Laserfiche WebLink
Duke Power <br /> � <br /> 20'PT 6x6 MH <br />� <br /> 2#2 thhn MH <br /> 1#4 thhn <br /> 77'overhead drop <br /> i � <br /> � <br /> �' <br /> � <br /> meter combo O � <br /> 125A main <br /> 100A branch ircui to shed maintenance shed with existing Sub-Panel <br /> Office <br /> � 42'pole/shed � new T.�lph 1Z07 service pole <br /> � � � � • <br /> 1 1/�sch 40 protector <br /> .intenance shed 57'to fence <br /> 2#2 use copper line 1&2) <br /> 1#4 use copper neutral) Existing shed is fed with underground branch circuit from office. Customer <br /> 1#6 use copper ground) wants shed to be on its own service. Duke Power wants new service pole <br /> to be installed so that their overhead drop does not cross any MH roofs <br /> 2- 8'ground rods spaced 10' <br /> #6 solid bare copper between rods and meter ground <br /> 6th Avenue <br /> r <br />