO E-1
• ' Feedline Distribution Chart
0'-288'
Rui+�d F�et App In Face App Out Face Truss Leg
Face A Face B Face C Face D
288.00 288.00
-----`- --''.----- ---" ------- 285.00 ------------- 285.00 . 285.00
_-_ __
'__'__.___.__'.'._. .__.._.___._.._.
279.00 . ----_------_ '__.__.___.________
--�---------'- - ---- -- --- ------- ---279.00
. _------.__----------."--------'-'_-----
zn.00
- --- - -
_----- --------- ---
zse.00
- - --- -- - - z58.00
za.00
---- - - --
237.00
--- �------- - ---- -
'. -- ---- --- - -----
---
- -- -...
232 00 -----------------------___-------'-=
. .______ .__...__ . _ ___. ._
_ __ __._ __ _.
_. __ . ._________.___
__.
_. ___.._________.____._____..______'-
. _____._..' __ _._.. _ . �.� 227.00
_ ____.
'____ . _. .__ '
_ __
222.00 ._._____ _______.___.____ _.___.._
- ---._. ...'- - --�'- --- 222.W
�- - -�----------- - - -"-------`--- - -- - -------. .--------.._-------- "'-----"-
- .--.--------'.--- - 215.00 215.00
'_- -------- -� -- 215.00
-------- ------
210.00 ---------- -'----------- -- '-----------------
. .__ ._..___'_ . .___ . _ " ______..__
.__ ._.._.._ 270.00
" ------------------' -------- -
-- ----"------ 203.00 203.00
. .__ .. ._ _. ._ ._ ._._ ____. ._____. .
195.00 .______'
___...'_'____.....'__..___ _"____ _'_____.._ 79/.00 . . _"__________' ___. ."_.._____'.__ 191.00 _""_'__ ___."".____ '__ '______"""'___ iS1.00
___..._"______..."'.'_.__ __.__..
'.__
163.OD.____'___.._.....__.____ '_'___ _.___.'_._ 185.00 ________._..__ -'.______'_._-___' &5.00 _ '_ ___ 185.00
_'.__
_. __.___'_ .__.__ _. ._ __._____ __.... .__..___.___. .__'.___..____ _ __ _'._ .__ __ ____ ___ _____ _ _'.____ ___._"'______""_ ____""'__
m.00 m oo - - ---------- ---------- ---- --------
...
- -
-. ..-�---.---- ---- - ---- -- - --- --- -- -- --- - --- ---- -----� -- -. .
_ - --- - - �e3.w
, �ri.00
ntoo - --------- ---° ----------- --�-----
--- --�----------- - ---- - --
-- - - -
�
... �$ �
� o �
�4s.00 �
� o � I
� -- �---a - - -- - - - us.00
� h- - - ' --- - ----- --- -- ---- -
� € �
U �
m � I � I I �
;
W �� o �
�zz.00 I - c -------�- - :;-- f-- --�- --- --g- --�-- - ----�-- ---- -- ----�- ---- --�
I
. . -- -- - --��
�
_�.._ �zz.00
i g s� o � � � a - � � -
' � � $ � � � � � � � � �
--� � � �
g � � � ;
�.� . �.-- -- --- --�� �
� -�- .. --N � �- _�_ .�.._�_ . �.o�
, F
�
� - g-- --€-
� ... � � - - --- --
- -- ---...----- ----- --
g r � I F LL ;
� � = ,�
�z.�
- - - - - - ;
-- -
_
,
- --- - -
-- �
---- - - - ----- -
------ -
I ' � ! �
�.� � ,
. -... ----- - - - I
--
� - - ----
. - � -- --'- -- - - 52.00
------- �--...
- ._------'.' -----------�-------'
I -----�---
I �
32 W '
-- - -- --- - - -I I�.. ._ . .- - -
- - --- - - -- ---
� _� -. ___._ . . _.___ _ 32.00
- --
i ----- --------------
-------
I I I li
0.�_--__ __.__ -_-J E. . __ . _ _. . 8.00 _ .____ _. _ _ . ._ ._ . ..__.._. 8.00 I
r-- - -- --- _ _ 8.00 -------� ------------- --------_I
�-_.-__-_---.� -- . 0.00
O����,r SSOE Inc. ° 816298 Ze h rhills
1001 Madison Ave. P'°�"o�s-o�zs2-0o
Toledo, OH 43604 ONeM cci �`a'"nby 81352 �Pd
Phone:(419)2553830 code TIA-222-G ��8 10/23/12 �� NTS
FAX. 419 255-6101 �a' a+'9 No E_�
tnxTower �ob Page
816298 Zephyrhills 1 of 11
SSOE Inc. Project Date
�oo�Macl�sonAve. 012-01232-00 13 53'51 10/23/12
Toledo,OH4360�t Client Designed by
Phone. (4/9J 255-3830
FA.t: (4/9 255-610/ CCI 81352
Tow�er In Data
The main tower is a 4x free standing tower with an overall height of 288.00 ft above the ground line.
The base of the tower is set at an elevation of 0.00 ft above the ground line.
The face width of the tower is ]0.00 ft at the top and 48.00 ft at the base.
This tower is designed using the TIA-222-G standard.
The following design criteria apply:
Tower is located in Pasco County,Florida.
Basic wind speed of 108 mph.
Structwe Class II.
Exposure Category C.
Topographic Category 1.
Crest Height 0.00 ft.
Deflections calculated using a wind speed of60 mph.
A non-lineaz(P-delta)analysis was used.
Pressures are calculated at each section.
Stress ratio used in tower member design is 1.
Local bending stresses due to climbing loads,feedline supports,and appurtenance mounts are not considered.
0 �0118
Consider Moments-Legs D�stribute Leg Loads As Uniform Treat Feedline Bundles As Cylinder
Consider Moments-Horizontals Assume Legs Pinned Use ASCE 10 X-Brace Ly Rules
Consider Moments-D�agonals � Assume Rigid Index Plate � Calculate Redundant Bracing Forces
Use Moment Magnification � Use Clear Spans For Wind Area [gnore Redundant Members in FEA
� Use Code Stress Ratws Use Clear Spans For kL/r � SR Leg Bolts Resist Compression
� Use Code Safety Factors-Guys Retension Guys To Initial Tension � All Leg Panels Have Same Allowable
Escalate Ice � Bypass Mast Stabiliry Checks Offset Girt At Foundation
Always Use Max Kz � Use Azimuth Dish Coefficients � Consider Feedline Torque
Use Special Wind Profile � Project Wind Area of Appurt. � Include Angle Block Shear Check
� [nclude Bolts In Member Capaciry Autocalc Torque Arm Areas pp�p
� Leg Bolts Are At Top Of Section SR Members Have Cut Ends (nclude Shear-Torsion[nteraction
� Secondary Honzontal Braces Leg � Sort Capaciry Reports By Component Always Use Sub-Criticai Flow
Use Diamond Inner Bracing(4 Sided) � Triangulate Diamond Inner Bracmg Use Top Mounted Sockets
Add IBC 6D+W Combination
Feed LineefLir�ar A rtenances - Entered As Raund Or Flat
Descriptian Face Allow Component Placement Face Lateral # # Clear Width or Penmeter Weight
or Shield Type Offset O,Jf'set Per Spacing Diameter
e_, �_?�.__ ` ft in (Frac FWJ Row tn in in klj
Feedline A No Af(CaAa) 177 00-8.00 0 00 � -0 15 I 1 3 00 3 00 v� 0 01
Ladder(A�
LDF7-SOA A No Ar(CaAa) U7 00-8 00 0 00 -0 16 3 3 1 00 1 98 0 00
(1-5/8 FOAM)
LDFS-SOA A No Ar(CaAa) 285 00-8 00 -I 00 0 495 ] 1 1 00 1 09 0 00
(7/8 FOAM)
Feedlme B No Af(CaAa) 203 00-8 00 0 00 -0 152 1 I 3 00 3 00 0 Ol
Ladder(A�
TSZ 999 B No Ar(CaAa) 203 00-8 00 0 00 -0 153 3 3 I 00 1 04 0 00
066/x�cM-8A
WG(1-i/32")
tnacTower J°b Pa9e
816298 Zephyrhills 2 of 11
SSOE Inc. Project Date
100/Madison Ave. 012-01232-00 13 53 51 10/23/12
Toledo,OHd3604 Client Designed by
Phone (a19)255-3830 CC� 81352
FAX. (4!9 255-610/
Description Face Allow Component Placement Face Lateral # # Clear Width or Perimeter Weight
or Shield Type Offset Offset Per Spacing Drameter
Leg ft in (Frac FW) Row in in rn klf
LDF2-SOA B No Ar(CaAa) 203 00-8 00 1.50 -0 155 2 2 1 00 0 44 0 00
(3/8 FOAM)
LDF7-SOA C No Ar(CaAa) 194 00-8 00 0 00 -0 25 12 6 1 00 1.98 0 00
(1-5/8 FOAM)
LDF7-SOA C No Ar(CaAa) 215 00-8 00 0 00 0296 6 6 1 00 I.98 0 00
(1-5/8 FOAM)
EWP63 C No Af(CaAa) 185 00-8 00 0 00 0299 1 1 1 00 1.57 0 00
LDF7-SOA C No Ar(CaAa) 215 00-8 00 0 00 0 302 5 5 1 00 1.98 0 00
(t-5/8 FOAM)
LDF4RN-SOA C No Ar(CaAa) 215 00-8 00 0 00 0.304 2 2 1 00 0 63 0 00
(1/2 FOAM)
LDF7-SOA D No Ar(CaAa) 227 00-8 00 0 00 03 12 6 1 00 1 98 0 00
(1-5/8 FOAM)
Feedline C No Af(CaAa) 194 00-8 00 0 00 -0 25 1 1 3 00 3 00 0 01
Ladder(A�
Feedline D No Af(CaAa) 227 00-8 00 0 00 0 3 1 I 3 00 3 00 0 Ol
Ladder(A�
Feedlme C No Af(CaAa) 215 00-8 00 0 00 0.3 1 1 3 00 3 00 0 Ol
Ladder(A�
Chmbing A No Af(CaAa) 288 00-8 00 -] 00 0.5 1 1 025 0 00 0 O1
Ladder
Safety Line A No Ar(CaAa) 288.00-8 00 -1 00 0.5 1 I 0 38 0 38 0 00
3/8
LDF7-SOA A No Ar(CaAa) U7 00-8 00 2.50 -0 15 9 9 1 00 1 98 0 00
(1-5/8 FOAM)
[�screte Tower Loicis
Descriplion Face Offset Offsets: Azimuth Placement C_�A.a C�A� Weigh�
or Tvpe Horz Adjushnent Fron� Side
Leg Lalera!
6'en
� � ./� � � k
�
-- �
Zephyrhills Platform C None 0 00 96 00 No Ice 41 00 41 00 � 3 00
Sector Mount[SM 408-3] A None 0 00 177 00 No Ice 22 45 22.45 I 02
(2)LPD-7905/8 w/Mount A From Leg 3 00 0 00 177 00 No Ice 621 1 1 53 0 08
Pipe 0 00
0 00
X7GFR0-860 w/Mount A From Leg 3 00 0 00 177 00 No Ice I 3 63 1026 0 07
Pipe 0 00
0 00
(2)LPD-7905/8 w/Mount B From Leg 3 00 0 00 l77 00 No lce 6 21 11 53 0 08
P�pe 0 00
0 00
X7GFR0-860 w/Mount B From Leg 3 00 0 00 177 00 No Ice 13.63 1026 0 07
Pipe 0 00
0 00
(2)LPD-7905/8 w/Mount C From Leg 3 00 0 00 177 00 No Ice 6.21 1 1 53 0 08
Pipe 0 00
0 00
X7C-FRO-860 w/Mount C From Leg 3 00 0 00 177 00 No Ice 13 63 10 26 0 07
P�Pe 0 00
0 00
Pipe Mount[PM 501-1] C From Leg 0 50 0 00 I 85 00 No Ice 3 47 1 67 0 OS
0 00
0 00
Sector Mount[SM 402-3] C None 0 00 194 00 No Ice 18 91 18 91 0 85
Page
tnxTower Job 816298 Zephyrhills 3 of 11
SSOE InG Project Date
loo!Madtson Ave. 012-01232-00 13 53 51 10/23/12
Toledo,OH43604 Client Designed by
Phone. (419)255-3830 CC�
FAX. (4/9J 255-610/ 81352
Descnpnon Face OJjset Offsets.� Azimuth Placement CaA.a C,a,4.i Weight
or Tvpe Horz Adjushnent Front Sade
Leg Lateral
Vert
.ft ° .R 1t` h1 K
�
J�
(2)RR65-19-02DP B From Leg 3 00 0 00 194 00 No[ce 5 87 2 75 0 02
0 00
0 00
TMBXb517-A1 M w/Mount B From Leg 3 00 0 00 194 00 No[ce 5 54 5 02 0 04
Pipe 0 00
0 00
(2)LGP13908 TMA B From Leg 3 00 0 00 194 00 No Ice 0.59 028 0 Ol
0 00
0 00
ETW200VS 12UB B From Leg 3 00 0 00 194 00 No Ice 0 18 0 47 0 01
0 00
0 00
(2)RR65-19-02DP C From Leg 3 00 0 00 194 00 No Ice 5 87 2J5 0 02
0 00
0 00
TMBX6517-A1 M w/Mount C From Leg 3 00 0 00 194 00 No Ice 5 54 5 02 0 04
Pipe 0 00
0 00
(2)LGP13908 TMA C From Leg 3 00 0 00 194 00 No[ce 0.59 028 0 Ol
0 00
0 00
ETW200VS12UB C From Leg 3 00 0 00 l94 00 No[ce 0 18 0 47 0 O1
0 00
0 00
(2)RR65-19-02DP D From Leg 3 00 0 00 l94 00 No[ce 5 87 2 75 0 02
0 00
0 00
TMBX<i517-A1 M w/Mount D From Leg 3 00 0 00 194 00 No Ice 5 54 5 02 0 04
Pipe 0 00
0 00
(2)LGP13908 TMA D From Leg 3 00 0 00 194 00 No Ice 0.59 0.28 0 Ol
0 00
0 00
ETW200VS 12UB D From Leg 3 00 0 00 194 00 No Ice 0 18 0 47 0 01
0 00
0 00
Zephyrhil is Platform C None 0 00 195 00 No Ice 41 00 41 00 3 00
Sector Mount[SM 502-3] B None 0 00 203 00 No[ce 33 02 33 02 1 67
APXV9ERR18-C w/Mount A From Leg 4 00 0 00 203 00 No Ice 8.26 6 47 0 07
Pipe 0 00
0 00
RRUS A2 Module A From Leg 4 00 0 00 203 00 No Ice 1 87 0 42 0 02
0 00
-3 00
(2)RRUS-1 1 1900MHz A From Leg 4 00 0 00 203 00 No Ice 2.94 1 19 0 04
0 00
0 00
RRUS-1 1 800MHz A From Leg 4 00 0 00 203 00 No Ice 2.94 L52 0 OS
0 00
0 00
(3)ACU-A20-N A From Leg 4 00 0 00 203 00 No Ice 0 08 0 14 0 00
0 00
0 00
800 MHz SMR Filter A From Leg 4 00 0 00 203 00 No Ice 0.26 0 25 0 Ol
0 00
0 00
6'mount pipe A From Leg 4 00 0 00 203 00 No Ice 1 77 I 77 0 04
Page
t�Tower J�b 816298 Zephyrhilis 4 of 11
SSOE lnG Project Date
1001 Madison Ave 012-01232-00 13:53:51 10/23/12
Toledo.OH43604 Ciient Designed by
Phone. (419J 255-3830 CCI 81352
FAX. (919)155-6/0/
Description Face Ofjset Offsets: Azrmuth Placement C.�A.a Cyt.a Weight
or Tvpe Horz Adjustment Front Side
Leg Latera!
G"en
f� ° 1� 1�z �t` K
�
— ----- ----- � -------------
0 00
0 00
APXVERRl8-C w/Mount B From Leg 4 00 0 00 203 00 No Ice 826 7 Ol 0 08
Pipe 0 00
0 00
RRUS A2 Module B From Leg 4 00 0 00 203 00 No[ce 1 87 0 42 0 02
0 00
-3 00
(2)RRUS-1 1 1900MHz B From Leg 4 00 0 00 203 00 No[ce 2.94 1 19 0 04
0 00
0 00
RRUS-11 800MHz B From Leg 4 00 0 00 203 00 No Ice 2 94 1.52 0 OS
0 00
0 00
(3)ACU-A20-N B From Leg 4 00 0 00 203 00 No Ice 0 08 0 14 0 00
0 00
0 00
800 MHz SMR Filter B From Leg 4 00 0 00 203 00 No Ice 0 26 0.25 0 Ol
0 00
0 00
(2)TN 1 1/2X 248T/256X HP B From Leg 4 00 0 00 203 00 No Ice 1.25 0 46 0 Ol
0 00
0 00
6'mount pipe B From Leg 4 00 0 00 203 00 No Ice 1 77 1 77 0 04
0 00
0 00
APXV9ERR18-C w/Mount C From Leg 4 00 0 00 203 00 No Ice 8 26 6 47 0 07
Pipe 0 00
0 00
RRUS A2 Module C From Leg 4 00 0 00 203 00 No Ice 1 87 0 42 0 02
0 00
-3 00
(2)RRUS-11 1900MHz C From Leg 4 00 0 00 203 00 No Ice 2 94 1 19 0 04
0 00
0 00
RRUS-1 1 800MHz C From Leg 4 00 0 00 203 00 No Ice 2.94 I.52 0 OS
0 00
0 00
(3)ACU-A20-N C From Leg 4 00 0 00 203 00 No Ice 0 08 0 14 0 00
0 00
0 00
800 MHz SMR Fdter C From Leg 4 00 0 00 203 00 No Ice 026 0.25 0 Ol
0 00
0 00
6'mount pipe C From Leg 4 00 0 00 203 00 No Ice 1 77 1 77 0 04
0 00
0 00
Sector Mount[SM 602-3] B None 0 00 215 00 No Ice 33 1 1 33 1 1 L54
(4)DB878G90A-XY A From Leg 3 00 0 00 215 00 No Ice 10 30 7.53 0 OS
w/Mount Pipe 0 00
0 00
(3)DB878G90A-XY B From Leg 3 00 0 00 215 00 No[ce ]0.30 7.53 0 OS
w/Mount Pipe 0 00
0 00
(4)D6878G90A-XY C From Leg 3 00 0 00 215 00 No Ice 10.30 7 53 0 OS
w/Mount Pipe 0 00
0 00
Page
tnxTower J�b 816298 Zephyrhills 5 of 11
SSOE Inc. Project Date
1001 MadisonAve. 012-01232-00 13 53.51 10/23/12
Toledo,OH4360� Client Designed by
Phone. (4!9)255-3830 CCI 81352
FAX (419 255-6101
Descrrption Face O,�set O,�jsets: A�imuth Placement C�A� CaA.i Weight
or Tvpe Horz Adjushnent Front Side
Leg Latera!
G'ert
/1 ° /t .Rz .� K
.�
� _
Sector Mount[SM 402-3] B None 0 00 227 00 No Ice 18.91 18 91 0.85
(2)UMWD-03319-R2DM w/ A From Leg 3 00 0 00 227 00 No[ce 6.39 4 76 0 OS
Mount Pipe 0 00
0 00
(2)UMWD-03319-R2DM w/ B From Leg 3 00 0 00 227 00 No[ce 639 4 76 0 OS
Mount Pipe 0 00
0 00
(2)UMWD-03319-R2DM w/ C From Leg 3 00 0 00 227 00 No Ice 6.39 4 76 0 OS
Mount P�pe 0 00
0 00
DB224 B From Leg 3 00 0 00 285 00 No Ice 3 15 3 15 0 03
0 00
5 00
Flash Beacon C None 0 00 288.00 No Ice 3 00 3 00 0 10
Lightning Rod 10'x 0.5" C None 0 00 288.00 No[ce 0.50 0.50 0 O1
1���$
Descriptron Face Drsh Offset O/jsets: Azimuth 3 d8 Elevation Outside Aperture Weight
or Type Type Horz Ad�ustment Beam Diameter Area
L,eg Lateral Width
�ert
1� __ ° ° _ fr f _ .f" K _
PAR6-65 C Paraboloid w/o From 0 50 37 00 185 00 6 00 No Ice 2827 0 14
Radome Leg 0 00
0 00
ANT2 0 6 11 HPX C Paraboloid From 4 00 25 00 203 00 2 17 No Ice 3 72 0 03
w/Shroud(HP) Leg 0 00
0 00
Boit Desi n Data
Section Elevation Component Bolt Bolt Sire Number Maximum A//owable Ratio Allowable Criteria
No. Type Grade Of Load per Load Load Ratio
ft an Bolts Bolt K Allowable
K
T 1 � 288 Diagonal A325N 0 75 2 031 � 35 78 0 009 � � Bolt Shear
Top Gut A325N 0 75 2 0 11 z229 0 005 � l Member Block
Shear
T2 279 Diagona] A325N 0 75 2 0 63 26 20 0 024 � I Member Block
Shear
Horizontal A325N 0 75 2 0 46 22.66 �02� � 1 Member Block
Shear
T3 272 Diagonal A325N 0 75 2 1.56 26 20 0 060 � � Member Block
Shear
Horizontai A325N 0 75 2 0 73 32 l8 0 023 � I Member Biock
Shear
T4 259 Diagonal A325N 0 75 2 2 17 23 l6 0 094 � � Member Block
Shear
Horizontal A325N 0 75 2 1 19 22.66 0 052 � � Member Block
Shear
TS 247 Leg A325N 0 75 8 3 86 35 78 ���g ✓ 1 Bolt DS
Job Page
tnxTower 816298 Zephyrhills 6 of 11
SSOE Inc. Project Date
!ool nfadison Ave. 012-01232-00 13.53 51 10/23/12
Toledo.OH43604 Client Designed by
Phone (4/9)255-3830 CC� 81352
FAX. (4!9)255-6/01
Section Elevation Component Bolt BoltSize Number Maximum A!(owable Ratio Allowable Criteria
No Tvpe Grade Of Load per Load Load Ratio
fi in Bolts Bolt K A!lowable
K
� Diagonal A325N 0 75 2 2.40 27 73 �og� ✓ 1 Member Block
Shear
Horizonlal A325N 0 75 2 1.61 24 02 0 067 � � Member Block
Shear
T6 237 Diagonai A325N 0 75 2 2.35 35 78 0 066 � � Bolt Shear
Horizontal A325N 0 75 2 1.92 22 66 0 085 � � Member Block
Shear
T7 232 Diagonal A325N 0 75 3 2.30 30.21 0 076 � � Member Block
Shear
Horizonhal A325N 0 75 2 2.46 35 78 0 069 I � Bolt Shear
T8 222 Leg A325N 0 75 12 5 77 35 78 0 l61 � � Bolt DS
Diagonal A325N 0 75 3 3 63 24�� 0 l50 � � Member Block
Shear
Horizontal A325N 0 75 2 3 40 24.02 ��42 � 1 Member Block
Shear
T9 210 Diagonal A325N 0 75 3 5 40 24 17 �224 � 1 Member Block
Shear
Horizontal A325N 0 75 2 4 72 24.02 �197 � 1 Member Block
Shear
T10 195 Leg A325N 0 88 12 12 16 48 7l 0250 � � Bolt DS
Diagonal A325N 0 75 4 4.37 25 44 p�7z �" 1 Member Block
Shear
Horizontal A325N 0 75 3 4 14 34 41 p��p ✓ I Member Block
Shear
T I 1 183 D�agonal A325N 0 75 4 525 23 92 p 220 � 1 Member Block
Shear
Honzontal A325N 0 75 3 5 21 34 4l 0 152 � � Member Block
Shear
Tl2 U 1 Leg A325N 0 88 16 l4 82 48 71 0304 � � Bolt DS
D�agonal A325N 0 75 5 7 43 35 78 �208 � 1 Bolt Shear
Honzontal A325N 0 75 3 5 99 23 90 0 251 � � Member Block
Shear
T13 146 Leg A325N 1 00 12 28.23 63 62 0 444 � � Bolt DS
Diagonal A325N 0 75 5 8 01 35 78 0 224 � � Bolt Shear
Horizonhal A325N 0 75 3 7 09 35 78 ��98 ✓ 1 Bolt Shear
T14 122 Leg A325N 1 00 16 27 69 63 62 0 435 � � Bolt DS
Diagonal A325N 0 75 5 8 60 30 47 0 282 � 1 Member Block
�/ Shear
Horizonhal A325N 0 75 3 8.08 23 90 0 338 I � Member Block
Shear
T15 96 Leg A325N 1 00 20 28 18 63 62 0 443 � � Bolt DS
Diagonal A325N 0 75 5 8 88 30 47 �29� ✓ 1 Member Block
Shear
Honzontal A325N 0 75 3 9 43 35 78 0 263 I � Bolt Shear
T16 72 Leg A325N 1 00 20 34 03 63 62 0 535 � � Bolt DS
Diagonal A325N 0 75 5 8.51 30 47 �279 ✓ 1 Member Block
Shear
Horizonhal A325N 0 75 3 10 18 23 90 0 426 I � Member Block
�/ Shear
T U 52 Leg A325N 1 00 20 39 10 63 62 0 615 I � Bolt DS
Diagonal A325N 0 75 3 14 67 34 02 0 431 I � Member Biock
Shear
Page
tnxTower JOb 816298 Zephyrhills 7 of 11
SSOE Inc. Project Date
lool Madtson Ave. 012-01232-00 13 53:51 10/23/12
Toledo,OH43604 Client Designed by
Phone. (4l9)255-3830 CCI 81352
FAX. (4/9 255-610/
Sectron Elevahon Component Bolt Bolt Sire Number Maximum Allowable Ratio Allowab/e Criteria
No Tvpe Grade Of Load per Load Load Ratio
Jt m Bolts Bolt K A!lowable
K
! Honzonhal A325N�0 75 � 3 � 10 90 2� �g 0 515 ! � Member Block
Shear
T18 32 Leg A325N 1 00 20 3934 63 62 0 618 � � Bolt DS
Diagonal A325N 0 88 5 16 76 48 71 0.344 � � Bolt Shear
Horizonhl A325N 0 75 4 17 02 35 78 0 476 � � Bolt Shear
Sec�Eiion Ca c�t Tabie
Section Elevation Component Size Critical P ePa��o„ % Pass
No /�t Type Element K K Capacetv Fai!
T 1 288-279 Leg A LSxSxI/2 4 -039 87 75 0 4 Pass �
T2 279-272 Leg LS�cSxl/2 25 -145 12474 12 Pass
T3 272-259 Leg LSxSxI/2 46 -3 48 134 35 2 6 Pass
T4 259-247 Leg LSxSxI/2 83 -8 64 143.90 6 0 Pass
TS 247-237 Leg L8x8x5/8 120 -15 46 282.60 5 5 Pass
]0 8(b)
T6 237-232 Leg LSx8x5/8 141 -22 12 388 82 5 7 Pass
T7 232-222 Leg L8x8x5/8 l62 -26 34 388 82 6 8 Pass
T8 222-2l0 Leg L8x8x5/8 199 -35.54 371 04 9 6 Pass
16 1 (b)
T9 210-195 Leg L8x8x5/8 235 -50 04 340 41 14 7 Pass
T]0 195-183 Leg LSx8xl 1/8 271 -7367 642.24 1I5 Pass
25 0(b)
T 11 I 83-171 Leg LSx8xl 1/8 308 -94 95 642 24 14 8 Pass
T12 171 -146 Leg L8xSxl 1/8 347 -119.50 380 00 31 4 Pass
T13 146-122 Leg L8x8�/4 2PLO.Sx8 392 -169.39 788 33 21 5 Pass
44 4(b)
T14 122-96 Leg L8x8x3/4 2PLO.Sx8 461 -221.56 774 14 28 6 Pass
43.5(b)
T I 5 96-72 Leg L8xSx1 2PL0 75x8 530 -281 89 806 79 34 9 Pass
44 3(b)
T16 72-52 Leg L8x8xl 2PL0 625x8 599 -340 37 1046 93 32.5 Pass
53.5(b)
T l7 52-32 Leg L8r8xl 2PL0 75x8 680 -392 33 1132.32 34 6 Pass
61 5(b)
T18 32-0 Leg L8x8x12PL0.875x8 761 -394.85 1181 17 334 Pass
61.8(b)
T I 288-279 Diagonal 2L2 1/2�c2x1/4�/8 18 -0 61 24 08 2 5 Pass
T2 279-272 Diagonal 2L21/2x2x1/4x3/8 33 -1.54 2913 53 Pass
T3 272-259 Diagonal 2L21/2x21/2xl/4x3/8 62 -3.50 2340 l49 Pass
T4 259-247 Diagonal 2L2x2 1/2xl/4�/8 99 -4 69 23 29 20 1 Pass
TS 247-237 D�agonal 2L3�1/2xt/4ac3/8 128 -5 25 28 62 I 8 3 Pass
T6 237-232 Diagonal 2L3 I/2�c2 1/2x5/16x3/8 149 -4 71 62 90 7� Pass
T7 232-222 Diagonal 2L2 1/2x3x5/16x3/8 178 -7 73 54.26 14 2 Pass
T8 222-210 Diagonal 2L2 1/2x3 1/2xl/4x3/8 215 -11 51 43 67 26 4 Pass
T9 210-195 Diagonal 2L21/2x31/2x1/4x3/8 245 -1675 3293 509 Pass
T10 195-183 Diagonal 2L3 1/2x4x1/4�c3/8 285 -18.35 66 06 27 8 Pass
Ti l 183-U I Diagonal 2L3x3 1/2xU4�/8 322 -21 83 44 09 49 5 Pass
T12 171 -146 Diagonal 2L3 1/2x5x3/8�/8 359 -37 l4 58 62 63 4 Pass
T13 146-122 D�agonal 2L3 1/2x5x3/8x3/8 410 -39 07 101.21 38 6 Pass
T14 122-96 D�agonal 2L3 I/2x5x5/16x3/8 479 -44 33 77 28 57 4 Pass
T15 96-72 D�agonal 2L3 1/2x5x5/16x3/8 548 -46 79 80 34 58 2 Pass
T16 72-52 Diagonal 2L3 1/2x4x5/16�/8 620 -44 37 78 49 56 5 Pass
T17 52-32 D�agonal 2L3 1/2x4a5/16x3/8 701 -45 96 76 07 60 4 Pass
T18 32-0 Diagonal 2LSx5x3/8x3/8 790 -82 34 167.68 49 1 Pass
Pa e
tr�Tower J�b 816298 Zephyrhills 9 8 of 11
SSOE Inc. Project Date
1001 Mad�sonAve. O�2-0�232-00 13 53 51 10/23/12
Toledo,OH33604 Client Designed by
Phone:(419)255-3830 (`,(��
FAX: 419)255-6/0/ 81352
Section Elevation Component Sire Critical P OPa��,,,,. % Pass
No /�t Type Element K K Capacity Fai!
T2 279-272 Horizonbl 2L21/2�x1/4x3/8 32 -0.85 4042 21 Pass
T3 272-259 Horizontal 2LSx3xl/4x3/8 61 -1 39 73 48 1 9 Pass
2 3(b)
T4 259-247 Horizonbl 2L2 U2x2xU4x3/8 98 -2.34 36 1 l 6 5 Pass
TS 247-237 Horizontal 2L3�c2 1/2x1/4�c3/8 127 -3 13 46.50 6 7 Pass
T6 237-232 Horizontal 2L21/2x2x1/4ac3/8 148 -3.63 310� 117 Pass
T7 232-222 Horizontal 2LSac3 1/2x3/Sx3/8 177 -4 60 126 83 3 6 Pass
69(b)
T8 222-210 Horizontal 2L3x2x1/4x3/8 20� -6.56 29 80 22 0 Pass
T9 210-195 Horizontal 2L3x2xU4x3/8 244 -9 47 25 89 36 6 Pass
T10 195-183 Horizontal 2LSx3x5/16�c3/8 281 -12 70 7926 16 0 Pass
Tl1 183-171 Horizontal 2LSx3 1/2x5/16x3/8 318 -15.32 93 31 16 4 Pass
T12 171 -146 Horizontal 2L3 1/2x2 l/2xl/4x3/8 355 -l8 06 31 77 56 8 Pass
T 13 146-122 Honzontal 2LSx3 1/2�c3/8�/8 404 -2]28 93 14 22 8 Pass
T14 122-96 Horizontal 2L4x3xl/4x3/8 473 -?.427 34 07 71 2 Pass
T 15 96-72 Honzontal 2L4x3 1/2x3/8x3/8 542 -28.28 41 94 67 4 Pass
T16 72-S2 Horizontai 2L3 1/2u2 l/2xl/4x3/8 613 -30 85 63 34 48 7 Pass
T17 52-32 Honzonhl 2L2 1/2ac2 1/2xl/4x3/8 694 -32.74 45 49 72 0 Pass
T I 8 32-0 Horizontal 2L6x4x3/8x3/8 782 -62.35 106 79 58 4 Pass
T 1 288-279 Top Girt 2L3�1/2xl/4�c3/8 7 -0 24 55 48 0 4 Pass
0.5(b)
T3 272-259 Redund Horz 1 L2 1/2x2x1/4 66 -0 19 I 9 68 I 0 Pass
Bracmg
T4 259-247 Redund Horz I L2 I/2x2x1/4 107 -0 14 I 839 0 8 Pass
Bracing
T7 232-222 Redund Horz 1 L2 1/2x2x1/4 182 -0 64 I 5 48 4 1 Pass
Bracing
T8 222-210 Redund Horz I L2 1/2�c2x1/4 219 -1.24 13.65 9 1 Pass
Bracing
T9 210-195 Redund Horz 1 L2 1/2�c2x1/4 246 -1 00 11.62 8 6 Pass
Bracing
T10 195-183 Redund Horz 1 2L2 1/2x2x1/4x3/8 290 -1 43 39.65 3 6 Pass
Bracing
Tl 1 183-171 Redund Horz I L2n2 1/2xl/4 337 -1 44 8 41 17 1 Pass
Bracing
T12 171 -146 Redund Horz l L2x2 U2xl/4 369 -1 97 7 39 26 6 Pass
Bracing
Tl 3 146-122 Redund Horz l L2x2 1/2xl/4 426 -2 60 13 03 19 9 Pass
Bracing
Tl4 122-96 Redund Hoa 1 L2x2 I/2xl/4 505 -3 58 10.57 33 9 Pass
Bracing
T15 96-72 Redund Horz 1 L2� I/2xl/4 564 -0 70 8 62 8.1 Pass
Bracing
T16 72-52 Redund Hoa 1 2L2 12x2x1/4ac3/8 638 -5 12 36 88 l3 9 Pass
Bracing
T 17 52-32 Redund Horz 1 2L2 1l2�s 1/4x3/8 719 -5 90 35 46 I 6 6 Pass
Bracing
T 18 32-0 Redund Horz I 2L2 1/2�c2 1/2xl/4x3/8 816 -5 94 50.42 11 8 Pass
Bracmg
T 13 146-122 Redund Horz 2 L3x3x1/4 427 -2.60 8 63 30 1 Pass
Bracing
T14 122-96 Redund Horz 2 L3�c3x1/4 506 -3.58 7 00 51 2 Pass
Bracmg
T15 96-72 Redund Horz 2 L3x3xl/4 575 -0 70 5 71 I2.3 Pass
Bracmg
T 16 72-52 Redund Horz 2 2L2 I/2x2 U2xl/4x3/8 639 -5 12 13 41 38 2 Pass
Bracing
T U 52-32 Redund Horz 2 2L2 U2aQ 1/2x1/4x3/8 720 -5 90 1 1 74 50 2 Pass
Bracmg
T 18 32-0 Redund Horz 2 2L2 1/2x2 1/2xl/4x3/8 817 -5 94 36 28 16 4 Pass
Brac�ng
tnxTower �ob Pege
816298 Zephyrhilis 9 of 11
SSOE Inc. Project Date
1001 Madison Ave 012-01232-00 13 53 51 10/23/12
Toledo,OH4360a Client Designed by
Phone:(919J 255-3830
FAX. (a19)255-6l0/ CCI 81352
Section Elevation Component Size Critical P OP����,„, % Pass
No _ f _ Tvpe Element K K Capacity Fail
T18 32-0 Redund Horz 3 2L3�x1/4x3/8 837 -5 94 29 69 20 0 Pass
Bracing
T3 272-259 Redund Diag 1 L2 I/2�x1/4 74 -0 17 6 08 2.9 Pass
Bracing
T4 259-247 Redund Diag I L2 1/2�x1/4 104 -0 13 6.57 1 9 Pass
Bracing
T7 232-222 Redund Diag 1 L2 1/2�c2 1/2xl/4 173 -0 45 10 91 4 1 Pass
Bracmg
T8 222-210 Redund Diag 1 L2 1/2x2 1/2xl/4 220 -0 97 8 26 11 8 Pass
Bracing
T9 210-195 Redund Diag 1 L2 1/2x2]/2xl/4 257 -0 82 5.81 ]4 I Pass
Bracing
T10 195-l83 RedundDiag 1 2L2 l/2x2x1/4�c3/8 294 -1 08 31 77 34 Pass
Bracing
Tl 1 183-171 Redund Diag 1 L2 1/2x2 1/2x5/16 338 -1 03 8 16 12 7 Pass
Bracing
T12 ]71 -146 RedundD�ag I 2L2 1/2ac2xl/4�c3/8 370 -2 12 10.95 194 Pass
Bracing
TI3 146-122 Redund Diag l 2L2 1/2aQxl/4x3/8 428 -2.46 24 91 9 9 Pass
Bracing
Tl4 122-96 Redund Diag 1 2L2 U2�xl/4x3/8 507 -3 34 20 97 15 9 Pass
Bracing
T15 96-72 Redund Diag l 2L2 U2x2xl/4x3/8 566 -5 78 22 08 262 Pass
Bracing
T I 6 72-52 Redund D�ag 1 2L2 1/2�c2x 1/4!c3/8 640 -3 57 25.56 I 4 0 Pass
Bracing
T17 52-32 Redund Diag 1 2L2 I/2�x1/4x3/8 721 -3 98 23 94 16 6 Pass
Bracmg
T18 32-0 RedundDiagl 2L21/2x21/2xl/4x3/8 836 -673 2938 229 Pass
Bracing
T13 146-122 Redund Diag2 2L2 1/2�x1/4x3/8 429 -1 64 14 OS 1 I 7 Pass
Bracing
T14 122-96 Redund D�ag 2 2L2 1/2aQx1/4x3/8 498 �.24 11 62 l9 3 Pass
Bracmg
T15 96-72 Redund Diag 2 2L2 1/2aQ 1/2xl/4x3/8 567 -4 14 11.57 35 8 Pass
Bracmg
T 16 72-52 Redund Diag 2 2L2 1/2u2x 1/4x3/8 641 -3.21 14 07 22 8 Pass
Bracing
T17 52-32 Redund Diag 2 2L2 1/2x2x1/4s3/8 733 -3 62 12.87 282 Pass
Bracing
Tl 8 32-0 Redund D�ag 2 2L3x3x3/16x3/8 820 �16 2623 15 9 Pass
Bracing
T18 32-0 Redund D�ag 3 2LS�c3 1/2x5/16x3/8 796 -42 46 80.30 52.9 Pass
Bracing
T12 171 -146 Redund Hip 1 2L3 1/2x3 ll2Y1/4x3/8 362 -0 U 58 25 0 3 Pass
Bracing
T13 146-122 Redund Hip i 2L2 1/2x2 1/2xl/4x3/8 415 -042 3944 1 1 pass
Bracmg
T14 122-96 Redund Hip 1 2L3x2 1/2xl/4x3/8 484 -0 44 46 25 0 9 Pass
Bracmg
T15 96-72 Redund Hip l 2L3�? 1/2xl/4x3/8 553 -0.39 4729 0 8 Pass
Bracing
T16 72-52 RedundHipl 2L3x21/2xl/4x3/8 626 -0.28 4114 07 Pass
Bracing
T17 52-32 RedundH�pl 2L3x21/2xl/4x3/8 707 -028 3836 07 Pass
Bracing
T18 32-0 Redund H�p I 2L3x2 12x 1/4�/8 798 -0 82 53.34 1 5 Pass
Bracmg
T13 ]46-122 RedundHip2 2L21/2�c21/2xl/4x3/8 416 -020 1203 17 Pass
Bracmg
T I4 122-96 Redund Hip 2 2L3x2 12x1/4x3/8 485 -0 22 16 29 I 3 Pass
tnzTower J°b Pa9e
816298 Zephyrhills 10 of 11
SSOEInc. Project Date
/oo!Madison Ave. 012-01232-00 13 53.51 10/23/12
Toledo,OH43604 Client Designed by
Phone. (4/9)255-3830 CCI 81352
FAX. (4/9)255-6101
Section Elevation Component Si�e Critical P oPo��o„ % Pass
No .rt Tvpe Element K K Capaciry Fail
--- -- ----- Bracing ----- ---- ------- ---
T15 96-72 Redund Hip 2 2L3x2 U2xl/4�/8 554 -020 13 28 1 S Pass
Bracing
T16 72-52 Redund H�p 2 2L3x2 1/2x1/4�c3/S 627 -0]4 I 1 19 1 2 Pass
Bracmg
T17 52-32 Redund Hip 2 2L3x2 1/2xl/4�c3/8 708 -0 i5 9 80 1 � Pass
Bracing
T 18 32-0 Redund Hip 2 2L2 1/2�x1/4�/8 854 -039 17.56 2 2 Pass
Bracing
T18 32-0 Redund Hip 3 2L3aQ 1/2xl/4x3/8 826 -0.23 ]4 00 1 6 Pass
Bracing
T 12 171-146 Redund H�p Diagonal 2L3 1/2x3 1/2xl/4x3/8 372 -0 25 17 O l 1 5 Pass
Bracing
T13 146-122 Redund Hip Diagonal 2L3 1/2�c3 1/2xl/4x3/8 417 -0 59 34 18 l 7 Pass
Bracmg
T14 l22-96 Redund Hip Diagonal 2L2 1/2x2x1/4x3/8 486 -0.53 9.20 5 8 Pass
Bracing
T]5 96-72 Redund Hip Diagonal 2L2 1/2x2x1/4�/8 555 -0 49 8 41 5 S Pass
Bracing
T16 72-52 Redund Hip Diagonal 2L2 1/2�x1/4�/8 629 -0 14 3 51 3 9 Pass
Bracing
T17 52-32 Redund Hip Diagonal 2L2 1/2x2x1/4u3/8 710 -0 14 3 10 4 4 Pass
Bracing
T18 32-0 Redund Hip Diagonal 2L2 1/2�xU4ac3/8 800 -1 14 14 49 7 9 Pass
Bracing
T 18 32-0 Redund Sub Horz 2L5x5x3/8x3/8 797 �3 15 108 54 39.8 Pass
Bracmg
T18 32-0 RedundSub 2LS�c31/2x5/16�c3/8 805 -5936 I0013 593 Pass
Diagonal Bracing
T 1 288-279 Inner Bracing L3x3xl/4 13 -0 00 7 92 0 2 Pass
T2 279-272 Inner Bracing L3x3xl/4 42 -0 00 6 33 02 Pass
T3 272-259 [nner Bracing L3x3xl/4 79 -0 00 5 40 0.3 Pass
T4 259-247 Inner Bracing L3�xl/4 116 -0 00 4 14 0.3 Pass
TS 247-237 Inner Brac�ng L3�xl/4 137 -0 00 3.33 0.3 Pass
T6 237-232 Inner Bracmg L3�xl/4 I 58 -0 00 2.83 0 4 Pass
T7 232-222 Inner Bracing L4x4x1/4 195 -0 Ol 636 0 4 Pass
T8 222-210 Inner Bracing L4x4xl/4 232 -0 O1 5 50 0 4 Pass
T9 210-195 Inner Bracmg L2x3x1/4 267 -0 03 I 72 1.5 Pass
T10 I95-183 Inner Bracing L7x4�/8 306 -0 01 9 75 0 7 Pass
T 1 1 183-171 Inner Bracing L3 1/2x2 1/2xl/4 339 -0 04 235 1 7 Pass
T 12 171-146 Inner Bracing L3x3xl/4 384 -0 08 2.45 3 4 Pass
T13 146-122 Inner Bracing LS�c3xl/4 453 -0 13 3 24 3.9 Pass
T14 122-96 InnerBracing L31/2x31/2xl/4 522 -013 2.51 52 Pass
T 15 96-72 Innet Bracing 2L2x2 1/2x]/4x3/8 591 -0 15 1 88 7 S Pass
T16 72-52 Inner Bracmg 2L2 1/2x2 1/2x]/4x3/8 671 -0 13 2.98 4 3 Pass
T U 52-32 Inner Bracing 2L2 1/2x3x1/4x3/8 749 -0 14 2.76 5 I Pass
T I 8 32-0 Inner Bracing 2L4x3x5/I bx3/8 866 -0 03 5.52 l I Pass
Summary
Leg(T18) 61 8 Pass
Diagonal 63 4 Pass
(T12)
Horizontal 72 0 Pass
(T17)
Top Girt 0.5 Pass
(TI)
Redund 33 9 Pass
Horz l
Bracing
(T14)
Redund 512 Pass
Hotz 2
tnxTower J°b Pege
816298 Zephyrhilis 11 of 11
SSOE Inc. Project Date
I oo�Madison Ave. 012-01232-00 13 53'51 10/23/12
Toledo,OH4360�1 Client Deslgned by
Phone. (479)255-3830 C+C� 81352
FA�: (419 255-6101
Section Elevation Component Size Crtttcal P ePo��„„ % Pass
No f Type Element K K Capaciry Far!
---- — -- ---- ------— - -- —---- Bracmg - ---- -
(T14)
Redund 20 0 Pass
Horz 3
Bracing
(T18)
Redund 26 2 Pass
Diag I
Bracing
(T15)
Redund 35 8 Pass
Diag 2
Bracing
(T 15)
Redund 52 9 Pass
Diag 3
Bracing
(T18)
Redund H�p 1.5 Pass
1 Bracing
(T18)
Redund Hip 2.2 Pass
2 Bracing
(T18)
Redund Hip 1 6 Pass
3 Bracing
(T18)
Redund Hip 7 9 Pass
Diagonal
Bracing
(T18)
Redund Sub 39 8 Pass
Horz
Bracmg
(Tl8)
Redund Sub 59.3 Pass
Diagonal
Bracmg
(T18)
Inner 7 8 Pass
Bracing
(T15)
Bolt Checks 61 8 Pass
RATING= 72.0 Pass
Progam Version 6 0 4 0- I/27/2012 File:C./Users/81352/Desktop/816298 Zephyrhills/Structural/fiac/816298 eri
Crown Castle USA, lnc. October 24, 2012
285 Ft Self Support Tower Structura/Analysis CC/BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 13
APPENDIX B
BASE LEVEL DRAWING
tnxTower Report-version 6.0.4 0
� ���� 5
� ���� x
� ���� �
�a ����� ,.�
�� ���� �
e �
< m
� .�-.o� .... �
.
..
..
..
.. �
..
..
, d
. �.
.
. �
.
� s
• �
•
• �a �
a �
a
0
� b
i
•����•
o •����• u.
7 �
��� � � ���
� � � �o N�g
�� p F p N�
�p^� F F
F
�^� o ���
s s .^, � ���
�:,�:.
�,�..�
Crown Cast/e USA, Inc. October 24, 2012
285 Ft Self Support Tower Structural Analysis CCI BU No 816298
Project Number 012-01232-00,Application 165308, Revision 1 Page 14
APPENDIX C
ADDITIONAL CALCULATIONS
tnxTower Report-version 6.0 4 0
Anchor Rod Check for Self Supporting Towers �/
TIA-222-G,Section 4 9.9 Rev 6.1 � C�A�TL E
Site Data Reactions
BU#� 816298 Eta Factor, 0.5 Detail T e
Site Name: Ze h rhills Down bad Pu: 522 ki s
A #� 165308 Rev.1 Shear, Vu: 95 ki s
Anchor Rod Data �n
Qty' 4 Mu =0 65`la;"V� ft-kipS
Diam 3.25 in
Rod Material: A36
Stren th Fu : 58 ksi Anchor Rod Results:
Yield F 36 ksi Max Rod (Cu+Vu/r�): 178.0 Kips
Design Axial, �*Fu*Anet: 277 0 Kips
� Rod C,ircle �n Anchor Rod Stress Ratio: 64 3%
�e in
' # of Rods 1 or 2
If Applicable;
Mu= P�x e ft-ki s Anchor Rod Results with Bendin Considered:
� Oniy entf�� rocl cv��le offset(e) an�l numher When the c(ear d�st�nce from the to� of�onaete to the f�otton�
��f anch��� r��cls a!the ertreme t�be� fo of level nuf ekcceeds 1 0 times the dr,meter of the anchor rod
�nns�der ii eccent��c load clue to lec� the follo�vmg interachu�i equabon shali also be satrsf�erl�see
reinfr�r;ernFnt e��ct Fiyure 4--? of Rev G)
-—-- ---- .
�Vu��Rn�)Z+��P���RM)+�M��Rm,)�2�= 1
" ��__4____"___ _ ___dJ`
r`
A� 0 0 ��y ,[�� o�0 1`` �Rn�=�•0 45•F„b*Ab= kips
- Q� I �*A gT�-� °�° �6 �Rnt-�*Fu*Anet' kIPS
```----~ �`°°'-----'°� �R�m=�*Fy*Z= ft-kips
r�ncre'e , � u�r�,reta- ..,L
f�"t'
�t G_� I ��
S�CTIOPd A-A SECTION B-B
Detail Type (a} Detail Type (b)
7Z=o��a 2-o-ao
f��� { M� ��.�,�
� oao
c}� °�°�c ° � �� -�a
4�n � �e
�-NGn Sh�fN _
rout �:a�cr�tn�
COiM9�e . � � r�
� — 4 '
L
SECTICN C-C 3EGTkOh D-7
Detail Type {c) Detail Type (d) Maximum Acceptable Ratio: 105 %
��O•SS (See Note 1 Eelow)
'--�---�-�- -- --- - -- —�-p Sp Governing Stress Ratio: 64.3% Pass
Figure 4-4 of TIA-222-G
SST Anchor Rod Check For Rev G-Rev 6 1 091912.x1s
°o$ '�J�'J' �e'
816298 Zephyrhllls
ProJecT�i:012-01232-00
Tow�r Rwcllm Overdl Fo�ndation CapaciN oN
Uplif� 399.0 kips
Com re 522.Oki s
DMW CdawnD�ldh SW Value
Dwmeter Sft '/�aferimleDepih SR
HeighlAboveGrode lfl Beanngiype Grois
lotal ro¢son Lengih 2d it Illfmale Entl Beann 22 ksl
Penmieter IS�f�
Cross-Secironal Area 19 6 r��
UTAma�e
SaI Loyer Ult�mole Uplrtt Dry Concrete
SoilL�yer ihickness 9unFric�ion Compression DrySoilUnfWeight UnitWeighl AdditiondlnpNForGatleBean�antlC011arMOtlifkohon
Skin Friction
tt ksf ks k< kcf Cdla Beam ]d8.73 ki s
I n ectetl 3 0000 0.000 0.124 0150 Gratle Beam Beann 360
0.9M 0.955 0150 Collor/Beom We' 1 U ift d2
3 �O.Id, 0.9 - 0150 Colla/BeamWei h�Com r 212.2� �ps
Q p p, 0150 Wei MofSalRemovetlssio "�'
5 3 � .618 ,19. 0150
6 .S � A1B O.b 0.11 - 0.150
l S Q67B .00D O.TIO 0150
io�als 23
Sol Cokulefbn�
Soil LayPr Effecirve Soil Effective Compressan Effecirve Soil
SoilLaya
ihickness Unilweghl ConcreteUnil UplrfiSkinFncPOnRevslance S1cinFricM1On weigM EffecirveroncrefeWeghlAdtled
fl kcf kc k s k s k s k i
1 n ectetl 30 0124 0.150 0 0 J3� II]8
20 0124 0150 30 � <8] 589
3 10 0062 0088 15 �5 I 21 1]2
4 O S 0 062 0 088 5 0 0 60 0 86
5 30 0048 0088 29 0 280 516
6 85 0048 0088 83 83 19d Idb:
7 5 0 0 048 0.088 d9 0 0 61 8.60
OD -006^ OOBB 0 0 000 000
00 -006^ OOBB 0 0 000 000
00 -006: OOBB 0 0 0.00 000
iatals 23 2W5 128.5 294 486
EndBeanngPesr,�mce ]805 lips ConcreteWeight 3125 kips
CompressionSkinFrictionResistance 963 kips �pIillSkinkicipnRPSistance ISII 4ips
i��alCOmpreSSOnResisimce 8)69 Fips �ofalUpl�flResisimce 469� kips
So/Ca acW�f
Com r onCa ao� J ��x
UphfiC�ocily �M
RNn/orc�m�nlh wi�a RNM�orcwn�nfCh�ck
BarS¢e 9 �nalon
N�mberolVerticdBars IS RebarCageDiameter S:Iin
Honzontalriesize 3 RqrtlDevelopmeniLen9in al8in
Bar Sheng�h F., 60 ksi Development Lengih 394 in P�G,Incl�tle ieruie Shengm Retl�ction ILtl/Req tl Ltl�
nchor Rod Qrcle 17 in i„ 399 0 k
nchor Rotl Embetlm?n� 60 in �enile Sfrergih.OP 516I k
ConaeleCO�er 31n iensieCapacity �1:% OK
ConcreteStren m,f'c 300Dpsi Campr�aflon
A�� 150^
Aq 28_JC�n�
6lcompresvm� o�
4P 451aBk
Compression Capacity _'08% OK
NIIMmum R�Infacwnmf
Au�effective I 1 d 13 J in
CompressionA,mn Idl�� OF
�NMOreln Ca ad/p
ftemforcemen�Ca aat ��K
A�Min Met2 -K
Client:
OOOQ �� Subject: � � Z-
Oe7M gy Sheet
_�L r1 Number
�'��'w ssoe,com �ate: Chk'd: —"_�--of?—_._-
11���,�._ � ,. �� Date: Project Number
��, v �� { ' ��s
� �C?�;� �''. ?,c-, �r- _�� -k �' • ��� � � �� ,
{ c% , J `� �.k"��_u) ,��I - _ I ,
- ,�?. �_.-. {—
i i-' � (s-R `G'`�
��-�rl
, �_+.�--�, _I�_f> ,�C �.\ t� � ��1�}'l['�1
� � l(�}-�r �1 �,,�t-i-�?
�'�jC� k �i �r��>-_-1� �� k
�
�5' a�.�`
T l�Z�I`� " �-`, I� �`;��'
�� �Q�' �_r.�li �.
`J � . �,.:�r i,� �.-� i i ?-,
,_ �.�� �i�(!,,�
�S 1 i k '}=�{.:, ') _ -Z�� � ki
.
��� F
� -�'� � � 1��' } �?• (t��g (C��
Ll,�"�,_I c�c '
t �} ,�;-�
i � �_���
/ 4_Z °l:_ ! � �(iil
( ' - .�� ) - �Q {= _-2 �l�1( r-� i�� �( i , y� �
-IL � , C�, �. - - ! -
' ; . _ I - :y 4
Z� � ... _. I. � - �
` ' � ' � - , k�,;_ __ : , , _ -_. . ,
- _,—�___ .
!� ' r z =Z � `�-', � vt t.' , �'`�`-:,`� ��_-(-.
��_t r
�' � �t_ ='
�c�! •��Z ` ��
�;'�7� I� J �_�.9���I
�.� i - ,.
CC, �.�I .4 i ,
/ " _ • . , -
l � � � j G - �' ' _ _-- E ,�!_ '� � �f--� ��� � .
r!
(..._" ' � Z-� � , �
—,�_�: �� � _� _�— 1 1
/ � f. � � � i
1 � C� e � � { f — 1�� � � ,
L �- �- � C�I-. ` ' (��� `�,� i�, r �
�� �, � � 1
/� - 'Z-L��� , -� � 1 �^�LJ� (` � ``�-
�`
'.� � �f i ���`��` .
—� 4 �2 2 �) c-- �, 1. %��.. ,G'� , , ;� LT- ( � `r
_ � .� '� - �S��=- � -i / , '� !` � � , �, — .
J' ' =1 _ -� �= ,,
� , ��-
w�, �, ; , _ , r :�; � j�` � L�� { � ` � � C c�.c���._�,j ;-_ - __
_, -�,c ,,4 , ,_ ���. r _ ,
' � �.!, I, _''��..= ' � � 1 t t' � � �`�•< ! ..
, ( ,I ��1 +-{� �'1.� � ��` � j ;
I 1- ( ,.1, _ , _ .�� �� . ��-,
- - --- F' I
C�ient:
�O Subject:
OO s$oe� By: Sheet
k"n'w.ssoe.com Date:_____ Nurnber
Chk'd: ----of�_
Date: Project Number
� I� � cYc }.;; _{, ,
�`t : �4,�-{, -
i , �_:�.,� c
,�,<_1�,r r
/Z -�� � �� � ' �
(-����C�1'� � `� 4' � _ ,
�� _,�_� `
�r c ��. _ - � -
,
, ,�, ,
�� Z � �__ /----a_ - `- , .�.S� _ , -
��r Ls ! �` lc�,cr � -'' I �-��.,-„� ; t I'f_i
� ' `i � 't�'y�� �r� j-� , j� `-, !` i
' ��..E '( �
�1t��{�'' ! ( , . i\ l.J�t��'_ _ r !r� �r�� �c' 11 fi.� ,
=' t C''cC`l-, n
�.+ �,�'� .,'� � •�� I< �� --��c��
�'[?i� l�l_t( I � ���a, 151
�1, c Z� r
l , �i � C�;—
)`--' I��r1= f��,_
� �� �l
�� � ��_�- =�/7',
- � ���1 �1 - I�_'n �
���j#�, �
cj - �� `.�,; -
, �
,��-,��i _ �.t?i Cc�,;
1
�s ' —
� (J- �� 11�` '�' �l L (��
t/ 1; , 1
�` , / r •-
' � � ��+`- _ "� {:- � �
I� �_ ' E t z— -) - �.
---_ Z�� � �-
� � �� ` 1l� ' A `. �c - ��
_ �� �� ��`J, �z !I -}�-�
� S 1,��- ��> �� , '`�----�__— = k - 'i{- .
_' ', �, , � �?,cr_ e
Vr'1 = - . . J I. � �< y-r-
Vc t�1/�_� c�k
V�; �_
�`-t��c.. -2 < <
1�`, - f-1_.���1_ �� '( i -� �' ,C�I=',� -� - -
/ , J'� ��
c - — `��1 I ) \' � _.! ,
� - '----� � !�(��i)�L'� � ' '�?-'� ��
�'��'� --� -{-`� ( r- 1 c_,�� �' - `���C
�--�
, - � ' � ^��
{;'� _ ` — ) C.���;��",`rc_r k
V
1 r��_ � � � _ �.f�- - -
i � ,
tiC%! s� �` .�t; t ,, _ /L J �, , � 11 f �
. -� , , i�� r � • `� E� c ��(r!c.?
' L� 7' ;(� �' ' ( � � `'� t� k
�:�2"c's 1; � ��_ ;, 1 `.I'_ ; � -z ,`_l �� _ -----_„_ J —�
. , . .,,< �� -- . I c,� kl
<< �_ �_ � r� � 'f' I -,; i � � ._ `___— J
t, -- �- ' �: � ; � ! ' _' t �-� L =i �- �
' �� f �� !'_����( r '+ ( Z k� c\ � s`=",_Z-__ir_-,
-� -� r.:� '�-i
� ---- _ �
�
�
�
.,,,
�
�
N �
�.. ~
o �
N
� �.,�
� U �
� ,~ .. �
o ,z
Q � o �
Z � �
Q
O � � A � A
� � � � o Q
� a � � � �
�
� a A �
►� W O 3
0
�
� � � �
�
� � O .� �
ax w � � �
N p�p � '� ° � 3
� O � �
� ..., o �
� � � � � � �
O M `_, � ° � �
� � � o � �
� � N o � �
, W o � w
U � �, N � o
� � � �
� � N � Z
►-�
+�, N � �'J A
z
o � � Ao �
� A � ° �
x � � r� � .. W
QA U � ~ � �
z A a a � Q �a
� a � a W a
a �
�
� �
�
C�7
� w N n y
z
0
n � b a
..= t°-� � c m '�n � O
t--� C .�-� -� m C
o ,�, r � D � � � (�
ti7 r; � � u' D o = m
�;.' "'=} ::� `�=-�� � m Q° � d -rnl
rT '-' .�' � � -ni z � Z
r' Y�' --� "�� z p -� �
z� ,-- ��, :� � Z � m
�� ''' � ::�; C� z ►t� X
t-� r, �, � O D �,,,3 �
,> ,=� � ,'..��� T m O �
� �� � , � � z
�: � rD c �
d tr"-, r
t� � � t1� �
° � N
z
�
= o O
m
m
� � �
�
� �
O � �
� � � �
,LS N.L9 m �
W
� `_`.;a�ay� D � O
4
- ��- + � � r �
m � Z � ,
S 7TM ST �� ysNyl, m �
hd < T � C . . �
tSCS 3�S�iCX �/�
8TH'ST � � �„� O Z � V L
�03Y�NM Z � N Ill m � 1�, VL
9TH ST � � ND —� � Z `�
iT 1S H16 ,� D � C 0 m � � �
�' y � � z v = � � �
CIMBALL CT';m W C � �
17TH ST W m m � r �
� � cn � m � �,
s axa��na , � rv (n � (,�
18TH.aT O lIITH ST r � � �
S � �
ia�If1Ql / 19TH ST �' ,�� � � � •
r m 19TH ST � �
m - QD �
N Z ~ � _ V
, �_ � � r
� r � ''
r� CD
� � �
� �
� �
D �
� y �
�
o ZDO � � �
� � � m � �
� _� � � O
° � � m �
°' !?im � n
� � N � �
° N N Z C ���IIIIIi���
o � � D `` �--E�
—1 �� � .......
� w c'' � � `��'��O'�� �' . �i
O � � ��� �' �
� � � .'2 �
� � � �; ncn �
p � � • O n : "�
o = �� � m �¢ �.
. Q o � , �
� �; yn o
i
�-, • �
C /.��/•%n^��Y��ef�'��� `/_ ``
�g�o ���oo�ogzoo
�
z�; � °��Bo� �
�
�f- o���;�o��o..
;�� �,�oo�� o�
�_° � �� ���Z�
��Z ��r�°�o��°�
� �o�� m��
f�o ��yA�����
m°; �c $; �o�
� zv � or^�
� vo� w �mm �c�� v�""'i6°�o�
z�o �
Z �,�.. Z �y.. ��" r`�cZii�z�� �
N m�z � ��� �m� � nZtl�o�
�
S rn; m � � yG� ��O ;C��
� o O
� � A�r�* o ��v��f �Z =��m �� �
"' �s� �i c�
❑ �o �
� °yR ��
� N�
� 1 � �2
G7
C� Q
�� �m
� _ z
z
c�
� o � �! x
Z V�Z Z 2 2 2
v
� ��m � �
o mN � z z z
� �N
�
r
X �S� � ��
� � ��
N � O .n J N� � �
V V� � �� �Q� � A�
�4� � � z X r � ��
c'' �� v� z
z �
Z
G7
D
Z
—i
Z
Z
D
�
O
C
`
� � �� Sf
�� sF�l o "`��sfioy��s ,��,%°�
��3° '`
1 O��S ���•�'o� � D �� Ac<
c� r
```���11{ !l/////
�Q
` m
� (� �N���� /]i �VI
�v� •��-y � �Z
,-�Q�� ��`���� • � �G�
�-'�� � Gj:� • �
O�I*1� � �i ^�� � � s
�
�1�Nm �. Z� � � •Q] � �2Z
; � � m '' —� �D
b+ C .� �•
vC fn � �i 0 a �`� � ..w.0
��� 2:�' c� ^� � m
�� �� ���• •`e m
Z � �A.�*_ e � ��
, N u� � �+ r�
���ccn C ;� ��� 5��� m�C�� �Z�D�
�coOm
$�2�Z -� � ��� n AO� � �f�i �$
4� `�' ' 30 0� � Zm
?�o�°c D '�' � '"cZi� °vo��"� � F3�;� Zt��*+�8
c,, �� r �� fc>� �xo � ��z �� �°��z
A���� ZO �g° Agv� �o��� ���g�� ��or=.,i
O�tn g� m �A m�� C�p�� ����goC N�m��
F� �
�v��� m� �?A o�,�,,'�''z gz�cmm ����
� �� �� �����
N � _ '< y O y A
N
ZZ��� v� o ° ��$z�z g�m� �ii oo��m
!n��N � A � ���N� ��A �y O�n�
C A �� � 2-S
���� m � � cZi�og ����Z� g��N
�1 �p�A +1
� z� � '?zA m ��.o� m0 C$vf �Q
��0� � H � VIry�Z ���m�� UI�A�
� �O D� � A y 0,y���� GR�I�A�m O ZA�
p��n O � S ?� �N� A ORIZ �ORI
� � Z� m�m � ��'
oc �
o�ZN � g � .r�* "�Z� Q��-rc�� �=�m
m � m o � ov�-i�Z �zz�� �vi�o
°c�r°.�� " Z r'S• z°z� m�°� r�+��
m x�� � ����
m�^� J v � � Z o� �
� � � � �g�° �ZO�g o��ti
0 om �
°u n°� �
AO;�O ��O V J v .
m0 p � ^�Zl�*,
y_N Z
� -- -- ���-� ��S_t o�,
o � � -- -- ���� g��� i� � ' � � li
� >m v. ri r.i
� � CNZC � �C Ny�
�
rn � � —_ _— ' ����p � �jy Z� N 4
f�+ ��� mg � D� v N R
Z m -�RI Q Q
��OA �y
Z O
'yV��A A�p� �C
R+� �o ^2 4 �2
r� �� ��
� �g�� r-�°'" �°v nN u�i vAi I
� C��y N N N
�O�� -�1 � -i
� ;�g�
� �m�c� ��o A A n
�6� A�l�'. \ � \
� � -- -- D �A���C �� .Xi .xi v
O Vl O f� � A n A
D � u svmp �� � o �
� �Oy O� O� rn �p�
O O O
� � � X X X X � mV-�IS�Z Z� O O O
� � pC�UI �� G7 � W m � �
�p m m c c � �
-- -- C�gO Oz
���; Z� � u # w a u
o�^� �
Za�o � o�o� o�o � o�o
````�a��i���,,,� . . . . .
```��O•••,� •�����• I� N U � N N N
• • I F� FF FF Fh FF F�
� � : • I
�. C7 • � I
.
� �i ^ � O n � � �
•
� � T :,
� 9 i � m * �
�
. c� L�: �° c� , �
98'-8'
r_______�
i i
i i
i i
I I �
I I
I 1
I I N 3n Z
� �
� �
i i m
i i ,
i
i i
� i
I I
I �
� � � ��� g��
i i �� m� ��
i i C
i i n ;;
' ' � m
� � rn
� � v �O
i �
i i
i i
i i
i i
i i
i i
i i ----
i i i i
i i i i
i i i � �-------- ----�
i i i � i i
ii �----- ' '--------� i
i i i m i i i �
i i i SCZQ i i i ���
� � � m- � i �
i i i �;�� � � ----�----' z
`---
2 C)
L___ _-_J i z��c� i i i N
� � i � m r�
`-------------------� i O�
I I CN
� _ _
4 �� �� �_; �� ���� �2
or�------------------------------------r �
O �.``"'' �� i
. I �i.
, nn
�________'_� , � ______"____ _"""___ �
ii .----, I ir---------- -----------1 t--
� � � i i ii
i i � i � i ' i�
i i i � C�Q� i ii
i i i i ii
i mRt i ig��i � ----j�----- --------------
1 i S C X i � i p�i I I� ----�� �✓
r�"X �! r-- �.p� i � i A i ' J i
A— �y i � �;Z i I � � I ----- �i
m� n� �__� zr^� `----' � i i
ii
o� �� � � � � i �� �
� �----�� ��
c� � � � �, x� i ��
;� m� i �----�' mmQ � i�
Z i � � t� � � i i
� � -----
�Z A �---------- � ��Z ' ii �r----
ZZ � I �� � I �� �i
� I � � ii
v x m m .\ �,
Ii-----EXISTING ----i v� � i�-==7��'�=_, ��'
�T—MOBILE EOUIPMENTi I �;- i�
� �
I �-----� PAD � I � ;� ii n
li i i ', '� u
�� Om� I y---------------' ' � '� �-� ��� E��S �===J`====
v� m�� ----- I i� ' ' n ii
j� i i �� ��
�Z �NZ I I I �i � � ii ii
� v� ���. '�'�'• �i � � ii ii
. I
� Q � LJ__"—'_—"_"—_'_"_"__'_"__'_"—'�' ` Ji_`_�_:1 11
� ' I ` —L__'—L_'_r _ __�
T
Crr � ��,_�� �. � I � ��_
� Z • •
� G� i------�------i � � '9 V�
� i
-'----° •—Q �<
m �----------, y <fJ
�� CNQ i � � O � �j� D�
I ��� i ��Q I I i I Or
' b;�� � g � � � ��
�
�, - �----- , w
� � ----- -� Z-
I � I z -- i"�Z� �`�
�--------------� ��--------� o x ��
�
� � Z v
�--------�
O
�
``````���������,`'' v
♦ Qz> �.......
``� �• �• •.
: j
� (��� � A I
i
� � � ^ "� � • " r
• �
.� � � ?J m � n' �� '—'
_.. r • a `
; o -..
•- „ o • �
� �2;y a, • �
� ,� �'- -