Laserfiche WebLink
�;dE� (.: �'7 �� C� iTiC? ��: i �� � ��� t:! F� � �"ilf� C: 5 � �;,� � r � <br /> Proposal for: <br /> The Clock Restaurant <br /> Zephyr Hills, FL � <br /> Scope of Work: <br /> • Removal and haul away of the three 5-ton rooftop package units,duct covers,and air <br /> plenums. <br /> • Installation of three new 5-ton Daikin, straight cool rooftop package units with 10 KV�1 <br /> electric heating elements. <br /> • Installation of new curb adaptors to properly seat the new package units. <br /> • The new units will be reconnected to the existing electrical. <br /> • Disconnect and reinstall the two refrigeration compressors on new Aluma-Stand roof top <br /> rails. <br /> • New zails will be bolted to the roof, and temporary sealed with tar. Roofing company <br /> must do permanent dry in on the rails. <br /> • Installation of new supply and return plenums for a11 three units. <br /> • Returns plenums will terminate into a griile directly below the units. <br /> • Installation of three new R-6.5 tnznk lines and new flexible duct take offs to the main <br /> dining area and bathrooms. <br /> • Installation of air flow balancing dampers at all flex connections to trunk lines. <br /> • New trunk lines will be suspended from ceiling with Duct mate clutches and 2"U- <br /> Channel. <br /> • Reconnect existing kitchen duct work to the closest new supply trunk line. <br /> • Installation of 3 new Honeywell Pro3000 thermostats with lock boxes. <br /> • Installation of new step down,lay in supply grilles at all new supply termination,and <br /> new filter frame retuzn grilles at all new return terminations. <br /> Total investment $20,550.00 <br />