Laserfiche WebLink
�il��r ��������� , ��� �.� <br /> � � <br /> -� -� 15911 11.5. 301, D�de City, FL 33523 ,���' �� � 5tate Cert Rnafer#CCC1329�92 � <br /> Ph: 8�R/5�2-2393 Fax: 35ZI5�7-445� � � � � ftCl(2eg Rnof Cnnsultant #p149 �' <br /> m�16arC��arthlink.��t .� L �`����- '�� `�` <br /> a,r,°`''o�' `� � `� (� � �� I <br /> � p � ��QF ��������.,�aae 1 of 2 l� �� <br /> v � <br /> DATE: 06/05115 � � rfi �� <br /> � <br /> l� <br /> TO� MANN, MICHAEL PH. 813l763-1122 <br /> =� {�:...{aiamann�a.vahoo.cam <br /> Jt3B: SINGLE FAMI�Y RESIDENCE flNLY <br /> 39214 PARK DRIVE <br /> ZEPHYRHILLS, FL 33542 <br /> ________________________-----------_______-----------_.__-----------------------=----------------_ <br /> ---------------------------------------------------------------------------------------------- <br /> SHIN�LE F�E-���(F <br /> 1 Tear oif and haul away existing one-layer shingle roofing system <br /> 2. Re-fasten the existing plywood roof deck in accordance with the Flarida Building Gocles. <br /> 3. Provide and install iwo layers af new Type I (ASTM D-226) saturated felt paper(ASTM D-226) secondary water <br /> barrier in accarcfance with the Flarida Building Cades. <br /> 4. Provide and install new algae-resistant fiberglass shingies, avuner to choose shingle color from manufacturer's <br /> standard colors Provide manufacturer's limited shingle warranty Please see options an page 2. <br /> 5 Replace all valley t7ashing and re-flash roof penetrations. <br /> 6. Provide and instaiE new lead baots for the pfumE�ing vents <br /> Re-use the existing 4"gas stove pipe. <br /> 7. Pravide and insta(i new pre-finished"white"aluminum eavedrip <br /> 8. RepairlReplacement af any rotten or damaged woad {deck, fdscia, firim, framing, etc.} will be cornpleted an a cost- <br /> plus basis above and beyond the contract price ($55.50 per 4'x8'x1/2"sheet of CDX plywood replaced, labor&materials). <br /> 9 MilBar Roofing, Inc. to provide a 5-year workmanship warranty to the original purchaser that cavers shingle roof <br /> leaks; exclusions, storm damage, wark done or damage by others, tree damage, and/or structural damage to roof <br /> deck. <br /> 10. Owner ta� provide access to roaf far deEivery truck for loading/unloading of raofing materials, access to electricity <br /> 11. MilBar Roofing, lnc. to peovide General Liability and Worker's Compensation lnsurance ($2,OOQ,OOO limit)and re- <br /> roofing permit. <br /> --------------------------------------------------------------------------------------------- <br /> -------------------------------------------------___------------------------------___---------- <br /> We propose to furnish material and labor,camplete in accardance with above specifications,for the Cantract Sum af: <br /> As stated in Options on Page 2. <br /> Payment ko be made as follows: Due Upon Completion. <br />