Laserfiche WebLink
2015-()4-29 13:17 isoprt 75 8138389008 » P 6t4 <br /> existing laminate floor. <br /> C Watl Tile <br /> r <br /> Nc�tes; Shower walls anly. <br /> � Millwork <br /> R1c�tes: R&R existing drywall. Patch cQiling where knock-down <br /> will be needed after wall removal. <br /> � Paint <br /> Notes: Poss(bly. <br /> � Lighting <br /> Notes: Vanity lights being repfaced. <br /> C Plumbing <br /> Notas: R&R with va(v� replacement at shower. New location of <br /> #oilet with 31f af ex9t(ine needed ta be added under this <br /> r"` modular hame(skErted access). Moving shower drain a <br /> few inches to accammodate a nea-angle shower vs.the <br /> existing rectangular:Adding a new drain for a new jetted <br /> whiripoal tub with heater. Moving two sinks to <br /> accommodate one douhle vanity and counter. <br /> C_ Window Treatrnents <br /> NotE,s: NA <br /> � EJectrical <br /> NotE:s; G�I moving.Adding power for t�ew Whirlpool tub. <br /> � Other <br /> Notes: <br /> � <br /> Aage 2 of 9 � <br />