Laserfiche WebLink
���i��ar ������ Inca . -� <br /> � � ��� <br /> 15911 11.5. 3�1, 'Dade Ci�►, FL 33523 • State Cert Raufer#CCC1329�92 <br /> Ph:�00/562-2393 Fax: 352/567-4454 RCI Reg Ronf Cnnsultant #0149 <br /> milbarC�earthlink.rr�� <br /> ROOF PROI�OS�L, paae 1 of 2 <br /> DATE: 01/21/15 <br /> TO: WALTERS, AVELINA G PH: 813/562-9719 <br /> 6555 FOXfV�00R DRIVE <br /> ZEPHYRHILLS, FL 33542-0614 <br /> JOB: SINGLE FAMILY RESIDENCE <br /> SILVER OAKS <br /> 6555 FOXMOOR DRIVE <br /> ZEPHYRHILLS, FL 33542-0614 <br /> --------------------------------------------------------------------------------------------- <br /> --------------------------------------------------------------------------------------------- <br /> SHINGLE RE-R��� <br /> (Scope of work does not include the aluminum pan roof on back porch) <br /> 1. Tear off and haul away existing one-layer shingle roofing system. <br /> 2. Re-fasten the existing plywood roof deck in accordance with the Florida Building Codes. <br /> 3. Provide and install the new 15 Ib. saturated felt paper(ASTM D-226)secondary.water barrier in accordance with <br /> the Florida Building Codes. <br /> 4. Provide and install new algae-resistant fiberglass shingles; Owner to choose shingle color from manufacturer's <br /> standard colors. Provide manufacturer's limited shingle warranty. Please see options on page 2. <br /> 5. Replace all valley flashing and re-flash roof penetrations. <br /> 6. Provide and install new lead boots for the plumbing vents. <br /> 7. Provide and install new pre-finished "white" aluminum eavedrip. <br /> Replace existing ridge vent with 50 I.f. of new pre-finished aluminum ridge vent. <br /> Remove lightning rods prior to re-roofing; re-install existing lightning rods after re-roofing complete. <br /> 8. RepaiNReplacement of any rotten or damaged wood (deck, fascia, trim, framing, etc.) will be completed on a cost- <br /> plus basis above and beyond the contract price. ($5s.so per a�xs�x��2��sheet of CDX plywood replaced,labor&materials). <br /> 9. MilBar Roofing, Inc. to provide a 5-year workmanship warranty to the original purchaser that covers shingle roof <br /> leaks; exclusions: storm damage, work done or damage by others, tree damage, and/or structural damage to roof <br /> deck. <br /> 10. Owner to: provide access to roof for delivery truck for loading/unloading of roofing materials, access to electricity. <br /> Owner to remove satellite dish prior to re-roofing and re-install on fascia. <br /> 11. MilBar Roofing, Inc. to provide General Liability and Worker's Compensation Insurance($2,000,000 limit) and re- <br /> roofing permit. <br /> --------------------------------------------------------------------------------------------- <br /> --------------------------------------------------------------------------------------------- <br /> We propose to furnish material and labor,complete in accordance with above specifications,for the Contract Sum of: <br /> As stated in Options on Page 2. , � <br /> --------------------------------=------------------------------------------------------------ <br /> --------------------------------------------------------------------------------------------- <br /> Payment to be made as followrs: Due Upon Completion. <br /> --------------------------------------------------------------------------------------------- <br /> --------------------------------------------------------------------------------------------- <br /> • � <br /> � <br />