HomeMy WebLinkAbout1196-13 WATER SUPPLY PLAN , i ii iiiii iiiii iiui iiiii iiiii hill iiiii hill iiiii IIII l 2013112042 Rcpt:1531148 Rec: 222.50 ORDINANCE NO: 1196-13 DS: 0.00 IT: 0.00 06/26/13 K. Garcia, Dpty Clerk AN ORDINANCE AMENDING THE COMPREHENSIVE PLAN OF THE CITY OF ZEPHYRHILLS, FLORIDA; AMENDING THE PUBLIC FACILITIES ELEMENT AND THE CONSERVATION ELEMENT REGARDING THE 10-YEAR WATER SUPPLY FACILITIES WORK PLAN AMENDMENTS AND SUBMITTING SAME TO THE STATE LAND PLANNING AGENCY AND OTHER AGENCIES PURSUANT TO SECTION 163.3191, FLORIDA STATUTES; PROVIDING FOR SEVERABILITY, REPEALER,AND AN EFFECTIVE DATE. c"D p\r D WHEREAS, consistent with the requirement of Chapter 163, Florida Statutes, the City of Zephyrhills has adopted a Comprehensive Plan to establish goals, objectives, and policies to guide the development and redevelopment of the City; and WHEREAS, the City is required to adopt a 10-Year Water Supply Facilities Work Plan and ,pa supporting policies in accordance with Section 163.3177, Florida Statutes; and �,o WHEREAS, the Planning Commission of the City has reviewed the proposed amendments to c, the Comprehensive Plan at a public hearing on January 8, 2013, and has recommended approval; and Z1 WHEREAS, the City Council, after taking into consideration the recommendations of the Planning Commission and the City Administration, and the comments received during the public hearing conducted on this matter, finds the proposed amendments to the Comprehensive Plan are appropriate; NOW, THEREFORE, BE IT ENACTED AND ORDAINED BY THE CITY COUNCIL OF ZEPHYRHILLS,FLORIDA,AS FOLLOWS: SECTION 1. Adoption of Large-scale Comprehensive Plan Text Amendment. The City of Zephyrhills Comprehensive Plan is hereby amended asset forth in the following: A. Public Facilities Element Goals, Objectives and Policies INTRODUCTION - Pursuant to Chapter 163.3177(3)(a)(b), F.S., and Chapter 9-J- 6(`(a`(b`(^), F..F.A.C., the following represents the Goals, Objectives and Policies of the Public Facilities Element. In addition to statutory requirements, the Goals, Objectives and Policies were developed in keeping with the character, conditions, both environmental and social, and desires of the community. These Goals, Objectives and Policies are intended to provide guidance for maintaining the City's adopted levels of service standards for potable water, wastewater, stormwater drainage and solid waste to infrastructure serving the Zephyrhills area, and to protect water recharge areas lying within the greater Zephyrhills vicinity. POLICY PUB 1-1-6: The City shall maintain the Zephyrhills a Water Supply Facilities Work Plan pursuant to Section 163.3177(6)(c), F.S. The Work Plan shall incorporate traditional and alternative water supply projects and conservation and reuse programs deemecl`necessary to meet the City's water supply needs over the comprehensive a 10-year planning period, at minimum. OBJECTIVE The PUB-5-2: City shall mMaintain or improve water quality by prohibiting runoff that will contribute pollutants to degrades water quality consistent with Rule-9J 511(c)5�C applicable regulations. B. Public Facilities Element Appendix A The existing 10-Year Water Supply Facilities Work Plan is deleted and a new 10-Year Water Supply Facilities Work Plan, attached hereto as Attachment "A", is added to reflect updated data and analysis for the next 10-year planning period. C. Conservation Element Goals, Objectives and Policies Record and Return to: City Clerk's Office 5335 8th Street Zephyrhills,FL 33542 OR BK 8894 PG 1507 2 of 26 INTRODUCTION Pursuant to Sections 163.3177(6)(d), F.S., and Section 9J 5.013�� the following represents the Conservation Goals, Objectives and Policies of the City of Zephyrhills. In addition to statutory requirements, the following Goals, Objectives and Policies were developed in keeping with the character, conditions, both environmental and social, and desires of the community. These Goals, Objectives and Policies are intended to address the establishment of the long-term end towards which the conservation programs and activities are ultimately directed. POLICY CON-2-2-6: Implement traditional and alternative water supply projects and conservation and reuse programs deemed necessary to meet the water needs identified in the Zephyrhills Water Supply Facilities Plan(20082025). SECTION 2. Repealer. Any ordinance or part of any ordinance, in conflict herewith is hereby repealed to the extent of any conflict. SECTION 3. Severability. It is declared to be the intent of the City Council of the City of Zephyrhills, Florida, that if any section, subsection, sentence, clause, or provision of this Ordinance shall be declared invalid, the remainder of this Ordinance shall be construed as not having contained said section, subsection, sentence, clause, or provision and shall not be affected by such holding. SECTION 4. Effective Date. This Ordinance shall become effective upon passage on the second reading and signing by the Mayor. The;foregQir .Ornnance No. 1196-13 was read and passed on the first reading in an open and regi 1axnieeti'n of the`City Council of the City of Zephyrhills, Florida, on this 11th day of Februaty, 2013 `' AtteA ' i'irda D. Boan, icy Clerk Kenneth V. Compton, Council President The forego'ig Ordinance No. 1196-13 was read and passed on the second reading, following a public hear in �inlan;open and regular meeting of the City Council of the City of Zephyrhills, Florida, on t i .l Oth day oune, 2013. Attet: , ip61 .l"a D. an;.City`Clerk Lanc A. S ith, cil President The foregomgfOrdinanceNB. 1196-13 was approve e this 10th day of June, 2013. 41 Daniel W. urgess, Jr., ayo Approved as to legal form and legal content sep . Poblick, City Attorney Table 13 POTENTIAL WATER SUPPLY PROJECTS&PROGRAMS,2013-2025 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 2.49 2.48 2.51 2.55 2.58 2.62 2.66 2.70 2.74 2.77 2.82 2.86 2.92 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 PROJECT TYPE PROJECT TITLE FUND FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 TOTAL Facility Expansion Water Mains W&S $0.316 $0.205 $0.490 $1°011 Facility Expansion Reclaimed Water Mains W&S $0.410 $0.280 $0.310 $1.000 Equipment Radio Read Meters W&S $0.200 $0.200 $0.200 $0.600 Facility Rehab Wells(Security Enhancement) W&S $0.500 $0.500 $1.000 Facility Replacement Lift Station W&S $0.500 $0.500 Facility Rehab Lift Stations W&S $0.300 $0.300 $0.300 $0.900 Facility Inventory Wastewater Treatment Plant W&S $0.050 $0.050 $0.050 $0.150 Facility Inventory Reclaimed Water Facilities W&S $0.050 $0.050 $0.050 $0.150 Zephvrhills/Dade City Water 1.925 Facility Expansion Grant Interconnect SUBTOTAL $1.326 $2.085 $3.825 $0.000 $0.000 $0.000 $0.000 $0.00001 $0.000 $0.000 $0.000 $0.000 $0.000 $7.236 TYPE PROJECT TITLE FUND FY12/13 FY13/14 FY14/15 FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 TOTAL Conservation Drop Savers PosterContest2 W&S $0.001 $0.001 ca Conservation Sustainable Zephyhills-Related2 W&S $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.013 SUBTOTAL $0.002 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001- $0.001 $0.001 $0.014 W/y� A.AI GRAND TOTAL $1.328 $2.086 $3.826 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $0.001 $7.250 O NOTES: y+� 1.Project listed In FY12/13 through FY1 4/15 are programmed for funding in the City of Zephryhills Capital Improvements Plan,FY 10/11 to FY 14/15. 2.A range of potential water conservation strategies are identified in Sustainable Zephyrhills,A Commmunity Action Plan,June 2012. ON1 SOURCE:City of Zephyrhills,2942 2013: CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN(Draft 5/6/13) O��1 PUB-A-21 0 Draft: May 6, 2013 OR BK 8894 PG 1509 4 of 26 WATER SUPPLY FACILITIES WORK PLAN 2013-2025 CITY OF ZEPHYRHILLS t' • Every drop of water saved is like adding supply—except it doesn't cost millions of dollars to do it. J ur�E ADOPTED: lD, 2013 Draft: May 6, 2013 OR BK 8894 Pr, 1509 4 of 26 WATER SUPPLY FACILITIES WORK PLAN 2013-2025 CITY OF ZEPHYRHILLS ++ r+'t :;ji.. - - - rn�� r'at��1 Every drop of water saved is like adding supply—except it doesn't cost millions of dollars to do it. JunlC ADOPTED:, !fl, 2013 OR BK 8894 PG 1510 5 of 26 WATER SUPPLY FACILITIES WORK PLAN,2013-2025 CITY OF ZEPHYRH ILLS TABLE OF CONTENTS 1. INTRODUCTION ...................................................................................................................1 2. WATER DEMAND.................................................................................................................1 PotableWater Demand ...........................................................................................................................1 ReclaimedWater Demand.......................................................................................................................4 3. WATER SUPPLIES...............................................................................................................4 PotableWater Supply..............................................................................................................................4 ReclaimedWater Supply.........................................................................................................................4 4. WATER SUPPLY FACILITIES..............................................................................................4 PotableWater Facilities...........................................................................................................................4 Non-Potable Water Facilities...................................................................................................................6 WaterFacility Condition...........................................................................................................................6 5. LEVEL OF SERVICE ANALYSIS..........................................................................................6 6. IMPACTS ON NATURAL RESOURCES...............................................................................9 Wetland&Surficial Aquifer Impacts........................................................................................................9 Lakeand Wetland Impacts....................................................................................................................10 WellfieldProtection................................................................................................................................10 7. CONSERVATION POLICIES, PROGRAMS & PRACTICES...............................................10 Comprehensive Plan Policies............................................................................................................ 10 Land Development Code Provisions.....................................................................................................12 City Programs&Practices.....................................................................................................................13 Water Conservation Program Performance ..........................................................................................14 8. PLAN TO MEET WATER SUPPLY NEEDS........................................................................15 Water Conservation Awareness, Encouragement&Regulation...........................................................15 WaterSupply Facility Projects...............................................................................................................15 Coordination for Water Supply Planning &Project Development.........................................................16 APPENDIX Ex..erptc from Zephyrhills Capita! Irnproverentc Plan CV10/4 4_FYI 1/4 5 1 • CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-i OR BK 8894 G 1511 LIST OF TABLES Table 1 Potable Water Demand, City of Zephyrhills ...........................................................A-2 Table.2 Potable Water Demand, Pasco County Utilities.....................................................A-2 Table 3 Potable Water Demand, Domestic Self-Supply(Private Wells)..............................A-2 A-2 Table 4 Total Potable Water Demand (Tables 1-3).............................................................A-2 Table 5 Large Quantity Water Users ..................................................................................A-3 Table 6 Approved Future Dwelling Units.............................................................................A-3 Table 7 Potable Water Wells..............................................................................................A-5 Table 8 Potable Water Level of Service Analysis................................................................A-7 Table 9 Projected Water Demand and Supply with Reclaimed Water Offset......................A-8 Table 10 Water Facilities Capacity Analysis.........................................................................A-9 Table 11 Cost Effectiveness of Water Conservation Programs...........................................A-14 A-14 Table 12 CIP Potable & Reclaimed Water Supply Projects.................................................A-17 A-17 Table 13 Potential Water Supply Projects & Programs, 2013-2025 ...................................A-21 CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-ii OR BK 8894 PG 1512 7 of 26 WATER SUPPLY FACILITIES WORK PLAN,2013-2025 CITY OF ZEPHYRHILLS 1. INTRODUCTION Recognizing the vital importance of an adequate water supply to a sustainable future, the Florida Legislature established a process for water supply planning via the state's Growth Management Act (Chapter 163, Part II, Florida Statutes) and Water Protection and Sustainability Program (Chapter.373, Florida Statutes). Under this system, Florida's water management districts must periodically evaluate the adequacy of water supplies to meet demand in the state's water planning regions over a 20-year planning period. The Southwest Florida Water Management District (SWFWMD)—the planning region which encompasses Pasco County—adopted its current Regional Water Supply Plan on July 26, 2010. The plan addresses years 2010-2030. Local governments within the planning region addressed by a Regional Water Supply Plan are required to adopt a Water Supply Facilities Work Plan (Work Plan) to demonstrate that adequate water supplies will be available to meet future demand for at least a 10-year period. Water supplies may include traditional water sources, such groundwater, as well as alternative water sources, water reuse and water conservation. Per Section 163.3177(6)(c), F.S., the Work Plan must be adopted as part of the local comprehensive plan within 18 months of the adoption of the applicable Regional Water Supply Plan (January 26, 2013). This Work Plan demonstrates the City's ability to meet current and projected water demand in the Zephyrhills Utility Service Area (USA) through 2025. The Work Plan is supported by policies in the Comprehensive Plan Public Facilities, Conservation, Intergovernmental Coordination and Capital Improvements elements and programmed capital projects in the Zephyrhills Capital Improvements Plan (CIP). 2. WATER DEMAND Potable Water Demand Utility Service Area The Zephyrhills USA is depicted in Map PF-2 in Comprehensive Plan Appendix D. The USA encompasses most of the Zephyrhills incorporated area and parts of unincorporated Pasco County. The portion of the Zephyrhills incorporated area lying outside the USA is served by Pasco County Utilities. Pasco County Utilities also serves a small number of water customers within the USA. USA Water Demand—All Suppliers Tables on the following page show the estimated 2012 and projected service populations and water demand in the USA by water supplier. Water suppliers in the USA include the City (Table 1), Pasco County Utilities (Table 2) and domestic self-supply (Table 3). The 2012 estimated total USA service population is 19,511, of which 98.3 percent are served by City utilities. The total USA service population is projected to increase by 20.9 percent(4,072 persons) by 2025. The estimated 2012 potable water demand in the USA from all suppliers is 2.521 million gallons per day (MGD). Total water demand is expected to increase by 0.437 MGD to reach 2.958 MGD by 2025. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-1 OR BK 8894 2 4Po 1513 Table 1 POTABLE WATER DEMAND,CITY OF ZEPHYRHILLS UTILITIES Zephyrhills Utility Service Area Year 2012 2015 2020 2025 City Population Served' 13,521 13,924 14,846 15,985 Average Daily Demand(MGD)2 1.756 1.754 1.871 2.014 Utility Service Area Population' 19,174 20,152 21,496 23,158 Average Daily Demand(MGD)2 2.490 2.539 2.708 2.918 Notes: 1. Population projections assume average annual growth rate of 1.6%. 2.Based on actual per capita water use of 129.86 gallons for 2012. Future year per capita water demand is based on the adopted level of service standard of 126 gallons per day per capita. Source:2010 U.S.Census;City of Zephyrhills Utilities Department and Vrana Consulting, Inc.,2012. Table 2 POTABLE WATER DEMAND, PASCO COUNTY UTILITIES Zephyrhills Utility Service Area Year 2012 2015 2020 2025 City Population Served 37 42 53 64 Average Daily Demand(MGD)' 0.004 0.005 0.006 0.008 Notes: 1. Based on per capita water use of 119 gallons per day(2003-2007). Source: Southwest Florida Water Management District,2011, and Vrana Consulting, Inc.,2012. Table 3 POTABLE WATER DEMAND, DOMESTIC SELF-SUPPLY(PRIVATE WELLS) Zephyrhills Utility Service Area Year 2012 2015 2020 2025 Water Service Area Population Served 300 309 329 355 Average Daily Demand(MGD)' 0.027 0.028 0.029 0.032 Notes: 1. Based on estimated per capita water use of 89 gallons per day(2003-2007). Source: Vrana Consulting, Inc.,2012. Table 4 TOTAL POTABLE WATER DEMAND(TABLES 1-3) Zephyrhills Utility Service Area Year 2010 2015 2020 2025 Water Service Area Population Served 19,511 20,503 21,878 23,577 Average Daily Demand(MGD) 2.521 2.572 2.743 2.958 Source: City of Zephyrhills Utilities Department and Vrana Consulting, Inc.,2012. There are two additional SWFWMD permitted, large-quantity water users in the USA. Together, these water suppliers pump an average of 0.012 MGD of groundwater per day (see Table 5). Nestle Waters North America is also a large-quantity water user in the USA, but this portion of the company's regional water use is derived as a City water customer. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-2 0R BI( 8894 PG 1514 9 of 26 Table 5 LARGE QUANTITY WATER USES Zephyrhills Utility Service Area Average Peak Permit Holder Permit# Withdrawal Withdrawal (MGD) (MGD) Valley Oaks Corporation 2007881.002 0.06 0.128 Rollins Fruit Company 2004212.005 0.0621 0.2746 Total 0.01221 0.4026 Source: Southwest Florida Water Management District,Water Management Information System,.2012. USA Water Demand—City of Zephyrhills Utilities Note: The focus of the information presented in this section and in the remainder of this Work Plan is solely related to City-provided utilities within the USA. The average daily water flow from City utilities in 2012 was 2.49 MGD, a reduction of 0.168 MGD from 2007. From 2007 to 2012, the City's service population,decreased by 13.8 percent (2,548 persons), which is largely attributable to out-migration during the recent economic recession and possibly undercounting of consolidated households also in response to recessionary conditions. The service population projections shown previously in Table 1 assume an average annual growth rate of 1.6 percent through 2025. In that year, the USA service population is anticipated to reach 23,158 persons. The increase of 3,984 persons is expected to occur through re-habitation of vacant dwellings and extension/connection of City utilities to presently unserved properties (i.e., well users and new dwelling units). Table 6 identifies City-approved development projects that will affect the number of dwelling units and residents in the USA over the 2025 Work Plan period. Upon build-out of these developments—which is not likely to occur by 2025—the potential water demand from the approved dwelling units is projected to be 0.718 MGD, almost one-quarter of the USA water demand in 2030 (City served area only). Note:A portion of the build-out of these developments is factored into the USA population projections. Table 6 APPROVED FUTURE DWELLING UNITS Zephyrhills Utility Service Area Approved Estimated Build-Out Projected Water Development Project Dwelling Units Population' Demand (MGD)2 Valley Oaks 450 1,215 0.153 Zephyr Lakes 525 1,417 0.179 Links 122 329 0.041 Cottages of Silver Oaks 416 1,123 0.141 Hidden River 325 877 0.111 Preserves 200 540 0.068 Total 2,482 5,699 0.718 Notes: 1. Assumes developments yield 80%of approved dwelling units. 2. Based on City adopted level of service standard of 126 gallons per day per capita. Source: City of Zephyrhills Planning Department and Vrana Consulting, Inc.,2012. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-3 OR BK 8894 PG 1515 10 of 26 Reclaimed Water Demand Approximately 0.56 MGD or 35 percent of the 1.6 MGD of City-produced reclaimed (reuse)water is currently distributed in the USA for irrigation purposes. The unused 65 percent is currently is sprayed on one of four Rapid Infiltration Basins (RIB) located at the Zephyrhills Municipal Airport. The City's goal is to extend reclaimed water mains to unserved areas of the USA to enable full allocation of the reclaimed water supply and corresponding reduction in groundwater use for irrigation. 3. WATER SUPPLIES Potable Water Supply The USA is located predominantly within the Hillsborough River Groundwater Basin. The relatively small northern portion of the USA lies within the Withlacoochee River Groundwater Basin. The principal hydrogeologic units in these basins are the surficial, intermediate and Floridan aquifer system. The Upper Floridan aquifer is the principal storage and water conveying component of the basin hydrologic system and is the principal source of potable water for domestic, agricultural and industrial supplies for the City, Pasco County and most of west central Florida. The surficial aquifer, which occurs within sand overlying the Upper Floridan aquifer, is used primarily for lawn irrigation. Water demand and resource limitations in the Hillsborough River Groundwater Basin, particularly from major urban areas downstream, have prompted the SWFWMD to impose. pumping restrictions in this basin. SWFWMD regulates water withdrawals from the Floridan aquifer system via water use permits. A SWFWMD water use permit (WUP) specifies the maximum permitted pumping capacity for the permit holder. The City's WUP, approved on July 24, 2009, allows maximum water withdrawals of 2.9 MGD (average annual) and 3.75 MGD (peak monthly). Currently, the City's average annual withdrawal is 2.49 MGD, which leaves 0.41 MGD available for future growth in the City's service population. Reclaimed Water Supply The City's reclaimed water system has a production capacity of 4.5 MGD. Current production is 1.6 MGD (average). Only 35 percent of production is currently distributed. The City's goal is to expand reclaimed water distribution mains to unserved areas of the USA in order to utilize the entire supply of reclaimed water customers based water while reducing demand for potable water for irrigation. 4. WATER SUPPLY FACILITIES An inventory and analysis of water supply facilities is provided in this section. Facility deficiencies anticipated through the 2025 planning period will be addressed through rehabilitation/ replacement. Potable Water Facilities Water Wells City water wells are shown on Map LU-8 Future Service Area (see Comprehensive Plan Appendix D). The City Utilities Department operates and maintains a system of nine public supply water wells that pump groundwater from the Floridan Aquifer. Wells are interconnected by a grid of trunk lines allowing operation of any combination of wells to provide water service throughout the USA. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-4 OR BK 8894 PG 1616 11 of 26 City wells vary in depth from 146 feet to 960 feet (see well specifications in Table 7). Active and standby wells are equipped with pumps with a total rated capacity of approximately 12.384 MGD. Current permitted withdrawal rates are 2.9 MGD (average daily) and 3.750 MGD (maximum peak month). In accordance with the City's WUP, new wells #11 and #12 will be brought online in February 2013 and Well#10 will transition from active to standby status. Table 7 POTABLE WATER WELLS Zephyrhills Utility Service Area Bore Pump Max Peak Month Average Day Peak Month Well Hold Capacity Well Casing Withdrawal Withdrawal Withdrawal Status ID# Diameter (GPM)' Depth Depth (MGD) (MGD) (MGD) #1 12" 500 146' 55' 0.227 0.284 Active #2 12" 550 966' 125' 0.188 0.235 Active #3 16" 1,400 840' 125' 0.442 0.553 Active #4 16" 1,200 460' 125' 3.750 0.708 0.980 Active #5 16" 1,400 885' 125' (total) 0.516 0.616 Active #9 8" 250 450' 153' 0.066 0.132 Active #10 16" 500 300' 150' 0.708 0.980 Standby #11 16" 1,400 651' 140' 0.701 0.876 Active #12 12" 1,400 597' 143' 0.701 0.876 Active Source:SWFWMD Water Use Permit#20006040.007,2009,and city of Zephyrhills Utilities Department,2012. Water Treatment The City operates and maintains a water treatment plant at each water well site. These nine plants have combined rated capacity of 4.5 MGD. Water Storage The City maintains an elevated water storage tank on Dairy Road. The tank's maximum daily flow capacity is 0.75 MGD. The dual tank system allocates 0.25 million gallons for higher elevations • and 0.5 million gallons for lower elevations to provide stable water pressure and adequate fire flow throughout the USA. Water Distribution The interconnected water distribution system in the USA consists of water mains, fire hydrants, meters, valves, backflow prevention devices and miscellaneous appurtenances. The water distribution system consists of main loops that are 2-12 inches in diameter. Depending upon location and/or design circumstances, water mains are manufactured from a variety of materials including asbestos cement ductile iron, polyvinyl/chloride, high-density polyethylene (HDPE) and cast iron. Much of the approximately 348 miles of water pipes in the USA were installed in the 1920s. The average life span of water pipes is 50 years, after which pipes are prone to leaks and infiltration. A 2012 water rate increase will provide funding for water main replacements and coincident reductions in water loss over the planning period. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-5 OR BK 8894 PG 1517 12 of 26 Non-Potable Water Facilities Reclaimed Water The City's reclaimed water system was brought online in 1997 as a measure to reduce groundwater withdrawals for irrigation use. -A $19 million expansion of the City's wastewater treatment plant in 2009 increased the plant's reclaimed water production capacity to 4.5 MGD. The City produces an average of 1.6 MGD of reclaimed water, of which approximately 0.56 MGD (35%) is distributed to area schools, the municipal golf course and the 5th Street median for irrigation. The remaining 1.04 MGD of reclaimed water is pumped to RIBs to percolate into the groundwater. There are several reclaimed water projects listed in the City's CIP, including transmission lines for right-of-way landscaping irrigation (see Table 14). Expansion of the reclaimed system will target large-scale water users and proximate residential customers. Water Facility Condition The City's water supply facilities perform very well. No problems in maintaining performance are anticipated over the 2025 planning period. City water treatment plants have consistently operated in compliance with all criteria established by the U.S. Environmental Protection Agency and Florida Department of Environmental Protection for public water supply facilities. The water treatment plants are repaired and upgraded as needed to remain in good operating condition. Groundwater resources in the area are high quality, requiring only chlorination treatment to meet public water supply standards. The City plans and budgets for scheduled maintenance and replacement of water supply facilities, and recently instituted a water rate increase to ensure adequate funding to keep facilities in operational and in good repair. 5. LEVEL OF SERVICE ANALYSIS Tho City adoptod potable wator lovol of service standard is 126 gallons por day por capita. The potable water level of service standard adopted as part of the Comprehensive Plan serves two purposes: 1) to assess the adequacy of water supplies and supply facilities to serve new development (i.e., concurrency management) in the Zephyrhills incorporated area, and 2) to project needs for developing new water supplies and supply facilities (i.e., facility planning) in the USA. The City's adopted standard of 126 gallons per capita per day is a based on the total potable water use in the USA, including residential and non-residential consumption and water losses, distributed across the total USA population (estimated). Table 8 on page A-7 demonstrates the current availability of City water supply facilities and water supply to serve existing water customers and provide committed capacity to approved future dwelling units in the USA. The analysis indicates that City water supply facilities and the water supply are currently adequate to meet the demand of the current USA service population. However when the approved future dwelling units are factored in committed capacity, the City's permitted water supply of 2.9 MGD is exceeded by 0.682 MGD. It should be noted that decades could pass before the total amount of approved future dwelling units are built and populated. This • time provides opportunity for the City to expand the reach of its conservation programs and reclaimed water system to reduce/offset potable water demand and decrease per capita potable water consumption. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-6 OR BK 8894 PG 1518 13 of 26 Table 8 POTABLE WATER LEVEL OF SERVICE ANALYSIS, CITY OF ZEPHYRHILLS UTILITIES Zephyrhills Utility Service Area Potable Water Facilities Wells—Production Capacity 12.384 MGD Wells—Treatment Capacity[FDEP Rated] 4.5 MGD Storage Tank Capacity 0.75 MG Water Supply Maximum Daily Flow[per SWFWMD Water Use Permit] 2.9 MGD Water Demand Functional Population 19,174 Service Connections 12,455 Average Annual Daily Flow 2.49 MGD Available Capacity—Water Supply Used Reserved Wells-Committed Capacity[Existing+Approved Dwelling Units] 2.49 MGD 0.678 0.718 MGD 238-°10 %Committed Capacity[Used/Reserved Capacity_2.9 MGD1 85.86% 24.76% Total Committed Capacity[(Used+ Reserved Capacity)_2.9 MGD] 3.168 3.208 MGD %Total Committed Capacity 1.092% 1.106% Remaining Capacity (9268 0.308 MGD) • % Remaining Capacity L0 O0.106% 0.106%Z Available Capacity— Water Wells Treatment Capacity Used Reserved Water Supply—Committed Capacity[Existing+Approved Dwelling Units] 2.49 MGD 0.678 0.718 MGD 664&°l 18:-08-0 Committed Capacity[Used/Reserved Capacity_4.5 MGD1 55.33 % 15.96% Total Committed Capacity[(Used+Reserved Capacity)+4.5 MGD1 3.168 3.208 MGD %Total Committed Capacity 66.58°14 71.29% Remaining Capacity 0.682 1.292 MGD % Remaining Capacity 33.'12%28.71% Source: City of Zephyrhills Utilities Department,2012,Vrana Consulting, Inc.,2012. Table 9 on page A-8 demonstrates the adequacy of the City water supply to meet projected demand in the USA through the 2025, taking potential reclaimed water offsets into consideration. The literature on irrigation demands and offsets indicates that reclaimed water use for irrigation use can directly correlates to reductions in potable water use. Tho SWFWMD data indicates that roolaimed wator use offeots potable wator use at an avorage rate of 60 percent. This faotor is reflected in the UA demand for reolaimod water shown in Table 9. Contingent upon expansion of the City's reclaimed water distribution system to serve additional customers, there is potential for a 0.202 MGD potable water surplus in 2025. Without reclaimed water system expansion or other effective measures to reduce potable demand over the 2025 planning period, a deficit of 0.018 MGD is projected. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-7 • OR BK 8894 PG 1519 14 of 26 Table9 PROJECTED WATER DEMAND AND Q11PP1 V WITH RECLAIMED\A�_-_��_`-�ATER OFFSET �cv v c�.-- WATER——.......— AND SUPPLY. �. .......ter..... _____ Zephyrhille Utility Service Area Avorage Annual Dcmand Average Annual Supply(MGD) 'Potential _I _ . "A I,reri,ai�iv' I�tC�I :darea�� TAt ar t�etabl e Vie{ aF' ;Ground -; — � Ratable t 2942 2.190 9:64 343 2:9G 9:8G 4-6Q 989 4-:59 x.245 2045 2.539 8$3 3 298 90 295 8-OG 4.99 2028 2.793 4:46 &S5 2:9G 9:9G 289 988 5:79 4-35 2825 2.943 .44g 44$ 2:9G 9:88 3-69 . 9:8G &59 4 Notes: 0 • " induced demand),SWFWMD,2002 AI 2. Assumes continuation of 2.9 MGD pumping limit por SWRNMD Wator Uso Pormit(oxpires in 2019). 3. Assumos 0 of potablo wator uso is for irrigation and 100% distribution of roolaimod wator supply for argo and email area irrigation. Source: Vrana Consulting, inc.,2012. Table 9 PROJECTED WATER DEMAND AND SUPPLY WITH RECLAIMED WATER OFFSET Zephyrhills Utility Service Area Average Annual Average Annual Supply(MGD)'. 'Potential: _ Potentiah _ r °Demand(MGD) i Adjusted Potable! Year — !Potable' Non Potable' Potable ;Potable! Supply ---- Non — Demand a Potable'— -- -- j Total Z 'Alterna. Re' Surface! s Demand i ISurplus! Potable Ground ! - - -- Offset I ' Deficit Sf true, claimed Water,' (.._) 2012 2.490 0.64 3.13 2.90 0.00 1.60 0.00 -- -- -- 2015 2.539 0.83 3.37 2.90 0.00 2.08 0.00 0.190 2.349 0.551 2020 2.708 1.16 3.86 2.90 0.00 2.89 0.00 0.203 2.505. 0.395 2025 2.918 1.48 4.40 2.90 0.00 3.69 0.00 0.219 2.699 0.201 Notes: 1. Assumes 40% of reclaimed water supply does not offset potable water demand (induced demand). Source: SWFWMD.2002. 2. Assumes continuation of 2.9 MGD pumping limit per SWFWMD Water Use Permit(expires 2019)thru year 2025. 3. Assumes 10% of potable water demand is used for irrigation and 75% of reclaimed water supply is available to meet that irrigation need. 4. "Average Annual Demand-Potable"minus"Potential Potable Demand Offset". 5. "Average Annual Supply-Potable"minus"Potential Potable Demand Offset". Source: Vrana Consulting. Inc..2013. Table 10 demonstrates the availability of City water supply facilities to serve projected demand through the 2025 Work Plan period. basod on the projooted USA population and tho adopted potable water level of service standard. In 2025, there is potential for a potable water surplus of 0.201. MGD contingent on reclaimed water use at the levels indicated in the table. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-8 OR BK 8894 PG 1520 15 of 26 Table 10 WATER FACILITIES CAPACITY ANALYSIS Zephyrhills Utility Service Area 'Level of Service° Total FDEP Rated Used Remaining Standard.jPerCapita Potable Year Population Treatment Treatment Treatment Capacity Potable Water Water i_3 Capacity(MGD) Capacity(%) (MGD) Demand)i+GPD) Demand 201 19,174 129.861 2.49 4.5 55.33 2.01 201 20,152 126 2.62 4.5 58.22 1.88 202 21,496 126 2.79 4.5 62.00 1.71 202 23,158 126 2.92 4.5 64.84 1.58 Notes: 1. Actual per capita demand. Source: City of Zephyrhills Utilities Department and Vrana Consulting, Inc.2012. Concurrency Management System Development proposals are reviewed by the City Planning and Utilities departments in accordance with the Zephyrhills Concurrency Management System (CMS) requirements set forth in the Comprehensive Plan and Article V. Adequate Public Facilities in the Zephyrhills Land Development Code. Prior to the issuance of a level of service determination, it must be demonstrated that the adopted level of service standards will be met at the time of issuance of a final local development order (i.e., site plan approval, record plat approval and Development of Regional Impact Development Order) for a development. Final development orders are conditioned upon authorization and approval of necessary utility services by Zephyrhills Utilities Department Director. Accordingly, committed water quantities are tracked by the Zephyrhills Utilities Department. 6. IMPACTS ON NATURAL RESOURCES Based on the analysis presented in the City's 2007 application for WUP modification, proposed water supply projects in the USA are not anticipated to impact the surficial aquifer or on-site and off-site lakes and wetlands. Continued enforcement of the City's wellfield protection regulations will help ensure continued groundwater quality. Furthermore, City conservation programs and reclaimed water system expansions will reduce demand for groundwater resources. Wetland &Surficial Aquifer Impacts In the Zephyrhills area the surficial aquifer is moderately well connected to the Upper Floridan aquifer through a .leaky semi-confining unit. The result of this leaky confinement is that when pumping from the Upper Floridan aquifer system, water level drawdown can be transmitted from the deeper aquifers up to the surficial aquifer. Beginning in 2000 near the end of an extreme dry period, water levels were measured in the Upper Floridan Aquifer monitor well located at Zephyr Park.The measurements show water levels increasing approximately 20 feet from 2001 through 2004, followed by a decline of approximately 15 feet through the current dry period. Measurements from the surficial aquifer monitoring well at Zephyr Park began in 2002 near the end of an extreme dry period. These records show approximately 18 feet of water level rise from 2002 to 2004 followed by 18 feet of decline from 2004 through the current dry period. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-9 OR BK 8894 PG 1521 16 of 26 Lake and Wetland Impacts A long term simulation was performed using average irrigation quantities in proposed City wells. The simulation showed the maximum modeled long term (10 years) estimate of drawdown in the surficial aquifer system, at the site of the proposed wells, is approximately 0.5 feet. The estimated threshold for a median water level that would cause impacts to wetlands is approximately 0.8 feet (SWFWMD 1998). Long term average drawdown at Lake Pasadena and Clear Lake are less than 0.5 feet in the Upper Floridan and surficial aquifer systems. Because the lakes are currently fluctuating above their minimum levels and proposed wells;withdrawals would not cause the lake levels to violate their minimum levels, no lake impacts are expected from the proposed wells. Wellfield Protection The City, adheres to FDEP standards adopted for wellhead protection including restricting the type of development allowed in the vicinity of a wellhead and requiring a 500-foot protection zone around wellheads. Part 4.03., Zephyrhills Land Development Code, regulates hazardous material transport and storage, well construction, and related aspects of land use,and development in the vicinity of potable water supply wells to protect the City's existing and future potable water supply. The City restricts certain uses and materials within the Cone of Influence and Secondary Cone of Influence, the land area between a well and the 30-day travel time contour and the land area between the 30-day and 210-day travel time contour, respectively. The regulations also provide standards for hazardous materials containment, drainage facilities, monitoring, maintenance/ repair, security, emergency equipment and procedures and Wellfield Protection Permits. 7. CONSERVATION POLICIES, PROGRAMS & PRACTICES Over the 2025 planning period, the City will implement the water conservation polices, practices and programs described in this section. Comprehensive-Plan Policies Note:Proposed policy amendments are indicated in this section by ctrikothrough and underlining. Conservation Element • GOAL CON-2: To protect and conserve water resources which are vital to community sustainability. • OBJ CON-2-2: Protect, conserve, and appropriately use potable water sources in order to meet the needs of the existing and future population of the Zephyrhills Utility Service Area. • CON-2-2-1: The City shall protect and conserve the natural functions of existing lakes, floodplains and wetlands. • CON-2-2-2: Encourage water conservation through education, awareness and incentive, regulation and incentive programs oriented to residential and commercial water customers. Such programs may include: a. Rebates for installation of low-flow plumbing fixtures b. Water conservation information on the City's web site. c. Water conservation displays and printed information at community focal points(e.g., library, recreation centers, City Hall). d. Community awards or demonstration projects for water efficient CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-10 OR BK 8894 s 1522 17 of landscapes. e. Staff involvement in "Drop Savers" and "Project WET" programs conducted in public schools. f. Requirement for installation of soil moisture sensors, rainfall sensors or other water-saving irrigation technologies g. Requirement for installation of water efficient landscaping in new developments and redevelopment. h. Requirement for facilities that support stormwater reuse as a source for supplemental irrigation when feasible. • CON-2-2-3: Enforce provisions of the Southwest Florida Water Management District Water Shortage Plan, Chapter 40D-21, Florida Administrative Code. • CON-2-2-4: Investigate the feasibility of a wet-weather storage option as a water source to augment reclaimed water flows. • CON-2-2-5: Coordinate with the Southwest Florida Water, Management District, including consideration of the Regional Water Supply Plan, to ensure that water supplies are adequate to meet the City's current and projected potable water needs and to reduce dependence upon the Floridan aquifer to meet potable water demand. • CON-2-2-6: Implement traditional and alternative water supply projects and conservation and reuse programs deemed necessary to meet the water needs identified in the Zephyrhills Water Supply Facilities Work Plan (2996- 2025). • CON-2-3-1: Coordinate with the Southwest Florida Water Management District and Florida Department of Environmental Protection to develop a plan to improve the water quality of Lake Zephyr. At minimum, the plan should address consistent water elevations and improvements to the littoral zones of Zephyr Lake and the overall drainage basin. • GOAL CON-4: To maintain the high quality of groundwater resources in the Zephyrhills Utility Service Area. • OBJ CON-4-1: Monitor and protect ground water quality/quantity and location of development/appropriate uses in recharge areas. • CON-4-1-1: The Land Development Code shall restrict land uses known to adversely affect water quality and quantity of within natural groundwater recharge areas, wellhead protection areas and surface waters used as a source of public water. • CON-4-1-2: Develop a water protection ordinance that will provide the City with a mechanism to review and regulate large water consumers and/or businesses that resell water. Public Facilities Element • PUB-1-1-1: The City will continue to encourage use of the lowest quality water available and suitable to a given purpose. Programs shall be developed that provide for water reuse alternatives- in lieu of wastewater and stormwater disposal to surface water bodies. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-11 OR BK PG 52 8894 13 Th 18 of 26 • PUB-1-1-2: The City will implement construction codes which require state-of-the-art water conservation techniques for new construction. • PUB-1-1-3: The City will continue to enforce provisions of the Southwest Florida Water Management District Water Shortage Plan, Chapter 40D-21, Florida Administrative Code. • PUB-1-1-6: The City shall maintain the Ze ills a Water Supply Facilities Work Plan pursuant to Section 163.3177(6)(c), FS. The Work Plan shall incorporate traditional and alternative water supply projects and conservation and reuse programs deemed necessary to meet the City's water supply,needs over tho compreheneive a 10-year planning period, at minimum. • OBJ PUB-5-3: Reduce demand for .groundwater resources and the need for potable water system expansion by promoting and practicing water conservation and expanding access to alternative water supplies. • PUB-5-3-1: The City shall continue to expand the reclaimed water system to provide alternatives to groundwater withdrawals for irrigation and other nonpotable water uses and to reduce the need for wastewater and stormwater disposal to surface water bodies. • _PUB-5-3-2: The City shall prohibit use of potable water for irrigation in the Zephyrhills Future Service Area where reclaimed water is available. • PUB-5-3-3: The City shall develop partnerships with community groups, developers and agencies, such as the Southwest Florida Water Management District and University of Florida/IFAS (Florida Yards & Neighborhoods Program), to promote awareness of water conservation needs and practices, and distribute water conservation information in one or more of the following ways: website, newsletters, brochures, speakers bureau presentations and displays at community events. Future Land Use Element • LU-1-7-3: Consider in land use planning and regulation, the impact of land use on water quality and quantity; the availability of land, water and other natural resources to meet demands; and the potential for flooding. Land Development Code Provisions The Zephyrhills Land Development Code includes the following water conservation provisions: • Water Restrictions: The City requires compliance with Pasco County's water use rules which prohibit watering between the hours of 8:00 a.m. to 6:00 p.m. and no more than once a week. • High Efficiency The City requires compliance with the Florida Building Code standards Plumbing Fixtures for low volume fixtures in all new development. • Conservation Rate The City amended the tiered rate structure for potable water service in Structure: 2012 to account for maintenance needs and to incentivize water conservation. Rate structure information is available on the City's CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-12 OR BK 8894, PG 1524 19 of 26 website at: http://bit.ly/UYTbdl. • Reclaimed Water The City's reclaimed water program is promoted via distribution of Policies & informational materials to water customers. The reclaimed water Regulations: regulations include connection, interconnection and discharge restrictions, including requirement that new development install a reclaimed or other non-potable water distribution system. Reclaimed water customers are individually metered and charged a flat rate. The City requires new development to provide infrastructure to connect private wells to reclaimed water lines to supplement irrigation water. City Programs & Practices The City administers the following conservation-related programs and practices: • Ultra-Low Flow Toilet - Toilets manufactured after January 1, 1994, must use no more Rebate Program than 1.6 gallons per flush (Energy Policy Act of 1992) - Encourages City water customers to replace inefficient toilets • Water Use - Supply well pumpage (monthly) Accounting - Water entering distribution system (daily) - Connections served and meter installations(monthly) - Meter replacements(monthly) - Fire Department water use (daily records tabulated monthly) - Hydrant flushing (daily records tabulated monthly) - Water break repairs(daily records tabulated monthly) - Other water uses (e.g., street cleaning) • Leak Detection - Periodic leak detection program • - Monitoring of accounted for water - Billing software to reduce discrepancies in reported gallons billed versus gallons pumped - Meter replacement program for meters with unaccounted water loss • Education/Awareness - Promotion of water efficient landscape and irrigation practices through regulations and education Provide customers with indoor/outdoor water audit information In 2012, the City and Zephyrhills community members developed Sustainable Zephyrhills, A Community Action Plan to increase community awareness and action within seven sustainability focus areas. The plan can be viewed at http://bit.ly/12Gp3Za. The target of the Water Conservation and Protection focus area is to reduce daily per capita water use by five percent by 2015 and by 10 percent by 2018 through a multi-pronged water conservation campaign. To achieve this target, the City envisions a water conservation campaign modeled after a successful campaign implemented by the City of Cooper City, Florida. The Zephyrhills campaign would include the following four phases: • Phase 1: Partner with local businesses to sponsor a water-saving competition between neighborhood/homeowners associations. CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-13 OR BK 8894 PG 1525 20 of 26 • Phase 2: Perform indoor and outdoor water audits of the largest water users in the city, such as schools and large businesses. Based on the findings, suggest ways to reduce water use. • Phase 3: Expand upon the City's high-efficiency toilet rebate program to include other water- saving devices such as rain barrels and sensor irrigation systems. • Phase 4: Challenge everyone in the City to save six gallons of water each day through simple water-saving actions. Since the plan was approved in June 2012, the City has revised its tier water rate structure to increase overall water rates to serve fiscal and ecological sustainability purposes. The rates structure can be viewed at http://bit.ly/UYTbdl. Additionally, the City has begun reaching out to area schools to initiate a local Drop Savers Poster Contest. The contest is sponsored by the Florida Section of the American Water Works Association (http://bit.ly/UQsNm3). Water Conservation Program Performance Table 11 shows the cost e#eGtovonoec potential water savings and associated costs of various water conservation measures. If 100 of each measure were implemented in the USA, the estimated annual water savings would be 0.057 MGD or approximately 2.0 percent of the City's potable water supply. TableTr•• 1 PAST EFFECTIVENESS OF WATER CONSERVATION PROGRAMS gm ($11,000 Gallonc) Wator Efficient Clathec 1.n/aehor Rebates $3-3'I' Plumbing Rotrofit Kit Dicthbution $9.24 Ultra Low Flow Toilet(ULFTV)Robatoc $44g Inductrial Commercial Pro Rinco Spray Volvo Robatoc $944 $ 9B $439 Water Budgeting X69-99 Sourco:Southwoct Flotida Water Managomont Dictrict Rogional Wotor Supply Plan,2010. Table 11 POTENTIAL WATER SAVINGS FROM CONSERVATION PROGRAMS Savings` Estimated •Cost Per: Cost Per 100; Cost Per 1.000, Conservafiori Measure ;Rate Savin s for 100' Measure! ,Measures' Gallons' GPD' Measures MGR Clothes Washer Rebates 16.30 0.00163 $16,000 $2.31 Plumbing Retrofit Kits 12.0 0.0012 12 $1,200 $0.24 ULF Toilet Rebates 27.0 0.0027 $13,500 $1.18 Large Landscape&Irrigation 140.0 0.014 460 $46,000 $1.30 Suaeys Rain Sensor Rebates 100.0 0.010 80 $8,000 $0.51 Water Budgeting 78.0 0.0078 11 $1,100 $0.09 Pre-Rinse Spray Valves 200.0 0.020 $9,200 $1.30 CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-14 OR BK 8894 PG 1526 21 of 26 Industrial Commercial 2,308.0 Not Calculated $3,450 Not Not Calculated Institutional Facility Assessments - - Calculated Total 0.05733 $95,000 6.93 Source:Southwest Florida Water Management District Regional Water SuDDIV Plan,2010. 8. PLAN TO MEET WATER SUPPLY NEEDS The foregoing analysis indicates adequate water supplies in the USA through 2025, conditional on City implementation of robust conservation measures and programmed capital improvements projects to reduce water loss and expand reclaimed water distribution. Water Conservation Awareness, Encouragement& Regulation The City will continue to implement existing water conservation policies, regulations and programs identified above in Section 6. The City will seek funding (e.g. grants) and other support (e.g., partnerships) to implement additional water conservation measures, examples of which are listed in the following: Zephyrhills Land Development Code New Water Conservation Programs • Require installation of soil moisture • Promote low-impact development(LID) sensors, rainfall sensors or other water- techniques in developed areas(e.g., saving irrigation technologies rainwater capture for irrigation use and • Require installation of water-efficient groundwater recharge) landscaping for new developments/ • Develop partnerships to increase • redevelopment awareness of water conservation needs and practices • When feasible, require new development/ - SWFWMD redevelopment to install stormwater reuse - Pasco County UF/IFAS Extension facilities as a supplemental water source - Builder associations for landscape irrigation - Community groups • Require or provide incentives for low- • Distribute water conservation information impact development(LID)techniques for - City newsletter/website/brochures new development/.redevelopment - Community events • In coordination with SFWMD, explore the - Speakers bureau presentations feasibility of stormwater credits for on-site • Install educational, water conservation rainwater capture, use and recharge demonstration projects • Coordinate with area school for water- related educational programs (e.g., Drop Savers Poster contest and Project WET) Water Supply Facility Projects Planned and programmed water supply facility projects and conservation programs affecting the USA are shown in Table 12, which is a subset of the City's adopted five-year Capital Improvements Program (CIP), FY10/11-FY14/15, showing programmed water supply-related projects, estimated project costs and committed funding sources through FY14/15. Table 13 is a long-term schedule showing potential projects through the 2025 planning period and committed CIP projects. The table also shows the Zephyrhills/Dade City Water Interconnect CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-15 • OR BK 8894 PG 1527 22 of 26 project that will allow potable water to flow between the two municipal water systems if needed. Project funding will be predominately from a state grant with the balance funded by the City. Other viable long-term projects, including any othere may be identified later, will be considered for funding in conjunction with the City's annual budget and CIP process. SWFWMD Regional Water Supply Plan Projects The SWFWMD Regional Water Supply Plan recommends that the City consider implementing the following water supply projects. The City has considered the projects and will not be pursuing them at this time. • Zephyr Creek Stormwater.Detention & ASR/2 — Responsible entity: City of Zephyrhills; average annual yield: 0.2 MGD; intake capacity: 2.0 MGD; capital cost/MGD: $22,749,000; unit cost/1,000 gallons: $6.21; annual operation and maintenance: $73,000; distribution method: piped to reuse line for golf course irrigation • Reuse Expansion in Zephyrhills WWTP 2011-2030 — Responsible entity: City of Zephyrhills; supply: 2.0 MGD; potable water offset 1.5 MGD; capital cost: $11,534,000; cost/benefit: $1.56; operation and maintenance offset: $0.40 • Reclaimed Water Option #1 Plant City to Zephyrhills Interconnect 2011-2030 — Responsible entity: City of Zephyrhills; capital cost: $6,460,000; cost/MGD offset: $4,306,666; cost/1,000 gallons offset: $0.85; operation and maintenance/1,000 gallons offset: $0.40 This option would provide 2.0 MGD of reclaimed water from Plant City's advanced wastewater treatment facility to restore/create a wetland and offset 0.5 MGD of future withdrawals for agricultural, commercial, residential and recreational customers. The option would include design and construction of 48,000 feet of 12-inch transmission main, an automated pump station, a 2-million gallon storage tank and a man-made wetland. The City of Plant City's reclaimed water system would be interconnected with the City of Zephyrhills reuse system. Customers in and around the City of Zephyrhills would be served by the system. Coordination for Water Supply Planning & Project Development The City is a member of the East Pasco Water Coalition (EPWC), a working group of the four East Pasco municipalities—the City of Dade City, Town of St. Leo and Town of San Antonio. EPWC's mission is to address potable water, sewer and reclaimed water needs and opportunities in the region through "policy, programs, and pipes." Other EPWC participants include Pasco County(reclaimed water topics only), SWFWMD, landowners and other interested parties. Unlike other EPWC municipalities, Zephyrhills lies predominantly within the Hillsborough River Groundwater Basin, which is severely restricted for additional groundwater use. The EPWC is currently exploring multiple projects involving water distribution from less-strained water supplies in northeast Pasco to Zephyrhills. Preliminary project concepts include potable water interconnects between Dade City and Zephyrhills and between Pasco County and Zephyrhills. The feasibility of new water wells in northern portions of the Zephyrhills USA, north of the Hillsborough River Groundwater Basin, is also being explored. I . CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATER SUPPLY FACILITIES WORK PLAN PUB-A-16 Table 12 CIP POTABLE&RECLAIMED WATER SUPPLY PROJECTS City of Zephyrhills Five-Year Capital Improvements Plan (FY10/11-FY14/15) Cost by Fiscal Year $ Project Description FY1.0/11 FY11/12 FY12113 FY13/14 FY14/15 Total Revenue Source Potable Water Projects Well No.6, 7&8: Decommissioning&Plugging, 25,000 25,000 Utility Fund&Connection Fees SWFWMD Required Well No.'11: Hydro, Engineering& 80,000 80,000 Utility Fund &Connection Fees Permitting Well No. 11: Construction 500,000 500,000 Utility Fund&Connection Fees Well No. 12, Hydro, Engineering 80,000 80,000 Utility Fund &Connection Fees and Permitting Well No. 12: Construction 500,000 500,000 Utility Fund&Connection Fees 8"Water Main Extension (Pretty 25,000 25,000 Utility Fund&Connection Fees Pond to Forbes Rd): Engineeringg 12"Water Main Extension & Connecting New Wells(23rd.St to 10,000 10,000 Utility Fund&Connection Fees the Highlands): Engineering& Permitting Well Rehabilitation/Security Enhancement Program: Phase 1 500,000 500,000 Utility Fund&Connection Fees of 6 8"Water Main Extension(Pretty Pond Rd to Forbes Rd): 200,000 200,000 Utility Fund&Connection Fees oo Construction 12"Water Main Extension& Connecting New Wells(23w St to 100,000 100,000 Utility Fund&Connection Fees the Highlands): Construction wOD Well Rehabilitation/Security Enhancement Program: Phase 2 500,000 500,000 Utility Fund&Connection Fees of 6 ° � 8"Water Main Extension (Simmons Rd): Engineering& 16,000 16,000 Utility Fund&Connection Fees Permitting 8"Water Main Extension(Otis Allen to Forbes Rd): Engineering 35,000 35,000 Utility Fund&Connection Fees N &Permitting K) Well Rehabilitation/Security 500,000 500,000 Utility Fund&Connection Fees • CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATR SUPPLY FACILITIES WORK PLAN. PUB-A-17 Table 12 CIP POTABLE&RECLAIMED WATER SUPPLY PROJECTS City of Zephyrhills Five-Year Capital Improvements Plan(FYI 0/11-FY14/15) Cost by Fiscal.Year a Project Description FY10/11 FY11/12` FY12/13. FY13/14 FY14115 Total Revenue Source Enhancement Program: Phase 3 or6 8"Water Main Extension (20th St to Clay.St): Engineering& 10,000 10,000 Utility Fund&Connection Fees Permitting 8"Water Main Extension, 160,000 160,000 Utility Fund&Connection Fees Simmons Rd, Construction 8"Water Main Ext, Otis Allen to 350,000 350,000 Utility Fund&Connection Fees Forbes Rd, Construction hase 12"Water Main Extension (US 301 N to the Highlands): 60,000 60,000 Utility Fund&Connection Fees En ineerin ,&Permitting Well Rehabilitation/Security Enhancement Program: Phase 4 500,000 500,000 Utility Fund&Connection Fees or6 8"Water Main Extension (20th St 80,000 80,000 Utility Fund&Connection Fees to Cla St : Construction Meter Replacement Program 200,000 200,000 200,000 200,000 200,000 1,000,000 Utility Fund&Connection Fees Manual Reads to Radio Reads Inventory 130,000 130,000 130,000 130,000 130,000 650,000 Utility Fund&Connection_ Fees Total 1,410000 865,000 1,146,000 1,035,000 1,320,000 5,776,000 "' Sanitary Sewer Projects 12" Reclaimed Water Main Extension (17th St to Zephyr Park 30,000 30,000 Utility Fund&Connection Fees along South Ave): Engineering&, �00 Permitting 00 8"Gravity Sewer Line Extension (Court St/Waverly Ave): 20,000 20,000 Utility Fund&Connection Fees Engineering&Permitting Lift Station No. 5 Replacement c (12th Ave&4th St): Property 100,000 fl 100,000 Utility-Fund&Connection Fees Acquisition 8"Reclaimed Water Main N Extension(12th St along Henry Dr 30,000 30,000 Utility Fund&Connection Fees to Woodlawn Elementa /Police CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATR SUPPLY FACILITIES WORK PLAN PUB-A-18 Table 12 CIP POTABLE&RECLAIMED WATER SUPPLY PROJECTS City of Zephyrhills Five-Year Capital Improvements Plan(FYI 0/11-FY14/15) Cost by Fiscal Year($) Project Description FY10/11 FYII/12 FY12/13 FY13114 FY14/15 Total Revenue Source Station): Engineering &Permitting 8"Reclaimed Water Main Extension (17th St to Veteran's 20,000 20,000 Utility Fund &Connection Fees Park): Engineering &Permitting 12"Reclaimed Water Main Extension (17th St to Zephyr Park 120,000 120,000 Utility Fund &Connection Fees along South Aye): Construction 8"Gravity Sewer Line Extension (Court St/Waverly Ave): 140,000 140,000 Utility Fund &Connection Fees Construction Lift Station No. 5 Replacement (12th Ave&4th St): Engineering & 50,000 50,000 Utility Fund &Connection Fees Permitting 12"Reclaimed Water Main Extension (South Ave N tol6th Ave along 6th St, including spurs 60,000 60,000 Utility Fund &Connection Fees to City Cemetery and West Elementary): Engineering& Permitting 8" Reclaimed Water Main Extension (12th St along Henry 250,000 250,000 Utility Fund &Connection Fees Drive to Woodlawn Elementary/ Police Station): Construction 8" Reclaimed Water Main Extension (17th St to Veteran's 100,000 100,000 Utility Fund &Connection Fees �00 Park): Construction Lift Station No. 5 Replacement, 500,000 500,000 Utility Fund &Connection Fees o 12th Ave&4th St): Construction 8"Reclaimed Water Main Extension (7th Ave along 7th St to CD M North Ave): Engineering& 30,000 30,000 Utility Fund &Connection Fees Permitting 12" Reclaimed Water Main Extension (South Ave N to 16th 250,000 250,000 Utility Fund &Connection Fees Ave along 6th St) including Spurs CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATR SUPPLY FACILITIES WORK PLAN PUB-A-19 Table 12 CIP POTABLE&RECLAIMED WATER SUPPLY PROJECTS City of Zephyrhills Five-Year Capital Improvements Plan (FYI 0/11-FYI4/15) Cost by Fiscal Year $ Project Description FY10/11 FY11/12 FY12113 FY13/14 FY14/15 Total Revenue Source to City Cemetery and West Elementary: Construction 8"Reclaimed Water Main Extension(West Elementary to T the YMCA, including 60,000 60,000 Utility Fund&Connection Fees Wedgewood): Engineering& Permitting 8"Reclaimed Water Main Extension (7th Ave along 7th St to 250,000 250,000 Utility Fund&Connection Fees North Ave): Engineering& Permitting Lift Station Rehabilitation Projects 300,000 300,000 300,000 300,000 300,000 1,500,000 Utility Fund&Connection Fees (3 Lift Stations Per Year) Inventory 50,000 50,000 50,000 50,000 50,000 250,000 Utility Fund&Connection Fees WWTP Rehabilitation of No. 1 & 30,000 30,000 No. 2 Effluent Pumps: Design WWTP Rapid Infiltration Basins: 150,000 150,000 Engineering &Permitting WWTP Misc.Valve Replacement 33,000 33,000 Project: Engineering 0 WWTP Rapid Infiltration Basins: 3,500,000 3,500,000 Construction w WWTP Rehabilitation of No. 1 & No. 2 Effluent Pumps: 130,000 130,000 Noo Construction 01D WWTP Misc.Valve Replacement 330,000 330,000 Project: Construction %,� WWTP Inventory 50,000 50,000 50,000 50,000 50,000 250,000 Total 763,000 4,720,000 1,310,000 680,000 710,000 8,183,000 -U w 1-i CITY OF ZEPHYRHILLS COMPREHENSIVE PLAN-WATR SUPPLY FACILITIES WORK PLAN PUB-A-20