My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16497
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 9:38:08 AM
Creation date
3/7/2016 9:38:08 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
15-16497
Building Department - Name
NHC-FL115 LLC (3843) QUAKER ST
Address
3843 QUAKER RIDGE ST LOT 62
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> page 1 <br /> � • OLIVER TECHNOLOGIES,INC. revision 6l07 <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> MODEL 1101 "V"SERIES ALI�STEEL FOUNDATION SYSTEM <br /> MODEL 11b1"V"(STEPS 1-15) <br /> � LONGITUDINAL dNLY.•FOLLOW STEPS 1-9 <br /> FOR ADD/NG LATE AL ARM:Follow Steps l0-15 <br /> FOR CONCRETE APP ICATIONS:Fo(!ow Steps 1&19 <br /> ENGINEERS STAMP ENGINEERS STAMP <br /> 1. SPECIAL CIRCUMSTANCES: If the following conditions occur-STOP! Contact Oliver Technologies at 9-800-284-7437: <br /> a) Pier height exceeds 48" b) Length of home exceeds�6'c) Roof eaves exceed 16"d)Sidewali height exceed 96" <br /> e) Location is within 1500 feet of coast <br /> INSTALLATION OF GROUND PAN <br /> 2. Remove weeds and debris in an approximate two foot squa�re to expose firm soil for each ground pan (C) . <br /> 3. Place ground pan (C)directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. <br /> SPECIAL NOTE:The longitudinal"V"brace system serves�s a pier under the home and should be loaded as any <br /> other pier. It is recommended that after leveling piers, and one-third inch (1/3")before home is lowered completely on <br /> to piers, complete steps 4 through 9 below then remove jacl�s. <br /> INSTi4LLATION OF LONGITUDINAL"V"BRACE SYSTEM <br /> NOTE: WHEN INSTALLING THE LOPIGITUDINAL SYSTEM ONLY, �►MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SOIL TEST <br /> PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION.IF PROBE TEST READINGS ARE BETWEEN <br /> 175 8�275 A 5 FOOT ANCHOR MUST BE USED.IF PROBE TEST R�ADINGS ARE BETWEEN 276&350 A 4 FOOT ANCHOR MAY BE USED.USE <br /> GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4".VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED <br /> WITH VERTICAL TIE CONNECTIOPI POINTS(PER FLORIQA REG�). <br /> 4.Select the correct square tube brace(E)length for set-up�pier) height at support location. (The 18"tube is always <br /> used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degree angle is maintained. <br /> PIER HEIGHT 1.25"ADJUSTABL 1.50"ADJUSTABLE <br /> (Approx.45 degrees Max.) Tube Length Tube Length <br /> .:�7;374".:to,25" =-:::;�.__;=` - - _ _- 22,��.�'.,-;:.:";_.;�, -..._-=`:-t�-�-:�=-.� ,=_' -_ - -=-18„ _-- _ = <br /> • ,_ . _ .:. . _� =- - -} -' - - - - <br /> 24 3/4"to 32 1/4" �.= 32 I � 1 g ` <br /> - -- � _. - <br /> _:.. � „ - '� -44„ : .-; _ . <br /> -.;..33=to�41 °::..:.�:_.�:;'.<-::�-'" -' ._�- _.=-:- - - -�'--'-�___ -_ _ _-_ _ _ -=-- -- _ �18"- -;-,.;=-_:•.<_:. <br /> 40"to 48" 54�� I = - - - 18� <br /> 5. Install (2)of the 1.50"square tubes(E {18"tube})into thl"U°bracket(J), insert carriage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place I-beam connector(F)loosely on the bottom flange f the I-beam. <br /> 7. Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely with bolt and nut. <br /> 8_ Repeat steps 6 through 7 to create the"V" pattern of the quare tubes loosely in place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.After all bolts are tightened,secure 1.25"and 1.50"tubes i sing four(4) 1/4"-14 x 3/4"self-tapping screws in pre-drilled holes. <br /> INSTALLATION OF LATERAL TELESGOPING TRANSVERSE ARM SYSTEM <br /> THE MODEL 1101 "V"(LONGITUDINAL 8�LATERAL PROTECTIO )ELIMINATES THE NEED FOR MOST STABILIZER PLATES 8�FRAME TIES. <br /> NOTE:THE USE OF THIS SYSTE REQUIRES VERTICAL TIES SPACED AT 5'4". <br /> FOUR FOOT(4')GROUND ANCHOR MAY BE USED IXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. <br /> 10. Install remaining vertical tie-down straps and 4'ground anlchors per home manufacturer's instructions. nlo7e: Centerline <br /> a�chors to be sized according to soil torque condition.An� manufacturer's specifications for sidewall anchor loads in excess of <br /> 4,000 Ibs. require a 5'anchor per Florida Code. <br /> 11. No7'e:Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location.This frame tie& <br /> stabilizer plate needs to be located within 18"from of ce �ter ground pan. <br /> 12. Select the correct square tube brace(H)length for set-up�lateral transverse at support loca6on.The lengths come in either 60" <br /> or 72"lengths. (With the 1.50"tube as the bottom tube, a��d the 1.25"tube as the inserted tube.) <br /> 13. Install the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. <br /> 14. Slide 1.25"transverse brace into the 1.50°brace and attach to adjacent I-beam connector( I )with bolt and nut. <br /> 15. Secure 1_50"transverse arm to 1.25"transverse arm usir�q four(4) 1/4"- 14 x 3/4"self-tappin4 screws in ore-drilled holes <br /> • � { OLIVER TECHNOLOGIES, INC. Telephone:931-796-4555 <br /> 1-800-2847437 Fax:931-796-8811 <br /> www.olivertech nolegies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.