My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16144
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 2:14:03 PM
Creation date
3/21/2016 2:14:02 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Permit #
15-16144
Building Department - Name
OTIS,RICHARD & BARNETT,SUSAN
Address
6747 NORTHLAKE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ♦ <br /> ��� ��� <br /> State of Florida License#CCC1326166 and#CBC058155 <br /> 30427 Commerce IDrive, San Antonio,�'L 33576 <br /> Phone(813) 782-9080/Fag(352) 668-4803/www.neuixiannroofs.coan <br /> Unit Pricin�Schedule for Unforeseen Conditions: <br /> 1. Replace any rotted or damaged decking$65.00 Per Sheet. (Neumann Roofmg provides 1- <br /> sheet of 4'x8' plywood; included in contract price). <br />� 2. Replace any rotted or damaged fascia or rafters$5.00 Per Lineal Foot. <br /> 3. If there are multiple layers of shingles on the existing roof; we will add$30.00 Per Square <br /> Per I,ayer of roofmg to cover the tear off cost. <br /> IiTeumann�toofn�'s �o��itment to Quali�: <br />' • All work will be supervised by project managers to ensure quality work is preformed <br /> according to our proposed contract. <br /> • All work will be completed in a timely manner, excluding acts of nature beyond our control. <br /> • All carpentry work will be performed in conjunction with roofmg work, in a timely manner <br /> following general workmanship quality. <br /> • All work will be completed by skilled and knowledgeable craftsman to ensure production of <br /> high quality of work. <br /> • The job-site will be kept free of debris throughout the duration of the project. <br /> • The perimeter of the project area will be swept with magnets to pick up any loose nails, <br /> staples, or other various scrap sheet metal components. <br /> • Any existing gutters will be cleaned of all organic and roof related debris prior to project <br /> close-out. <br /> • Neumann Roofing, LLC. is fully insured with workman compensation and general liability <br /> - insurance. - <br /> It is understood and agreed the Neumann Roofing,LLC will be held harmless for alleged or actual damages/claims as a <br /> result of algae,fungus,or mold. It is understood the roofing contractor.and the roofing contractor's insurance will <br /> exclude all coverage,including defense,damages,related to bodily injury,properiy damage and clean up directly or <br /> indirectly in whole or in part for any action brought by mold,including fungus and mildew regardless of the cost,event, <br /> product or worl�anship that may have contributed concurrently or in any sequence to the injury or damage occurs. <br /> "This document has been prepared for those parties financially responsible for services rendered. Reliance upon this <br /> document or upon information,observations or opinions contained herein should not be made by any party other than the <br /> intended recipient designated on the title sheet of this estimate or report. The intent of this evaluation is to prepare an <br /> opinion of the probate scope and/or cost of work to be performed based upon the parameters set forth by the client and <br /> the individual needs and conditions found within the structure at the time of inspection. This opinion assumes a specific <br /> scope and methodology. The user is cautioned that changes in either scope or methodology would have a reciprocal <br /> a <br /> � � <br /> ,.�..., Mas�"rEli�e <br /> �� <br /> FL License#: CCC1326166 GAF License#:ME20454 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.