Laserfiche WebLink
d � . <br /> ,�i�v�r C)�s ��age <br />� .f�-c�te�tu�-a1l�evie� �ornnr�ittee <br /> �iirlor Project� <br /> All construction, alterations, additions, replacements, reconstruction or attachments of any nature <br /> inciuding structural, landsca�ing, or other including, but not limited to exterior home color changes <br />'�, and fencing must have written approvaf from the Architectural Review Committee (ARC) rip or to <br />� commencement. This is a recorded deed restrictian. <br /> i <br /> The following form must be submitted to the ARC Committee at Silver Oaks Village Owner's Assoc., <br /> Qualified Property Management, Attention: Jim Staub, Property Manager, 5901 U.S., 19, Suite 7Q, <br /> New Port Richey, FI 34652 or emai!iames qualifiedproper�y.com along with any other required <br /> documentation. You wili be contacted within 20 days from submission of all required <br /> documentation. — <br /> Ovuner's Name �� �1`� ��� �;+��i��-+�, Submittal Date �'��-� � <br /> J <br /> r ;� � <br /> Address � i`( � �J1 r �l�•�t�,�i'� hv� <br /> J <br /> Phone# � � ���� 1 � �( � �� E-mail ,.,�.11�� �;n�;��u r�:1��,���c c�.��� <br /> � <br /> �� <br /> Nature of Work Proposed �r�;�-�, � I - �-�„�� U�^ ��_��;�. =,r"�:� �-��' ��.��ti-<<- <br /> Materials used in Proposed Project <br /> Please submit the following (if applicable) <br /> __Site planlbuilding plan (should be detailed showing lot lines, setbacks, driveways, sidewalks <br /> and permits(City of Zephyrhills) if applicable. <br /> Approved exterior colors—Go to Sherwin Williams on Eiland Blvd, for approved color <br /> samples for Silver Oaks Village. Indicate Sherwin Williams#'s. <br /> Body SW# Trim W# Accent_SW# <br /> Front doar SW# Garage door SW# Shutters SW# <br /> Roofing material (or brochure} DecklRoof material (or brochure) <br /> Material samples Landscaping layout <br /> ,� Fence material (or brochure)— Requires Pictures of existing conditions <br /> City of Zephyrhills permit <br /> I agree that I witl nat begin property improvements until the Architectural Committee notifies me in <br /> writing of their approval. If any change is made to the project that has not been 3pproved, the <br /> Committee has the right to demand the removal of that unapprowed portion of the project from my <br /> property, or the return of the property to its previous state. <br /> � <br /> .� �!�>� �- ��-��-� �- <br /> Property 0 'er Signature Date <br />