NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" �
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions. -
<br /> UNLICENSED CONTRACTORS AND CONTR�►CTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block° of this application for wrhich they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TFZA(dSPORTATION IMPACT/UTILITIES III�P�ICT AND RESOURCE REC�VERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is$2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the °Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner" prior to commencement.
<br /> CONTFtACTOR'SIOWIVER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br /> will�be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be pertormed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. ,�
<br /> - Department of Health $ Rehabilitative Services/Environmental Flealth Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks. ._
<br /> - US Envi�onmental Protection Agency-Asbestos abatement. �
<br /> - Fede�al Aviation Authority-Runways. �
<br /> I understand that the following restrictions apply to the use of fill:�
<br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone °A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for Iots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required.
<br /> If I am the AGENl' FOR THE OIRIfVER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to.violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Buildirig Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of.permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension
<br /> may be requested, in wr' ing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for th xtension. If work ceases for ninety(90)consecutive days, th\job is considered abandoned.
<br /> WI4RNING TO O _ R:__ OU AILURE TO RECORD A NOTICE OF COM ENGEMEN_T__MI�Y_RESUL�T It�YO114�----
<br /> PAYING I O IMP flflENTS TO YOUR F'ROPEIZTY. IF YOU I E D TO OBTAIN FIN�►NC G, CONSULY
<br /> iNITH YO R E A► A7YOFZNEY BEFORE RECORDING YOU O IC O COMWIE ENT.
<br /> FLORIDA RA (F .0 )
<br /> OWNER CONTRACTOR
<br /> Subscrib d o(or a d)before me this Subscrlbed and sw before me this
<br /> Who islare personally known to me or has/have produced Who Is/ar son to m has/have produced
<br /> as IdentlficaUon. as identification.
<br /> �� Notary Public /.�?(�C� Notary Public
<br /> ��Y•°,�" JAC
<br /> C m ssi Commiss o o. :��� Y�'-- Q�
<br /> ,•�: � r FF 150422 = . :k, ommission#FF 150422
<br /> va�• _,.
<br /> �;; Commission# 2018 ;; ,p�,: Expires Dece
<br /> Name of N ' edce800.305d019 Name of Notary " �� e ° Pd���ITIFp�Insurence800.3g5.70f9
<br /> ��F F o,,�P Bon ed h�Q� �' �
<br /> P
<br />
|