My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
15-16583
Zephyrhills
>
Building Department
>
Permits
>
2015
>
15-16583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 10:18:48 AM
Creation date
6/15/2016 10:18:47 AM
Metadata
Fields
Template:
Building Department
Company Name
C & R HOLDINGS OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
15-16583
Building Department - Name
C & R HOLDINGS OF ZEPHYRHILLS
Address
5221 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> i.A}1 materiai is guarantecd to be as specified and co�gieted in a sub&taritial workmanlike manner. <br /> 2.Att agreements eontingent opon strikes,accidents or delays heyand our controt.Ovmer to earry fire,hurricane and other necessary <br /> insurance upnn ahove work. <br /> 3_Labar wairaitEy does not eoVer datnage to roofs eaused by lighting,hu i canc,tornado,hailstorm,impact'of foreign objects or other <br /> violent skorm or casualty dattiage to mofs due to selUer'nent,distorkion,failure or cracking of roof deck,waTls or foundation af a <br /> building.Interior water damage will he covered for a period of 12 inonths from time of job completion. <br /> 4.Workmen's comgensaHon and public liability insurarice on sbove work to be taken aut by 1tYMAN ROOFtNC,ar its sub- <br /> contractors. j <br /> 5.RYMAN ROOFING,INC.is not responsible to provide any mate�iels or fo perform any work ofher than what is described above. <br /> Replacement of deteriorated decking,fascia 6oard or any other additional maieriats/labar thatmaybe needed and is not descrihed � <br /> above will be ciearge as an extra unless ot�terwiae state�herein. � <br /> 6.T'his contraet is subject to final approval by RYMAN ROOFING,ING�'.and is the entire agreement af the parties and no other <br /> written or other Torms will be recognized. , I <br /> 7.A chaz�e of I.5%wi1l be mede on all unpaid balances after 30 days pius attomey's fses. <br /> 8.A 4%processing feo will be added to att credit Card orders. <br /> 9.Ryman Roofing,lnc.will not b�held responsble fo�any septic tank,'sod,stnvbbery,driveway,conerete,sidewalk,piping af any <br /> type that may occur from ihe refcrred job.Not respansibte for eatcitite signal toss. <br /> (p.Ryman Roufing,inc.is not responsibte for the painti�g of any replaced/non-repiaced items such as,6utnot timited to,fascia <br /> boazds,rafters,plywood,sidittg,ete. <br /> i l.This proposal is subJect ta buiiding department ap�rovat and�nai detaiis appraved by Ryman 3taofing,inc.and maybe cancelled <br /> by Rymen Roofing,tne,at anytime for anry reasan before commencoment of.wark. • <br /> i 2.Ali otose as pqsSible conditions shat3 be at the eanfraetar`s discretidn due ta variables in matching exisEing r,andidons. <br /> 13,Contractor expresses na gusiantee an scheduling eiccept that ai1 customers wi11 be treated an a first cflme first serve basis and — <br /> contraetor can nvt be respansi`(sie far deSays flue to masi pawer,materiai de]ivers andlor weatEier conditions.C}nea praject is started <br /> continusl:pragress other than reasonabie detays wiii be made untii prnj�t oamptet�an. <br /> t4.Purchaser(s}agree{s}to allaw I2yman Roafing,Tne:ttss of water and house power on site for duration Qf the projeat <br /> t 5.Any approvals requiret3 by the Homeewners Association is the sole responsibility of the purchaser(s) <br /> i 6.Fiydr�ulie dvmp tr�ailers wiii remsin an site until all work ia campleteil.If purchaset requires the dump trailar to he re-located or <br /> removed bafora the compietian of tlte wark there wiU he an additional;charge of$195.4D per mnve added to the contract price. <br /> i YI.A!t permits snust ramaia postesi at jab site and must remsin aocessible to inspectors to allow sign off of aU inspections.Tf <br /> � paperwork is remaved before all inspccdons have been campleted theie will be a$100A0 re-inapection fee assessed to the property <br /> owner. <br /> l8.All a�diiional work reyuired will be submitted in a:changa order and must be apprpved in writing before commencement af said <br /> work,a11 change ordera muat be gaid in full upon rmmaliate completion of said work,Att change•orders will be submitted in a timety <br /> mannecto eliminate delay of wark,any change orders.whieh are not i dressed by the purchaser(s)in a timety mannar may reautt in a <br /> delay of work oharge af ffi250.00. <br /> l9.Existing damages such as but not limited too screen dama�e,paint,Tandscaping,pavement,etc.wiri be identified with photos, <br /> Ryman RuoFing.inc.wil]not be held liable for existing damages i <br /> Page 2.af 3 <br /> Si�nat�re: �cz�s+- 6�'r�-,��-�'�"i� Date•C��'-�y--�5 <br /> i <br /> Si�ua�ure: • � Date: <br /> � <br /> � <br /> � <br /> _ - i <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.