Laserfiche WebLink
����� � <br /> �'���TRl�II� ER�., ' '� <br /> � <br /> APPENDIX-1:ATfACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE � ' - <br /> Table Deck Applicatian Type Description Page •� <br /> 1 Wood New or Reroof(Tear-Of� A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 4-5 <br /> 2 Wood New,Reroof(Tear-Of�or Recover C Mech.Attached Insulation,Bonded Roof Cover 6-8 � <br /> 3 Wood New,Reroof(Tear-Of�or Recover D Prelim.Attached Insulation,Mech.Attached Base Sheet,Bonded Roof Cover 9-10 <br /> 4 Wood New,Reroof(Tear-Offl E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 11-12 <br /> 5 Wood New,Reroof(Tear-Of� E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 13-14 <br /> The followins notes aaulv to the svstems outlined herein: <br /> 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and strudurel members shall be in accordance with FBC requirements to the satisfaction of the AHJ. Load resistance of the <br /> roof deck shall be documented through proper codified and/or FBC Approval documentation. <br /> 2. Unless otherwise noted,insulation may be any one layer or combination of polyisocyanurate,polystyrene,wood fiberboard,perlfte or gypsum-based roof board that meets the qA requirements of F.A.C.Rule 61G20- <br /> 3 and is documented as meeting FBC 1505.1 and,for foam plastic,FBC 2603.4.1 or 2603.8,when installed with the roof cover. <br /> 3. Bonded polyisocyanurate insulation boards shall be maximum 4 x 4 ft. <br /> 4. The maximum design pressure for the selected base assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC Chapter 16. This is already addressed in the tables that follow via <br /> "N/A"reference ifthe baseline system is"Not Applicable"to Zone 1 design pressure requirements. <br /> 5. For existing decks,fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing <br /> and analysis shall be in acco�ance with TAS 105 or ANSI/SPRI FX-1. <br /> 6. For Recover Applicati singcS�9stem Type D,the insulation is optional;however,the existing roof system shall be suitable for a recover application. <br /> � `\ <br /> 7. Unless otherwise�tefi,reTj�dfo�e following references for bonded base,ply or cap sheet applications. <br /> � <br /> = � � - TABLE A:CERTAINTEED PLINTLASTIC�MODIFIED BITUMEN COMPONENTS&APPLICATION METHODS - � � � ' - , <br /> Refe (�. Layer Material � Application <br /> P-AA � /� B e Glasbase;All Weather/Empire Base;Flexiglas Base;Flintlastic Base 20 <br /> (B� sheets,Asphalt- 0� F f�glas Ply Sheet Type IV;Flintglas Premium Ply Sheet Type VI Hot asphalt at 20-40 Ibs/square <br /> � �S ` Ij tic Base 20;Flintlastic Poly SMS Base;Flintlastic Ultre Poly SMS Base <br /> SBS- A�J ' � tlastic Base 20;Flintlastic Poly SMS Base;Flintlastic Ultra Poly SMS Base <br /> Flintlastic Ca Hot asphalt at 20-40 Ibs/square <br /> �5,Asphalt-Applied) OS��� ��Oa�� p 30;Flintlastic Cap 30 CoolStar;Flintlastic FR Cap 30;Flintlastic fR Cap 30 CoolStar;Flintlastic FR Dual Cap; <br /> Flintlastic FR-P; Flfntlastic FR-P CoolStar; Flintlastic Premium FR-P; Flintlastic Premium FR-P CoolStar; Flintlastic GMS; <br /> � Cj �� Flintlastic GMS CoolStar;Flintlastic Premium GMS;Fl(ntlastic Premium GMS CoolStar <br /> a� (� Q Q Base Flintiastic Base 20 T;Flintlastic FR Base 20 T <br /> SBS-TA �����ad� Ply Flintlastic Base 20 T;Flintlastic FR Base 20 T Torch-Applied <br /> (SBS,Torch-A�¢I� b <br /> ��.���' �,�� Cap Flintlastic FR Cap 30 T;Flintlastic fR Cap 30 T CoolStar;Flintlastic GTS;Flintlastic GTS CooiStar;Flintlastic GTS-FR;Flintlastic <br /> GTS-FR CoolStar;FlintClad <br /> � � <br /> Exterior Research and Design,LLC,d/b/a Trinity�ERD Evaluation Report C40710.12.13-R3 for FL16709-R3 <br /> Certif(cate of Authorization#9503 Revision 3:Ol/26/2016 <br /> Prepared by: Robert Nieminen,PE-59166 Appendix 1,Page 1 of 14 <br />� <br />