My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16414
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 2:10:44 PM
Creation date
3/3/2016 2:10:43 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR HEIGHTS
Building Department - Doc Type
Permit
Permit #
15-16414
Building Department - Name
MANN,MCIHAEL
Address
39214 PARK DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��il�a� Ra����a�, Inc. <br /> ' 15911 LI.S. 3U1, Dade City, FL 335Z3 State Cert Roofer#CCC13Z9�9Z <br /> Ph: S0�/562-Z393 Fax: 352/567-4�+54 , R��Re9 Roof�ons��ta�t #ot4s <br /> milbarCearthlink.n�t <br /> ���F P�������., paqe 1 of 2 <br /> DATE. 06/05/15 <br /> TO: MANN, MICHAEL PH 813/763-1122 <br /> fi,,.��:,_.,i�;iG�nann(c�yahoo.com <br /> JOB� OUT BUILDING (approx 15'x 16') <br /> 39214 PARK DRIVE <br /> ZEPHYRHILLS, FL 33542 <br /> SFYIfVGLE I��-i���i� <br /> 1 Tear off and haul away existing one-layer shingle roofing system <br /> 2. Provide and install two layers of new Type I (ASTM D-226) saturated felt paper(ASTM D-226) secondary water <br /> barrier in accordance with the Florida Building Codes. <br /> 3 Provide and install new algae-resistant fiberglass shingles; Owner to choose shingle color from manufacturer's <br /> standard colors. Provide manufacturer's limited'shingle warranty. Please see options on page 2. <br /> 4. Replace all valley flashing and re-flash roof penetrations. <br /> 5. Provide and install new lead boots for the plumbing vents. <br /> Re-use the existing 4" gas stove pipe. <br /> 6. Provide and install new pre-finished "white" aluminum eavedrip <br /> 7. Repair/Replacement of any rotten or damaged wood (deck, fascia, trim, framing, etc.) will be completed on a cost- <br /> plus basis above and beyond the contract price ($55.50 per 4'x8'x1/2"sheet of CDX plywood replaced, labor&materials) <br /> 8. MilBar Roofing, Inc. to provide a 5-year workmanship warranty to the original purchaser that covers shingle roof <br /> leaks; exclusions. storm damage, work done or damage by others, tree damage, and/or structural damage to roof <br /> deck. <br /> 9 Owner to� provide access to roof for delivery truck for loading/unloading of roofing materials, access to electricity. <br /> 10 MilBar Roofing, Inc. to provide General Liability and Worker's Compensation Insurance ($2,000,000 limit) and re- <br /> roofing permit. <br /> We propose to furnish material and labor,complete in accordance with above specifications,for the Contract Sum of: <br /> As stated in Options on Page 2. <br /> Payment to be made as follows: Due Upon Completion. <br /> �il�ar �a��inp. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.