My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15083
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 1:02:25 PM
Creation date
3/3/2016 1:02:24 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
14-15083
Building Department - Name
KENNEDY,DAVID E & MARGARET E
Address
3504 MALACHITE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ���..+� <br /> , <br /> Procedure for �.ot Improvement Requests <br /> {Please refer t "Rules and Regulations') <br /> 1. All requests are to go to Chairman of the Property Evaluation Con�mittee, for the committee <br /> ta review. T�l�t'6 iS��ltD�dCP 1$�#�lC� "Froxrertv Evalttativn & Iranrvvemertts"in #he librarv <br /> for Z,ot ownets xo.ola►ce their aom�e,d(;�orm�in and thcse for.�n�will be�icic,ed uu fr.am <br /> t3�e Librrnrrv hv�e F�erlv Eva���tion I commi�t#ee. <br /> 2. Any req�est which is NQT filled out p operly or in detail, which includes, cornplete plan <br /> layout,elevations (where applicable}, wri en details of unprovement being rec�uested, incituding <br /> color, etc,and any other informativn pertu�ent ta the grocessing of#he request,r�ili be�ned <br /> to the La�ow�,fer coai�►2�a befluce b+�m�reviewed bv the Cam�mittee. , <br /> 3. Committee will review requests and visit the site of the request as necessRry. <br /> 4. After the Committee has approved or d nied the request, it wilt be presentec3 to the Board of <br /> Directors for th�ir�gpraval or denial. <br /> i 5. T'here wiil be Nd? mare one day approvals or lasi minute approvals. Request will Cake 7- I4 <br /> C�c1}rS�4S S�?I'O�TZIA�C i'BYIeW�Tit� CtTI1Si{��I8.ti0I2, thus giving the Committee and Board members <br /> time to review and consider the request in a thorough manner. <br /> 6. The original request will be stamped approved ar denied, and after being copied the origina3 <br /> �ill go into to the members file az�d the cop returned to the Lat awner by the Baard of Director <br /> liaison tv the committee. <br /> 7. The cammittee will follow up on reques s ta determine that the request as presented and <br /> aFproved is being adhered to. <br /> As the owner of Lot#_ f�4� , I uz�derstand ttze Property Evaluation Committee andior the <br /> Boazd of Directors will enter the property to�ollow the external prc�gress vf the cons�cvctian or <br /> improvement,as submitted on the Lot Impro) ernent Request. <br /> � �.e� � ' �. :.�'-��.� ����. <br /> Lot Owner's Si � � Da#e � <br /> 4/03/06 <br /> , <br /> �.�'� ��� f� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.