My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
16-17208
Zephyrhills
>
Building Department
>
Permits
>
2016
>
16-17208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 11:09:17 AM
Creation date
10/31/2016 11:09:16 AM
Metadata
Fields
Template:
Building Department
Company Name
ZSC INC
Building Department - Doc Type
Permit
Permit #
16-17208
Building Department - Name
ZSC INC
Address
5209 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> TRII'�IITY�ERD <br /> 4. PRODUCT DESCRIPTION: � <br /> The following roof cove.s are mechanically attached or fully adhered to Approved substrates using fasteners,stress piates and <br /> I adhesives,as outlined in he Limitations/Conditions of Use herein. <br /> ➢ Mule-Hide TPO-c me brenes are nominal 45-mil(1.1mm)or 60-mil(1.5 mm)thick,polyester-scrim reinforced,thermoplastic <br /> olefin(TPO)single-ply roof inembranes. <br /> ➢ Mule-Hide TPO-c membranes are nominal 72-mil (1.8mm) or 80-mil (2.Omm) thick, polyester-scrim reinforced, <br /> thermoplastic olefin PO),single-ply roof inembranes. <br /> ➢ Mule-Hide TPO-c FleEce Back membrane is a nominal 45-mil (l.lmm)or 60-mil(1.5 mm)thick,polyester-scrim reinforced, <br /> thermoplastic olefin �TPO)single-ply roof inembrane with a polyester fleece backing. <br /> 5. LinnrrnnoNs: <br /> 5.1 This is a building code evaluation. Neither Trinity�ERD nor Robert Nieminen,P.E.are,in any way,the Designer of Record <br /> for any project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design <br /> guidance unless retained speci�cally for that purpose. <br /> 5.2 This Evaluation R�port is not for use in HVHZ. • <br /> 5.3 Refer to a currentd Roofing Materials Diredory for fire ratings of this product. <br /> 5.4 For steel deck ins'tallations,foam plastic insulation shall be separated from the building interior in accordance with FBC <br /> 2603.4 unless the exceptions stated in FBC 2603.4.1 or 2603.6 apply. <br /> 5.5 The roof system aluation herein pertains to above-deck roof components. Roof decks and struciural members shall be <br /> in accordance wit FBC requirements to the satisfadion of the AH1. Load resistance of the roof deck shall be documented <br /> through proper c�dified and/or FBC Approval documentation. <br /> 5.6 For recover installations,the existing roof shall be examined in accordance with FBC 1510. <br /> 5.7 For mechanically�attached insulation or membrane or strip-bonded insulation, the maximum design pressure for the• <br /> selected assembl'�shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. Zones <br /> 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure <br /> criteria. Commor��y used methods are RA5 117,RAS 137,FM LPDS 1-29 and ANSI/SPRI WDS. Assemblies marked with an <br /> asterisk•carry th� limitations set forth in Section 2.2.1.5.1(a)of FM LPD51-29 for Zone 2/3 enhancements. <br /> 5.8 For assemblies w�h all components fully bonded in place,the maximum design pressure for the selected assembly shall <br /> meet or exceed cntical design pressure determined in accordance with FBC Chapter 16. No rational anatysis is permitted <br /> ,, for these systems <br /> 5.9 For mechanically ttached insulation or membrane over existing roof decks,fasteners shall be tested in the existing deck <br /> , . for withdrewal r sistance. A qua4ified design professional shall review the data for comparison to the minimum <br /> requirements for t e system. Testing and analysis shall be in accordance with TA5105 or ANSI/SPRI FX-1. <br /> 5.10 For bonded insula�ion or membrane over existing substrates in a re-roof(tear off)or recover installation,the existing deck <br /> or existing roof s'rface shall be examined for compatibility with the adhesive to be installed. If any surface conditions <br /> exist that bring s�rstem performance into question, field uplift testing in accordance with ILSTM E907, FM LPDS 1-52, <br /> AN51/SPRI IA-1 or�A5124 shall be conducted on mock-ups ofthe proposed new roof assembly. <br /> 5.11 For bonded insul�tion or membrane over existing substretes in a recover installation,the existing roof system shall be <br /> capable of resisti�project design pressures on its own merit to the satisfaction of the AHJ,as documented through field <br /> uplift testing in ac•ordance with ASTM E907,FM LPDS 1-52,ANSI/SPRI IA-1 or TAS 124, <br /> 5.12 Metal edge attach ent(except gutters),shall be designed and installed for wind loads in accordance with FBC Chapter 16 <br /> and tested for res tance in accordance with AP1S1/SPRI ES-1 or RAS 111,except the basic wind speed shall be determined <br /> from FBC Figure 1 09. <br /> 5.13 All products in th roof assembly shall have quality assurance audit in accordance with the FBC and F.A.C.Rule 61G20-3. <br /> Exterlor Research and Design,LL . EvaluaUon Report M15060.06.09-R3 <br /> LeitlfltaAe o�1Wthartratlon N9503 fL12772-R3 <br /> Revision 3:03/18/2015 <br /> Page 3 of 4 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.