Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" � <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. - <br /> UNLICENSED CONTRACTORS AND CONTR�►CTOR RESPONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions of the "contractor Block° of this application for wrhich they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TFZA(dSPORTATION IMPACT/UTILITIES III�P�ICT AND RESOURCE REC�VERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of <br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact <br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I <br /> certify that I, the applicant, have been provided with a copy of the °Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner" prior to commencement. <br /> CONTFtACTOR'SIOWIVER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work <br /> will�be done in compliance with all applicable laws regulating construction, zoning and land development. Application is <br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and that all work will be pertormed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also <br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands, Water/Wastewater Treatment. <br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. ,� <br /> - Department of Health $ Rehabilitative Services/Environmental Flealth Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. ._ <br /> - US Envi�onmental Protection Agency-Asbestos abatement. � <br /> - Fede�al Aviation Authority-Runways. � <br /> I understand that the following restrictions apply to the use of fill:� <br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. <br /> - If the fill material is to be used in Flood Zone °A", it is understood that a drainage plan addressing a <br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br /> construction, I certify that fill will be used only to fill the area within the stem wall. <br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application, for Iots less than one (1) <br /> acre which are elevated by fill, an engineered drainage plan is required. <br /> If I am the AGENl' FOR THE OIRIfVER, I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed with the work and not as authority to.violate, cancel, alter, or <br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Buildirig Official from thereafter <br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid <br /> unless the work authorized by such permit is commenced within six months of.permit issuance, or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension <br /> may be requested, in wr' ing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate <br /> justifiable cause for th xtension. If work ceases for ninety(90)consecutive days, th\job is considered abandoned. <br /> WI4RNING TO O _ R:__ OU AILURE TO RECORD A NOTICE OF COM ENGEMEN_T__MI�Y_RESUL�T It�YO114�---- <br /> PAYING I O IMP flflENTS TO YOUR F'ROPEIZTY. IF YOU I E D TO OBTAIN FIN�►NC G, CONSULY <br /> iNITH YO R E A► A7YOFZNEY BEFORE RECORDING YOU O IC O COMWIE ENT. <br /> FLORIDA RA (F .0 ) <br /> OWNER CONTRACTOR <br /> Subscrib d o(or a d)before me this Subscrlbed and sw before me this <br /> Who islare personally known to me or has/have produced Who Is/ar son to m has/have produced <br /> as IdentlficaUon. as identification. <br /> �� Notary Public /.�?(�C� Notary Public <br /> ��Y•°,�" JAC <br /> C m ssi Commiss o o. :��� Y�'-- Q� <br /> ,•�: � r FF 150422 = . :k, ommission#FF 150422 <br /> va�• _,. <br /> �;; Commission# 2018 ;; ,p�,: Expires Dece <br /> Name of N ' edce800.305d019 Name of Notary " �� e ° Pd���ITIFp�Insurence800.3g5.70f9 <br /> ��F F o,,�P Bon ed h�Q� �' � <br /> P <br />