Laserfiche WebLink
Aziz Consfruction Co.,Inc. Printed 5/8/2015 <br /> PO Box 1439 <br /> Lutz,FL 33548,1439 <br /> . <br /> Project: Zephyrhills Fire Dept.-Station 2 pate: 518/2015 <br /> Address: 36410 6th Ave. <br /> City/$UZip: Zephyrhilis,FL 33542 <br /> Total Estimated Job Price 39,695.09 <br /> Total ofAllowance Items 5,592.00 <br /> Total Job Cost Less Allowance 34,103.09 <br /> Allowance Overhead Percentage 8.OD% Added to Actual Allowance Cost <br /> _ Allowance Profit Percentage 8.DD% Added to Actual Allowance Cost <br /> SCOPE OF WORK: <br /> Allowance Total <br /> No. Allow Room Description of Work QTY U/M Per Item Allowance <br /> ELECTRIC <br /> 13 [113]-Radio Room Cubicle power connected to wall recep. 1 EA <br /> 17 [119J-New Bathroom Install EMT/box for fire alarm wire 80"AFF 1 EA <br /> 18 [119]-New Bathroom New GFCI for remodeled bathrooms 2 EA <br /> 19 [119]-New Bathroom Relocate power for exhaust fan in remodel 2 EA <br /> 20 [119J-New Bathroom New Lighting for remodeled bathrooms 2 EA <br /> 23 [122]-New Bunk Rooms install EMTlbox for fire alarm wire 80"AFF 1 EA <br /> 26 [122]-New Bunk Rooms Install switch for existing ceiling lighting 2 EA <br /> 27 (122j-New Bunk Rooms Instali GP receptacle 2 EA <br /> 28 [122]-New Bunk Rooms Relocate lay-in to fit in new hall 1 EA <br /> 44 [127j-Generator Room Wire SCBA compressor to existing disconnect 1 EA <br /> 49 ELECTRIC SUB-CONTRACT LS <br /> PLUMBING <br /> 3 [112A]-Officers Bathroom Remove and repiace shower head to 84"AFF 1 EA <br /> 3 [112A]-Officers Bathroom Remove and replace toilet with comfort height 1 EA <br /> 7 [119]-New Bathroom Sewer rough-in for new layout/remove existing 1 EA <br /> 8 [119]-New Bathroom Water rough-in for new layout/remove existing 1 EA <br /> 9 [119�-New Bathroom Instali shower.pan and rough-in valve 2 EA <br /> 10 [119J-New Bathroom Install shower fim and head 2 -EA <br /> 11 [119]-New Bathroom Install new lavatory and faucet 1 EA <br /> 12 [119]-New Bathroom Instaii new comfort height elongated toilet 2 EA <br /> 13 [121]-K(tchen Install Ice maker line for Refrigerator 3 EA <br /> 17 PLUMBING SUB-CONTRACT <br /> HVAC <br /> 4 [119]-New Bathroom New exhaust fan 50 CFM tie in to existing pipe 2 EA <br /> 5 [122]-New Bunk Rooms Relocate existing supply/return to fit room 2 EA <br /> 9 HVAC SUB-CONTRACT LS <br /> N's <br /> Disclaimer:This Confidential Cost Estimate is intended solely for intemal budgetary purposes. 1 of 3 <br />