My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16048
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 10:46:20 AM
Creation date
3/21/2016 10:46:20 AM
Metadata
Fields
Template:
Building Department
Company Name
BURGER KING
Building Department - Doc Type
Permit
Permit #
15-16048
Building Department - Name
BURGER KING
Address
5610 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . • Green Roofing Technologies Inc. PRIIVIE <br /> "Green Is Good" Co1�iTIV1� f <br /> 901 South Woodrow Wilson St <br /> Plant City, Florida 33563 <br /> (813)704-6950 or(727)799-7886 <br /> Fax(813)7046952 <br /> License#CCC-1329708 <br /> greenroofi ng 10@yahoo.com <br /> THIS CONTRACT IS ENTERED INTO THIS DATE: <br /> 17 1 <br /> ONMERBUYER NAME OWNER'S AD�RESS <br /> o ti 17 2 I t t <br /> OWNER'S CI7Y,STATE 8 POSTAL CODE ONMER'S HOME PHONE W4MER'SUUl7RKPHONE <br /> I t L 7 727-4 7- <br /> PROJECTNAME PROJECTADDRESS <br /> I rhill <br /> PROJECT GTY,STA7E 6 P0.STAL CODE PROJECT PHONE PROJECTPHONE2 <br /> il L <br /> CONSTRUCTION LENDER IS:(Name and address of constructian fund hokler) � <br /> (Name and Brand�Address of Bank,Saving and Loan Assn.,Escrow Agent,Joint Control or Olher) <br /> WE HEREBY PROPOSE to fumish all materials and necessary equipment, and perform all labor necessary to complete the following work <br /> (Describe Labor, Material and Equipment to be fumished): <br /> 1)Tear off existing roof system down to the roofs deck. GC to supply any wood or metal decking if needed. <br /> 2) Install 2 layers of 2.5 Insula6on to reach an R-30. <br /> 3) Install 60 mil TPO mechanically attached to the metal or wood deck. <br /> 4) Install TPO system up and over the new parapet walls totally adhered. <br /> 5) Install mill finish metal coping to the parapet walls. <br />� 6) Install 2 newwall vents. <br /> 7) Install all flashings to ensure a water tight system. <br /> 8) Install 3" ISO board over top of the new cooler roof with a full tapered system to push the water to the scuppers. <br /> 9) Install a new collector head and down spout at the rear of the building. <br /> 10)Supply the property owner with a 15 year NDL waRanty from GAF corporation or Carlisle <br /> 11)Supply a 2 year warranty from Green Roofing Technologies. <br /> Repair quote _ _._ <br /> F�einove the�stiingle:�_on._ttie�driue_thcough side�,of.'tFie�liuilding_down�to_the-blyNVVOOd.deck:repace•6�sheets_:of.pljciii�ood:�� <br /> Lnsfall"fiino;.synthefiew.underl�ment�and,�new�bl ue,stiingles;�,�$1 20U=p:0% <br /> TIME FOR COMPLETIOIV: The work to be performed by Contractar pursuant to this Agreement shall be substantialty completed within <br /> ( )days or approximately on <br /> INTEREST: Overdue payments will bear interest at the rate of 18 °/a per month. <br /> PAYMEfVT:This is a cash transaction. Owner agrees to pay Contractor a total cash price of: <br /> Twenty Eight Thousand Three Hundred Sixt�r Five Dollars and Zero Cents Dollars($ 28,365.00 ). <br /> Down payment(if any)$ with payments to be made as follows: 30 Day Billing <br /> Contractor/Seller Signature Dale OwnerBuyer Author¢ed Signature Date <br /> Contractor/Seller Signalure Date OwnedBuyer Aulhoraed Signature Date <br /> G t99t2006 8ieppyFORMS.com.•Rune Comm<rdal Cm�red. <br />
The URL can be used to link to this page
Your browser does not support the video tag.