Laserfiche WebLink
Project:Suzin Nails&S a � <br /> P <br /> Title:Interior Renovation <br /> Type:Retail <br /> (WEA File:Tampa.tmy) <br /> Building End Uses <br /> 1)Proposed 2) Baseline <br /> , <br /> Total 77.10 I06.10 <br /> $I,182 $I,625 <br /> ELECTRICITY(MBtulkWhl$) 77.10 106.10 <br /> 22605 31070 <br /> $1,182 $I,625 <br /> AREA LIGHTS 2i.�o s2.2o <br /> 6353 9425 <br /> $332 $493 <br /> MISC EQUIPMT 19.10 19.10 <br /> 5593 5593 <br /> $293 $293 <br /> PUMPS�MISC o.00 o.00 <br /> 12 6 <br /> $I $0 <br /> SPACE COOL 22.60 2s.6o <br /> -- 6628 8367 <br /> $347 $438 <br /> SPACE HEAT o.60 0.70 <br /> 167 196 <br /> $9 $10 <br /> VENT FANS 13.10 2sso <br /> 3852 7483 <br /> $201 $39I <br /> Credits Applied: None � PASSES <br /> Passing Criteria= 1381 <br /> Design (including any cred.its)= 1182 <br /> Passing requires Proposed Build.ing cost to be at most 85% of <br /> Baseline cost This Proposed Building is at 7 i.S°lo <br /> � <br /> EnergyGauge Summit0 FlalCom-2014.Section 506.4 Compliant Software.Effective Date:June 30,2015 <br /> 7/14/2015 ' Page 4 of 13 <br /> * y I� <br /> � I <br />